Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station License Termination Plan, Rev. 0. Chapter 2 - Site Characterization to Chapter 5 - Final Status Survey Plan
ML061430213
Person / Time
Site: Rancho Seco
Issue date: 04/30/2006
From:
Sacramento Municipal Utility District (SMUD)
To:
NRC/FSME
References
Download: ML061430213 (242)


Text

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 2.8 References

  • , 2-1 U.S. Nuclear Regulatory Commission NUREG-1575, Revision 1, "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)," August 2000 2-2 U.S. Nuclear Regulatory Commission NUREG/CR-2082 - "Monitoring for Compliance with Decommissioning Termination Survey Criteria" 2-3 U.S. Nuclear Regulatory Commission draft Regulatory Guide DG-1 005, "Standard Format and Content for Decommissioning Plans for Nuclear Reactors" 2-4 "Sacramento Municipal Utility District, Rancho Seco Nuclear Generating Station, Unit No. 1, Final Safety Analysis Report" 2-5 "Sacramento Municipal Utility District, Rancho Seco Nuclear Generating Station, Unit No. 1, Updated Final Safety Analysis Report" 2-6 Sacramento Municipal Utility District, "Geotechnical Investigation for Proposed Evaporation Ponds," ERPT-C0104, Rev.1, 1989 2-7 Sacramento Municipal Utility District, "Final Engineering Report Assessment of Spent Fuel Liner Leakage," ERPT-M0221, Rev.0, 1990 2-8 Sacramento Municipal Utility District, "Rancho Seco Independent Spent Fuel Storage Installation Final Safety Analysis Report," Volumes I, II, and mI 2-9 Bechtel Corporation, "Construction Report for Rancho Seco Nuclear Generating Station Unit No. 1," January 15, 1976 2-10 'Sacramento Municipal Utility District, Rancho Seco Facility, Defueled Safety Analysis Report" 2-11 'U.S. Nuclear Regulatory Commission Safety Evaluation by the Directorate of Licensing, US Atomic Energy Commission, in the matter of Sacramento Municipal Utility District, Rancho Seco Nuclear Generating Station, Unit 1,Docket 50-312' 2-12 Sacramento Municipal Utility District, "Rancho Seco Nuclear Generating Station Proposed Decommissioning Plan" (PDP), May 20, 1991 2-13 Sacramento Municipal Utility District, "Plan for Ultimate Disposition of the Facility" (PUDF),

July1990 2-14 U.S. Nuclear Regulatory Commission NUREG-0586, "Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (FGEIS)," August 1988 2-15 U.S. Nuclear Regulatory Commission NUREG/CR-4286, "Evaluation of Radioactive Liquid Effluent Releases From the Rancho Seco Nuclear Power Plant." March 1986 2-16 Lawrence Livermore National Laboratory Report UCID 20963, Part 11, "Environmental Radiological Studies Conducted During 1986 in the Vicinity of the Rancho Seco Nuclear Generating Station," 1987 Page 2-91

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization . .- ... . 7. I April 2006 2-17 Sacramento Municipal Utility District, "Rancho Seco Nuclear Generating Station, Historical Site Assessment," March 2004 2-18 Sacramento Municipal Utility District, "Supplement to Rancho Seco Environmental Report -

Post Operating License Stage," May 20, 1991 2-19 URS Corporation, "Hydrogeological Characterization of the Rancho Seco Nuclear Generating Station," March 2006 2-20 Federal Emergency Management Agency (FEMA), Flood Insurance Rate Maps 500 and 525, Sacramento County, 1980 2-21 Page, R., 1986, "Geology of the Fresh Ground-Water Basin of the Central Valley, California with Texture Maps and Sections," U.S.G.S. Professional Paper 1401-C, p 54 2-22 California Department of Water Resources, "San Joaquin Valley Groundwater Basin, Cosumnes Subbasin," Bulletin 118, p. 5, 2004 2-23 Shonka Research Associates, Inc., "Rancho Seco Non-Industrial Area Survey Project," Final Report, Revision 2, June 26, 2001 2-24 U.S. Nuclear Regulatory Commission NUREG-1505, Revision 1, "A Nonparametric Statistical Methodology for the Design and Analysis of Final Status Decommissioning Surveys," June 1998 draft 2-25 Rancho Seco Procedure Manual, RASP-1901, Revision 0, "Decommissioning Surveys Program," July 30,2001 2-26 Rancho Seco Decommissioning Technical Basis Document DTBD-05-015, Revision 0, "Rancho Seco Nuclear Generating Station Structure Nuclide Fraction and DCGLs" 2-27 Rancho Seco Decommissioning Technical Basis Document DTBD-05-014, Revision 0, "RSNGS Surface Soil Nuclide Fractions and DCGL" 2-28 Rancho Seco Decommissioning Technical Basis Document DTBD-05-009, Revision 0, "Embedded Piping Scenario and DCGL Determination Basis" 2-29 U.S. Nuclear Regulatory Commission NUREG/CR-5512 V3, "Residual Radi6activity Contamination From Decommissioning Parameter Analysis" Draft October, 1999 2-30 Rancho Seco Decommissioning Technical Basis Document DTBD-05-013, Revision 0, "Buried Piping Scenario and DCGL Determination Basis" 2-31 NRC Inspection Report 050-00312/04-003, Correspondence U.S. NRC Region IV, Arlington Texas, October 14, 2005 2-32 NRC Inspection Report 050-0031204; 072-00011/04-004; Analytical Results For Soil Samples, Correspondence U.S. NRC Region IV, Arlington, Texas, January 24, 2005 Page 2-92

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs December 27, 1968 - Clay access road and Clay East road intersection Page 2-93

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Coinstruction Photographs C/

March 10, 1969 - Site Preparation, looking south at rough grading in turbine and reactor area Page 2-94

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 10, 1969 - Site Preparation, looking north at first rough grading cut into the turbine area Page 2-95

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs U

April 4, 1969 - Site Preparation, looking north along the east edge of the reactor containment structure Page 2-96 .

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 1, 1969 - Site Preparation, Twin Cities access road looking north Page 2-97

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs QU)

September 9, 1969 - forming for the fill concrete under the tendon access gallery floor slab Page 2-98

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs November 11, 1969 - a view of the shop and warehouse construction taken from the tower crane Page 2-99

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs U

February 9, 1970 - installing floor liner plate on reactor building floor slab Page 2-100

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 20, 1970 - a view looking north of the auxiliary building sub-basement slab Page 2-101

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs March 20, 1970 - overall view of the containment structure with cooling tower No. 1 in background Page 2-102

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-PA, Miscellaneous Historical Construction Photographs April 23, 1970 - reinforcing steel and tendon sheathing for the first lift of the containment wall Page 2-103

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs-

.April 23, 1970 - overall view looking northeast Page 2-104

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs April 24, 1970 - 108" diameter circulating water pipe forming and reinforcement for concrete encasement Page 2-105

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 28, 1970- looking west at the auxiliary building subbasement wall with the turbine building in the background Page 2-106

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs May 28, 1970 - view looking south at the turbine building with the reactor and auxiliary buildings on the extreme left' Page 2-107,

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs

~u)

'..-~

May 28, 1970 - view looking south at the turbine and reactor buildings Page 2-108

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs July 17, 1970- auxiliary building showing reinforcing being placed Page 2-109

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-A, Miscellaneous Historical Construction Photographs This page intentionally left blank Page 2-110

0 0 0 Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-111 C'-4%:

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations UNIQUESUID SURVEYUNITS S SMU93 IA BOUNDARYFENCE UNIQUESUID SURVEYUNITS Figure 2-33 ROADS& RAILS SACRAMENTO MUNICIPAL r Overview of Industrial Area PAVEMENTAREA UTILITY DISTRICT Roads, Rail, Pavment, Land & Grass LAND& GRASS AREA I DWG:MAP Page 2-112 cAc~

Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations RAILROAD 0 2b .RAILROAD 02b *03b 9 04b 05b 06b 07b 08b Ogb 600000 10b 700000 10b 09b 08b 07b 06b 05b 04b RAILROAD-,,,, 03b IS FS I* 02b Olb Figure 2-34

  • SMUD SACRAMENTO MUNICIPAL Railroad UTILITY DISTRICT 601000 & 701000 DwG;:601100C Page 2-113 C,6(3

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations UNIQUESUID SURVEYUNITS

____ IA BOUNDARY FENCE UNIQUESUID SURVEYUNITS SMU OFigure 2-35 El] ROADS & RAILS PAVEMENTAREA M D Overview of Industrial SACRAMENTO MUNICIPAL Areas Area LAND & GRASS AREA UTILITY DISTRICT Grass & Soil DWG:MAP Page 2-114 C-311

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations TANK FARM-REACTOR CONTAINMENT Figure 2-36 SSfMUa Tank Farm 810001 & 2 Page 2-115

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-116

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations

!u...u...m.ug.....u..uu..u..u.

U

  • S U
  • 1 EUUUUUaaU.UUUU U

U

  • U
  • U 5 3
  • U RHUT AREA
  • UUUUUUUUUUEUEUUEUUZEURSSUEUUUUU.EUUEEU9
  • U U

U U

U U

U muuuuuuuuuumummmuumamus....a..~

U U

NOTE:

U CHARACTERIZATIONOF AREA UUU SURROUNDING REGENERATIVEHOLDUP U

U TANK BASED ON THE SUMMARIZATION U OF APPROXIMATELY130 SOIL SAMPLES U

U U

UUUU U

UUUU U

U UUUU U

U U

U UUU U

U U

UUUUU U

  • U U*

U PAD

  • U CP~P)
  • U
  • U
  • U U

U U

U U

U UUUUUU Figure 2-38.

S U

U U

UUU SMUD SACRAMENTO MUNICIPAL RHUT Area S U I

  • U UTILITY DISTRICT 837000 I  : 837000.01 Page 2-117

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations BARREL-~

FARM 6/-843002 jw

/-DIRT COVER

7t,

/-843001-hiF4B Figure 2-39

  • SMUD Barrel Form SACRAMENTO MUNICIPAL UTILITY DISTRICT 843000 DWG:843000.01 Page 2-118

I 0

Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations BASIN I

I 77777/72 ~. EXCLUDING

>1 I

'>1 I I >7 I

'-7'*// /// I

'V'4 - >z <C'7' <*

.4

'4 44

.4

.4

.4

.4

.4-Figure 2-40

  • SMUD Retention Basin Buffer SACRAMENTO MUNICIPAL UTILITY DISTRICT DWG:848(

848002 Page 2-119

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations

/ 6...6 n, . ~ i 4

/

/

.4, SWITCHYARD

/

f~z I

I I

I I

I I

I, I

I I

I I

I EXCLUDING---_

I (T'P.)~

I I

(

I

'4

'4

'4 2j

'4 I

Figure 2-41 SACRAMENTO MUNICIPAL Switch Yard UTILITY DISTRICT 851000 851000.01 IDWG:

Page 2-120

0 Rancho Seco License Termination Plan 9 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-121 c~k

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations UPPER/OUTER YARD I HAZARDOUS MATERIAL WAREHOUSE R,,

0 113b FENCE Figure 2-43 o SMUD Upper/Outer Yard SACRAMENTO MUNICIPAL UTILITY DISTRICT D*WC '50D10035 501003 DWG:' 0 100-3 Page 2-122 cg7ý?9

Rancho Seco License Termination Plan 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations

-~ -------~ -14

[J!

22b.

21b 19b ------

b1 I I 37b, 35b, 15b 16b 17b 25 34b 14b, 18b, 26b 13b iPERSONNEL ACCESS 1 RECEIVING PORTAL(PAP) S44/ WwAREHousE 12bIlb Ob 06b L I051 0b: **  ;

I01b 0 30b 29b 02b Figure 2-44

  • SMUD Park ing Lot/Lay Down Areas SACRAMENTO MUNICIPAL UTILITY DISTRICT IDW: 501004 501004 Page 2-123 C'-FO

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations BKG Rt 104-/ 01b ACCESS ROAD, 02b

, 03b, 04b 05b 06b 07b 08b 09b ý-ACCESS ROAD

!Ob 11b 12b 13b 14b 15b 16b 17b 18b 19b 20b 21b 22b 23b 24b 25b 26b 27b"ý ACCESS ROAD 30b 29b 28b Figure 2-45

  • SMUD Access Road SACRAMENTO MUNICIPAL UTILITY DISTRICT 501005 DWG:501005 Page 2-124 c LP

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations I I I I 04 CANAL I -I ii 5

.FOLSO(

INAKE I I I - I I I I I I I Iv I I

1 \* I II II I

I N I I

I I I N I

I N

I N I I N I I I I N II I I I N N I I N I I N I N I I "-

I I I -I I I L----------------------J Figure 2-46

  • SMUD Folsom Canal Intake SACRAMENTO MUNICIPAL UTILITY DISTRICT 800001 DWG:800001 Page 2-125

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations j

p 6~~------------------------------------------------------------

I . . . lOb I 07b 09b HELICOPTERPAD I o0b 08b 4b - II,.

I I I II I . .. ..[ ]-. I}.

I ,b II I [ Z I*-

II I I I , I I L II I

l 30b 28b 27b 26b 29b I

L--- ----------------------------------------------

Figure 2-47

  • SMUD Helicopter Pad SACRAMENTO MUNICIPAL UTILITY DISTRICT 800002 DWC-:800002 Page 2-126 cLF3>

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations iilZ. ii 7 I--- - - - - --- -i --------

03b I I 05bb 2Gb. F I SCRAP YARD-/

  • 20 21b T~jj I I16b I I*

I ~ I'AZ I I-oI.,- -

t t,/"

09b /-

I I L -- -- ------------------------------ ----------------------------

Figure 2-48 S SMUD SACRAMENTO MUNICIPAL South Scrap Yard UTILITY DISTRICT 800003 DWG:800003 Page 2-127 C.4-

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations

-,~ ~A U

x

.30 RANDOM ASPHALT, CONCRETE SOL*.... .2 /'30 RANDOM ASPHALT SAMPLES.

TBY "*,.

SAMPLES EACH SAMPLE LOCATION * '* . EACH SCAN & 5 LOCATION SAMPLE BETA DIRECT SUPPORTED MAUEETOGRD(0xO . MEASUREMENT OF GRID (10'x10')

FROM WHICH SAMPLE WAS TAKEN, .. FROM WHICH SAMPLE WAS TAKEN.

,LII Oi

,I __

II I IL I I I

  • t I,
  • SMUID( Figure 2-49 Central N-S Transit SACRAMENTO MUNICIPAL UTILITY DISTRICT 800004 Page 2-128

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations SOUTHE-W I I EXCLUDING IL IL;I06b

  • 15b 19I 20b 11-I 11b 05b 03b z 09b 06b02 I .Ir

'11 ... I Figure 2-50

  • 4SMUD South E-W Transit SACRAMENTO MUNICIPAL UTILITY DISTRICT 800005 DWG:80000 Page 2-129

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations STORMDRI BUFFER S.-

- - - -.............-- - - - - - -... *- -. -- '- - I*-*

I I*

I IF r-------------------------------------------------------------i-- 1 II I I Figure 2-50a

  • MUn Storm Drain Buffer SACRAMENTO MUNICIPAL UTILITY DISTRICT 800006 DWG- R()nc)r Page 2-130

Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-131

Rancho Seco License Termination Plan Revision 0 April 2006 Chapter 2, Site Characterization Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations S SUPPORTJ STRUCTUREYARD II07b I I

I I[ 12b L - - -3 0 5- I I 13b I

- - - -i -

k, I,' I 22bt r----L

-[- - -I /Ib t I~""-.EXCLUODING (TYP.) b 28b L- -J14, J I 9bb j29b 2*. [ 08b 7 I ,

,I II0215b

, 1 1 F20t .. . -If. .. .. ..qi I oJ Lo o, r I I I I0 2bI L 15 I II- -- -- I 30t, 27b F L

Figure 2-52

  • SMUD South Support Structure Yard SACRAMENTO MUNICIPAL UTILITY DISTRICT 800008 DWG:800008 Page 2-132 CuL

0 Rancho Seco License Termination Plan 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Ir------------------------------------


~

I BKG I OlGb 2G

  • 30 30b 2ob I SOUTHEA [

'29b 27b 25b 02b 28b 24b 23b C03b 22b

~04b 21b S05b 20b I I 19b

~06b

  • 0 ob 18b I I G 07b EXCLUDING i 08b 17b II I III

! 09b 1 14b I 164b 16 I10b II11b

! ob LLI -__ 1!lb . . .

L~ 3 5 Figure 2-53

  • smun SACRAMENTO MUNICIPAL South East IA UTILITY DISTRICT 800009 DWG:800009 Page 2-133 C0o

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations i- m-1T IA CENTRAL-/

YARD

/ . II I

I L I -

I LL r~~ -9TP - II - - -- - - - --- -- I I I I I II S 7---EXCLUDING


.... -- F L (TYP.)

L--------------------- I I r- r*:J:.. I

  • "1r---]B I I--

".. -. J I IIb ... . .,I I uI I 1Fd" I I II I / l Il I

,1 .... IF II * -** -:. 1 I Ii

.- . -~ JII I " Ii L I..- ~L  ;.~I i

I 1I Figure 2-54 SMUID SACRAMENTO MUNICIPAL Industrial Area Central Yard UTILITY DISTRICT 800010 DWC:800010 Page 2-134

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations IA CENTRAL

  • E-W CORRIDOR.?.

S EXCLUDING (FYPR)'

1 I " 1 b' BKG BKG"T BKG 13b I -- -- - ------------------- . -'r". - -" -* -, - - - I-'- lbb *'-'1 II I BKG02 2b I  : I I1 8b 4b 11b BKG . / I L--------------- -----

. . -J Figure 2-55

  • SMUD Indusfrial Area E-W Corridor SACRAMENTO MUNICIPAL UTILITY DISTRICT 800011 DWG:8000 11 Page 2-135

Rancho Seco License Termination Plan Revision 0 April 2006 Chapter 2, Site Characterization Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations IA WASTE STORAGE BUFFER I I I I II I I I- ---- - - -- - I

! j I -EXCLUDING r - - - - - --- -- - -

I~II L- -I I~II I~II I~II I~II

-iI

" L---------------

Figure 2-56 S SMUD IA Waste Storage Buffer SACRAMENTO MUNICIPAL UTILITY DISTRICT 800012 OWG:800012 Page 2-136

0 Rancho Seco License Termination Plan 0 S Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations CENTRAL IA -,

I I.-------------------------------------------------------- 7--------------------- 015 I i -O bI-I ~02ýI I . .I I - A-2b

/ \ /

41 f 7 07Ob05b- ' i J1' I 07b. I 09 ;08b I A03b 10b2 II A04b

/ ,,ib I

"- ""11 2b L -- --- -

\-EXCLUDING I (TYP.)

! 1" 235

\I 3 I

. ... .. .. . . . 27b

.- *.... 291t 9 bL

-- i I7 18b 20b 22b 24b 26b5 28b 30b 15"-- " -- - - --- ,--------- --

Figure 2-57

  • SMUOSACRAMENTO MUNICIPAL Central Industrial Area UTILITY DISTRICT 800013 DWG:8000 1.3 Page 2-137

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations NORTH IA-,.,

r --------- -- -- - - - - - - - -------

I27b 26b 25b 28b1324b 23b 22b 21b 20b 19b 18b 17b 16b 15b 141 13 121p 11b 10b 09b 08b 07b 06b 05b 04b 03b 02b 01bJ 1

28b \'-BKG BKG-j BKG BKOJ BKGJ D

,/09 K 07 06G / K BKG"J 0 KG 06 05 04 03 02 .. ..

I SKOlO B," 08 01 I 29b 30b I. ./ / 3Db,.

/

./

/

Figure 2-58

  • SMUn North Industrial Area SACRAMENTO MUNICIPAL UTILITYDISTRICT 800014 DWG:800014 Page 2-138

0 Rancho Seco License Termination Plan

0. 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations

,QUONSETHUT PAD-"

ONLY Figure 2-59 SSMUD SACRAMENTO MUNICIPAL Quonsef Huf UTILITY DISTRICT 803001 OWG:803001.01 Page 2-139

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations EXCLUDING II 0-HUT YARDK I

I I

I I

L I

I I

I L.

Figure 2-60

  • SMUD Q-Hut Scrap Yard Area SACRAMENTO MUNICIPAL UTILITY DISTRICT 803002 Page 2-140

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations 16b 15b 06b 05b BKG BKG 02 05 x"\JSPRAY POND 17b BKG 06 07b 04b 14b 18b 08b 13b 03b 19b 12b O2b 09b 8KG 03

-EAST NUCLEAR SERVICE SPRAY POND 20b 11bK G1b lob BKG BKG 01 BKG 04 07 30b 21b 22b, 8KG ^ B BKG b 08 23b 09 24b 25b 26b 27b 28b BKG 29b WEST NUCLEARSERV SPRAY POND Figure 2-61 SMUO West & East Spray Ponds SACRAMENTO MUNICIPAL UTILITY DISTRICT 806001 & 2 806001.01 DWG:

Page 2-141

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations

  • PRAY POND 119

,,-EAST NUCLEAR SERVICE SPRAY POND

\ 15g

[03 I 61 WEST NUCLEARSERVICE SPRAY POND Figure 2-62 wSMUD West & East Spray Ponds SACRAMENTO MUNICIPAL UTILITY DISTRICT 806 001 & 2 DWG:806001.01 b Page 2-142

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations SPRAYPOND 4 4-fb EAST NUCLEAR SERVICE SPRAY POND d

WESTNUCLEARSERVICE SPRAYPOND Figure 2-63 S SMUD SACRAMENTO MUNICIPAL West & East Spray Ponds UTILITY DISTRICT 806001 & 2 806001 01 DWG:

Page 2-143 CLoo

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-144

S Revision 0 April 2006 Termination Plan Rancho Seco License Locations Chapter 2, Site Characterization Drawings With Sample and Survey and Structure Appendix 2-B, Site Figure 2-65 Tower Cooling Area Surrounding 808003 Page 2-145

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations 7

ELECTRICAL FAB SHOP PAD--/

ONLY Figure 2-66

  • SMUD Electrical Fab Shop SACRAMENTO MUNICIPAL UTILITY DISTRICT nWc; 818000 DWG:81800001 Page 2-146 Cp3

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations L & D BLDG PADL/

ONLY --, , ,

Figure 2-67 SMU= L & D Building SACRAMENTO MUNICIPAL UTILITY DISTRICT DWG:820000 01 820000 Page 2-147 CCPIL-f-

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations I ' N. LADOWN

,AREA II II I Ii I I II II T I~IT II I I7 Ii Figure 2-68

  • SMUO North Laydown Area SACRAMENTO MUNICIPAL UTILITY DISTRICT 826025 8260 DWG:

Page 2-148

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations TOOLROOM]

V4r 4'

4<

PADO ONLY Figure 2-69 SMUD Tool Room SACRAMENTO MUNICIPAL UTILITY DISTRICT 827000 DWG:

827000.01 Page 2-149 C&Cp

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations WRS WAREHOUSE PAD-/I ONLY Figure 2-70

  • SMUO GRS Warehouse SACRAMENTO MUNICIPAL UTILITY DISTRICT 828000 DWG:828000.01 Page 2-150 Col

Rancho Seco License Termination Plan 0 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations E,-'1 AUIX BOI1LER--"'-

BKG 03( 81*0 02 34b 33b 3 A' 3 1t iBIG 04 105 351, 36b 371 38 421) 41b 40t 49b 47b 48b 43t1 44t, 45b 46b 5()r 59b 57t, 55b 53h, 8K0 06 pADO /

ONLY

  • MD SACRAMENTO MUNICIPAL UTILITY DISTRICT Figure 2-71 Aux Boiler 836000 DWG:836000.01 Page 2-151 cc0%

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations FAB SHOP-PAD ONLY Figure 2-72 S SMUD SACRAMENTO MUNICIPAL Fob Shop UTILITY DISTRICT 838000 DWG:838000.01 Page 2-152 c&9

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations I I IG TRANSFORMER I 11'-B,G I YARD F-. BKG-.. 261 I I

I 23t, 25t, 08 24bI N KG B (07 200 Fvý IlfI 06 ii71 151 / '1i 1.1 211 111~

12L 11b 3.1 IDb PAD ONLY-/"_

(TYP.)

