ML043000187
Letter Sequence Other | |
---|---|
TAC:MB6062, Administratively Control Containment Penetrations (Approved, Closed) TAC:MB6063, Administratively Control Containment Penetrations (Approved, Closed) | |
Initiation
Administration | |
MONTHYEARML0227402062002-09-26026 September 2002
[Table View]Proposed Amendments Re 2 TSTFs Project stage: Other ML0406406372004-03-0101 March 2004 Response to Request for Additional Information Concerning the License Amendment Request to Revise the Refueling Operations Section of the Technical Specifications Project stage: Response to RAI ML0414505032004-05-20020 May 2004 Additional Information Concerning the License Amendment Request to Revise the Refueling Operations Section of the Technical Specifications Project stage: Request ML0422902382004-08-11011 August 2004 Withdrawal of Change 1 to License Amendment Request Regarding Revisions to the Refueling Operations Section of the Technical Specifications Project stage: Withdrawal ML0425304362004-09-13013 September 2004 Issuance of License Amendments Revision to the Refueling Operations Section of the Technical Specifications Project stage: Approval ML0430001872004-10-21021 October 2004 Technical Specification Page for Corrected Amendment Nos. 268 and 244 Project stage: Other ML0429500162004-10-21021 October 2004 Correction to Amendment No. 268 and 244 Project stage: Other 2004-03-01 |
ML043000187 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 10/21/2004 |
From: | NRC/NRR/DLPM/LPD1 |
To: | |
References | |
TAC MB6062, TAC MB6063 | |
Download: ML043000187 (1) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:Technical Specification
MONTHYEARML24103A2042024-04-12012 April 2024
[Table view]Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. RS-22-008, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report to Add References to NRC-Approved Topical Report with Admin2022-01-24024 January 2022 Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report to Add References to NRC-Approved Topical Report with Admin ML21278A2972021-09-0707 September 2021 6 to Technical Specification Bases ML21165A4062021-06-14014 June 2021 Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Design Basis License Amendment Request ML19346E5362019-12-11011 December 2019 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML19325C1282019-11-21021 November 2019 License Amendment Request - Revision to Technical Specification 5.5.7, Reactor Coolant Pump Flywheel Inspection Program RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19127A0762019-05-0606 May 2019 Application to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML18239A2602018-08-27027 August 2018 Supplement to Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk .. ML18235A1992018-08-23023 August 2018 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to ... ML18172A1452018-06-21021 June 2018 Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed ... ML18262A0962018-03-0606 March 2018 Technical Specification Bases, Revisions 62 Through 63 ML17261A2342017-07-19019 July 2017 Bases 3.7, Plant Systems, Revisions; B 3.7.1-1 Through B 3.7.18-3 ML17261A2252017-07-19019 July 2017 Bases 3.2, Power Distribution Limits, Revisions; B 3.2.1-1 Through B 3.2.5-5 ML17261A2352017-07-19019 July 2017 Bases 3.8, Electric Power Systems, Revisions; B 3.8.1-1 Through B 3.8.10-5 ML17261A2272017-07-19019 July 2017 Bases 3.3, Instrumentation, Revisions; B 3.3.1-18 Through B 3.3.12-4 ML17261A2212017-07-19019 July 2017 Bases 2.0, Safety Limits, Revision 2; B 2.1.1-1 Through B 2.1.2-4 ML17261A2192017-07-19019 July 2017 Technical Specification Bases ML17261A2312017-07-19019 July 2017 Bases 3.5, Emergency Core Cooling System (Eccs), Revisions; B 3.5.1-1 Through B 3.5.5-5 ML17261A2232017-07-19019 July 2017 Bases 3.1, Reactivity Control Systems, Revisions; B 3.1.1-1 Through B 3.1.8-5 ML17261A2322017-07-19019 July 2017 Bases 3.0, Containment System, Revisions; B 3.0.1-1 Through B 3.0.8-4 ML17261A2292017-07-19019 July 2017 Bases 3.4, Reactor Coolant System(Rcs), Revisions; B 3.4.1-1 Through B 3.4318-8 ML17261A2382017-07-19019 July 2017 Bases 3.9, Refueling Operations, Revisions; B 3.9.1-1 Through B 3.9.6-2 ML17261A2222017-07-19019 July 2017 Basis 3.0, Limiting Condition for Operation (LCO) Applicability, Revisions; B 3.0-1 Through