BK),

. 04 09b 08b 07b 06b,-

011b1 02 04t, L----------------------------j Figure 2-73

  • SMUD Transformer Yard SACRAMENTO MUNICIPAL UTILITY DISTRICT 839000 DWG:839000. 01 Page 2-153 C7o

Rancho Seco License Termination Plan Revision April 20060 Chapter 2, Site Characterization Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-154 c"77

Rancho Seco License Termination Plan 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations BARREL FARM

,/-843002--/

--DIRT COVER 1v 843001-/'

4 V.

F-K 0 Figure 2-75

  • SMUD Barrel Farm SACRAMENTO MUNICIPAL UTILITY DISTRICT 843000 DWG:

843000 01 Page 2-155 c -ri-Z

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations RETENTION BASIN N. RETENTION BASIN 197 GRID 3ý3 METERS EACH GAMMA SCANNED W/44-10 HIGHEST TWO GRIDS (61 & 93) SUBDIVIDES INTO 9 GRIDS (lx1 METER EACH). EACH BETA SCANNED WITH 43-68b HIGHEST GRID SAMPLED VIA SCABBLING.

FINALEFFLUENT BASIN F]

Figure 2-76 o SMUD Retention Basin SACRAMENTO MUNICIPAL UTILTrY DISTRICT 848000 DWG:848000.01 Page 2-156 C-cý

0 Rancho Seco License Termination Plan 9 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-157

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations I-

/*

/*

SWITCH 9YARD I

I I

I, I

I I l j

I I EXCLUDING-,,.,

I I

2TP.

I

(

'a

'a

'a J

%.. - - ý - I 7 -l-j Figure 2-78

  • SMUD Switch Yard SACRAMENTO MUNICIPAL UTILITY DISTRICT 851000 DWG:

851000.01 Page 2-158

0 Rancho Seco License Termination Plan 9 0 Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations CONTROL-/ý FAB SHOP TEMP. RAM.-

BARRIER 24b 25b 06b 02b I 03b 07b 27t BKG 9 04b 1 BKG 6KG BKO 3 02 I 06 17b 12b 23b BKG 5 26b BKG 8 01b L -05b......

BKG 6 14b 15b 16b 22b 09b 13b BKG 1 19b 12b 20b 29b 30b BKG 7 BKG 1lb 10 21b 28b BKG 10b 08b 4

PAD ONLY Figure 2-79 SSMUD SACRAMENTO MUNICIPAL Confrol Fab Shop UTILITY DISTRICT 853000 DWG:853000, 01 Page 2-159

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-160

Rancho Seco License Termination Plan Revi n 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-161

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations C

Pa r 162 C

Rancho Seco License Termination Plan Revisi6n 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-163

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Figure. 2-84 PAP Building 2nd Floor 804001 C Paj,1, 64 C

Rancho Seco License Termination Plan C (

Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-165

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Figure 2-86 Acdimin., Building EI.QO 805001 C- Pagcoý1-166 4-- C

Rancho Seco License Termination Plan _ Revis(in 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-167

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations.

AFtguire: 2--88RR-of Adri~i11. Building, 8*05001 Paje2 68 C

C

C" Rancho Seco License Termination Plan

( Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-169

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations 8Q.OO Figure: 2--90 React r Building. EI 0 Page( 170 C C

Rancho Seco License Termination Plan Revisin 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-171

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B,,Site and Structure Drawings With Sample and Survey Locations C

Pag( 172 C

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-173

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations nI I1 V1i It~~4T$WELOA~4 rgr~e, 2-'94 Fuel Slorega

.... Bldg Subsoi. El. 0 Bi2000 Paa ,174 C" C

C Rancho Seco License Termination Plan

( Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-175

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Fuel Sforacmg F

PgUre; Bu2-~96 jd~n I EDO 81,200:0 C

PaePj,476 C

Rancho Seco License Termination Plan

(

Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-177

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Paae(P478 C C

(

Rancho Seco License Termination Plan

( Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations

.2~2~ ObIf 21b S 27tx.

Gob g8~46 07b lob

.17 Ofmb 144 i elI IOlb Ftg.ure 2-99 S SMUO MCE=MUNICIPAL sewage PKant 809001 AA .4

.. I., ... . . ý2-1 ldyw P.

Page 2-179

Rancho Seco License Termination Plan Revision 0 April 2006 Chapter 2, Site Characterization Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations cN"GAJUPOF*~ ALL~

U* 30 WO~

kApLnE?0NT g228 ItAU S(~IR

~400$

'014. 8-do 1510b ýWAIOMOA2.

Se~j42 dri~1~m

= k MIS Nip dpil,24c Figure 2:-100 e

ciry Buyidif EL -.47 8134000' PagrAI180 C C

(

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-181

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations LOWER. WALLS.

se F-LoO1 .2.- ! 02 EIl.

Aigure6uildring SUMu SACRAMET lIU41111AL Auxilkiray 818300.0- 0 UDILVRWCT I

Pagr-?482 C C

Rancho Seco License Termination Plan

(

Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-183

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations kUpi wwt10/08".~

3335Z Omhpom Mmo~ 706~t7OBB1 OWODW*

-6Md dWM2 Slrf~t~85 p~MtOý SMU. .Figure .2-104 SHUM. I Auxflary- BuIdd.i9 Eli 10 LM~rr D aCT813000 Pagr 184 C C

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Figure, 2-105 smull Auxil iary Building EL .20

.81300G0' Page 2-185

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations MOPU~LMEY4TAL SURVEr DATAVGINIS Figure 2-106 Auxiliaory Buildirnig.El, .40 81 3000 Pag.X.86 C C

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-187

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations booI T &FigR B~kfldirtg Ere 0 2-0.8 E!I.,

. .. 814000.

C, PageP)188 C

(

Rancho Seco License Termination Plan C -

f Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-189

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page-t490 C C

(

Rancho Seco License Termination Plan (C Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-191

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations SIMUD T R Bulldir El. 54, 81,400, C Pagr_-192 C

f Rancho Seco License Termination Plan

( RevisTin 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-193

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Paga 7 194 C C

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-195

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and.Survey Locations,

]L~L I2 Figure 2-116 NS10 El. 20 "81:500:0, Pag(jL196 C C(-

C Rancho Seco License Termination Plan

( Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-197

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations h 0 NSE Fi~guwre, 2-1i8 NSE8 Rooef 815000 C

Pagye198 C

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B], Site and Structure Drawings With Sample and Survey Locations ZDILD

'. I Figure 2-1 19 GAS Bui Iing EL. 0i 81600Q Page 2-199

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations C Pageel-700 C

(

Rancho Seco License Termination Plan C Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-201

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations rgure 2-12,3 BW Bui[ldinmg.

81i9000 C

Pagr

?202 C

(

Rancho Seco License Termination Plan C (

Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-203

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Figure, 2-1225 Water Treaftment Roof 8,21000 C

Pagr 04 C

(

Rancho Seco License Termination Plan

( f Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-205

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Figurea 2-127 If"tOke PRuM p Struture.

823000 C,

Pagj.2 0' 6 C

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-207

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-13, Site and Structure Drawings With Sample and Survey Locations Figure: 2-129 Turbine BuIlding EL. -10 826000.

Pag(-208 C C-

C Rancho Seco License Termination Plan C Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-209

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Pag 10 C

7 C

(

Rancho Seco License Termination Plan

( Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-211

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations OIL*

rigure 2-1 3-OsMUD Mjc~row Ve Cormmunitotion, BidgS

.- 831000 Pag 112 C C

(

Rancho Seco License Termination Plan

( Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Figure .2-134 Warehouse B 833000 Page 2-213

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Figujre :2-1 :SMUOD -Wrehouse 840000 I

Page,,%214 C (7

C Rancho Seco License Termination Plan C (

Revision 0 Chapter 2,"Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-215

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations-rigr~2-37 I'~dIf1 cailon 'Pad C Par 216 C

Rancho Seco License Termination Plan Revis n 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-217

Rancho Seco License Termination Plan Revision 0 Chapter 2, Site Characterization- April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations 0.

F'ig-uire.213 k~SMUD Sw~fchyord, Contr~l BAilding Basemont W0

$AC&RAMNQ ANI(A fCT MVIVIVAL 5

8,51 Page-218 C C

(

Rancho Seco License Termination Plan U

Revision 0 Chapter 2, Site Characterization April 2006 Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations Page 2-219

Rancho Seco License Termination Plan Revision 0 April 2006 Chapter 2, Site Characterization Appendix 2-B, Site and Structure Drawings With Sample and Survey Locations FgU're .2-,141

. SMUDFOUNrdPAL MM MSRIfC SAS 9Wuidng & Roof.

____________________________________________________ I -

Pa 220 C r C

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 TABLE OF CONTENTS 3.0 IDENTIFICATION OF REMAINING.DECOMMISSIONING ACTIVITIES .......... 34-3.1 Introduction ................................................................................................................................... 3-1 3.2 Completed Decommissioning Activities and Tasks ............................ 3-2 3.2.1 Spent Fuel Storage ................................................................. i...................................................... 3-2 3.2.2 Spent Fuel Pool Activities ............................................................................................................ 3-3 3.2.3 System Rem oval ............................................................................................................................ 3-4 3.2.4 Large Component Removal ................................................................................................... 3-4 3.2.5 .Underground Pipe Removal ......................................................................................................... 3-6 3.2.6 Non-Radiological Decommissioning Activities ............................................................................ 3-7 3.3 Future Decommissioning Activities .............................................................................................. 3-7 3.3.1 Remaining Component Removal .................................................................................................. 3-7 3.3.2 Reactor Building Internal Structure Removal .............................................................................. 3-8 3.3.3 Decontamination of Structures and Systems ................................................................................. 3-8 3.3.4 Non-Radiological Activities ........................................................................................................ 3-10 3.3.5 Control Mechanisms to Ensure No Recontamination ............................................................... 3-10 3.3.6 D eferred A ctivities ...................................................................................................................... 3-10 3.4 Radiological Impacts of Decontamination and Dismantlement Activities ................................. 3-11 3.4.1 Occupational Exposure ............................................................................................................. 3-11 3.4.2 Public Exposure ........................................................................................................................... 3-11 3.4.3 Estimate of Quantity of Radioactive Material to be Shipped for Disposal or Processing ........... 3-11 3.4.4 , Solid Waste Activity and Volume:2........2.... ..... ........................... ...................................... 3-11 3.4.5 Liquid Waste Activity and Volume .................................. ........................................................... 3-12 3.4.6 Gaseous Waste Activity and Volume .......................................................................................... 3-13 3.5 Site Description after License Release ........................................................................................ 3-14 3.6 Coordination with Outside Entities ............................................................................................. 3-14 3.7 References ..................... .............................................................................................................. 3-16 TABLES 3-1 Schedule of Remaining Major Activities ................................................................................... 3-7 3-2 Solid Waste Effluent Release Report Summary .............................. 3-12 3-3 Liquid Waste Effluent Releases ..................................................... ................................... 3-13 3-4 Gaseous Waste Effluent Releases ............................................... ....... ....................................... 3-14

FIGURES, 3-1 Dose-Estimate and. Actual (Person-Rem) ................. .............................. 3-15 Page 3-i

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning'Activities April 2006 This page intentionallyleft blank Page 3-ii

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 3.0 IDENTIFICATION OF REMAINING DECOMMISSIONING ACTIVITIES 3.1 Introduction In accordance with 10 CFR 50.82 (a)(9)(ii)(B), the License Termination Plan (LTP) must identify the major remaining dismantlement and decontamination activities. This chapter was written following the guidance of NUREG-1700, "Standard Review Plan for Evaluating Nuclear Power ReactorLicense Termination Plans," [Reference 3-1] and Regulatory Guide 1.179, "Standard Format and Content of License Termination Plans for Nuclear Power Reactors," [Reference 3-2] and will discuss those dismantlement activities as of December 31, 2005. Information is presented to demonstrate that these activities will be performed in accordance with 10 CFR 50 and will not be inimical to the common defense and security or to the health and safety of the public pursuant to 10 CFR 50.82(a)(10). Information that demonstrates that these activities will not have a significant effect on the quality of the environment is provided in LTP Chapter 8, Supplement to the Environmental Report.

The information includes those areas and equipment that need further remediation and an estimate of radiological conditions that may be encountered. Included are estimates of associated occupational radiation dose and projected volumes of radioactive waste.

Sacramento Municipal Utility District's (District's) primary goals are to decommission the Rancho Seco Nuclear Generating Station (Rancho Seco) safely and to maintain the continued safe storage of spent fuel in an Independent Spent Fuel Storage Installation (ISFSI). The District will decontaminate and dismantle Rancho Seco in accordance with the DECON alternative, as described in NUREG,05 86, "Final Generic Environmental Impact Statement" (FGEIS) [Reference 3-3]. Completion of the DECON option is contingent upon access to one or more low-level waste (LLW) disposal sites. Currently, Rancho Seco has access to the disposal facilities of EnergySolutionsi. These facilities currently only accept Class A waste.

Completion of the second phase of site release will require access to a LLW disposal facility, acceptable to the District, which can accept Class B and C waste.

The District is currently conducting decontamination and dismantlement (D&D) activities at the Rancho Seco site in accordance with the Rancho Seco Post Shutdown Decommissioning Activities Report (PSDAR) [Reference 3-4]. Decommissioning activities are being coordinated with the appropriate Federal and State regulatory agencies in accordance with plant administrative procedures. All special nuclear material (spent fuel) is located at the ISFSI. By the end of the second quarter of 2006, it is expected that all greater than Class C (GTCC) waste material will also be located at the ISFSI.

Decommissioning activities at Rancho Seco are conducted in accordance with the Rancho Seco Defueled Safety Analysis Report (DSAR) [Reference 3-5], Permanently Defueled Technical Specifications [Reference 3-6], Rancho Seco Quality Assurance Program (QAP) [Reference 3-7], existing 10 CFR Part 50 license, and the requirements of 10 CFR 50.82(a)(6) and (a)(7). If an activity requires prior Nuclear Regulatory Commission (NRC) approval under 10 CFR 50.59(c)(2) or a change to the Rancho Seco Permanently Defueled Technical Specifications or license, a submittal shall be made to the NRC for review and approval before implementation of the activity in question.,

EnergySolutions was previously Envirocare of Utah Page 3-1

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 Decommissioning activities are conducted in accordance with the Rancho Seco Radiation Protection Program, the Off-Site Dose Calculation Manual (ODCM), Safety Program, and the Radwaste Manual. Such activities are and shall be conducted in accordance with these established programs that are frequently inspected by the NRC. Activities conducted during decommissioning do not pose any greater radiological or safety risk than those conducted during former plant operations. Decommissioning activity radiological risk is bounded by previously analyzed radiological risk for former operating activities that occurred during major maintenance and outage evolutions.

The activities described in Section 3.3, Future Decommissioning Activities, include activities up to the futurerelease of the site. This section provides an overview and describes the major remaining components of contaminated plant systems and, as appropriate, a description of specific equipment remediation considerations.

Information related to the remaining D&D tasks is also provided. This information includes an estimate of the quantity of radioactive material to be released in accordance with 10 CFR 20.2001, a-description of proposed control mechanisms to ensure areas are not re-contaminated, estimates of occupational exposures, and characterization of radiological conditions to be encountered and the types and quantities of radioactive waste. This, information supports the assessment of impacts considered in other sections of the LTP and provides sufficient detail to identify inspection or technical resources needed during the remaining dismantlement activities. Many of these dismantlement tasks require coordination with other federal, state or local regulatory agencies or groups.

The dismantlement activities described in Section 3.3 provide the NRC the information to support site release and future license termination pursuant to 10 CFR'50.82(a)( l)Xi).

Therefore, this section was writtenito clearly indicate each dismantlement activity that remains to be completed prior to qualifying for license termination. The final state of the Industrial Area will be a partially abandoned facility (as defined in Chapter 1 of this LTP) with portions, other than the power block, available for reuse. The impacts of decommissioning activities performed will be to reduce residual radioactivity to a level that permits release of the property for beneficial reuse by the District for industrial purposes.

3.2 Completed Decommissioning Activities and Tasks 3.2.1 Spent Fuel Storage The District signed the contract in 1992 for the design, licensing and fabrication of a transportable storage system. In 1995 the ISFSI was constructed and fabrication of the cask and associated equipment began. However, in 1996, quality issues throughout the dry storage industry and vendor bankruptcy forced work to be stopped. In 1997, a new supplier resumed the design and license work.

The transportable storage system consists of a transportation cask, twenty-one dry storage canisters, twenty-two horizontal storage modules and a multi-axle trailer. The cask serves for on-site transfer and off-site transportation overpack for the canisters. The canisters hold the spent fuel in a structural array and are then seal-welded. The horizontal storage modules are thick reinforced concrete storage bunkers used to store the canisters. The twenty-second module will provide storage for GTCC waste from reactor vessel internals.

Page 3-2

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 Fuel movement began in May of 2001 and was completed in August of 2002. All spent fuel is currently stored in the ISFSI under a separate Part 72 license.

3.2.2 Spent Fuel Pool Activities The eleven spent fuel racks were removed from the pool during the first quarter of 2003 and shipped to EnergySolutions for direct disposal. The process for removal and disposal began with vacuuming the debris from each cell, followed by radiological survey for hot spots and further rack decontamination during removal from the pool. A vacuuming unit coupled with high-loading filters was used to collect the loose debris from the racks.

Upon removal each rack was placed on the cask wash-down platform, where a thorough decontamination and survey of each cell and outer surface was performed. The racks were then removed from the wash-down platform and staged for drying, followed with a coating of spray adhesive, and wrapped in 12-mil plastic. The 12-mil plastic served for contamination control during packaging, which occurred butside on the plant turbine deck.

The racks were then moved to a laydown area outside the fuel building, down-ended, and placed in a watertight shipping bag. The final step involved re-rigging the rack for placement in a large metal strong-tight container. Each rack had less than an A2 quantity of radioactivity that allowed use of the strong-tight container. Radiological surveys were performed to ensure DOT radiation limits were met, communications applied, and the package placed on the transport vehicle for disposal. Each transport package contained only one rack and was transported by highway for disposal at EnergySolutions.

Dose rates on the rack exteriors ranged from 2 mremi/h on the top, to 15 mrem/h in the middle, and 50 to 80 mrem/h on the bottom. Hotspots within the cells ranged from 1 to 4 rem/h. The hotspots were easily removed through decontamination using high-pressure washing except for the 4 rem/h hotspot, which was found between the cells and was found to be mobile. After making several attempts to remove the hot spot, ready-mix groutwas poured into the cell.

matrix, to fix the hotspot in place. The introduction of grout lowered the measured dose rate to less than 80 mrem/h. ,

Prior to decontamination, loose surface contamination ranged from 300,000 to 500,000 dpm/100 cm 2 beta-gamma, and less than 20 dpM/100 cm2 alpha. Post-decontamination levels were found to be no more than 30,000 dpm/1 00 cm 2 beta-gamma.

Following successful completion of the rack project, the remaining pool water was drained, and the pool walls and floor were pressurewashed. Loose contamination levels on the floor and walls after washdown ranged from 1,000 to 3,000 dpm/100 cm2.'The remaining water and wash water was sent to a holding tank for processing. Work then commenced on removal of the pool liner plate, which was constructed of 1/4 inch thick stainless steel and was connected to the concrete wall with numerous embedded supports positioned at 6-foot centers in the horizontal and vertical direction. Various methods for removal were considered including plasma cutting and machine cutting the plates. Plasma cutting would have involved a tremendous effort to construct an enclosed area to control smoke and potential hazardous fumes (chromium +6) generated by the flamecut. Although a slow process, machine cutting was selected because it generated little secondary waste, involved no industrial hygiene concerns and was proven to be capable of performing the cuts.

Page 3-3

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 The machine cutting was performed with a carbide bit installed on a hydraulically operated milling unit track which could be positioned horizontally or vertically depending on the cut to be made. The carbide bit travels along the milling unit track machining the stainless steel as it travels. The milling unit was affixed to the wall by use of fasteners installed with a stud gun.

The milled sections of the liner plate were loaded into top-loading 20 foot Seavans and shipped for direct disposal. Dose rates on a loaded Seavan were no greater than 0.2 mrem/h.

Once the liner plate was removed, the underlying concrete structure and subsurface soil was sampled to ascertain if pool water leakage (known to have occurred) would require their excavation and packaging for disposition. No significant activity was found below the concrete floor.

3.2.3 System Removal System removal began in 1997 with secondary system components. As experience was gained in removal, decontamination and shipping, removal rates increased and staff was added to begin full decommissioning. In 2000 system removal moved to the Tank Farm and the Auxiliary Building, both containing significantly more contaminated systems. After an initial building decontamination, work moved to the Reactor Building-in 2002. Most contaminated systems had been removed by mid 2004 with the exception of large components. Remaining radioactive liquids were processed in temporary systems.

3.2.4 Large Component Removal 3.2.4.1 Reactor Coolant Pumps -)

Main reactor coolant piping and the reactor coolant pumps were removed and shipped in 2002 with the exception of piping sections attached to the reactor vessel remaining in the primary shield walls. Primary piping was cut with machine tooling into short sections that could be filled with other piping and placed into standard shipping containers. The four reactor coolant pumps were removed and packaged for shipment to EnergySolutions in two rail cars.

Packaging included welded covers on piping connections and stuffing boxes, paint for contamination control, and heavy bags for final packaging. The pumps were blocked and braced in the rail cars with heavy cables and steel cradles.

3.2.4.2 Reactor Head A major work activity during 2003 involved the disposition of the Reactor Head. This Babcock and Wilcox design consisted of sixty-nine Control Rod Drive Motors, each weighing approximately 1,000 pounds; a Service Structure weighing 35,000 pounds and the Reactor Head itself, weighing 160,000 pounds.

This work began with removal of the Service Structure, which was removed from the Reactor Head after flame cutting the lower shroud. The Service Structure was removed from the

.Refueling Cavity and taken to an adjacent work area where it was segmented. These sections were packaged into a 20-foot Seavan, which was subsequently sent to a processor for dispositioning.

The next step was to remove the Control Rod Drive Mechanisms (CRDMs) from the Reactor Head. The CRDMs were grouped by their applicable function during plant operation and Page 3-4

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 consisted of safeties, control and power shaping rods.. There was very little radiological data associated with the CRDMs and leadscrews, which connected to the control rods, thus the dismantlement crew proceeded very carefully during removal of the CRDMs.

The CRDMs were removed by cutting the nozzles just below the mounting flange by use of a machine tool. Once cut, the CRDM was lifted from the cavity, surveyed and placed in a processing area where it was segmented into box-sized lengths for disposition.

The first CRDM removed was from the "safety" group and surveys indicated low dose rates.

The survey along the length of the lead screw indicated 50 to 60 mrem/h gamma while the tip of the lead screw was 40 mrem/hr gamma. There was little fluctuation in dose rates as the different CRDM groups were removed and surveyed. All were packaged within a metal container and sent for direct disposal after segmentation.

The Reactor Head was segmented with use of a diamond wire cable supplied by the segmentation vendor. The five segmented sections included three sections of the flange and two sections of the top portion of the Head, cut just'off-center through a clear path around the remaining portions of the CRDM nozzles.

The reactor head showed no signs of corrosion including the extended area around the CRDM nozzles.

3.2.4.3 Pressurizer The Pressurizer, a 45-foot long, 150-ton component, was disposed of at EnergySolutionsin May of 2004. Preparation for this project included removal of piping systems with subsequent plugging of the penetrations. Contracts were established for rigging and removal of the Pressurizer from the Reactor Building and for railroad transport to EnergySolutions. Exterior dose rates were 0.2 mrem/h or less except for a hot spot at the Pressurizer bottom where the surge line exits the vessel. To ensure 49 CFR 173.441 radiation limits were met, a carbon steel

,shielding cover was placed over the surge line and welded to the exterior of the vessel reducing

'the contact dose rate to less than 200 mrem/h. To prepare the vessel for contamination control while handling onsite, a polymer-based latex paint was applied to the exterior rendering loose contaminant levels to less than 1,000 dpm/100 cm2. The Pressurizer was shipped as a surface contaminated object within a soft-sided strong tight container 3.2.4.4' Steam Generators The Rancho Seco Steam Generators are of Babcock & Wilcox (B&W) design and commonly known as Once-Through Steam Generators (OTSGs). The B&W design consists of two such steam generators, each approximately 80 feet in height, 12 feet in diameter, and over 550 tons in weight. The OTSGs were too'large to ship to EnergySolutions in their intact state due to rail clearances with respect to the length of the generator and certain radii oftrack along the required route to the disposal facility. Rancho Seco cut the OTSGs in the latitudinal direction at approximately the halfway point and capped the cuts with large steel plates to meet rail requirements and enable the OTSGs to be shipped directly for disposal to EnergySolutions.

Rancho Seco staff evaluated each section of the OTSG as it's own package and included other

'documentation to submit with the request for the DOT Exemption which was approved by the DOT in May 2004. The first OTSG was segmented and removed from the Reactor Building in the last quarter of 2004 and loaded onto railcars. Blocking and bracing work was completed Page 3-5

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 and shipment of the OTSG sections was performed in December 2004. The second OTSG was similarly prepared and'ship'ped in January 2005.

3.2.4.5 Outside Tanks Two large stainless-steel tanks and two lined carbon-steel outdoor tanks were dismantled, packaged and shipped for direct disposal in 2003. The four tanks included the:

1. Borated Water Storage Tank (BWST),
2. Demineralized Reactor Coolant Storage Tank (DRCST),

3 The A Regenerant Hold-Up Tank, and

4. The B Regenerant Hold-Up Tank (RHUT).

The BWST and DRCST contained water for reactor coolant makeup and filling the reactor cavity during outages. The RHUTs held water collected for discharge.

The process fortank removal was the same for all four - layout of cut locations, lead paint

-abatement of these locations (if required), plasma arc segmentation of the stainless-steel sections or cutting torch segmentation of the carbon steel sections and packaging the sections in open-top 20 foot Seavans. The original plan for the RHUTs was to attempt free release, however residual activity prevented this. The BWST and DRCST presented minor contamination control challenges regarding radioactivity within the tanks - up to 400,000 dpm/100 cm2 beta-gamma was discovered on the surfaces of the inner walls and floors. A wash-down of the interior was conducted prior to segmentation and the wash water with gross contamination was sent to a holding tank for processing.

The inside of the RHUTs were lined with a rubber barrier, which was removed and placed within a Seavan with segmented sections of the tank. The barrier was only slightly contaminated and the desire was that the inner tank would be free of detectable contamination and could thus, be free released. Small amounts of radioactive contamination were discovered in many areas inside the tank and the decision was made not to pursue free release.

The BWST and the DRCST each weighed 112,000 pounds while the A RHUT weighed 38,000 pounds and the B RHUT weighed 56,000 pounds. The segmented waste from these tanks was packaged into eight open-top 20-foot Seavans; each Seavan contained approximately 300 cubic feet of waste and was shipped for disposal at EnergySolutions.

3.2.5 Underground Pipe Removal Underground pipe of highly contaminated systems has been removed except for a small portion remaining to be removed in 2006. These systems include the Decay Heat System, Borated Water System, Radioactive Waste System and the Spent Fuel Cooling System. Other minimally contaminated systems Were also removed, or sampled and surveyed to ensure that they could remain. These include the Component Cooling Water System, Auxiliary Feedwater System, Main Condensate and Make-up System, and portions of the Clean Drain System used for radioactive effluents.- Portions of non-impacted systems in close proximity to the target piping were also removed. The radioactive discharge line from the RHUTs to the Retention Basins is scheduled to be removed in the spring of 2007.

Page 3-6

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 3.2.6, Non-Radiological Decommissioning Activities Non-radiological deconmmissioning activities include the removal of temporary buildings such as wooden or metal structures after being cleared by Radiation Protection. Underground storage tanks for diesel fuel oil were removed and the remaining lines cleaned. Asbestos was removed from the cooling towers, the roofs of permanent buildings and other miscellaneous locations.

Removal of non-essential materials and equipment and general cleanup of the site was also performed. The electrical generator was sold and removed. The Switchyard remains in operation by the newly constructed Cosumnes Power Plant (CPP) being operated on a non-impacted portion of the 2,480-acre Rancho Seco site.

3.3 , Future Decommissioning Activities Table 3-1 lists the current schedule for the remaining decommissioning activities. The following sections describe those activities.

Table 3-1 Schedule of Remaining Major Activities Activity Start Date Finish Date Reactor Vessel Interhals Removal January 2005 June 2006 Rector Vessel Removal May 2006 December 2006 Underground Piping June 2006 May 2007 Reactor Building Internal Structures Removal December 2006 January 2008 Embedded Piping Decontamination October 2005 June 2007

-Auxiliary Building Decontamination October 2005 October 2007 Spent Fuel Pool Decontamination April 2006 April 2007 Wastewater Systems Decontamination October 2005 October 2007 Reactor Building Decontamination - January 2008 June 2008 3.3.1 Remaining Component Removal 3.3.1.1 Reactor Vessel Internals The Reactor Vessel Internals project is currently in progress and is expected to be completed in the second quarter of 2006. The final activation analysis and radiological characterization of the Vessel and Internals was completed in June of 2003. As of that date the GTCC waste totaled approximately 50,000 curies with 28,000 curies attributable to Co-:60.

The GTCC waste weighs approximately 25,000 pounds and has been packaged into a single canister and will be stored within the onsite ISFSI alongside the spent fuel under the separate Part 72 license. It is scheduled i** cask by June of 2006.

to.i**'

be transported- fromr -*the reactor cavity to the ISFSI in the fuel

  • l Class A pieces are being shipped in boxes and liners to EnergySolutions.ClassB and C waste, approximately 16,000 curies (as of January 1 2006), will be stored in liners in the Interim Onsite Storage Building (IOSB) under the Part 50 license until acceptable disposal is arranged.

Page 3-7

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities , April 2006 With the exception of the plenum, the vessel internals are being cut or disassembled underwater with mechanical milling or cutting devices designed to minimize the production of fine material that could be dispersed in the water or air.

3.3.1.2 Reactor Vessel "

The Reactor Vessel is scheduled to be segmented andshipped beginning in the third and fourth quarters of 2006 once the vessel internals project is complete, the cavity drained, and the cavity and vessel are cleaned. In preparation, shield blocks around the flange will be removed and the mirror insulation on the vessel will be removed. Once the vessel is removed the remaining primary piping segments will be removed from the shield wall penetrations.

The vessel will be segmented using a robotic arm and a high-pressure water/abrasive cutting head. Pieces will be sized to allow standard packaging with the exception of the cylinder pieces opposite the core that will require special packaging. The fuel region of the vessel will be cut into six pieces vertically and be placed into two boxes, grouted and transported by rail.

3.3.1.3 Remaining Underground Pipe Portions of underground pipe (approximately 140 linear feet) from the Borated Water System and the Decay Heat System in the area in front of the Reactor Building equipment hatch remain to be removed. They are scheduled to be removed during the summer of 2006. The radioactive discharge line from the RHUTs to the Retention Basins is scheduled to be removed in the spring of 2007.

3.3.1.4 Reactor Building Exhaust Ventilation The only remaining radiological exhaust system, the Reactor Building Exhaust System, is currently in use to exhaust and filter the Reactor Building atmosphere. This system will remain until significant activities in the Reactor Building are complete.

3.3.2 Reactor Building Internal Structure Removal Once the Reactor Vessel is removed, work is to begin on the removal of almost all concrete and internal structures in the Reactor Building. Removal of the concrete to the liner plate should minimize the need for decontamination and simplify the final status survey (FSS). Only the building liner should remain inside the structure and possibly a grade level platform just inside the equipment hatch. The structure removal includes the activated steel and concrete around the vessel, and the polar crane.

3.3.3 Decontamination of Structures and Systems Decontamination methods include wiping, washing, vacuuming, scabbling, spalling, and abrasive blasting. Selection of the preferred method is based on the specific situation. Other decontamination technologies will be considered and utilized, as appropriate. Approved administrative procedures and processes control decontamination. These controls ensure that wastewater is collected for processing by liquid waste processing systems. Airborne contamination control and waste processing systems are used as necessary to control and monitor releases. Decontamination methods are further discussed in Chapter 4 of this LTP.

Page 3-8

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 3.3.3.1 Reactor Building Some liner decontamination is expected to be required once internal structures are removed.

Cleaning, up to and including paint removal, will be done as necessary to meet the derived concentration guideline level (DCGL).

3.3.3.2 Auxiliary Building Extensive decontamination is planned for rooms below grade level in the Auxiliary Building.

Many of the rooms were exposed to leaking or spraying water systems and decontamination is expected to include extensive surface removal including core boring and sawing. It may be necessary to remove floors or sumps if contamination extends through the concrete. These rooms are currently undergoing removal of obstacles that will interfere with 100% scanning surveys.

3.3.3.3 Spent Fuel Pool Significant decontamination is required for the Spent Fuel Pool. The pool liner has been removed and one interior wall where significant pool liner leakage has occurred is scheduled for removal. Once the wall is removed decontamination of remaining wall and floor surfaces will occur as well as the cleaning of the embedded leak chases and through-wall pipes.

3.3.3.4 Turbine Building The Turbine Building has only minor contamination levels with little decontamination planned with the exception of selected floor drain piping segments and sumps.

3.3.3.5 Embedded Pipe Systems Embedded pipe systemsare located in all of the impacted buildings listed above. Most embedded system piping is for floor drains. Cleaning is in progress with an initial high-pressure wash to remove debris followed by an abrasive grit blast process as required. Once cleaned to acceptable limits most embedded piping will be grouted to mitigate reuse or transport of remaining residual activity.

3.3.3.6 Wastewater Systems.

While most wastewater piping that will remain is believed to be below DCGL levels, the Retention Basins and associated bottom drains will require remediation and/or partial removal.

The radioactive discharge line from the RHUTs to the Retention Basins is expected to be removed. Storm drains that lead directly offsite and storm drains that collect system drainage and lead to the outfall should require no remediation. Some system piping that leads to the storm drains is currently being removed in lieu of extensive surveys. Cleaning is currently underway on the oil/water separator. Oil and sludge will be removed and a FSS will be performed. r Page 3-9

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 3.3.4 Non-Radiological Activities 3.3.4.1 Outbuilding Demolition .)

The demolition of temporary outbuildings continues. The remaining concrete pads will be surveyed as a part of the FSS process.

3.3.4.2 Site Grading Once Phase I site release is obtained, low areas will be filled and graded for drainage. These areas include the cooling tower basins and canal, the spray ponds and the below grade portion of the Turbine Building including the circulating water lines. Other grading and landscaping may occur.

3.3.5 Control Mechanisms to Ensure No Recontamination Due to the large scope of remaining structures and systems to be decontaminated and the need for some FSS activities to be performed in parallel with dismantlement activities, a systematic approach to controlling areas is established. Upon commencement of the FSS for survey areas within the Restricted Area where there is a potential for re-contamination, implementation of

-one or more of the following control measures will be required:

  • Personnel taining,
  • Installation of barriers to control access to surveyed areas,
  • Installation of barriers to prevent the migration of contamination from adjacent areas,
  • Installation of postings requiring personnel to perform contamination monitoring prior, to surveyed area access,
  • Locking entrances to surveyed areas of the facility,
  • Installation of tamper-evident labels or seals, or Upon completion of FSS, the area is placed under periodic routine survey by Radiation Protection to ensure no re-contamination occurs. If re-contamination is identified, an investigation will be initiated that would result in corrective actions up to and including re-performance of the FSS for that area.

3.3.6 Deferred Activities 3.3.6.1 Storage of Class B and C Waste It is the decision of District management that acceptable waste disposal options for Class B and C waste do not exist at this time. As a result, the waste will be stored in the IOSB until such time as an acceptable waste disposal site is available. Once a solution is available, waste will be shipped and the building will be decontaminated as required.

3.3.6.2 Final Status Survey of IOSB Once the IOSB is decontaminated a FSS will be performed in accordance with this LTP and a final release from the Part 50 license will be requested. The time frame for that request is Page 3-10

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 currently scheduled for 2028, but depends of factors outside of District control. The request is expected to occur prior to the decommissioning of the ISFSI.

3.4 Radiological Impacts of Decontamination and Dismantlement Activities 3.4.1 Occupational Exposure, Figure 3-1 provides Rancho Seco cumulative site dose and estimates for the decommissioning project. These estimates were developed to provide site management ALARA goals. The goals are verified by summation of actual site dose, as determined by appropriate dosimetry. ALARA estimates are a compilation of work plan (radiation work permit) estimates for the period. This information is in addition to information gathered for reporting of yearly site dose in accordance with the Rancho Seco Quality Manual (RSQM), Appendix A. The annual report of occupational dose meets the guidance of NRC Regulatory Guide 1.16, "Reporting of Operating Information-Appendix A Technical Specifications," [Reference 3-8]. The total nuclear worker exposure during decommissioning is currently estimated to be less than 200 person-rem. This estimate is significantly below the 1,2 15 person-rem estimate of the FGEIS for immediate dismantlement and below the ten-year SAFSTOR estimate of 664 person-rem.

3.4.2 Public Exposure Continued application of Rancho Seco's current and future Radiation Protection, Radioactive Waste, Radiological Effluent Technical Specification and Radiological Environmental Monitoring Programs assures public protection in accordance with 10 CFR Part 20 and 10 CFR Part 50, Appendix I. Section 8.6.2 of this LTP contains an evaluation of estimated public exposure as a result of decommissioning activities including the transportation of radioactive waste as compared to the FGEIS. .

3.4.3 Estimate of Quantity of Radioactive Material to be Shipped for Disposal or Processing Rancho Seco has shipped for radioactive disposal approximately 5,560 cubic meters (196,325 cubic feet) through December 31, 2005. The estimate of remaining waste is 11,730 cubic meters (414,206 cubic feet), most of which is very low activity concrete debris from the Reactor Building interior. This volume of waste is bounded by NUREG-05 86, (FGEIS) volume for the reference pressurized water reactor of 18,343 cubic meters (647,700 cubic feet).

3.4.4 Solid Waste Activity and Volume Rancho Seco's Annual Radioactive Effluent Release Report, submitted in accordance with the RSQM and 10 CFR 50.36(a), includes a report on solid waste activity and volumes. This report is submitted before May I' each year. A summary of solid waste disposal for 1997 through 2005 is provided in Table 3-2. Future updates may be obtained from Rancho Seco for inspection. .. ...

Page,3-11

Rancho Seco License Termination Plan Revision 0 Chanter 3. Identification of Remaining Decommissioning Activities Anril 2006 Table 3-2 Solid Waste Effluent Release Report Summary Waste Source Year Volume Total Principle Type (m_) Curies Radionuclides

a. Spent Resins, filter 1997 0. 0 Co-60, Sr-90, Cs-137, sludges, evaporator 1998 0 0 Cs-134, Fe-55, Ni-63, bottoms, etc. 1999 46.5 0.867 H-3, C-14 2000 37.7 140 2001 26.1_ 0.03 2002- 21.1 4.79 2003- 3.01 0.082 Iz 2004 0 .0 2005 0 " -0
b. DAW, contaminated 1997 0 0 Co-60, Cs-137, Fe-55, equipment, etc. 1998 196 0.025 Ni-63, C-14, Sr-90, 1999 434 0.89 H-3 2000 498 3.12 2001 422 3.99 2002 946 53.7 2003 710 13.2 2004 799 124 2005 784 131 C. Irradiated components, 1997-control rods, etc. 2002 0 0 -

2003 0.166 0.599 Co-60, Ni-63, Fe-55,

. 2004 3.17 0.0007 Eu-152, Eu-154

' , . 2004 0 0007 2005 0, 0 _________

d. Other (primary metals,, 1997 0 0 valves, piping) 1998 0 0 1999 0.89 0.05 2000 11.2 0.147 Co-60, Fe-55, Ni-63, 2001 116 1.02 Cs-137, C-14, Sr-90, 2002 246, 6.31 H-3 2003 132 2.35 2004 117 7.13 2005 6.64 0.008 _

3.4.5 Liquid Waste Activity and Volume Rancho Seco also reports, in accordance with the RSQM, Appendix A, the Annual Radioactive Effluent Release Report, which includes data on liquid waste.. The set of data provided in Table 3-3 provides a compilation of this information. A summary of the liquid waste effluent release reports for 1997 through 2004 is provided below. Liquid effluent release data was not Page 3-12

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 available for 2005 at the time of this LTP submittal; future updates may be obtained from Rancho Seco for inspection. Releases for 2005 and 2006 are expected to be similar to 2004 releases, a small fraction of the limits. Liquid radioactive releases are expected to cease in 2007.

Table 3-3 Liquid Waste Effluent Releases Dissolved Other Max. Dose Tritium and Alpha Fission Volume of Commitment Max Dose Teritiumea e Entrained trie Release and Volume Dilution Commitment Gas Release Activation Release (Liters) Water (Liters) Whole Body - Organ (Ci) (Ci) (mrem)

(mrem) 1997 8.15E -03 0.00 0.00 8.07E-05 2.02E+06 1.40E+10 0.026 0.051 1998 5.50E+00 0.00 0.00 9.11E-05 2.27E+07 1.53E+10 0.094 0.147 1999 5.53E-01 0.00 0.00 5.65E-04 1.06E+06 1,.69E+10 0.128 0.266 2000 2.64E+00 0.00 0.00 5.13E-04 3.61E+06 1.64E+10 0.139 0.276 2001 3.52E+00 0.00 0.00 6.50E-03 9.82E+06 1.58E+10 0.065 0.093 2002 1.15E+01 0.00 1.52E-05 1.36E-03 1.37E+07 1.68E+10 0.258 0.372 2003 1.82E+01 0.00 2.53E-05 5.55E-03 1.70E+07 1.57E+10 0.666 1.26 2004 8.73E-03 0.00 0.00 3.95E-05 4.28E+06 1.76E+10 0.010 0.023 3.4.6 Gaseous Waste Activity and Volume Rancho Seco also reports, in accordance with the RSQM, Appendix A, the Annual Radioactive Effluent Release Report, which includes data on gaseous waste. The set of data provided in Table 3-4 provides a compilation of this information., A summary of the liquid waste effluent release reportsfor 1997 through 2004 is provided below. After all spent fuel was moved to the ISFSI for storage, no source for gases exists. Particulate matter is the only expected material to be released in gaseous effluents after 2002. Gaseous effluent release data was not available for 2005 at the time of this LTP submission; future updates may be obtained from Rancho Seco for inspection. Releases for 2005 and 2006 are expected to be similar to 2004 releases, a small fraction of the limits. Radioactive gaseous releases are expected to cease in early 2008.

Page 3-13

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 Table 3-4 Gaseous Waste Effluent Releases Fission and Whole Body Whole Body Organ Dose Iodines Particulates Tritium Dose, P Dose, - (mrem)

Year Activation (mrads) .. .. ..

Gas Release (Ci) (Ci) .(Ci) (mrads)

(CI) ____ ____ ___ _

1997 0.00 0.00 0.00 1.61E+00 0.00 0.00 - 5.22E-02 1998 0.00- 0.00 0.00 2.87E+00 0.00 0.00 9.33E-02 1999 2.84E-02 0.00 0.00 1.94E+00 1.76E-04 1.55E-06 6.59E-02 2000 0.00 0.00 0.00 1.74E+00 0.00 0.00 5.65E-02 2001 0.00 0.00 0.00 9.04E-01 0.00 0.00 2.93E-02 2002 0.00 0.00 1.07E-05 I 41E+00 0.00 0.00 1.11E-01 2003 0.00 0.00 9.91E-06 3.50E-01 0.00 0.00 6.98E-02 2004 0.00 0.00 2.13E-06, 4.10E-02 0.00 0.00 1.42E-02 3.5 Site Description after License Release Currently, no permanent buildings or structures on site are scheduled for demolition. The switchyard is in use for the Cosumnes Power Plant, the IOSB will be used for storage of Class B and C waste, the Administration Building is used as an Emergency Operation Facility for the District in case Sacramento facilities are unavailable and the Secondary Alarm Station is used U by ISFSI security personnel. Various other buildings may be used for office space or maintenance activities.

The District may at some future date decide to demolish or refurbish any of the buildings or structures onsite. However, the impacted structures (Reactor Building, -Spent Fuel Building and the Auxiliary Building) are unlikely to be reused or demolished in the near future.

Many possible uses for the site or portions of the site have been considered but it will remain District property and the site's most likely use would be for future electric generation due to switchyard access and water availability.

3.6 . Coordination with Outside Entities The decommissioning and termination of Rancho Seco's 10 CFR Part 50 license involves, among others, the US NRC, the US Department of Transportation, US Department of Energy, the State of California (Cal/OSHA, Cal/EPA, State Water Resources Board, Central Valley Regional Water Quality Control Board), Sacramento County and the local fire district.

Chapter 8 of this LTP discusses some of the related requirements.

Page 3-14

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chanter 3. Identification of Remaining Decommissioning Activities Avril 2006 300 250 200 150 100 50 0

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 i- Actual - 'Estimate Figure 3-1 Dose-Estimate and Actual (PerSon-Rem)

Page 3-15

Rancho Seco License Termination Plan Revision 0 Chapter 3, Identification of Remaining Decommissioning Activities April 2006 3.7 References 3-1 U.S. Nuclear Regulatory Commission NUREG-1700, "Standard Review Plan for Evaluating

(

Nuclear Power Reactor License Termination Plans" (April 2000) 3-2 U.S. Nuclear Regulatory Commission Regulatory Guide 1.179, "Standard Format and Content of License Termination Plans for Nuclear Power Reactors" (January 1999) 3-3 U.S. Nuclear Regulatory Commission NUREG-0586, "Final Generic Environmental Impact Statement (FGEIS) on Decommissioning of Nuclear Facilities" (August 1998) 3-4 Rancho Seco Post Shutdown Decommissioning Activities Report (PSDAR), Revision 4, 3-5 Rancho Seco Defueled Safety Analysis Report, Amendment 6, October 25, 2004 3-6 Rancho Seco Unit 1, Permanently Defueled Technical Specifications, Amendment 130, September 29, 2005 3-7 Sacramento Municipal Utility District, Rancho Seco Quality Manual 3-8 U.S. Nuclear Regulatory Commission Regulatory Guide 1.16, Revision 4, "Reporting of Operating Information-Appendix A Technical Specifications, August 1975 Page 3-16

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 TABLE OF CONTENTS 4.0 SITE REM EDIATION PLAN ......................................................................................... 4-1 4.1 Remediation Actions and ALARA Evaluations ............................................................................ 4-1 4.2 Remediation Actions ..................................................................................................................... 4-1 4.2.1 Structures ....................................................................................................................................... 4-1 4.2.2 Soil ................................................................................................................................................ 4-3 4.3 Remediation Activities Impact on the Radiation Protection Program .................................... 4-4 4.4 ALARA Evaluation ....................................................................................................................... 4-5 4.4.1 Dose Models ................................................................................................................................. 4-5 4.4.2 Methods for ALARA Evaluation ........................................ 4-5 4.4.3 Remediation M ethods and Cost .................................................................................................... 4-6 4.4.4 Remediation Cost Basis ........................................................................... .................................... 4-6 4.5 Unit Cost Estimates ....................................................................................................................... 4-9 4.5.1 Calculation of Total Cost .............................................................................................................. 4-9 4.5.2 Calculation of Benefits ................................................................................................................ 4-12 4.5.3 Residual Radioactivity Levels that are ALARA .............................. 4-13 4.6 Radionuclides Considered for ALARA Calculations .................................................................. 4-14 4.7 ALARA Calculation Results ....................................................................................................... 4-15 4.8 References ............................ *...................................................................................................... 4-15 TABLES 4-1 Acceptable Parameter Values for Use in ALARA Analyses .... ......................................... ....... 4-11 4-2 ALARA Evaluation Results .......................................... 4-15 APPENDICES 4A Unit Cost Values........................................................................................................................4-17 Page 4-i

Rancho Seco License Termination Plan Revision 0 Chanter 4. Site Remediation Plan Chanter 4 a Site Remediation Plan This page intentionally left blank Page 4-ii

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 4.0 SITE REMEDIATION PLAN, 4.1 Remediation Actions and ALARA Evaluations This chapter of the LTP describes various remediation actions that may be used during the decommissioning of.Rancho Seco. In addition, the methods used to reduce residual contamination to levelsfthat comply with the NRC's annual dose limit of 25 mrem plus ALARA are described. Finally, the-Radiation Protection Program requirements for the remediation are described.

4.2 Remediation Actions Remediation actions are performed throughout the decommissioning process. The remediation action taken is dependent on the material contaminated., The principal materials that may be subjected to remediation are hardened structural surfaces and soils. Appendix 4-A of this LTP chapter describes the equipment, personnel, and waste costs used to generate a unit cost basis for the remediation actions discussed below.

4.2.1 Structures Following the removal of equipment and components, structures will be surveyed as necessary and contaminated materials will be remediated or removed and disposed of as radioactive waste.

Contaminated structural surfaces will be remediated to a level that will meet the established radiological criteria provided in Chapter 5 of this LT.P.

Remediation techniques that may be used for the structural surfaces include washing, wiping, pressure washing, vacuumig, scabbling, chipping, and sponge or abrasive blasting. Washing, wiping, abrasive blasting, vacuuming and pressure washing techniques may be used for both metal and concrete surfaces. Scabbling and chipping are mechanical surface removal methods that are intended for concrete surfaces. Activated concrete removal may include using machines with hydraulic-assisted, remote-operated, articulating tools. These machines have the ability to exchange scabbling, shear, chisel and other tool heads.