B 3.0-25 ML16266A0862016-09-22022 September 2016 License Amendment Request - Control Room Emergency Ventilation System ML16258A0762016-09-0808 September 2016 Technical Specification Bases B 3.2, Power Distribution Limits - Linear Heat Rate (Lhr) ML16258A0732016-09-0808 September 2016 Technical Specification Bases B 2.1.1-1, Safety Limits ML16258A0772016-09-0808 September 2016 Technical Specification Bases B 3.3.1, Reactor Protective System (RPS) Instrumentation-Operating ML16258A0722016-09-0808 September 2016 Inc. - Technical Specification Bases, Unit Nos. 1 and 2 ML16258A0742016-09-0808 September 2016 Technical Specification Bases B 3.0-1, Limiting Condition for Operation (LCO) Applicability ML16258A0842016-09-0808 September 2016 Technical Specification Bases B 3.9.1, Refueling Operations, Boron Concentration ML16258A0802016-09-0808 September 2016 Technical Specification Bases B 3.5.1, Emergency Core Cooling System (Eccs), Safety Injection Tanks (Sits) ML16258A0812016-09-0808 September 2016 Technical Specification Bases B 3.6, Containment Systems ML16258A0752016-09-0808 September 2016 Technical Specification Bases B 3.1, Reactivity Control Systems ML16258A0832016-09-0808 September 2016 Technical Specification Bases B 3.8.1, Electrical Power Systems, AC Sources-Operating ML16258A0822016-09-0808 September 2016 Technical Specification Bases B 3.7.1, Plant Systems, Main Steam Safety Valves (Mssvs) ML16258A0782016-09-0808 September 2016 Technical Specification Bases B 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML15257A2002015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 8 of 12 ML15257A2032015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 11 of 12 ML15257A1992015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 7 of 12 ML15257A1982015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 6 of 12 ML15257A1972015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 5 of 12 ML15257A1962015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 4 of 12 ML15257A1952015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 3 of 12 ML15257A1942015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 2 of 12 ML15257A1932015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 1 of 12 ML15257A2022015-09-0404 September 2015 Technical Specification Bases, Revisions 49 Through 55. Part 10 of 12 2024-04-12 Category:Amendment MONTHYEARML24103A2042024-04-12012 April 2024
[Table view]Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. ML19346E5362019-12-11011 December 2019 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML19325C1282019-11-21021 November 2019 License Amendment Request - Revision to Technical Specification 5.5.7, Reactor Coolant Pump Flywheel Inspection Program RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19127A0762019-05-0606 May 2019 Application to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML18239A2602018-08-27027 August 2018 Supplement to Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk .. ML18235A1992018-08-23023 August 2018 License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to ... ML18172A1452018-06-21021 June 2018 Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed ... ML16266A0862016-09-22022 September 2016 License Amendment Request - Control Room Emergency Ventilation System ML14191A2552014-07-10010 July 2014 Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML1003405862010-01-29029 January 2010 License Amendment Request: Pressurizer Safety Valve Technical Specification Revision ML0911700492009-04-23023 April 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26 ML0821804962008-08-27027 August 2008 Technical Specifications, Amendment No. 288 ML0811601412008-04-23023 April 2008 Tech Spec Pages for Amendments 286 and 263 Modification of Technical Specification Definitions ML0731701802007-11-0808 November 2007 License Amendment Request: Modify Technical Specification Definitions ML0727007162007-09-27027 September 2007 Technical Specification Pages Re Unavailability of Barriers Using Consolidated Line Item Improvement Process ML0718403352007-06-29029 June 2007 License Amendment Request: Revise Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448 Using the Consolidated Line Item Improvement Process ML0516602072005-06-0707 June 2005 License Amendment Request: Eliminate