4.2.1.1 Scabbling and Shaving The principal remediation method expected to be used for removing contaminants from concrete surfaces is scabbling and shaving. Scabbling is a surface removal process that uses pneumatically operated air pistons with tungsten-carbide tips that fracture the concrete surface to a nominal depth of 0.25 inches at a rate of about 20 fte per hour., The scabbling pistons (feet)

'are contained in a close-capture enclosure that is connected by hoses to a sealed vacuum and collector system. .Shaving uses a series of diamond cutting wheels on a spindle, and performs at similar rates to scabbling. The wheels are also contained in a close-capture enclosure similar to scabbling equipment. The fractured media and dusts from both methods are deposited into a sealed removable container. The exhaust air passes through both roughing and absolute IEPA (high efficiency particulate air filter) filtration devices. Dust and generated debris are collected and controlled during the operation.

4.2.1.2 Needle Guns A second form of scabbling is accomplished using needle guns. The needle gun is a pneumatic air-operated tool containing a series of tungsten carbide or hardened steel rods enclosed in a Page 4-1

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan Aril 2006 housing. The rods are connected to an air-driven piston to abrade and fracture the media surface. The media removal depth is a function of the residence time of the rods over the surface. Typically, one to two millimeters are removed per pass. Generated debris collection, transport and dust control are accomplished in the same manner as for scabbling. Use of needle 0

.guns forbremovaland chipping of media is usually reserved for areas not accessible to normal scabbling operations. These include, but are not limited to inside Corners, cracks, joints and crevices. Needle gunning techniques can also be applied to painted and'oxidized surfaces.

4.2.1.3 Chipping Chipping includes the use of pneumatically operated chisels and similar tools coupled to vacuum-assisted collection devices. Chipping activities are usually reserved for cracks and crevices but may also be used in lieu of concrete saws to remove pedestal bases or similar equipment platforms. This action is also a form of scabbling.

4.2.1.4 Sponge and Abrasive Blasting Sponge and.abrasive blasting are similar techniques that use media or materials coated with abrasive compounds such as silica sands, garnet, aluminum oxide, and walnut hulls. Sponge blasting is less aggressive incorporating a foam media that, upon impact and compression, absorbs contaminants. The medium is collected by vacuum and the contaminants washed from the medium for reuse..

Abrasive blasting is more aggressive than sponge blasting but less aggressive than scabbling.

Both operations use intermediate air pressures. Sponge and abrasive blasting are intended for the removal of surface films and paints. Abrasive blasting is evaluated as a remediation action and the cost is comparable to sponge blasting with an abrasive media.

  • 4.2.1.5 Pressure Washing Pressure washing uses a hydrolazer-type nozzle of intermediate water pressure to direct a jet of pressurized water that removes surficial materials from the suspect surface. A header may be used to minimize over-spray. A wet vacuum system is used to suction the potentially contaminated water into containers for filtration or processing.

4.2.1.6 Washing and Wiping Washing and wiping techniques are actions that are normally performed during the course of remediation activities and will not always be evaluated as a separate ALARA action. When washing and wiping techniques are used as the sole means to reduce residual contamination below DCGL levels, ALARA evaluations are performed. Washing and wiping techniques used as a housekeeping or good practice measure will not be evaluated. Examples of washing and wiping activities for which ALARA evaluations would be performed include:

  • Decontamination of stairs and rails,,
  • Decontamination of structural materials, metals or media for which decontamination

-reagents may be required, or

  • Structure areas that do not provide sufficient access for utilization of other decontamination equipment such as pressure washing.

Page 4-2

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 4.2.1.7 Grit Blasting -

Most contaminated piping will be removed and disposed of as radioactive waste. Any remaining contaminated piping buried or embedded in concrete may be remediated using methods such as grit blasting. Grit blasting uses grit media such as garnet or sand under intermediate air pressure directed through a nozzle that is pulled through the closed piping at a fixed rate. The grit blasting action removes the interior surface layer of the piping. A HEPA vacuum system maintains the sections being cleaned under negative pressure and collects the media for reuse or disposal. The final system pass is performed with clean grit to remove any residual contamination.

4.2.1.8 'Removal of Activated/Contaminated Concrete Removal of concrete may be accomplished using a machine mounted, remote-operated articulating arm with exchangeable actuated hammer and bucket (sawing, impact hammering and expansion fracturing may also be employed). As concrete is fractured and rebar exposed, the metal is cut using flame cutting (oxygen-acetylene or other) equipment. Bulk concrete such as walls or floors may be removed as intact sections after sawing with blades, wires or other cutting methods. Removal may also be accomplished by demolition using power impact tools or explosives.

The debris media are transferred into containers for later disposal. Dusts, fumes and generated debris are collected locally or in bulk room exhaust and as necessary, controlled using temporary enclosures coupled with close-capture HEPA filtration systems and controlled water misting. Any remaining loose media are removed by pressure washing or dry vacuuming using a HEPA filter equipped wet-dry vacuum.

4.2.2, Soil Soil contamination above the site specific DCGL will be removed and disposed of as radioactive waste. Operational constraints and dust control will be addressed in site excavation and soil control procedures. In addition, work package instructions for remediation of soil may include additional constraints and mitigation or control methods. The site characterization process established the location, depth and extent of soil contamination. As needed, additional investigations will be performed to ensure that any changing soil contamination profile during the remediation actions is adequately identified and addressed. It should also be noted that soil*

remediation volume estimates in the LTP may vary from section to section, as appropriate, zdepending on their use, e.g., decommissioning cost estimates, ALARA evaluations, or dose assessment. Section 5.4.1.2 of this LTP discusses soil sampling and survey methods.

Soil remediation equipment will include, but not be limited to, back and track hoe excavators.

As practical, when the remediation depth approaches the soil interface region between unacceptable and acceptable contamination, a squared edge excavator bucket design or similar technique may be used. This simple methodology minimizes the mixing of contaminated soils

.,with acceptable lower soil layers as would occur with a toothed excavator bucket. Remediation of soils will include the use of established Excavation Safety and Environmental Control procedures. Additionally, soil handling procedures and work package instructions will augment the above guidance and procedural requirements to ensure adequate erosion, sediment, and air emission controls during soil remediation.

Page 4-3

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 4.3 Remediation Activities Impact on the Radiation Protection Program The Radiation Protection Program approved for decommissioning is similar to the program in place during commercial power operation. During power operations, contaminated structures, systems and components were decontaminated in order to perform maintenance or repair actions. The techniques used during operations are the same or similar to the techniques used during decommissioning to reduce personnel exposure to radiation and contamination and to prevent the spread of contamination from established contaminated areas.

Decommissioning does not present any new challenge to the Radiation Protection Program above those encountered during normal plant operation and refueling. Decommissioning planning allows radiation protection personnel to focus on each area of the site and plan each activity well before execution of the remediation technique.

Low levels of surface contamination are expected to be remediated by washing and wiping.

These techniques have been used throughout the operational history of the facility. Water washing with detergent has been the method of choice for large area decontamination. Wiping with detergent soaked or oil-impregnated media has been used on small items, overhead spaces and small hand tools to remove surface contaminants. These'same techniques will be applied to remediation of lightly contaminated structure surfaces during remediation actions.

Intermediate levels of contamination and contamination on the internal surfaces of piping or components have been subjected to high-pressure washing, hydrolazing or grit blasting in the past. The refueling cavity has been decontaminated by both pressure washing and hydrolazing.

Pipes, surfaces and drain lines have been cleaned and hot spots removed using hydrolazing, sponge blasting or grit blasting. Small tools, hoses and cables have been pressure washed in a self-contained glove box to remove surface contamination. These methods will be used to (.)

reduce contamination on moderately contaminated exterior surfaces as well as internal surfaces' of pipes during decommissioning.

Scabbling or other surface removal techniques will reduce high'levels of contamination, including that present on contaminated concrete. Concrete cutting or surface scabbling has been used at Rancho Seco in the past during or prior to installation of new equipment or structures both outside and inside the RCA.

Abrasive water jet cutting will be used to section the reactor vessel and mechanical cutting was be used to section reactor internals. Abrasive water jet cutting uses actions similar to hydrolazing and grit blasting that have been used at the site in the past. Mechanical cutting was used at this facility during past operations. The current Radiation Protection Program provides adequate controls for these actions.

The decommissioning organization is experienced in and capable of applying these remediation techniques on contaminated systems, structures or components during decommissioning. The Radiation Protection Program is adequate to safely control the radiological aspects of this work.

Because the activities expected during decommissioning are the same or similar to those encountered during operations, as described above, no changes to the program are necessary in order to ensure the health and safety of the workers and the public.

Page 4-4

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 4.4 ALARA Evaluation As described in Chapter 6 of this LTP, dose assessment s enarios were evaluated for the residual contamination that could remain on structural surfaces and soils. The ALARA analysis is based on the same industrial worker, industrial workei:"liding occupancy and containment building renovation/demolition scenarios used for RESRAD and RESRAD-BUILD derivation ofsingle nuclide DCGLs i .

. .- '.t-,,' I-L.

4.4.1 Dose Models','.

To calculate the cost'and benefit of averted dose for the-ALARA'calculation, certain'parameters such as size of contaminated area and population density are required. This information was

'developed as a part of the dose models described in Chapter 6 and the Final Status Survey, Program in Chapter 5 and is summarized below.

4.4.1.1 Industrial Worker Scenario foi" Surface and Subsurface Soil Exposure

.The average memier'of the'critical group'is dein'ed as a'District employee or contractor who is allowked occupationalaacess to areas of the Site'(which ivere"classified as impacted prior to liee'nse termination) 6vbr th*e ourse of his/her employ*n t "The assumption is made that occupancy would belimited to a 50-workweek year (2,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per year). It was further assumed that the"industrial workýr would spend 50 p'ercent 'ofhis/her time indoors hnd 50 percent outdoors while onsite.

The drinking water pathway is not suppressed - there are currently fouir potable'water wells

- existing on the 2,480-acre site. Three of these wells are upgradient of the impacted area; however, the fourth well is in the norther portion ofhe and is used for potable are ampacted water purposes.,...  :.,

4.4.1.2 Industrial Wrrker Scenario'for Building Occupancy Exposure The averagemember of the c6rial group is defined a' ADistrict employee or contractor who is average meero ri"cigupfa i mpye 6 ail acess' to structures (which wereclafid as impacted prior to license

. ; allowed occupatni termination) of the oite over'the course of his/her empioiyyment. The occupanicy assiumed is the 45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> per week used in NUREG/CR-5512, Voiume 3, Residual Radioactive Contamination from Decommissioning - Parameter Analysis," [Reference 4-1].

2 The building occupancy survey unit floor area size is 137 m based on the probabilistic

  • sensitivity analysis derivation found in LTP Section 6.7.3. ALARA cost analyses are based on

,,,an assumpton that only the 137 m2 floor area requires remediatin. This is conservave since includimg the wvvalls would increase iemedia'tio'n'cst without significantly increasing the benefit of averted dose.

4.4.2 Methods for ALARA Evaluation ...

The ALARA evaluations were performed in accordance with the guidance in Appendix N to NUREG-1757, VoltimIe 2,.Consohidated NMSS Deco6imissioning Guidance -

" Characterization, Survey, and Determinationof.Radiological Criteria," [Reference 4-2]. The principal equations used for the calculations are prisented in Section 4.5. The evaluation determines if the benefit 0f the dose avei-ted lbytheriiemediation is greater or less than the cost of

-Page 4-5

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 the remediation. When the benefit is greater than the cost, additional remediation is required.

Conversely when the benefit is less than the cost, additional remediation is not required.

4.4.3 Remediation Methods and Cost For the Rancho Seco facility the remediation techniques examined are scabbling, pressure water washing, wet and dry wiping, grit blasting for embedded and buried piping, grit blasting of surfaces and soil excavation. The principal remediation method expected to be used is scabbling, which is intended to include needle guns and chipping. The total cost of each remediation method is provided in Appendix 4-A. The cost inputs are defined in Section 4.5.1, Calculation of Total Cost.

4.4.3.1 Concrete Surfaces The characterization data for concrete surfaces at the Rancho Seco facility indicates that a major fraction of the contamination occurs in the top ten millimeters of the concrete. The ALARA evaluation was performed by bounding the cost estimate for a scabbled depth of 0.125 and 0.25 inches. For each evaluation the same manpower cost is used. However, the manpower and equipment costs for the lower bounding depth do not include compressor and consumable supply costs which adds some.conservatism to the cost estimate, i.e., biases the cost low. The majorvariables for the bounding conditions are the costs associated with manpower and waste disposal.

4.4.3.2 Structure Activated Concrete Concrete activation is associated with the containment building. Characterization of the reactor bioshield and loop area concrete has provided information regarding the identification, (,)

concentration, and distribution of the radionuclides. In addition to the observed concrete activation products, the concrete surfaces in the containment structure are radioactively contaminated by the deposition and transport of fluids and airborne distribution that occurred during plant operation. Based upon the difficulty that these activated and contaminated characteristics have raised in demonstrating compliance with the dose criteria in 10 CFR 20, Subpart E at other commercial reactor decommissioning projects; Rancho Seco has decided to remove and dispose of all containment building interior concrete without having performed an ALARA analysis.

4.4.4 Remediation Cost Basis The cost of remediation depends on several factors such as those listed below. This section describes the attributes of each remediation method that affect cost. The detailed cost estimates for each method are provided in Appendix 4-A.

  • Depth of contaminants;
  • Surface area(s) of contamination relative to total;
  • Types of surfaces: vertical walls, overhead surfaces, media condition; Consumable items and equipment parts;

!P Cleaning rate and efficiency (decontamination factor);

  • Work crew size; Page 4-6

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006

  • Support activities such as, waste packaging and transfer, set up time and interfering activities for other tasks; and

" Waste volume.

4.4.4.1 Scabbling NUREG/CR-5884, Volume 2, "Revised Analyses of Decommissioning for the Reference Pressurized Water Reactor Power Station," [Reference 4-3] states that scabbling can be effectively performed on smooth concrete surfaces to a depth of 0.125 inches at a rate of 115 ft2 per hour. The scabbling pistons (feet) are contained in a close-capture enclosure that is connected by hoses to a sealed vacuum and collector system. The waste media and dust are deposited into a sealed removable container. The exhaust air passes through both roughing and absolute HEPA filtration devices. Dust and generated debris are collected and controlled during the operation.

The unit cost is presented in Table 4-2; Scabbling the room assumes that 100% of the concrete surface contains contamination at levels equal to the DCGL and that 12.5% of this residual activity is removed by each pass and that it takes eight passes to effectively remove all the residual activity. The debris is vacuumed into collectors that are transferred to containers for 3

truck or rail shipments. For the evaluation, the truck container is assumed to carry 13.5 mn of concrete per shipment based on the NUREG-1757, Volume 2 guidance contained in Table 4-1.

Based on evaluation of concrete core samples, scabbling is expected to be the principal method used for remediation of concrete surfaces. The cost elements used to derive the unit costs for the ALARA evaluation are listed in Appendix 4-A. The methods for calculating total cost are provided in Section 4.5.1.

4.4.4.2 Pressure Water Washing The unit costs provided in Table 4-2 for pressure water-washing were established by assuming 2

that 20,312 mi of the site structures' surface area is pressure washed using the surface area example ofNUREG/CR-5884, Volume 1, "Revised Analyses of Decommissioning for the Reference Pressurized Water Reactor Power Station," [Reference 4-4], Table 3.22. This information was used to provide a cost per square meter factor. Appendix 4-A provides the cost details. The equipment consists of a hydrolazer and when used, a header assembly. The hydrolazer type nozzle directs the jet of pressurized water that removes surficial materials from the'concrete. The header minimizes over-spray. tA wet vacuum system is used to suction the potentially contaminated water into containers for filtration or processing. The cleaning speed is approximately 240 ft2 (22.3 in2) per hour and the process generatesabout 5.4 liters of liquid per square meter as discussed in NUREG/CR-5884, Volume 2. The contamination reduction rates are dependent on the media in which the contaminants are fixed, the composition of the contaminants, cleaning reagents used and water jet pressure. Mitigation of loose contaminants is high. Reductionof hard-to-rem"ove surface contamination is approximately 25% for the jet pressure and cleaning speed used.- The use of reagents and slower speeds can provide better contamination reduction rates but at proportionally higher costs. The formula associated with the cost elements is provided in Section 4.5.1 and the cost elements are provided in

_.Appendix4-A.'

Page 4-7

Rancho Seco License Termination Plan Revision 0 Chapter 4,-Site Remediation Plan - April 2006 4.4.4.3 Wet and Dry Wiping The unit costs provided in Table 4-2 for washing and wiping assume the same 20,312 m2 of the site structures' surface area as discussed in Section 4.4.4.2 is washed and wiped. The information is used to develop a cost per square meter. Appendix 4-A provides the detailed costs. Wet wiping consists of using a cleaning reagent and wipes on surfaces that cannot be otherwise cleaned or decontaminated. Dry wiping includes the use of oil-impregnated media to pick up and hold 2 2 contaminants. The cleaning rate of these actions is estimated at 2.8 i /hr

(~2 main per ft ), based on industry experience such as that described in the Maine Yankee License Termination Plan [Reference 4-5]. This action is labor intensive. The action is effective for the removal of loose contaminants and reduction of surface contaminants, especially when cleaning reagents are used. Waste generation is about 0.005 n3 per hour (NUREG-5884, Volume 2). Decontamination factors vary and are dependent on factors such as the reagents that are used, the level of wiping effort and the chemical and physical composition of the contaminant. The contamination reduction efficiency used for wet and dry wiping is 20 percent. Removal of loose contaminants, oil and grease is very effective (100 percent). The formula associated with the cost elements ,is provided in Section 4.5.1. Appendix 4-A lists the cost elements used for the evaluation.

4.4.4.4 Grit Blasting (Embedded Piping)

The cost for grit blasting was established by assuming that 5,354 linear feet, which is the estimated total of embedded piping to remain at Rancho Seco, is decontaminated. For the evaluation, the entire interior surface is assumed to require decontamination and the internal diameter is assumed at 4 inches (typical drain line dimensions). The grit blasting system is comprised of a hopper assembly that delivers a grit medium (garnet or sand) at intermediate air pressures through a nozzle that is pulled at a fixed rate (-1 ft/min) through the piping. A HEPA vacuum system maintains the piping system under a negative pressure and collects the grit for reuse (cyclone separator) or disposal. Usually several passes are required to effectively clean the piping to acceptable residual radioactivity levels. The contamination reduction efficiency used for grit blasting is 95 percent. This reduction rate can vary depending on radial bends in piping, reduction and expansion fittings, pipe material composition, physical condition and the plate-out mechanisms associated with the contaminants and effluents. The final pass is made with clean grit to mitigate the possibility of loose residual contaminants associated with previous cleaning passes. Grit decontamination factors are related to pressure, nozzle size, grit media and the number of passes made. A nominal grit usage rate of one pound per linear foot is used in the calculation. This cost unit information is provided as cost per linear foot factor and is also converted to in2 for evaluation. Appendix 4-A provides the cost details used to derive unit cost. The formula associated with the cost elements is provided in Section 4.5.1.

4.4.4.5 Sponge and Abrasive Blasting-Sponge and abrasive blasting uses media or materials coated with abrasive compounds such as silica sands, garnet, aluminum oxide and walnut hulls. The operation uses intermediate air pressures as that described for grit blasting. The operation uses a closed-capture system and air filtration system to mitigate loose and airborne radioactivity. The system includes a cyclone or similar separation system to collect the generated media. The operation is intended for removal of surficial films. The removal efficiency and depth are a function of the surface', abrasive mix, air pressure, grit media, and speed or number of passes performed over the suspect surface.

Surface cleaning rates are about 30 fe/lhr (2.8 m2 /hr). For the rate given, the removal depth using aluminum oxide grit will range from less than 1 to as much as 3 millimeters. Abrasive Page 4-8

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 blasting techniques are often used for film and paint removal and are less aggressive than scabbling.

4.4.4.6 Soil Excavation The unit costs provided in Table 4-2 for soil excavation were established by assuming 52,972 ft3 (1,500.0 in3) of soil is excavated from the site. This information was used to generate a cost per cubic meter for soil remediation. The equipment consists of an excavator that first moves the soil at the contaminated depth interface into a container or if necessary, a pile that is scooped into a staged shipping container. When filled, the container is moved from the excavation area with a forklift. Contamination reduction is assumed at 95%. The operation is performed using two equipment operators and two laborers. Costs for radiation protection support activities and supervision are also included. The formula associated with the cost elements is provided in Section 4.5.1 and the cost elements are provided in Appendix 4-A.

4.5 Unit Cost Estimates In order to effectively perform ALARA evaluations and remediation actions, unit cost values are required. These values are used to perform the NUREG-1757, Volume 2 cost-benefit analysis. Table 4-2 lists the unit costs of the remediation methods anticipated to be used at Rancho Seco.

4.5.1 Calculation of Total Cost In order to evaluate the cost of remediation actions NUREG-1757, Volume 2, Appendix N provides the elements necessary to derive the costs that are compared to the benefits. The total cost, Costr,which is balanced against the benefits, has several components defined as follows in Appendix N, Equation (N-3):

CostT CostR + CostWD + COStACC + CostTF + CostD,* + CoStFDok + COStoti, Equation 4-1 where:

COStR = monetary cost of the remediation action (may include "mobilization" costs);

CostwD = monetary cost for transport and disposal of the waste generated by the action;.

Cost4cc = monetary cost of worker accidents during the remediation action; CostTF = monetary cost of traffic fatalities during transporting of the waste; Costwose = monetary cost of dose received by workers performing the remediation action and transporting waste to the disposal facility; Costpnose = monetary cost of the dose to the public from excavation, transport, and disposal of the waste; and Costoth, = other costs as appropriate for the particular situation.

Page 4-9

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan- April 2006 4.5.1.1 Transport and Disposal of the Waste In accordance with the guidance provided in NUREG-1757, Volume 2, the cost of waste transport and disposal, CostwD, may be evaluated according to Equation 4-2 below:

CostWý = A xCostV Equation 4-2 where:

VA =. volume of waste produced, remediated in units of in 3 ; and Costv = cost of waste disposal per unit volume, including transportation cost, in units of $/m3 .

4.5.1.2 Nonradiological Risks Also 'in accordance with the guidance provided in NULREG-1757, Volume 2, the cost of nonradiological workplace accidents, CostAcc, may be evaluated using Equation 4-3 below:

CostAcc = $3,000,000 x Fw x TA Equation 4-3 where:

$3,000,000 = monetary value of a fatality equivalent to $2,000/person-rem (see pages 11-12 of NUREG-1530, "Reassessment of NRC's Dollar per Person-Rem Conversion Factor Policy," [Reference 4-6]);

Fw = workplace fatality rate 'in fatalities/hour worked; and TA = worker time required for remediation in units of w9rker-hours.

4.5.1.3 Transportation Risks Also, the cost of traffic fatalities incurred during the transportation of waste, Cost F, may be calculated using Equation 4-4 below:

CostT = $3,000,000 x r-~-Ix F~x DT Equation 4-4 where:

VA = volume of waste produced in units of m 3, Vsf== volume of a truck shipment in mi, FT = fatality rate per truck-kilometer traveled in units of fatalities/truck-kin, and DT = distance traveled in km.

Page 4-10

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 The actual parameters will depend on Rancho Seco's planned method of waste transport. This may include a mix of trucking and rail transport to get the waste to the disposal site. In these cases, the cost would be equivalent to the total fatalities likely from the rail transport and the limited trucking, not just the trucking alone.

4.5.1.4 Worker Dose Estimates The cost of the remediation worker dose, CostWoS,, can be calculated as shown in Equation 4-5 below:

CostwD,, = $2,000 x D. x T Equation 4-5 where:

DR = total effective dose equivalent (TEDE) rate to remediation workers in units of rems/hr, and T = time worked (site labor) to remediate the area in units of person-hour.

4.5.1.5 Default Parameter Values In accordance with the guidance provided in NUREG-1757, Volume 2, parameter values found acceptable by the NRC for performing the calculations provided in Equations 4-2 through 4-5 and the source of the parameter values, are provided in Table 4-1.

Table 4-1 Acceptable Parameter Values for Use in ALARA Analyses Parameter Parameter Value Reference Source Workplace accident 4.2E-08/hr NUREG-1496, Volume 1 [Reference 4-7] and fatality rate, Fw NUREG-1496, Volume 2 [Reference 4-8],

..... _______ _ _ Appendix B, Table A.1 Transportation fatal Trucks: 3.8E-08/km NUREG-1496, Volume 2, Appendix B, Table A. I accident rate, FT Dollars/person-rem $2,000 NUREG/BR-0058 [Reference 4-9], Section 4.3.5 Monetary discount 0.07/y for the first NUREG/BR-0058, Section 4.3.5 rate, r 100 years and 0.03/y thereafter, or 0.07 for Sbuildfings and 0.03 for soil Number of years of Buildings: 70 years NUREG-1496, Volume.2, Appendix B, Table A.1 exposure, N Soil: 1000 years' _

Population density, PD Building: 0.09 NUREG-1496, Volume 2, Appendix B, Table A.1 person/nm2 Land: 0.0004

..... . _____________ ' person/m2 Excavation, monitoring, Soil: 1.62 person- NpREG-1496, Volume 2, Appendix B, Table A. 1 packaging, and hours/mn of soil handling soil _ _ _ __,.___.

Waste shipment Truck: 13.6 NUREG-1496, Volume 2, Appendix B, Table A. I volume, VsHp m3/shipment Page 4-11

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan .- April 2006 4.5.2 Calculation of Benefits In order to evaluate the benefits of remediation actions NUREG-1757, Volume 2, Appendix N provides the elements necessary to derive the benefits that are compared to the total cost. As discussed in Section 4.4.1, calculation of the benefits of remediation actions is based on an industrial worker scenario for surface and subsurface soil exposure and for building occupancy exposure. The benefit from collective averted dose, BAD, is calculated by determining the present worth of the future collective averted dose and multiplying it by a factor to convert the dose to monetary value:

B $2:000 x PW(At ,DCO

,,,)

Equation 4-6 where:

"BAt benefit from an avoided dose for a remediation action, in current U.S.

dollars;

$2,000 = value in'doilars of a person-rem averted (see NUREG/BR-0058); and PW(ADoi,,,te) = present worth of a future collective averted dose.

A value acceptable to the NRC for a collective dose is $2,000 per person-rem averted, discounted for a dose'averted in the future (see Section 4.3.5 of NUREG/BR-0058, Revision 4).

For doses averted within the first 100 years (applicable to structural surfaces), a discount rate of 7 percent was used. For doses averted beyond 100 years (applicable to surface and subsurface soil), a 3 percent discount rate was used. ( )

The present worth of the future collective averted dose can be'estimated from Equation 4-7, for relatively simple situations:

Conc x1- e-(AN PW(ADole,,e)PD xA x0.025xFx DCGLw - r+A Equation 4-7 where:

PD = population density for the critical group scenario in people/m2 ;

A = area being evaluated in square meters (m2);

0.025 = annual dose to an average member of the critical group from residual radioactivity at the Derived Concentration Guideline Level (DCGLw) concentration in remly; F = effectiveness, or fraction of the residual radioactivity removed by the remediation action; Conc = average concentration of residual radioactivity in the area being evaluated in units of activity per unit area for buildings or activity per unit volume for'soils; "Page 4-12

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 DCGLw derived concentration guideline equivalent to the average concentration of residual radioactivity that would give a dose of 25 mrem/y to the average member of the critical group, in the same units as "Conc";

r = monetary discount rate in units per year; A = radiological decay constant for the radionuclide in units per year; and N = number of years over which the collective dose will be calculated.

The present worth of the benefit calculated by Equation 4-7, above, assumes that the peak dose occurs in the first year. The DCGLwused is the single nuclide DCGLw derived in LTP Chapter 6 to show compliance with the 25 mrem/y dose limit. The population density, PD, is based on the dose scenario used to demonstrate compliance with the dose limit. The factor at the far right of the equation, which includes the exponential terms, accounts for both the present worth of the monetary value and radiological decay.

4.5.3 Residual Radioactivity Levels that are ALARA NUREG-1757, Volume 2, Appendix N, also provides the guidance necessary to determine if residual levels of radioactivity are ALARA. The residual radioactivity level that is ALARA is the concentration, Conc, at which the benefit from removal equals the cost of removal. If the total cost, CostT, is set equal to the present worth of the collective dose averted in Equation 4-7, the ratio of the concentration, Conc, to the DCGLw can be determined from Equation 4-8 below (derivation shown in NUREG-1757, Volume 2, Section N.5).

Conc Costr r _+_ _

DCGL* -,$2,000xPD xO.025xF xA 1-e Equation 4-8 All the terms in Equation 4-8 are as defined previously.

Equation 4-9 may be derived from Equation 4-8 to perform the ALARA evaluation in the presence of multiple radionuclides as follows:

Conc _ COst.i ____e-__,

DC-G-L -$2,000 x PDx 0.025 x F x AI The right term of the above equation is then multiplied by 1 as follows:

Conc, DCG4 CostT

$2,000 x PD.xO .0.025-xF x. A x

[

1- II r+A)N eI Equation 4-8 is then expressed as:

Page 4-13

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Conc CoSt?,

DCGI'rw$,00 o x02x xxl'e-(r+'*)N]

DCLW$2,000OxPD xO0.025 xF XA X[1 2 For multiple radionuclides the denominator must be summed over all radionuclides as shown below:

Conc CostT DCG* *$2,000 x PDx 0.025 x D x F x, A x1 i *r+. . kl Equation 4-9 where:

i radionuclide "T',

n= total of all radionuclides, and Dfi dose fraction of radionuclide "'T and:

nf, DCGLwJ Df,= n SDCnGLw where:

nf = nuclide fraction of the mixture radionuclide 4.6 Radionuclides Considered for ALARA Calculations As discussed in LTP Chapter 6, Section 6.4.1, the site-specific suite of radionuclides identified for use at Rancho Seco contains 26 radionuclides. Only six of these radionuclides have been identified above minimum detectable concentration (MDC) levels in soil samples while 21 have been identified at least one time in structural surface samples. For purposes of the ALARA calculations, only Co-60 and Cs-137 were used along with their associated DCGL values (adjusted DCGL value for Co-60 and surrogate DCGL value for Cs-137) and nuclide fractions.

Cs-137 was used as a surrogate radionuclide for the other 19 radionuclides with the surrogate DCGL value used to classify survey units. Rancho Seco Decommissioning Technical Basis Document DTBD-05-015, "Rancho Seco Nuclear Generating Station Structure Nuclide Fraction and DCGLs," [Reference 4-10] provides the bases for the structural surface nuclide fractions and the surrogate DCGL value. Rancho Seco DTBD-05-014, "Rancho Seco Nuclear Generating Station Surface Soil Nuclide Fraction and DCGL," [Reference 4-11] provides the bases for the surface soil nuclide fractions and the surrogate DCGL value.

Page 4-14

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 4.7 ALARA Calculation Results The final ALARA calculations were performed by comparing the total remediation cost to the benefit of averted dose using Equation 4-9. The calculations were described in detail in Sections 4.5.1, 4.5.2 and 4.5.3. The results for each remediation method, for both the Industrial Worker (for soils),and (Industrial Worker) Building Occupancy scenarios, are provided in Table 4-2. Since the Conc/DCGLw values are greater than I for all remediation methods and scenarios, no remediation below the NRC 25 mremn/y dose limit is required.

Table 4-2 ALARA Evaluation Results:

Remediation Action Unit Costs

__ _ _ _ Action

__ _ _ ($per ft, M2 or m) Conc/DCGLwRatio Pressure Washing and Vacuuming 15.31 1.31 WipingfWashing 58.87 6.31 Concrete Scabbling(Upper Bound) 67.02 5.75 Concrete Scabbling (Lower Bound) 33.36 5.72 Grit Blasting Surfaces (Upper Bound) 96.88 2.19 Grit Blasting Surfaces (Lower Bound) 80.58 1.82 Grit Blasting Embedded/Buried Piping 27.39 42.77 Soil Excavation 2,679.82 1142.00 4.8 References 4-1 U.S. Nuclear Regulatory Commission NUREG/CR-5512, Volume 3, "Residual Radioactive Contamination from Decommissioning - Parameter Analysis, Draft Report for Comment,"

October 1999 4-2 U.S. Nuclear Regulatory Commission, NUREG-1757, Volume 2, Final Report, "Consolidated NMSS Decommissioning Guidance - Characterization, Survey, and Determination of Radiological Criteria," September 2003 4-3 U.S. Nuclear Regulatory Commission, NUREG/CR-5884, Volume 2, "Revised Analyses of Decommissioning for the Reference Pressurized Water Reactor Power Station," Draft Report for Comment, October 1993 4-4 U.S. Nuclear Regulatory Commission, NUREG/CR-5884, Volume 1, "Revised Analyses of Decommissioning for the Reference Pressurized Water Reactor Power Station," Draft Report for Comment, October 1993 4-5 "License Termination Plan," submitted by Maine Yankee Atomic Power Company, Revision 3, October 15, 2002 4-6 U.S. Nuclear Regulatory Commission, NUREG-1530, "Reassessment of NRC's Dollar per Person-Rem Conversion Factor Policy," December 1995 4-7 U.S. Nuclear Regulatory Commission, NUREG-1496, Volume 1, Final Report, "Final Generic Environmental Impact Statement in Support of Rulemaking on Radiological Criteria for License Termination of NRC-Licensed Nuclear Facilities," July 1997

  • Page 4-15

Rancho Seco License Termination Plan - Revision 0 Chapter 4, Site Remediation Plan April 2006 4-8 U.S. Nuclear Regulatory Commission, NUREG-1496, Volume 2, Final Report, "Tinal Generic Environmental Impact Statement in Support of Rulemaking on Radiological Criteria for License Termination of NRC-Licensed Nuclear Facilities," July 1997 4-09 U.S. Nuclear Regulatory Commission: NTUREG/BR-0058, Revision 4, "Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission," September 2004 4-10 Rancho Seco Decommissioning Technical Basis Document DTBD-05-0 15, Revision 0, "Rancho Seco Nuclear Generating Station Structure Nuclide Fraction and DCGLs" 4-11 Rancho Seco Decommissioning Technical Basis Document DTBD-05-014, Revision 0, "Rancho Seco Nuclear Generating Station Surface Soil Nuclide Fraction and DCGL" Page 4-16

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values A. 1 General This Appendix provides the unit cost values used to develop the total cost CT as defined in Section 4.5.1.

Remediation Activity Rates Remediation activity rates were provided based on previous experience, from published literature, or from groups or vendors currently performing these or similar activities. Past operational experience was also used in developing the rates.

Contingency A contingency of 0.25 was added to the manpower hours. Scabbling (the primary activity) was bounded using cost and manpower associated with the volume of concrete (disposal cost) for remediation of 0.125 inches versus using a compressor, consumable materials and the volume of concrete (disposal cost) for remediation of 0.25 inches of concrete.

Equipment Equipment costs were developed based on the cost of buying specific equipment and whenever possible prorating the cost over the task activities. Rental rates are also included for specific equipment such as forklifts and excavators. Consumable supplies and parts were included in the cost for equipment. Shipping containers were included with shipment costs.

Mobilization and Demobilization Costs Costs were conservatively included for delivery and pick up of equipment. Anticipated costs to stage and move equipment from location to location were also included.

Waste Disposal Cost Disposal costs for generated waste were based on an average total disposal cost of $2,500/mI3 .

This average cost includes packaging, transportation and disposal fees. The transportation component of this average cost is based on the average transportation cost of using either rail or highway hauling from the Rancho Seco site to Clive, Utah (EnergySolutions1 site). The details of the average total disposal cost of $2,500 are considered proprietary values defined by negotiated contract.

The Clive, Utah round trip distance from the Rancho Seco site by highway is 1,223 miles (1,968 kIn). The distance for rail shipments is considerably further than that for highway shipments because of the route rail shipments must follow. The highway shipment distance of 1,968 km (DT) was used as a conservative value for the calculation of CT since it results in a lower transportation cost.

The volume for highway hauling (Vmn) used for the calculation of CT was 13.6 m3 as specified in Table 4-1. The distance and haul volume are used for determining transport accident cost in 1

EnergySolutionswas previously Envirocare of Utah Page 4-17

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values accordance with NUREG-1757, Volume 2 and Section 4.5.1.3. The impact to total cost of this item is minimal.

Worker Accident Costs To determine worker accident cost in accordance with NUREG-1757, Volume 2 and Section 4.5.1.2, the same hours input for labor cost were used for worker accident cost.

Worker Dose Costs associated with worker dose are a function of the hours worked and the workers' radiation exposure for the task. A value of 2 mrem/hr per work crew or 3 mrem/hr per work crew for work crew dose depending upon remediation action was based on the assumed dose rate used forworkei dose calculations in NLJREG/CR-5 884 Volume 2.

Labor Costs The individual cost for the applicable disciplines, e.g., laborer, equipment operator, health physics technicians, were developed into an hourly crew rate for the task and based on guidance provided by NUREG/CR-5884, Volumes 1 and 2. Manpower costs assumptions were also based on NlREG/CR-5884. The NUREG/CR-5884 manpower cost assumptions are based on 1993 dollars and were not escalated to the projected time remediation activities would occur for the following CT calculations. This is considered a conservative approach because escalating manpower costs or using current contracted rates would only raise CT, thus raising the Conc/DCGLw/ratio. It is important to note that the total work hours for a normal day were used and not adjusted for personnel breaks, ALARA meetings or ingress and egress from an area. (,-~

Unit Cost The sum of all the cost elements was divided by the applicable unit (m2, m3 or linear feet) to provide a unit cost for the activity. Other cost units for cost per hour or linear foot were also developed in the same fashion. The tables to follow provide the crew cost per hour but do not provide the individual hourly rates for individual disciplines. These values are however included in the supporting calculation.

A.2 Pressure Water Washing And Vacuuming Area Evaluated For Unit Cost Determination: 20,312 m 2 (218,636 ft) per NUREG/CR-5884, Volume 1, Table 3.22 Crew Composition 2 Laborers, 1 Craft, 0.5 HP Technician and 0.5 Crew Leader per NUREG/CR-5884, Volume 2, Appendix C Hourly Crew Cost: $148.27 per NUREG/CR-5 884, Volume 2, Appendix C without escalation from 1993 labor costs Cleaning Rate: 22.3 m2/h (240 ft/hr) per NUREG/CR-5884, Volume 2, Appendix C .

Page 4-18

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values Contamination Removed: 25% based on industry experience Hours: 1,139 [(20,312 m2/22.3 m2/h)(1.25 contingency)]

Mobilization Costs $600 Labor Cost: $168,815 Equipment Costs:, $3,480 per NUREG/CR-5884, Volume 2, Appendix C Liquid Processing Costs: $34,276 [($1.00/g)(1.35g/m2)(20,3 12 mi)

(1.25 liquid contingency)]

$101,500 [Solids estimated at 0.002 m3 /m 2 -

Waste Disposal Cost (Costwn*):

40.6 in 3 ($ 2,500/m3 )]

Worker Accident Cost (CostAcc): $574 per Equation 4-3 Transportation Accident Cost (CostTF): $670 per Equation 4-4 Worker Dose Cost (CostwDo,,e): $1,139 at NUREG/CR-5884, Volume 2, AppendixC, dose rate of 0.002 rem/crew-hour using Equation 4-5 Total Costs (Costr): $311,053 Cost (CostO)per m2 $15.31 A.3 Washing and Wiping Remediation Actions Area Evaluated For Unit Cost Determination: 20,312 m 2 (218,636 19) per NUREG/CR-5884, Volume 1, Table 3.22 Crew Composition 2 Laborers, 0.5 HP Technician and 0.5 Crew Leader Hourly Crew Cost: $98.57 per NUREG/CR-5884, Volume 2, Appendix C without escalation from 1993 labor costs Cleanjng Rate: 2.8 m2/h based on industry experience Contamination Removed: 20% based on industry experience Hours: 9,975 [(20,312 m2/2.8 m2//h) + 4 h/40 h set up)(1.25 contingency)]

Mobilization Costs $600 Page 4-19

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values.

Labor Cost: $983,200-'

Equipment Costs: $21,571 based on industry experience Waste Generation: 68.9 m3 (3.39E-03 m3/m2) based on industry experience Waste Disposal Cost (Costwr.): $172,250 ($ 2,500/m 3)

SWorker Accident Cost (Cost cc): $3,770 per Equation 4-3 Transportation Accident Cost (Costm): $1,137 per Equation 4-4 Worker Dose Cost (Costi&o.-) $13,300 at NUREG/CR-5884, Volume 2, Appendix C, dose rate of 0.002 rem/crew-hour using Equation 4-5 Total Costs (CostT): $1,195,828 Cost (Cost&) per m2: $58.87 A.4.a Scabbling Remediation Action (Bounding Condition 0.635 em (0.25 in) Concrete)*

2 Area Evaluated For Unit Cost Determination: 2,007 mn (21,598 ft) per NUREG/CR-5884, Volume 1, Table 3.22 Crew Composition 3 Laborers, 0.25 HP Technician and 0.25 Crew Leader per NUREG/CR-5884, Volume 2, Appendix C Hourly Crew Cost: $102.02 per NUREG/CR-5 884, Volume 2, Appendix C without escalation from 1993 labor costs Cleaning Rate: 4.65 m2 /h per NUREG/CR-5884, Volume 2, Appendix C removal rate is 9.29 m2/h per pass with two passes required to remove 0.25 inches Contamination Removed: 25% per NUREG/CR-5884, Volume 2, Appendix C removal of 12.5% per pass Hours:. 540 [(2,007 m2/4.65 m 2//h)(1.25 contingency)]

Mobilization Costs $7,100 based on industry experience Labor Cost: $55,041 Page 4-20

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values Equipment Costs: $39,549.60 ($73.24/hr) based on current industry experience*

Waste Generation: 12.7 i ?3 (2,007 m 2)(6.35E-3 m)

Waste Disposal Cost (CostwD): $31,750 ($2,500/m 3)

Worker Accident Cost (CostAcc): $238 per Equation 4-3 Transportation Accident Cost (Cost7F): $210 per Equation 4-4 Worker Dose Cost (COStWjose): $617 at NUREG/CR-5884, Volume 2, Appendix C, dose rate of 0.003 rem/crew-hour using Equation 4-5 Total Costs (CostT): $134,505 Cost (Costr) per m2 $67.02*

  • Bounding condition includes cost for air compressor, consumables at 10% of the base equipment costs and the waste volume of 0.25 inch (0.635 cm) concrete depth.

A.4.b Scabbling Remediation Action (Bounding Condition 0.32 cm (0.125 in) Concrete)*

2 (21,598 ft) per NUREG/CR-5884, Area Evaluated For Unit Cost Determination: 2,007 mn Volume 1, Table 3.22 Crew Composition 3 Laborers, 0.25 lHP Technician and 0.25 Crew Leader per NUREG/CR-5 884, Volume 2, Appendix C Hourly Crew Cost:, $102.02 per NUREG/CR-5884, Volume 2, Appendix C without escalation from 1993 labor costs Cleaning Rate: 9.29 m2/h per NUREG/CR-5884, Volume 2, Appendix C removal rate is 9.29 m2/h per pass with one pass required to remove 0.125 inches Contamination Removed:, 12.5% per NUREG/CR-5884, Volume 2, Appendix C removal of 12.5% per pass Hours: 270 [(2,007 m2i9.29 m2//h)(i.25 contingency)]

Mobilization Costs $7,100 based on industry experience Labor Cost: $27,550 Page 4-21

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values,

$15,827.40 ($58.62/br) based on current Equipment Cost: $15,827.40 ($58.62/hr) based on current industry experience* Q Waste Generation: 6.38 m3 = (2,007 m2)(3.18E-3 m)*

Waste Disposal Cost (CostwD):. $15,950 ($2,500/m3 )

Worker Accident Cost (CostAcc): $119 per Equation 4-3 Transportation Accident Cost (CostTp): $105 per Equation 4-4 Worker Dose Cost (Costwpoe): $309 at NUREG/CR-5884, Volume 2, Appendix C, dose rate of 0.003 rem/crew-hour using Equation 4-5 Total Costs (CostT): $66,961 Cost (CostT) per m2 : $33.36

  • Bounding condition uses: (1) base equipment cost, (2) assumes an on-site air compressor, (3) no added consumanbles, and (4) the waste volume is relative to 0.125 inches (0.32 cm) depth of concrete, i.e., one-half of that assumed in A.4.a.

A.5 Grit Blasting (Embedded/Buried Piping) Remediation Action Length Evaluated For Unit Cost Determination: 5,354 linear feet (LF) - total of embedded piping to remain at Rancho Seco

(~)

Crew Composition 2 Laborers, 1 Craft, 0.5 HP Technician and 0.5 Crew Leader based on NUREG/CR-5884, Volume 2, Appendix C crew for pressure washing Hourly Crew Cost: $148.27 per NUREG/CR-5884, Volume 2, Appendix C without escalation from 1993 labor costs Cleaning Rate: 60 LF/h based on recent industry experience Hours: 112 [(5,354 LF/60 LF/hr)(1.25 contingency multiplier)]

Mobilization Costs $4,000 based on recent industry experience Labor Cost: $16,538 Equipment Costs: $123,311 based on recent industry experience Page 4-22

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values 3

Waste Generation: - 1.05 m3 = (5,354 LF x 1.96E-04 m /LF at -

1.0 lb. per linear foot) 3 Waste Disposal Cost (CostwD)-. $2,625 ($ 2,500/m )

Worker Accident Cost (CostAcc): $56 per Equation 4-3 Transportation Accident Cost (CostT): $17 per Equation 4-4 Worker Dose Cost (CostwD..): $112 at NUREG/CR-5884, Volume 2, Appendix C, dose rate of 0.002 rem/crew-hour for pressure washing using Equation 4-5 Total Costs (CostT): $146,659 Cost (Costr) per linear foot: $27.39 A.6.a Grit Blasting (Surfaces) Remediation Action (Bounding Condition 1.25 Contingency)

Area Evaluated For Unit Cost Determination: 2,007 m2 (21,598 ft2 ) per NUREG/CR-5884, Volume 1, Table 3.22 for scabbling evaluation Crew Composition: 3 Laborers, 0.25 HP Technician and 0.25 Crew Leader as in the NUREG/CR-5884, Volume 2, Appendix C, evaluation for scabbling remediation action Hourly Crew Cost: $102.02 per NUREG/CR-5884, Volume 2, Appendix C without escalation from 1993 labor costs Cleaning Rate: 2.79 m2/hr based on recent industry experience Hours: 899 [(2,007/2.79 m2 /h) x 1.25 contingency]

Mobilization Costs $7,339 [(2,007/2.79 m2/h) x 0.10 set up x

$102.02/crew hour]

Labor Cost: $91,736 Equipment Costs: $51,315 based on recent industry experience Grit/Consumables $17,984 based on recent industry experience 3

Waste Generation: 9.59 nm = (2,007 m2cx 3.0E-03 m + 3.57 m for grit)

Page 4-23

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values-.