Use of the Term Core Alterations in the Technical Specifications ML0516601952005-06-0707 June 2005 License Amendment Request: Technical Specification Changes to Modify Requirements Related to Positive Reactivity Additions ML0506002672005-02-24024 February 2005 Technical Specifications, Incorporating Core Operating Limits Analytical Methodology References Into Technical Specifications ML0503904972005-02-0303 February 2005 Technical Specification Pages to Calvert Cliffs, Unit 2 - Correction to Amendment No. 246 ML0503300972005-01-27027 January 2005 License Amendment Request: Change Regarding Mode Using the Consolidated Line Item Improvement Process ML0434400272004-12-0101 December 2004 Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports ML0431001302004-11-0303 November 2004 Units 1 & 2; Technical Specification Bases, Revisions 15. 16, 17, 18, 19, 20. 21, and 22 ML0430001872004-10-21021 October 2004 Technical Specification Page for Corrected Amendment Nos. 268 and 244 ML0420200822004-07-15015 July 2004 Units, 1 and 2, License Amendment Request: Incorporate Methodology References for the Implementation of PHOENIX-P, Anc, Paragon, and Zirconium Diboride Into the Technical Specifications ML0416201102004-06-0707 June 2004 Units I & 2, License Amendment Request: Use of Alternate Decay Heat Removal in Mode 6 Refueling ML0416300782004-06-0303 June 2004 License Amendment, Technical Specification Pages Re Spent Fuel Pool Maximum Enrichment Limit ML0335102762003-12-12012 December 2003 License Amendment Request Regarding Elimination of Post-Accident Sampling System (PASS) Sampling Requirements ML0334504822003-12-0909 December 2003 Technical Specification for Calvert Cliff Units 1 & 2, Amendment Nos. 261 & 238 ML0331405792003-09-30030 September 2003 Letter Transmitting Calvert Cliffs, Units 1 and 2 - License Amendment Request: Increase the Unit 2 Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron and Burnup Credit ML0312803252003-05-0101 May 2003 License Amendment Request Re Increase to Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron Credit, Attachment H ML0312703002003-05-0101 May 2003 License Amendment Request Re Increase to Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron Credit, Attachments 1 Through G ML0312803342003-05-0101 May 2003 License Amendment Request Re Increase to Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron Credit, Attachment I Through F ML0312702882003-05-0101 May 2003 License Amendment Request Re Increase to Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron Credit ML0235100562002-12-13013 December 2002 License Amend Request: Removal of Charging Pumps from Emergency Core Cooling System Technical Specification ML0221302562002-07-17017 July 2002 Westinghouse Lead Fuel Assemblies - Temporary Exemption Request & License Amendment Request ML0209904332002-04-0808 April 2002 Technical Specification Pages for Amendments 251 & 228, Calvert Cliffs, Units 1 & 2 ML0209802212002-04-0404 April 2002 Technical Specification, Emergency Amendment 227 One-Time Extension of the Unit 2 Control Room Emergency Ventilation System Technical Specification ML0206406192002-03-0404 March 2002 Technical Specifications, for Amendment Nos. 250 & 256 ML0206302602002-03-0101 March 2002 Technical Specifications, Amendment Steam Generator Replacement (Tac Nos. MB0951 and MB0952) ML0204505342002-02-13013 February 2002 Technical Specifications, Amendment One-Time Extension of the Unit 2 Control Room Emergency Ventilation System Technical Specification 2024-04-12 |
Text
SDC and Coolant Circulation-Low Water Level 3.9.5 ACTIONS (continued)
CONDITION R REQUIRED ACTION I COMPLETION TIME B. (Continued) B.3.1 Close equipment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> hatch and secure with a minimum of four bolts, OR B.3.2 Close the 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> containment outage door.
AND B.4 Close one door in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> each air lock.
AND B.5.1 Close each 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetration providing direct access from the containment atmosphere to the outside atmosphere with a manual or automatic isolation valve, blind flange, or equivalent.
OR CALVERT CLIFFS - UNIT 1 3.9.5-3 Amendment No. 268 CALVERT CLIFFS - UNIT 2 Amendment No. 244