Waste Disposal Cost (Costwý): $23,975 ($2,500/mr3 )

Worker Accident Cost (CostAcc):. $397 per Equation.4-3 Transportation Accident Cost (CostT.): $158 per Equation 4-4 Worker Dose Cost (Costpg~ose): $1,541 at NUREG/CR-5884, Volume 2, Appendix C, dose rate of 0.003 rem/crew-hour for scabbling using Equation 4-5 Total Costs (Co~sti): $194,445 Cost (CostT) per m2 $96.88 A.6.b Grit Blasting (Surfaces) Remediation Action (Bounding Condition No ContingencZy Area Evaluated For Unit Cost Determination: 2,007 m2 (21,598 ft')per NUREG/CR-5884, Volume 1, Table 3.22 for scabbling evaluation Crew Composition: 3 Laborers, 0.25 HP Technician and 0.25 Crew Leader as in the NUREG/CR-5884, Volume 2, Appendix C, evaluation for scabbling remediation action Hourly Crew Cost: $102.02 per NUREG/CR-5884, Volume 2, Appendix C without escalation from 1993 labor costs Cleaning Rate: 2.79 m2/hr based on recent industry experience Hours: 719 (2,007 m2/2.79 m2/hr)

Mobilization Costs $7,339 [(2,007/2.79 m2/h) x 0.10 set up x

$102.02/crew hour]

Labor Cost: $73,389 Equipment Costs: $37,320 based on recent industry experience Grit/Consumables $17,984 based on recent industry experience Waste Generationo' 9.59 m3 = (2,007 m2 x 3.OE-03 m + 3.57 m3 for grit)

Waste Disposal Cost (CostwD): $23,975 ($2,500/m3)

Worker Accident Cost (CostAcc): $317 per Equation 4-3 Page 4-24

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values Transportation Accident Cost (CostTF): $158 per Equation 4-4 Worker Dose Cost (CostwLose): $1,233 at NUREG/CR-5 884, Volume 2, Appendix C, dose rate of 0.003 rem/crew-hour for scabbling using Equation 4-5 Total Costs (CostT): $161,715 2 $80.58 Cost (CostT) per mn A.7 Soil Excavation Remediation Action 3 ( 52,972 fW) based on top 15 cm of Volume Evaluated For Unit Cost Determination: 1,500 mn soil removed from a 10,000 m2 area Crew Composition 2 Laborers, 2 Craft, 0.25 HP Technician and 0.25 Crew Leader based on recent industry experience Hourly Crew Cost: $175.06 per NUREG/CR-5884, Volume 2, Table B. 1 labor costs without escalation from 1993 labor costs Cleaning Rate: 3.06 m3/h based on recent industry experience 980 [(1,500 m 3/3.06 m3/h)(2.0 contingency Hours:

multiplier for restaging and articulation)]

Mobilization Costs $700 based on recent industry experience Labor Cost: $171,627 Equipment Costs: $71,228 (consumables $9,291)

Waste Generation: 1,500 m3 based on volume of soil removed Waste Disposal Cost (CostwD): $3,750,00 ($2,500/m3)

Worker Accident Cost (CoStAcc): $556 per Equation 4-3 Transportation Accident Cost (CostrF): $24,745 per Equation 4-4 Worker Dose Cost (CostWoje): $871 at NUREG/CR-5884, Volume 2, Appendix C, dose rate of 0.002 rem/crew-hour for pressure washing using Equation 4-5 Total Costs (Costr): $4,019,727 Page 4-25

Rancho Seco License Termination Plan Revision 0 Chapter 4, Site Remediation Plan April 2006 Appendix 4-A, Unit Cost Values Cost (CostT) per m3 : $2,679.82 K)

Page 4-26

Rancho Seco License Termination Plan Revision 0 Chanter 5. Final Status Survev Plan Anril 2006 TABLE OF CONTENTS 5.0 FINAL STATUS SURVEY PLAN ............................. ................................................... 5-1 5.1 Introduction ................................................................................................................................... 5-1 5.1.1 Purpose .......................................................................................................................................... 5-1 5.1.2 Scope ............................................................................ 5-1 5.1.3 Final Status Survey Preparation and Implementation Overview ........... .................................... 5-1 5.1.4 Regulatory Requirements and Industry Guidance .................................. ....................................... 5-4 5.2 Development of Survey Plan ....................................................................................................... 5-5 5.2.1 Radiological Status................................................................ ................................................. 5-5 5.2.2 Classification of Areas .............................. ........... .............................................................. 5-9 5..-...

5.2.3 Establishing Survey Units ........................................................................................................... 5-19 5.2.4 Access Control Measures .......... ..................................-... ...5,20 5.3 Survey Design and Data Qualiti Objectives .......... ........... ............. ... 5-21 1.............

5.3.1 Data Quality Objectives (DQOs).... ........................................... .............. ....................... 5-21 5.3.2 Scan Survey Coverage ............................................................................................................. 5-22 5.3.3 Sample Size Determination....................................................................................................... 5-22 5.3.4 Background Reference Area........... ...... ... ...................... 5-24 5.3.5 Reference Grid and Sample Location .................................... 5-25 5.3.6 Investigation Levels and Elevated Areas Test ............................................................................ 5-26 5.4 Survey M ethods and Instrumentation ........................................................................................ 5-31 5.4.1 Survey Measurement Methods....... .................................. 5-31 5.4.2 Specific Survey Area Considerations ........ ................................................ I ..... ....... 5-33 5.4.3 Instrumentation ............................................................................................................................. 5-35 5.5 Data Collection and Processing ............................................................................................... 5-46 5.5.1 Sample Handling and Record Keeping ....................................................................................... 5-46 5.5.2 Data Management ............................................... I. ... ....... ..................................................... 5-46 5.5.3 Data Verification and Validation .............. ................................... ....................................... 5-47 5.5.4 Graphical Data Review ..................... ......................................................................................... 5-47 5.6 Data Assessment and Compliance .............................................................................................. 5-48 5.6.1 Data Assessment Including Statistical Analysis ..................................................................... .. 5-48 5.6.2 Unity Rule...................................................................  ;..................................................5.-..........5-50 5.6.3 Data Conclusions ..................................................................................................................... 5-...5,52 5.6.4 Compliance ........................................................................................................................... 5-52 5.7 Reporting Format .......................... I ....... ....................... ................................ ....... ............ 5-53.

5.7.1 Operating History ............. ,................ ..................................................................................... 5-53 5.7.2 Survey Unit Release Record ...................................................................................................... 5-53 5.7.3 Final Status Survey Report ......................................................................................................... 5-53 5.7.14 'Other Reports....................................................... ..... ............................................  !...........5-54 5.8 Final Status Survey Quality Program ........................................................... ............................... 5-54 5.8.1 Rancho Seco Quality Assurance Program ......................................... 5-54 5.8.2. FSS Quality Assurance Project Plan (QAPP) ............................................................................ 5-54 5.8.3 Assessment and Oversight .................................................. 5-59 5.8.4 Data Validation and Verification ................................................................................................. 5-59 Page 5-i

Rancho Seco License Termination Plan Revision 0 Chapter '5, Final Status Survey Plan . . . .April 2006 5.8.5 Confirmatory Measurements ......................... .............. ............ .......................................... 5-59 5.9 R eferences ................................................................................................................................... 5-62 5.9.1 : Applicable Site Procedures For FSS ......................... ............ 5-62 TABLES 5-1, 'Single Nuclide DCGLw Valuesfor Detectable Radionuclides in Soil ........................ ................. 5-6 5-2 Calculated Structural Surface, Single Nuclide DCFs and DCGLws ................... 5-7 5-3 Area Designations .............. ........... . .......................... ................................................. 5-11 5-4A Survey Unit Classifications - General Open Land Areas ...................... ... 5-12 5-4B .Sur*ve niut.Classifications - Site Surface Soils .............................. 5-13 54C Survey Unit Classification - Paved Surfaces and Foundation Pads ............................................ 5-14 5-4D Survey Area Characterization-Structures ................

.................................. 5-16 5-4E Survey Area Characterization - Remaining Buried and Embedded Pipe ..................................... 5-18 5-5 Suggested Survey Unit Areas............. ........ ......

  • ........................................... 5-19 5-6 Scan Measurements ....... ......................................... 5-22 5-7 Investigation Levels ................................................. .. ............................................................. 5-27 5-8 Calculated Surface Soil Area Factors .............................................................................. 5-28 5-9 Calculated Structural Surface Area Factor Values .................................................................... 5-29 5-10 Investigation Actions for Individual Survey Unit Measurements..................... 5-30 5-11 Typical FSS Survey Instrumentation ..................................... 5-36 5-12 Typical FSS Detection Sensitivities .................... *....... *.................... . ........................ ............... 5-38 5-13 Interpretation of Sample Measurements When the WRS Test Is Used .................................. 5-.48 5-14 Interpretation of Sample Measurements When the Sign Test Is Used ..................................... 5-49 FIGURES 5-1 FSS Process Overview ................................................................................................................ 5-60 5-2 Area D esignations ........................................................................................................ I.............. 5-61 Page 5-ii

Rancho Seco License Termination Plan Revision 0 Chapter 54 Final Status Survey Plan April 2006 5.0 FINAL STATUS SURVEY PLAN 5.1 Introduction The Rancho Seco Nuclear Generating Station (Rancho Seco) Final Status Survey (FSS) Plan has been prepared using the applicable regulatoiy and industry guidance., This plan will be used to develop site procedures and work instructions to perform the FSS of the Rancho Seco site.

5.1.1 Purpose The FSS Plan describes the final survey process used to demonstrate that the Rancho Seco facility and site comply with radiological criteria for unrestricted use specified in 10 CFR 20.1402, i.e., annual dose limit of 25 millirem plus ALARA for all dose pathways. Nuclear Regulatory Commission (NRC) regulations applicable to radiation surveys are found in 10 CFR 50.82(aX9Xii)(D) and 10 CFR 20.1501(a) and (b).

5.1.2 Scope The Sacramento Municipal Utility District (District) intends to release site land from the 10 CFR Part 50 license using a phased approach. Phase I includes the majority of the site land and remaining structures (approximately 2,468 of the total 2,480 acres)'scheduled for release after all demolition, remediation and FSS activities associated with plant operation are complete. Phase II of site release. includes the approximately two acre Interim On-Site Storage Building (IOSB) following class B and C packaged radioactive waste removal, any required facility remediation and FSS, Once both these phases are complete the Rancho Seco site license under 10 CFR Part 50will be terminated. An approximate 10 acre IndependentSpent Fuel Storage Installation (ISFSI) located on the site is licensed under 10 CFR Part 72 and is not subject to the conditions of this License Termination Plan (LTP).

This FSS Plan addresses requirements applicable to Phase I of site release and may also be used during Phase II to release the IOSB following class B and C packaged radioactive waste removal. This Plan addresses only facilities and land areas that are identified as contaminated or potentially contaminated (impacted) resulting from activities associated with commercial nuclear plant operation.

5.1.3 ,: Final Status Survey Preparation and Implementation Overview procedures The FSS Plan contained in this chapter will be used as the basis for developng FSS and applying existing procedures to the FSS process. Section 5.1.4 contains a list of regulatory documents used as guidance in preparing the FSS Plan. Figure 5-1 provides an overview of the FSS process. Quality Assurance requirements are outlined in Section 5.8 and apply to activities associated with decommissioning and FSS.

An FSS Package will be produced for each survey area; this survey package is a collection of

.documentation detailing survey design, survey implementation and data evaluation for a final status survey of an area. The sections below describe specific elements of the FSS organization, preparation and implementation. All processes associated with final status surveys will be conducted in accordance with approved site procedures.

Page 5-1

Rancho Seco License Termination Plan Revision 0 .

Chapter 5, Final Status Survey Plan April 2006',

5.1.3.1 FSS Organization The general FSS organization will consist of supervision, technical specialists, work planning coordinators, field coordinators, data analysts, and technicians. Since the FSS organization has not been fully implemented at the time of LTP development, it is expected that specific job titles may vary over the period of project execution. These titles are used within this document to describe various functional areas of responsibility and do not necessarily refer to specific job titles. Refer to Section 5.8.2.1 and RSAP-1901 which outline the responsibilities and functions of the FSS organization.

5.1.3.2 Sur Preparation' '

Survey preparation is the first step in'the final status survey process and occurs after any necessary remediation is completed. In'areas where remediation is required, a remediation survey or equivalent evaluation will be performed to confirm that remediation was successful prior to initiating FSS activities. Remediation surveys, turnover surveys, or equivalent evaluation, for areas not requiring remediation, may be performed using the same process and controls as a FSS so that data from these surveys may be used as part of the FSS data. In order for survey data to be used for FSS, it is intended that it should have been designed and collected in compliance with approved procedures and Sections 5.3 through 5.5 and the area controlled in accordance with approved procedures and Section 5.2.4 (Any surveys performed prior to the approval of the LTP are understood to have been performed "at risk"., Survey design and the data collected would be carefully evaluated to ensure the intent of the LTP and associated procedures were met before using the'data). Following turnover/remediation surveys or post-remediation evaluation, the FSS is performed. Areas to be surveyed are isolated and/or controlled to ensure that radioactive material is not reintroduced into the area from ongoing activities nearby and to maintain the "as left" condition of the area. Section 5.2 addresses specific survey preparation requirements and considerations.

Tools, equipment, and materials not needed to support survey activities are removed, unless authorized by the Dismantlement Superintendent (Radiological). Routine access, material storage, and worker transit through the area are not allowed, unless authorized by the FSS Supervisor. However, survey areas may, with proper approval, be used for staging of materials and equipment providing; 1) the staging does not interfere with performance of surveys, and 2) the material or equipment is free of surface contamination or radioactive materials, and 3) the safety of survey personnel is notjeopardized. An inspection of the area is conducted by FSS personnel to ensure that work is complete and the area is ready for final status survey.

Approved procedures provide isolation and control measures until the area is released for unrestricted use.

5.1.3.3 Survey Design The survey design process establishes the methods and performance criteria used to conduct the survey. Survey design assumptions are documented in "Survey Packages" in accordance with approved procedures. The site land, structures, and systems (embedded and buried piping/conduit are the principal potentially contaminated systems that will remain after decommissioning) are organized into survey areas and classified by contamination potential as Class 1, Class 2, Class 3, or non-impacted in accordance with Section 5.2.2.

Survey unit size is based on the assumptions in the dose assessment models in accordance with the guidance provided in NUREG-1757, Volume 2, "Consolidated NMSS Decommissioning Page 5-2

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Guidance - Characterization, Survey, and Determination of Radiological Criteria, Final Report,"

[Reference 5-1]. The percent coverage for scan surveys is determined in accordancewith Section 5.3.2. The number and location of structure surface measurements (and structure volumetric samples) and soil samples are established in accordance with Sections 5.3.3 and 5.3.5. Investigation levels are also established in accordance with Section 5.3.6.

A survey map is prepared for each survey unit and a reference grid is superimposed on the map to allow use of an (x, y) coordinate system. Random numbers between 0 and 1 are generated, which are then multiplied by the maximum x and y axis values of the sample grid. This provides coordinates for each random sample location, or a random start location for systematic grid, as appropriate. The measurement/sample locations are plotted on the map.

Each measurement/sample location is assigned a uniqueidentification code, which identifies the measurement/sample by survey-unit, and sequential nnumber. The appropriate instruments and detectors, instrument operating modes and survey methods to be used to collect and analyze data are also specified.

Replicate measurements are performed as part of the quality process established to identify, assess, and control errors and uncertainty associated with sampling, survey, or analytical activities. This quality control process, described in Section 5.8.2 (FSS QAPP), provides assurance that the survey data meets the accuracy and reliability requirements necessary to support the decision to release or not release a survey unit.

Written survey instructions that incorporate the requirements set forth in the survey design are completed. Direction is provided, as applicable to survey design, for selection of instruments, count times, instrument modes, survey methods, required documentation, alarm/investigation setpoints, alarm actions, background requirements and other appropriate instructions. In conjunction with the survey instructions, survey data forms may be prepared to assist in survey documentation. Alternatively, electronic data recording sygtems may be utilized. The survey design is reviewed and quality verification steps applied to ensure that appropriate instruments, survey methods and sample locations have been properly identified.

5.1.3.4 Survey Data Collection After preparation of a survey package, the FSS data are collected. Trained and qualified personnel will perform the necessary measurements using calibrated instruments in accordance with approvedprocedures and instructions contained in the survey package. Section 5.5 addresses FSS data collection requirements.

Survey areas and/or locations are identified by gridding, markings, or flags as appropriate. A FSS Field Coordinator performs a pre-survey briefing with the survey technicians during which the survey instructions are reviewed and additional survey unit considerations are discussed

-(e.g., safety). ýThe technicians gather instruments and equipment as indicated and perform surveys in accordance with the appropriate procedures and survey package specifications.

- Technicians are responsible for documenting survey results and maintaining custody of samples and instrumentation.- At the completion of surveys, technicians return instruments and prepare samples for analysis. Survey instruments provided to the technicians are prepared in accordance with approved site procedures and the survey instructions. Instrument calibration and performance checks are performed in accordance with applicable procedures. Data are reviewed to flag any measurements that exceed investigation criteria so that appropriate investigation surveys and remediation can be performed as necessary. .

Page 5-3

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Following completion of a FSS, if a survey unit has been designated to receive a Quality Control (QC) survey (replicate surveys, sample recounts, etc.), a QC survey package is developed'and implemented. QC measurement results are compared to the original measurement results. If QC results do not reach the same conclusion as the original survey, an investigation is performed. Section 5.8 provides additional detail regarding QC survey requirements.

5.1.3.5 Data-Assessment Survey data assessment is performed to verify that the data are sufficient to demonstrate that the survey unit meets the unrestricted use criterion. Statistical analyses are performed on the data and compared to pre-determined investigation levels (see Section 5.3.6). Depending on the results of the data assessment andany required investigation, the survey unit may either be released or require further remediation, reclassification, and/or resurvey. Assumptions and requirements in the survey package are reviewed for applicability and completeness; additional data needs are identified during this review. Specific data assessment requirements are contained in Section 5.6.

A review is performed of survey data and sample counting reports to verify completeness, legibility and compliance with survey design and associated instructions. As directed by FSS supervision, the following types of activities may be performed:

  • Convert data to reporting units,
  • Calculate mean, median and range of the data set, Review the data for outliers,
  • Calculate the standard deviation of the data set,
  • Calculate minimum detectable concentration (MDC) for each survey type performed, and
  • Create posting, frequency or quantile plots for visual interpretation of data.

Computer programs may be utilized for these activities. FSS personnel include data quality verifications in their evaluations of statistical calculations; integrity and usefulness of the data set and the need for further data or investigation are also included in the evaluations. The results of the data evaluation are documented and filed in the survey package.

5.1.3.6 Final Status Survey Package Completion Survey results are documented by survey unit in corresponding survey packages. Each FSS Package may contain the data from the several survey units that are contained in a given survey area. The data are reviewed, analyzed, and processed and the results documented in the FSS ,

Package. This documentation file provides a record of the information necessary to support the decision to release the survey units for unrestricted use. An FSS Report will be prepared to provide the necessary data and analyses from survey packages for submittal to the NRC.

Section 5.7 addresses reporting of survey results and conclusions.

5.1.4 Regulatory Requirements and Industry Guidance This FSS Plan has been developed using the guidance contained in the following documents:

Page 5-4

Revision 0 Rancho Seco License Termination Plan April 2006 Chapter 5, Final Status Survey Plan

  • NUREG-15.75, "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)," [Reference 5-2],

NUREG-1 505, "A Nonparametric Statistical Methodology for the Design and Analysis of Final Status Decommissioning Surveys," [Reference 5-3],

  • NUREG-1507, "Minimum Detectable Concentrations With Typical Radiation Survey Instruments for Various Contaminants and Field Conditions," [Reference 5-4],.

a NUREG-1700, "Standard Review Plan for Evaluating Nuclear Power Reactor License Termination Plans," [Reference 5-5],'

e NUREG-1757, Vol. 2, "Consolidated NMSS Decommissioning Guidance -

Characterization, Survey, and Determination of Radiological Criteria, Final Report,"

and

  • Regulatory Guide 1.179, "Standard Format and Content of License Termination Plans for NuclearPower Reactors," (January 1999) [Reference 5-6].

Other documents used in the preparation of this plan are listed in the References section (see Section 5.9).

The District anticipates the NRC may choose to conduct confirmatory measurements during Rancho Seco FSS activities. The NRC may take confirmatory measurements to make a determination in accordance with 10 CFR 50.82(a)(I 1) that the FSS and associated documentation demonstrate that the site is suitable for release in accordance with the criteria established in 10 CFR Part 20; subpart E.

5.2 Development of Survev Plan 5.2.1 Radiological Status The following sections provide a summary of site characterization and dose modeling results applicable to development of the Rancho Seco FSS Plan.

5.2.1.1 Identification of Radiological Contaminants A site-specific suite of radionuclides potentially present at Rancho Seco has been developed.

This suite contains 26 radionuclides that are potentially present in Rancho Seco environs, structures and systems/components. Development of this site-specific suite of radionuclides is described in detail in the LTP Chapter 6, Compliance with the Radiological Criteria for License Termination, Section 6.4.

The District has conducted extensive radiological characterization of the site property to identify and document residual contamination resulting from nuclear plant operation. The effort included reviews of historical information as well as physical measurements of onsite soils, structures, systems and groundwater during scoping and characterization surveys, The LTP Chapter 2, Site Characterization, contains a detailed discussion of this effort.

5.2.1.2 Dose Modeling Summary Dose models were based on NUREG/CR-55-12, Volume 1, "Residual Radioactive Contamination from Decommissioning," [Reference 5-7] and RESRAD Version 6.22 and Page 5-5

Rancho Seco License Termination Plan Revision 0, Chapter 5, Final Status Survey Plan April 2006 RESRAD-BUILD Version 3.22 (RESRAD Version 6.3 and RESRAD-BUILD Version 3.3 for calculation revisions) were used to calculate single nuclide Derived Concentration Guideline Levels (DCGLs) for the Rancho Seco site. These dose models translate residual radioactivity levels into potential radiation doses to the public and are defined by three factors: (I) exposure scenario, (2) exposure pathways, and (3) exposed critical group. The scenarios presented in NUREG/CR-5512 address the major exposure pathways of direct exposure to penetrating radiation and inhalation and ingestion of radioactive materials'. These scenarios also identify the critical group. The "critical group" is the group of individuals reasonably expected to receive the greatest exposure to residual radioactivity within the assumptions of the particular land and structure use scenario.

As discussed in LTP Chapter 6, Section 6.5, the District has no plans to release any of the District-owned and District-controlled 2,480 acre site for ownership by members of the public.

The site continues to be an important electrical generation and distribution center for the District. Therefore, an industrial worker scenario was selected for developing site-specific soil DCGLs and an industrial worker building occupancy scenario was selected for developing site-specific structural surface DCGLs. Table 5-1 provides a list of significant radionuclides that may be present iii onsite soils and their corresponding single nuclide DCGL values derived in LTP Chapter 6. Table 5-2 provides a list of significant radionuclides that may be present on structural surfaces and their corresponaing single nuclide DCGL values as derived in Chapter 6.

Table 5-1 Single Nuclide DCGLw Values for Detectable Radionuclides in Soil Peak of the Mean Dose' DCGLw (mremly per pCi/g) (pCi/g)

C-14 2.93E-06 8.33E+06 (~~)

Co-60 1.93E+00 1.26E+01 Ni-63 1.60E-06 1.52E+07 Sr-90 3.76E-03 6.49E+03 Cs-134 1.09E+00 2.24E+01 Cs-137 4.62E-01 5.28E+01 Page 5-6

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Table 5-2 Calculated Structural Surface Single Nuclide DCFs and DCGLws Dose Conversion Factor 2 DCGLw Radionuclide (mrem/yr per dpm/100 cm ) (dpm/100 cm 2)

H-3 7.94E-08 3.15E+08 C-14 2.92E-06 8.56E+06 Na-22 1.47E-03 1.70E+04 Fe-55 7.3 IE-07 3.42E+07 Ni-59 3.13E-07 7.99E+07 Co-60 1.64E-03 1.52E+04 Ni-63 8.20E-07 3.05E+07 Sr-90 2.07E-04 1.21E+05 Nb-94', 1.09E-03 2.29E+04 Tc-99 2.13E-06 1.17E+07 Ag-108m 1.13E-03 2.21E+04 Sb-125 3.13E-04 7.99E+04 Cs-134 1.14E-03 2.19E+04 Cs-137 4.50E-04 5.56E+04 Pm-147 1.50E-06 1.67E+07 Eu-152 7.86E-04 3.18E+04 Eu-154 8.43E-04 2.97E+04 Eu-155 4.78E-05 5.23E+05 Np-237 1.05E-02 2.38E+03 Pu-238. 7.30E-03 3.42E+03 Pu-239 8.19E-03 3.05E+03 Pu-240 - 8.19E-03 3.05E+03 Pu-241 1.37E-04 1.82E+05 Am-241 8.37E-03 2.99E+03 Pu-242 7.8 1E-03 3.20E+03 Cm-244 4.15E-03 6.02E+03 Other specialized DCGL values have also been developed in LTP Chapter 6. These include DCGL yalues for bulk material, containment building interior surfaces, buried piping and embedded piping. .Their use is described in subsequent sections of this LT? Chapter.

5.2.1.3 Surrogate Ratio DCGLs..

As a general rule, surrogate ratio DCGLs are developed and applied to land areas and materials with volumetric residual radioactivity where fairly constant radionuclide concentration ratios

'can be demonstrated toexist. They are derived'using pre-remediation site characterization data collected prior to the FSS. The established ratio among the radionuclide c6ncentrations allows the concentration of every radionuclide to be expressed in terms of any one of them.

Likewise, a surrogate ratio DCGL allows the DCGLs specific to hard-to-detect radionuclides in a mixture to be expressed in terms of a single radionuclide that is more readily measured. The Page 5-7

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April2006 measured radionuclide is called the surrogate radionuclide. Cs-137 is expected to be the surrogate radionuclide.

A sufficient number of measurements, representative of the area of interest, are taken to establish a consistent ratio of radionuclide concentrations. The number of measurements needed to determine the ratio is based on the chemical, physical and radiological characteristics of the radionuclides and the site. Measurements from different media types will not be mixed to derive the ratio. The surrogate ratio is acceptable if the mean values for individual samples for a given media are within two standard deviations of the overall mean value for the media.

Once an appropriate surrogate ratio is determined, the DCGL of the measured radionuclide is modified to account for the represented radionuclide according to the following Equation 5-1 (MARSSIM Equation 4-1):

XGLsR =DCGLSur X' DCGLe p, 1(Cap/,

ICs.urXDCGLsur)I+ DCGLRep Equation 5-1 where:

DCGLsR = modified DCGL for surrogate ratio, DCGLsu,. = DCGL for surrogate radionuclide, DCGLRpP = DCGL for represented radionuclide, CRp =Concentration of represented radionuclide, and Cs, = Concentration of surrogate radionuclide.

When a surrogate ratio is established using data collected prior to remediation, post-remediation or FSS measurements will be'reviewed to ensure that the established ratios are still appropriate.

The surrogate ratio DCGL will be evaluated using the Rancho Seco DQOs and modified, if necessary. Professional judgment is used to determine consistency.

5.2.1.4 Gross Activity DCGLs As a rule, gross activity DCGLs are developed and applied to structures and plant systems with surface residual radioactivity where multiple radionuclides are present at concentrations that exceed 10 percent of their respective DCGLs. The gross activity DCGL is determined in a manner similar to surrogate DCGLs taking into account nuclide detectability to enable field measurement of gross activity, rather than the determination of individual radionuclide activity, for comparison to the radionuclide specific DCGL. The gross activity DCGL, or DCGLGA, for surfaces with multiple radionuclides is calculated using the following Equation 5-2 (MARSSJM, Equation 4-4):

Page 5-8

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 DCGLGA-A A__ __

DCGL 1 DCGL2 DCGL, Equation 5-2 where:

f= fraction of the total activity contributed by radionuclide n, and DCGL, DCGL for radionuclide n.

Different radionuclides or radionuclide combinations may exist on different portions of the site and require the calculation of one or more site-specific gross activity DCGLs. Gross activity DCGLs are calculated using the relative nuclide fractions determined from samples of building surface or plant system material, as appropriate, prior to remediation. For areas where the radionuclide distribution has not been determined, the most conservative distribution resulting in the lowest DCGL of those specified areas will be used. The distributions are based on the radionuclides identified in composite samples collected from the specific areas prior to FSS. If new radionuclide distribution data are obtained and determined to be more appropriate for use, the DCGL may be re-evaluated and altered during the course of the FSS, however the single nuclide DCGLs will not be revised without NRC approval.

5.2.2 Classification of Areas Prior to beginning the final status survey, a thorough characterization of the radiological status

'and history of the site was performed. Additional data may be collected and evaluated throughout the decommissioning. The methods and results from site characterization are described in Chapter 2 of this LTP. Based on the characterization results, the structures and open land areas were classified following the guidance in Appendix A of NUREG-1757, Volume 2 and Section 4.4 of NUREG 1575. Area classification ensures that the number of measurements, and the scan coverage, are commensurate with the potential for residual contamination to exceed the unrestricted use criteria.

Initial classification of site areas is based on historical information and site scoping and characterization data. Data from operational surveys performed in support of decommissioning,

-routinesurveillance or any other applicable survey data may be used to change the initial Sclassification of an area 'uptothe time of commencement of the final status survey as long as the classification ieflects the levels of residual radioactivity that existed prior to remediation.

Once the FSS of a given survey unit begins, the basis for any:reclassification will be documented, requiring a redesign of the survey unit package and the initiation of a new survey using the redesigned'survey unit package. If during the conduct of a FSS, sufficient evidence is accumulated to warrant an investigation and reclassification of the survey unit, the FSS may be terminated without completing the survey unit package.

5.2.2.1 Non-Impacted Areas Non-impacted areas have no reasonable potential for residual contamination because there was nodemonstrable impact from site operations. These areas are not required to be surveyed Sbeyond what has already been completed as a part of the HSA as described in the LTP Chapter 2, Section 2.2, or scoping or site characterization surveys performed to confirm the area's non-impacted classification. Rancho Seco will continue to implement a Radiological Environmental Page 5-9

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Monitoring Program (REMP) through decommissioning and license termination. The REMP program is focused upon the collection of radiological data from offsite, non-impacted areas.

Impacted areas are shown on Figure 2-2, Impacted Areas, in Chapter 2 of this LTP. The remaining areas of the 2,480 acre site listed in Table 5-3 are Non-Impacted.

5.2.2.2 Impacted Areas Impacted areas may contain residual radioactivity from licensed activities. Based on the levels of residual radioactivity present, impacted areas are further divided into Class 1, Class 2 or Class 3 designations. The definitions provided below are from NUREG-1757, Volume 2, Page A2.

    • . Class 1 Areas: Class 1 areas are impacted areas that are expected to have concentrations of residual radioactivity that exceed the DCGLw (DCGLw is defined in the Glossary of this LTP)1,
  • Class 2 Areas: Class 2 areas are impacted areas that are not likely to have concentrations of residual radioactivity that exceed the DCGLw, and
  • Class 3 Areas: Class 3 areas are impacted areas that have a low probability of containing residual radioactivity.

If the available information is not sufficient to designate an area as a particular class, the area will either be classified as Class 1 or be further characterized. Areas that are considered to be on the borderline between classes will receive the more restrictive classification.

.5.2.2.3 Initial Classification of Structural Surfaces, Land, Embedded Piping, and Buried Piping Based on more than 24,000 measurements made during the site characterization and the information evaluated as part of the HSA, all land areas, structural surfaces, and piping to remain after decommissioning were assigned an initial classification.

Characterization was performed and reported by initial survey unit designation. The area designations developed for the characterization process were used, for the most part, to delineate and classify areas for final status survey. This allows characterization data to be efficiently used for final survey area classification and for estimating the sigma value for sample size determination. For operational efficiency, each of the final survey areas listed in Table 5-3 may be subdivided into multiple areas. Smaller survey areas may be necessary to enhance the efficiency of data collection, processing, and review and serve to better support the decommissioning schedule. The classification of all subdivided survey areas will be the same as indicated in Tables 5-4A, 5-4B, 5,4C, 54D and 5-4E,unless reclassified in accordance with this LTP. No individual survey unit will have more than one classification.

The win DCGLw refers to the Wilcoxon Rank Sum test per MARSSIM (NURBG-1575, page 2-3) and generally represents the uniform level of residual contamination that results in the dose limit, regardless of the statistical test used. Rancho Seco intendsito use the Sign Test and will still use the term DCGLw to denote contamination limits, r see Section 5.6.1.3.

Page 5-10

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Table 5-3 Area Designations Area 1 (100000) Non-Impacted*

Area 2 (200000) Non-Impacted Area 3 (300000) Non-Impacted Area 4 (400000) Non-Impacted Area 5 (500000) Non-Impacted*

Area 6 (600000) Non-Impacted Area 7 (700000) Non-Impacted Area 8 (800000) " Impacted Area 9 (900000) Non-Impacted

  • Areas I and 5 contain impacted survey units within them Page 5-11

Rancho Seco License Termination Plan Revision 0 Chapter 5., Final Status Survey Plan April 2006 Table 5-4A Survey Unit Classification - General Open Land Areas urvey Survey Area Sigma Classification Mean Maximum Approx. Survey Unit ID # pCi/g, Cs-137 Cs-1371 pCi/g Cs-137, pCi/g Area Size, in2 100000 Plant Effluent Water Course 14.7 Class 2 9.22 42.2 42,315 100001,2 Area Around Effluent Path 0.14 Non-Impacted 0.349 0.483 N/A 200000 South Plant Outfall 0.15 Class 3 0.129 0.301 159,328 300000 South Non-Impacted Area 0.19 Non-Impacted 0.323 0.653 N/A 400000 South East Non-Impacted Area 0.17 Non-Impacted 0.344 . 0.465 N/A 500000 North East Non-Impacted Area 0.16 Non-Impacted 0.145 0.255 N/A (excluding parking lot and warehouse) _ _____ _

600000 North Non-Impacted Area 0.10 Non-Impacted 0.164 0.293 N/A 700000 West Non-Impacted Area 0.12 Non-Impacted 0.202 0.332 N/A I (excluding ISFSI) _ _,_........._ _ _

N/A- Not applicable Page 5-12 C C C

Cancho Seco License Termination Plan r Re(,n 0 Anril 2006 Chapter 5, Final Status Survey Plan Table 5-4B Survey Unit Classification - Site Surface Soils Survey Sigma SSurveyArea Classification Mean Maximum Approx. Survey

-Unit ED # Sur e Area pCi/g, Cs-137 Classiicatio pCi/g, Cs-137 pCi/g, Cs-137 Area Size, m2 800100 Industrial Area Soils (4 quadrants) 0.042 Class 3, 0.062 0.179 141,567

... Includes the following units as identified in the HSA: '.___ "

800001 Folsom Canal Intake 0.012 Class 3 0.073 0.091 4,645 800002 Helicopter Landing Pad 0.027 Class 3 0.065 0.127 -4,506 800003.. South Scrap Yard 0.103 Class 3 0.121 0.121 1,710 800004 Central N-S Transit/South 0.010 Class 3 0.028 0.048 200 800005 South E-W Transit Zone 0.042 Class 3 0.088 0.154 3,820 800006 Storm Drain Buffer Zone . 0.047 Class 3 0.085 0.179 15,794 800007 West Industrial Area 0.034 Class 3 0.077 0.144 65,776 800008, South Support Structures Yard 0.041 Class 3 0.083 0.083 7,250 800009, South East Industrial Area 0.019 Class 3 0.080 0.099 10,765 800012 Industrial Area Waste Storage Buffer 0.010 'Class 3 0.056 0.071 6,215 800013 Central Industrial Area 0.030 Class 3 0.070 0.149 14,676 800014 North Industrial Area Boundary 0.007 Class 3 0.060 0.068 6,410

....... __ " .* " Following to be managed on unit'specific basis -_____

501004 Extended Parking/Storage Area 0.058 Class 3 0.088 0.232 42,735 803002 Quonset-Hut Yard 0.030 Class 3 0.077 0.146 13,075 806000

  • East/West, Spray Ponds 0.'026 Class 3 :0.069 0.167 21,600 810001 Tank Farm 10.7 Class 1 379.0 1040.0 5,000 826015 Spent Fuel/Diesel Gen room Gap 0.006 Class 2 0.041 0.047 25 834002 -Rail Line, 0.018 Class 3 0.073 0.114 6,410 837000 RHUT Area 9.83 Class 1 4.10 31.1 929 839000 Transformer Yard 0.432 Class 3, 0.266 ' 0.913 " 1,858 843002 Barrel Farm Buffer 1.460 Class 2 0..750 4.250 929 843003 Barrel Farm Berms .. N/A N/A N/A N/A 3,486 848000 Retention Basins Buffer 0.047 Class 3 0.086 -0.200 17,615 851000 Switchgear Yard 0.008 Class 3 0.056 0.072 32,970 Page 5-13

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan ADril 2006 Table 5-4C Survey Unit Classification ' Paved Surfaces and Foundation Pads, Su-vey Pavement/Pad Mean Direct Maximum Approx. Survey Unitr Survey Area Sigma Pavement/Pad Pavement/Pad Area Size, m 2 Sdpm/0 cm 2 Classification* dpm/I0) cm 2 dpm/100 cm2 800200 Industrial.Area Pavement 513 Class 3 2,630 5,262 73,231 (Includes the following units as identified in the HSA): _____"__..

800001,2 Helicopter Pad Area 207 Class 3 2,713- 3,158 7,573 800003 South Scrap Yard 255 Class 3 3,172 3,518 6,650 S800004 Central N-S Transit/South 102 Class 3 1,613 1,719 5,350 800005 South E-W Transit/East .243, Class 3' 841, 1,344 5,470 800007 West Industrial Area 496 Class 3 2,977 5,262 5,759 800008 South Support Structures Yard 478 Class 3 2,397 3,517 18,820-

.... _____ Incorporated in 800008 818001 Electrical Fab Shop Pad 152. Class 3 1,392 1,647 233 820001 L&D Building Pad 163 Class 3 2,593 2,979 103 827001 Tool Room Pad 136 Class 3 1,245 1,593 605 828001 GRS Warehouse Pad 141 Class 3 1,337 1,892 446

.838001 Fab Shop Pad 169 Class 3 1,413 1,772 1,025 842000 Warehouse C Pad 235 Class 3 2,207 2,468 *235 800009 South East Industrial Area 440 Class 3 2,424 3,425 3,635 800010 IA Central Yard- 745 Class 3 2,261 3,397 6,725 Incorporated in 800010 _ " .....

839000 Transformer Pads 944 Class 3 1,086 3,930 100 800012 IA Waste Storage Buffer N/A N/A N/A N/A 4,935 800013 Central IA Area 496 Class 3 2,593 4,403 6,689 800014 North IA Boundary 147 Class 3 2,696 3,055 1,625 Following to be managed on unit specific basis _____"_.. .. _

501003 . Upper/Outer Yard 212 Class 3 2,419 2,805 2,375 501004 Extended Parking/Laydown 255 Class 3 2,522 3,251. 28I150 501005 Access Road 200 Class 3 2,000 2,240 7,250 800011 IA Central E-W Corridor 1,256 Class 2 3,664 7,175 8,065 ae5-14 C C

Cancho Seco License Termination Plan Chanter 5. Final Statns Siirvtv Pltrn C Ref, n 0 A-*pril ZUUO Table 5-4C Survey Unit Classification - Paved Surfaces and Foundation Pads Survey Pavement/Pad Mean Direct Maximum Approx. Survey

'Unitr Survey Area Sigma PavementlPad Pavement/Pad Area Size, m2

, _________________.....___-_- dpm/100 cm2 dpm/100 cm2 dpm/100 cm2 Incorporated in 800011 ,. _

853001 NPS Fab Shop Pad 829 Class 3 395 2,093 929 803001 ,Q.HutPad 234 Class 3 3,446 3,821 150 803002;"* Q-Hut Yard :N/A N/A N/A N/A 2,250 806000 Area Around Spray Ponds 207 Class 3 2,680 3,251 18,820 808003 Cooling Tower Basin Buffer 3,896 Class 2 2,894 14,025 37,996 809001 Sewer Plant 158 Class 3 1,892, 2,169 227 819000 Bulk Waste Bid -7,356 Class 2 2,497 69,870 " 475, 823000 Intake Pmp Structure 667 -Class 3 260 1,375 25-824000 PCW Intake, 397 Class 2 3,941 5,175 5 826025 N Laydown 250- 'Class 3 2,718, 3,207 175 834000 Rail Line 1470 Class 1 3,653 8,567** -100 836001 Aux Boiler Pad 1,109 -Class2 5,382 9,513 112 843002 Barrel Farm: 3,637- Class 1 9,393 14,574 1,170 848000 Retention Basins 1,294 Class 1,2,3 11,361 13,950 3,750 851000 Switchgear Yard 397 Class 3 2,751 3,696 225

  • Areas with more than one classification represent the range of classification throughout the area. Only a single class will apply to a survey unit.

C*contaminated asphalt at 43 pCi/g discovered.

N/A-.Not applicable Page 5-15

Rancho Seco License Termination Plan Revision 0 Anvil 7irni; Chanter 5. Final Status Survev Plan A ril 2Q06 Table 5-4D Survey Area Characterization-Structures Survey Interior _ Exterior turvey Mean Dir. Maximum Mean Dir. Maximum Approx.

Unit/ Survey Area Sigma Beta Dir. Beta Sigma Beta Dir. Beta Survey Area dpm/100 Class2 dpm/100 dpm/10~~0 dpm/

0 cm2 Class p/0 dpm/1O0 pmz0 Area Ae ID # em cm 2 m 100 2 cm, Size, m 2 501001 Receiving Warehouse 397 3 1,734 2,386 65 3 1,212 1,364 1,860

'501002 Hazmat Warehouse .533 3 1,913 2,642 147 3 1,468 1,826 1,420 804001 PAP Building 500 3 2,011 3,153 196 3 2,142 2,778 3,375 805001 Admin. Building 451. 3 1,903 2,734 712 3 2,017 4,387 3,750 808001 E/W Cool Twr Basin N/A N/A N/A N/A 685. 2 :4,952 6,289 189 811000 Reactor Bldg. -27' 2,593,910 1 1,535,383 8,134,000 N/A N/A N/A N/A '2,268 Reactor Bldg. Grade 238,479 1 201,670 370,000 N/A N/A N/A N/A 780 Reactor Bldg. +40' 67,358 1 51,521 99,150 N/A N/A N/A N/A 780 Reactor Bldg. +60' 22,086 1 20,110 46,660 N/A N/A N/A N/A 2,100 Reactor Bldg. Ext/Roof N/A N/A N/A N/A 119 93 1,364 1,571 8,483 812000 Spent Fuel Bldg pool 56,500,000 1 16,900,000 200,000,000 N/A N/A N/A N/A - 195 -

  • " Spent Fuel Bldg. +40' 4,631 2 5,942 19,358 N/A N/A N/A N/A 1,078 Spent Fuel Bid Exterior N/A N/A N/A N/A 747 2 1,935 4,996 -660

" Spent Fuel Bldg. roof N/A N/A N/A N/A 408 3 1,729 2,229 480 813000 Auxiliary Bldg. --47' 740,452 1 320,071 5,720,000 N/A N/A N/A N/A 1,639

__ Auxiliary Bldg. -29' 1,200,000 --1 544,756 11,370,277 N/A N/A N/A N/A 4,391 Auxiliary Bldg. -20' 920,181 1,2 247,831 10,080,000 N/A N/A N/A N/A 8,518 Auxiliary Bldg. Grade 1,046,734 1,2 373,758 5,800,000 N/A N/A N/A N/A 2,927 Auxiliary Bldg. +20' 309,414 1,2 85,408 1,900,000 N/A 'N/A N/A N/A 2,162 Auxiliary Bldg. +40' 3,627 1,2 3,288 .24,781 N/A N/A N/A N/A 1,572 Auxiliary Bldg. roof N/A - N/A .N/A N/A 136 3 1 2,250 1,955

.... Auxiliary Bid exterior N/A N/A N/A N/A 342' --3 1,897, 2,990  ;.950 814000 T&RBldg. 500 3 1,680 2,528 '435 ý3 1,865 2,995 11,400 815000 Nucl Svc Elect Bldg. 353. 3 1,636 2,131 261, ý3 1,913 2,669 4,650 816000 Cent Alarm Sta Bldg 364 3 2,066 3,327 234 3 2,327 2,789, 1,210 P 5-16 C Cý- C

(ancho Seco License Termination Plan ( ReC-,n 0 Chapter 5, Final Status Survey Plan A nwH ?.Dfl Table 5-4D Survey Area Characterization-Structures

________ Interior __Exterior Survey. Sigm I Mean Dir. Maximum Mean Dir. Maximum Approx.

Unit/ SimSia Area Survey Area dSm a. Beta Dir. Beta Sim a Beta Dir. Beta Survey

,pm/102 C dpm/100 dpm/100r p10 C lass dpm/100 dpm/100 Area ED cm cm 2 IT2 100 cm2, 2 2 2 cmcncm cm Size, m2 817000 TDIDiesel Gen Bldg 647 3 2,343 4,066 141. 3 1,859 2,256 4,500 821000 Water Treat Bld .266- 3 2,343 2,897 511- 3 2,968 3,816 826, 822000 ChlorineBid . 438- 3 828 1,723 1,032 - 3 1,517 3,832 1,055 826000 Turbine Bldg-7" . 5,990 1,2,3 3,077 24,900 N/A N/A N/A N/A 974 Turbine Bldg Grade, 1,316 - 1,2,3 2,305 6,980- N/A N/A N/A N/A 4,190 Turbine Bldg Mezz 402 3 1,566 2,626 N/A N/A N/A N/A 2,605

" Turbine Bld+40'& Ext 277 3 2,843 -3,615 1,723 3 1,984 10,312 144-831000 MicrowaveBld 1,639 3 1,568 6,344 5,210 2 2,875 13,253 350 833000 Warehouse B

  • 807 3 635 3,751 10,064 2 3,749. 34,785 6345 840000 Warehouse A 495 3 1,941 3,397 511 3 2,310 3,838 6,875 848000 Retention Basin - 601 1 1 45,485 45,910 N/A N/A N/A N/A 21,368 850000 Solidification Pad/Wall :N/A N/A N/A N/A 57,832 1 22,653 322,600 360 851000 Switchyard Control Bld 342 3 1,663 2,376 196 3 1,397 1,843, 2,975 852000 Machine Shop 288 3 1,973 2,408 217 3 2,087 2,620 2,900 856000 Sec Alarm Station 1,205 3 300 2,636-" 4,317 3 .293 9230 350 Page 5-17

Rancho Seco License Termination Plan Revision 0 Chanter 5. Final Status Survey Plan Arril 2006 Table 5-4E Survey Area Characterization - Remaining Buried and Embedded Pipe Survey Sigma Mean Maximum Internal Unit/Area Description dpm/100 Direct 2 Direct Classification Surface ID N em2 dpm/100 cm dpm/100 cm 2 _ Area m 2 899002 Aux Feedwater Piping 207 368 634 Class 3 <29 899005 Clean Drain System, Storm Drain Non-Discharge 392 196 380 Class 3 770 899006 Component Cooling Water System Piping 4,174 780 10,482 Class 3 15 899007 Clean Drain System Piping - Turbine 93,519 56,208 680,000 Class 1,2 310 899008 Clean Drain System Piping - Sewer 4 6 10 NI N/A 899009 Clean Drain System Piping - Storm Drain/Liquid Disch 431 2,590 3,158 1* 809 899010 Diesel Fuel Oil System Piping 4,984 -8,894 186 NI 66 899011 Decay Heat System Piping 630,324 480,508 3,412,000 Class 1 17 899017 Fire Protection Water System Piping 815 35 1,154 NI N/A 899025 Instrument Air System Piping 3,793 -5,367 1,520 NI N/A 899028 Main Condenser Makeup 1,089 594 3,542 Class 3 34 899029 Main Circulating Water System Piping 99 475 .614 Class 3 1,296 899032 Nitrogen Gas System Piping 9,677 19,100 33,200 Class 2 8 899034 Nuclear Service Raw Water System Piping 157 28 NI N413 N/A

.899035 Nuclear Service Water Piping 125 -59 174 Class 3 37 899036 Plant Cooling Water System Piping 153 -9 310 Ni N/A 899040 Reactor Coolant Drain System TBD TBD TBD Class 1 2 899042 Radwaste System Piping 66,200,000 49,700,000 211,000,000 Class 1 53 899043 Service Air System Piping 964 -5 1,740 Class 3 287 899044 Spent Fuel Cooling System Piping 4,730,000 5,190,000 16,500,000 Class 1 11 899045 Site Reservoir System 232 6 - 441 NI N/A 899047 Service Water System Piping 187T1,992 2,700 Class 3 1000 899050 Waste Gas System Piping 2,977 528 3,665 Class 3 <9 899051 Carbon Dioxide System 8,930 8,585 23,654 Class 2 4 899052 Acid Waste System 13,000 2,450,000 74,600,000 Class 1 26 NI - Non-Impacted

  • Pipe sediment activity .186 pCi/g Cs-137, 23.5 pCi/g Co-60 Pae 5-18 C C

Rancho Seco License Termination Plan Revision 0

-Chapter 5. Final Status Survey Plan April 2006 5.2.2.4 Changes in Classification Initial classification of site areas is based on historical information, scoping surveys and site characterization data. Data from operational surveys performed in support of decommissioning, routine surveillance and any other applicable survey data may be used to change the initial classification of an area up to the time of commencement of the FSS as long as the classification reflects the levels of residual radioactivity that existed prior to remediation. Areas within initial survey units may be upgraded in classification due to future requirements for laydown'and storage areas during demolition activities or incorrect initial classification. If during the conduct of a FSS sufficient evidence is accumulated to warrant an investigation and reclassification of the survey unit in accordance with Section 5.3.6, the survey may be terminated without completing the survey unit package.

5.2.3 Establishing Survey Units The survey units listed in Tables 54A,, 5-4B, 54C, 5-4D and 5-4E are areas that have similar characteristics and contamination levels. Survey units are assigned only one classification. The site and facility are surveyed, evaluated, and released on a survey unit basis.

5.2.3.1 Survey Unit Size Survey unit sizes will be selected based on area classification, survey execution logistics, and applicable regulatory guidance documents. NUREG-1757, Volume 2, Appendix A, provides suggested sizes for survey units based on the guidance contained in MARSSIM.

Typical survey unit sizes for structural surfaces and open land area soil are listed below in Table 5-5; these are consistent with NUREG-1757, Volume 2 guidance. Use of 319 m2 for structures meets the 25 mrem/y criterion at the surface DCGL as described in DTBD 06-002, "Use of a Survey Unit Size of 319 tn2 for Class One Structure Surveys at Rancho Seco Nuclear Generating Station," [Reference 5-8]. Class I and 2 areas provided in Tables 5-4A, 5-4B, 54C, 54D and 5-4E may be further subdivided into smaller areas to meet the guidelines present in Table 5-5. If larger survey unit areas are used, a technical evaluation will be presented in the FSS Package for the specific survey unit justifying the survey unit size.

Table 5-5

ýSuggested Survey Unit Areas Class Structural Surfaces Open Land Area Soil 1 up to 319 m2 up to 2,000 nm 2 319 to 1000m 2 2,000 to 10,000m 2 3 no limit no limit 5.2.3.2 Reference Coordinate System for Open Land Areas (Reference Grid)

A reference coordinate system is used for impacted areas to.facilitate the identification of survey units within the survey area. The reference coordinate system is basically an X-Y plot of the site area referenced to the state of California Mercator projections as shown in Figure 5-2.

Once the reference point is established, grids may be overlaid parallel to lines of latitude and longitude.

Page 5-19

Rancho Seco License Termination Plan r Revision 0 Chapter 5, Final Status Survey Plan .April 2006-5.2.4 Access Control Measures 5.2.4.1 Turnover K.)

Due to the large scope of decommissioning activities, it is anticipated that some surveys will be

.performed in parallel with dismantlement activities. This will require a systematic approach to

.turnover of areas be established. Prior to acceptance of a survey unit for FSS, the following conditions must be satisfied in accordance with applicable procedures. These include:

a) Decommissioning activities having the potential to contaminate a survey unit shall be complete or measures taken to eliminate such potential.

b) Tools and equipment not required for the survey must be removed, and housekeeping and cleanup shall be complete.

c) Decontamination activities in the area shall be complete.:

d) Access control or other measures to prevent recontamination must be implemented.

e) Turnover or remediation surveys may be performed and documented to the same standards as final status surveys so that data can be used for the FSS.

5.2.4.2 Walkdown The principal objective of the walkdown is to assess the physical scope of the survey unit. The walkdown ensures that the area has been left in the necessary configuration for FSS or that any further Work has been identified. The walkdown provides detailed physical information for survey design., Details such as structural interferences or sources needing special survey techniques can be determined. Specific requirements will be identified for accessing the survey area and obtaining support functions necessary to conduct final status surveys, such as excavation shoring, interference removal, dewatering, etc. Industrial safety and environmental concerns will also be identified during this walkdownw 5.2.4.3 Transfer of Control Once a walkdown has been performed and the turnover requirements have been met, control of access to the area is transferred from the RP/Chemistry Department to the FSS group. Access control and isolation methods are described in the subsection below.

5.2.4.4 Isolation and Control Measures Since all decommissioning activities will not be completed prior to the start of the FSS, measures will be implemented to protect survey areas from contamination during and subsequent to the FSS. Decommissioning activities creating a potential for the spread of contamination will be completed within each survey unit prior to the FSS. Additionally, decommissioning activities that create a potential for the spread of contamination to adjacent areas will be evaluated and controlled. Upon commencement of the FSS for survey units where there is a potential for re-contamination, implementation of one or more of the following control measures will be required:

Page 5-20

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006

  • Personnel training,
  • Installation of barriers to control access to surveyed areas, e Installation of barriers to prevent the migration of contamination from adjacent or overhead areas from water runoff, etc.,
  • Installation of postings requiring contamination monitoring prior to surveyed area access,
  • Locking entrances to surveyed areas of the facility,
  • Installation'of tamper-eVident devices at entrance points, or
  • Routine surveys to monitor and verify adequacy of isolation and control measures.

Routine surveys will not be required for open land areas that are not normally occupied and are unlikely to be impacted by decommissioning activities. Post-FSS survey locations will be judgmentally selected for survey, based on technical or site-specific knowledge and current conditions present in or near the survey area. These surveys .are primarily designed to detect the potential migration of contaminants from decommissioning activities taking place in adjacent areas.

5.3 Survey Design and Data Ouality Objectives This section describes the methods and data required to determine the number and location of measurements or samples in each survey unit and the coverage fraction for scan surveys. The design activities described in this section will be documented in a survey package for each survey unit. Survey design includes the following:

  • Type I and II Errors,

" Scan Survey Coverage,

  • Sample Size Determination,
  • Instrumentation and Required MDCs,
  • Reference Grid and Sample Location, and
  • DCGL and DCGLEmc.

5.3.1,, Data Quality Objectives (DQOs)

The appropriate design for-a given survey area is developed using the DQO process as outlined in MARSSIM, Appendix D. These seven steps are:

1) State the problem,
2) Identify the decision,
3) Identify inputs to the decision,
4) Define the study boundaries,
5) Develop a decision rule, Page 5-21

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final'Status Survey Plan April 2006

6) Specify limits on decision errors, and
7) Optimize the design for obtaining data.

The DQO process will be used for designing and conducting all final status surveys at Rancho Seco. Each survey package will contain the appropriate information, statistical parameters and contingencies to support the DQO process.

53.2 Scan Survey Coverage The area covered by scan measurement is based on the survey unit classification as described in NUREG 1757 and as shown in Table 5-6 below. A 100% accessible area scan of Class 1 survey units will be required. The emphasis will be placed on scanning the higher risk areas of Class 2 survey units such as soils, floors and lower walls. Scanning percentage of Class 3 survey units will be performed on likely areas of contamination based on the judgment of the FSS engineer.

Table 5-6 Scan Measurements Class I Class 2* Class 3 Scan Coverage 100% 10-100% 1Judgmental, 1-10%

  • For Class 2 Survey Units, the amount of scan coverage will be proportional to the potential for finding areas of elevated activity or areas close to the release criterion in accordance with MARSSIM Section 5.5.3. Accordingly, Rancho Seco will use the results of individual measurements collected during characterization to correlate this activity potential to scan coverage levels.

5.3.3 Sample Size Determination NUREG-1727, Volume 2, Appendix A describes the process for determining the number of survey measurements necessary to ensure a data set sufficient for statistical analysis. The sample density for Class I structures will be maintained at the level of 1/7In 2 for the larger survey unit size of 319 m 2 which results in a total of 46 samples for a relative shift of 3. Sample size is based on the relative shift, the Type I and II errors, sigma, and the specific statistical test used to evaluate the data.

Alternate processes may be used if such gain NRC and industry acceptance between the time this plan is adopted and the commencement of FSS activities. However, any new technologies must still meet the applicable requirements of this plan for calibration, detection limit, areal coverage, operator qualification, etc.

5.3.3.1 Determining Which Test Will Be Used Appropriate tests will be used for the statistical evaluation of survey data. Tests such as the Sign test and Wilcoxon Rank Sum (WRS) test will be implemented using unity rules, surrogate methodologies, or combinations of unity rules and surrogate methodologies, as described in MARSSIM and NUREG-1505 chapters 11 and 12.

Page 5-22

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 If the contaminant is not in the background or constitutes a small fraction of the DCGL, the Sign test will be used. If background is a significant fraction of the DCGL, the Wilcoxon Rank Sum (WRS) test will be used.

5.3.3.2 Establishing Decision Errors The probability of making decision errors is controlled by hypothesis testing. The survey results will be used to select between one condition of the environment (the null hypothesis) and an alternate condition (the alternative hypothesis). These hypotheses, chosen for MARSSIM Scenario A, are defined as follows:

Null Hypothesis (H0): The survey unit does not meet the release criteria. Alternate Hypothesis (Ha): The survey unit does meet the release criteria.

A Type I decision error would result in the release of a survey unit containing residual radioactivity above the release criteria. It occurs when the null hypothesis is rejected when it is true. The probability of making this error is designated as "a". A Type H decision error would result in the failure to release a survey unit when the residual radioactivity is below the release criteria. This occurs when the Null Hypothesis is accepted when it is not true. The probability of making this error is designated as "J3".

Appendix E of NUREG-1757, Volume 2 recommends using a Type I error probability (a) of 0.05 and states that any value for the Type I1error probability (P3)is acceptable. Following the NUREG-1757,!Volume 2 guidance, a will be set at 0.05. A P3 of 0.05 will initially be selected based on site specific considerations. The P3 may be modified, as necessary, after weighing the resulting change in the number of required survey measurements against the risk of unnecessarily investigating and/or remediating survey units that are truly below the release criteria.

5.3.3.3:, Relative Shift The relative shift (A/ a) is calculated. Delta (A) is equal to the DCGLw minus the Lower Boundary of the Gray Region (LBGR). Calculation of sigma's is discussed in Section 5.3.3.3.2 and initial values are provided in Table 5-4. The sigma's used for the relative shift calculation may be recalculated based on the most current data obtained from post-remediation or post-demolition surveys or from background reference areas, as appropriate. The LBGR is initially set at 0.5 times the DCGLw, but may be adjusted to obtain an optimal value, of normally between 1 and 3 for the relative shift;,

5.3.3.3.1 Lower Boundary of the Gray Region The Lower Boundary of the Gray Region (LBGR) is the point at which the Type 11 (3) error applies. The default value of the LBGR is set initially at 0.5 times the DCGL. If the relative shift is greater than 3, then the number of data points, N, listed for the relative shift values of 3 from Table 5-5 or Table 5-3 in MARSSIM will normally be used as the minimum sample size.

If the minimum sample size results in a sample density less than the required minimum density (see Section 5.2.3), the sample size will be increased accordingly.

Page 5-23

Rancho Seco License Termination Plan Revision .0 Chapter 5, Final Status Survey Plan April 2006 5.3.3.3.2 Sigma Sigma values (estimate of the standard deviation of the measured values in a survey unit, and/or reference area) were initially calculated from characterization data as listed in DTBD-06-001, "RSNGS Initial Classification of Survey Areas and Survey Design Sigma Values,"

[Reference 5-9]. These sigma values can be used in FSS design or more current post-remediation sigma values can be used.- The use of the sigma values from the characterization data will be conservative for the sample size determination since the post-remediation sigma's are expected to be smaller. The sigma values for survey areas listed in Tables 5-4A, 5-4B, 5-4C, 5-4D and 5-4E which contain survey units with two different classifications (typically upper walls and ceiling being a Class lower than lower walls and floor of the same room), will be evaluated to ensure that the sigma conservatively represents the contaminant distribution of each associated survey unit; otherwise a specific sigma value will be developed.

5.3.3.3.3 Wilcoxon Rank Sum Test Sample Size The number of data points, N, to be obtained from each reference area or survey unit are determined using Table 5-3 in MARSSIM. The table includes the recommended 20%

adjustment to ensure an adequate sample size.

5.3.3.3.4 Sign Test Sample Size The number of data points is determined from Table 5-5 in MARSSIM for application of the Sign Test. This table includes the recommended 20% adjustment to ensure an adequate sample size.

5.3.3.3.5 Elevated Measurement Comparison Sample Size Adjustment If the scan MDC is greater than the DCGLw, the sample size will be calculated using Equation 5-3 provided below. If Nac exceeds the statistically determined sample size (N), Nuc will replace N.

N mc= A/IAc Equation 5-3 where:

Ngmc= the elevated measurement comparison sample size, A = the survey unit area, and A4m = the area corresponding to the area factor calculated using the MDC.

concentration.

5.3.4 Background Reference Area Background reference area measurements are required when the WRS test is used, and background subtraction may be used with'the Sign test, under certain conditions such as those described in Chapter 12 of NUREG-1505. Reference area measurements, if needed, will be collected using the methods and procedures required for Class 3 final survey units. For soil, reference areas will have a soil type as similar to the soil type in the survey unit as possible.

When there is a reasonable choice of possible soil reference areas with similar soil types, Page 5-24

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 consideration will be given to selecting reference areas that are most similar in terms of other physical, chemical, geological, and biological characteristics. For structuresurvey units that contain a variety of materials with markedly different backgrounds, a reference area will be selected that has similar materials. Ifeone material is predominant or if there is not too great a variation in backgroundamong materials, a background from a reference area containing only a single material is appropriate when it is demonstrated that the selected reference area will not result in underestimating the residual radioactivity in the survey unit...

It is understood that background reference areas should have physical characteristics '(including soil type and rock formation) similar to the site and shall not be contaminated by site activities.

Non-impacted areas of the 2,480 acre site may be chosen to serve as background reference areas.

Should significant variations in background reference areas be encountered, appropriate evaluations will be performed to define the background concentration. As noted in NUREG-1757, Appendix A, Section A.3.4, the Kruskal-Wallis test can be conducted in such circumstances to determine that there are no significant differences in the mean background concentrations among potential reference areas. Rancho Seco will consider this and other statistical guidance in the evaluation of apparent significant variations in background reference areas.

If material background subtraction is performed, the sigma value used will take into account the variability of material background.,

5.3.5 Reference Grid and Sample Location Sample location is a function of the number of measurements required, the survey unit classification, and the contaminant variability.

5.3.5.1 Reference Grid The reference grid is primarily used for reference purposes and is illustrated on sample maps.

Physical marking of the reference grid lines in the survey unit will only be performed when necessary. For the sample grid in Class 1 and 2 survey units, a randomly selected sample start point will be identified and sample locations will be laid out in a square grid pattern at distance, L, from the start point in both the horizontal and Vertical directions. The sample and reference grids are illustrated on sample maps and may be physically marked in the field. For Class 3 survey units, all sample locations are randomly selected, based on the reference grid. An example is shown in Figure 5-2. Global Positioning System (GPS) instruments may be used in open land areas to determine reference or sample grid locations within the survey area.

Locations within a survey area may also be tied to a site USGS survey benchmark (The site drawings, including Figure 5-2, are based on the California Coordinate System 1927 which locates the center of the reeactor building at 2,249,270 east and 242,040 north within Zone 2).

Digital cameras may be employed to provide a record of survey location within the survey unit.

IWhen used, these photographic records will be linked to landmark and directional information

,to ensure reproducibility.'

5.3.5.2 -Measurement Locations .

Measurement locations within the survey unit are clearly identified and documented for purposes of reproducibility. Actual measurement locations are identified by tags, labels, flags, Page 5-25

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 stakes, paint marks, geopositioning units or photographic record. An identification code matches a survey location to a particular survey unit. "K Sample points for Class I anai Class 2 survey units are positioned in a systematic pattern or grid throughout the survey unit by first randomly selecting a start point coordinate. A random number generator is used to determine the start point of the square grid pattern. The grid spacing, L, is a function of the area of the survey unit as shown in Equation 5-4 below for a square grid:

Equation5-4 where:

A = the area of the survey unit, and n = the number of sample points in the survey unit.

Sample points are located, L distance from the random start point in both the X and Y directions.

Random measurement patterns are used for Class 3 survey units. Sample location coordinates are randomly picked using a random number generator.

Measurement locations selected using either a random selection process or a randomly-started systematic pattern that do not fall within the survey unit or that cannot be surveyed due to site conditions are replaced with other measurement locations as determined by the FSS Engineer.

5.3.6 Investigation Levels and Elevated Areas Test During survey unit measurements, levels of radioactivity may be identified that warrant investigation. Depending on the results of the investigation, the survey unit may require no action, remediation, and/or reclassification and resurvey. Investigation process and investigation levels are described belowý.

5.3.6.1 Investigation Process During the survey process, locations with potential residual activity exceeding investigation levels are marked for further investigation. The elevated survey measurement is verified by resurvey. For Class 1 areas, size and average activity level in the elevated area is acceptable if it complies with the area factors and other criteria that may apply to evaluation of the DCGL for elevated measurements DCGL~mc. As discussed in Section 5.3.6.3 below, the DCGLEmc is applicable only for Class I areas. If any location in a Class 2 area exceeds the DCGL, scanning coverage in the vicinity is increased in order to determine the extent and level of the elevated reading(s) and the area evaluated for reclassification. If the elevated reading occurs in a Class 3 area, the scanning coverage is increased and the area evaluated for reclassification and resurvey under the criteria of the new classification. All survey unit investigations will be conducted in accordance with the applicable FSS Data Quality Objectives (DQOs).

Page 5-26

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Investigations should address: (1) the assumptions made in the survey unit classification; (2) the most likely or known cause of the contamination; and (3) the effects of summing multiple areas with elevated activity within the survey unit. Depending on the results of the investigation, a portionof the survey unit may be reclassified or combined with an adjacent area with similar characteristics if there is sufficient justification. Either action would result in resurvey of the (new) area(s). The results of the investigation process are documented in the Survey Package.

See also Section 5.6 for additional discussion regarding potential reclassification of the survey unit.

5.3.6.2 Investigation Levels Technicians will respond to all instrumentalarms while surveying. Upon receiving an alarm, the technician will stop and resurvey the last square meter of area to verify the alarm.

Technicians are cautioned, in training, about the importance of the alarm verification survey and are given specific direction in the procedure as to survey extent and scan speed. If the alarm is verified, the technician will mark the area with a flag or other appropriate means. Each area marked will be addressed in an investigation survey instruction prepared for the survey unit.

The instruction will specify the required actions, such as a re-scan of the area, direct measurements, field gamma spectroscopy measurement (as appropriate), and collection of a soil sample (for land surveys). Each investigation will be evaluated and reported in the survey unit Release Record. Investigation levels are shown in Table 5-7.

Table 5-7 Investigation Levels Classification Scan Investigation Levels Direct Investigation Levels Class 1 >DCGL*mc >DCGLtm ClassY': 2 * * >DCGLw or >MDCSB if >DCGLw CMDC-.C= is greater than DCGLw Class 3 >DCGLw or >MDC.,S if >0.5 DCGLw MDC. is greater than DCGLw The size and average activity level in the elevated area is determined to demonstrate compliance with the area factors. If any location in a Class 2 areaexceeds the DCGL, scanning coverage in the vicinity is increased in order to determine the extent and level of the elevated reading(s). If the elevated reading occurs in a Class 3 area, the scanning coverage is increased and the area should be considered for reclassification.

5.3.6.3 Elevated Measurement Comparison 5.3.6.3.1 Open LandAreas -and Structural Surfaces The elevated measurement comparison is applied to Class I survey units when one or more verified scan or static measurement exceeds the investigation level. As stated in MARSSIM, the EMC is intended to flag potential failures in the remediation process and should not be considered the primary means to identify whether or not a survey unit meets the release.

criterion. The EMC provides assurance that unusually large measurements receive the proper attention and that any area having the potential for significant dose contribution is identified.

Locations identified by scan methodology or-soil sample analyses measurements with levels of residual radioactivity which exceed the DCGL~mc are subject to additional surveys to determine Page 5-27

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 compliance with the elevated measurement criteria. The size of the area containing the elevated residual radioactivity and the average level of residual activity within the area are determined.

The average level of activity is compared to the DCGLw based on the actual area of elevated activity. An aprioriDCGLEMC for the area between direct measurements (the likely size of an elevated area) is established during the survey design and is calculated as follows:

DCGLJ4I, = Area Factor x DCGLw, Equation 5-5 The area factor is the multiple of the DCGLw that is permitted in the area of elevated residual radioactivity without remediation. The area factor is related to the size of the area over which the elevated activity is distributed, The actual area is generally bordered by levels of residual radioactivity below the DCGLw and its size is determined during the investigation process.

Area factor calculations are described in LTP Section 6.7 and summarized in Tables 5-8 and 5-

9. (As shown in Tables 5-8 and 5-9, Co-60 and Cs-137 are the limiting Area Factors considering that direct exposure is the primary dose concern for structures and soil. Therefore, these area factors will typically be used to evaluate elevated measurements in soil or on surfaces). Alternatively, Figures 6-7 through 6-9 in Chapter 6 of this LTP provide a graphical method for selecting applicable area factors. The actual area of elevated activity is determined by investigation surveys and the area factor is adjusted for the actual area of elevated activity.

The product of the adjusted area factor and the DCGLw determinesthe DCGLEmc. Additional measurements are made to determine the average activity of the elevated area, if necessary. If the DCGLEmc is exceeded, the area is remediated and resurveyed. The results of the elevated area investigations in a given survey unit that are below the DCGLEmc limit are evaluated using Equation 5-6 below. If more than one elevated area is identified in a given survey unit, the unity rule with Equation 5-6 is used to determine compliance. If the formula value is less than unity, no further elevated area testing is required and the EMC test is satisfied.

Table 5-8 Calculated Surface Soil Area Factors Contaminated Radionucide Area Factor (unitless)

  • Area (m2) C-14 Co-60 Ni-63 Sr-90 Cs-134 Cs-137 10,000 1.00 1.00 1.00 1.00 1.00 1.00 3,000 1.66 1.02 1.00 1.02 1.02 1.02 1,000 2.52 1.04 1.00 1.04 1.04 1.04 300 4.80 1.12 3.27 1.20 1.12 1.11 100 8.04 1.24 9.30 1.36 1.23 1.23 30 13.6 1.62 26.9 1.77 1.58 1.58 10 21.8 2.39 60.6 2.61 2.31 2.31 3 41.5 5.05 114 5.51 4.89 4.87 1 76.0 11.8 164 12.8 11.3 11.3 Page 5-28

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Table 5-9 Calculated Structural Surface Area Factor Values Contaminated Radionuclide Area Factor (unitless)

Area (m) Co-60: Cs-134 Cs-137 Pu-238 Pu-239 Pu-240 137 1 1 1 68 1.22 1.24 1.26 - - -

36 1.51 1.55 1.59 -- -

25 1.74 1.79 1.85 - - -

16 2.11 2.18 2.26 "- - -

9, 2.83 2.91 3.03 - --

4 4.65 4.80 5.02 " - -

1 13.8 14.3 14.9 - - -

0.5 25.9 26.8 28.1 273 272 272 Contaminated Radionuclide Area Factor (unitless)

Area (t 2) Pu-241- Am-241 137 1 1 68 -37 __I_-_1 36 -

25 --

16 - -

4 0.5 274 257 Equation 5-5 applies to a single radionuclide contaminant. When multiple radionuclides are present, the calculation in Equation 5-5 is made with a unitized DCGL.

+ (COncA'F-5) <1 DCG4w (Area FactorXDCGLw,)

Equation 5-6 where:

( = Estimate of average concentration of residual radioactivity and i-.Conc4vE = average concentration in elevated area.

If more than one elevated area exists in the survey unit, a separate term will be included for each in Equation 5-6 (refer to Section 5.62..2),

5.3.6.3.2 Embedded Piping The dose model fortembedded pipe used a defaultpipe lengthof 3 m. Area factors will vary with the internal dimensions of the pipe being surveyed.If it becomes necessary to apply the elevated measurement comparison process to embeddedpiping, the first step will be to Page 5-29

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 determine the length of pipe in the room or area being surveyed. Then the interior surface area will be calculated for given pipe I.D. The specific physical dimensions of the pipe and intervening shielding will be input into MicroShieldTm using the "Cylinder Surface, External Dose Point Geometry" to calculate the gamma dose rate at a point one meter from the floor or wall surface. Subsequent calculations will be performed while reducing the contaminated area size for each calculation until the dose rates bound the hot spot area of interest. The dose rate for the initial pipe area will be divided by the dose rate for the reduced area of pipe to calculate area factors for the given hot spot size. Equation 5-5 may then be applied to provide the DCGLEmc.

5.3.6.4 Remediation and Reclassification As-shown in Table 5-10, Class 1 or Class 2 areas of elevated residual activity above the DCGLEmc are remediated to reduce the residual radioactivity to acceptable levels. Based on survey data, it may be necessary to remediate an entire survey unit or only a portion of it. If an individual survey measurement (scan or direct) in a Class 2 survey unit exceeds the DCGLw, the survey unit or a portion of it may be reclassified to a Class 1 survey unit and the survey redesigned and re-performed accordingly. If an individual survey measurement in a Class 3 survey unit exceeds 0.5 DCGLw, the survey unit,:or portion of a survey unit, will be evaluated, and if necessary, reclassified to a Class 2 survey unit and the survey redesigned and re-performed accordingly.

Table 5-10 Investigation Actions for Individual Survey Unit Measurements Area Action if Investigation Results Exceed:

Classification DCGL-MC DCGLw 0.5 DCGLw Remediate and Class 1 resurvey as necessary Acceptable* N/A Remediate, reclassify Reclassify portions as Class 2 portions as necessary N/A C and necessary and investigate** investigate**

Remediate, reclassify Reclassify portions as Reclassify portions as portions as necessary necessary, increase necessary and Class 3 resurvey, increase and scan coverage and investigate** investigate** scan coverage

  • For individual measurements above DCGL, the Sign Test will be conducted on the survey unit and an EMC evaluation performed.
    • Requires an investigation of the initial classification process and a'survey unit evaluation of sufficient intensity to satisfy the requirements of new classification status.

5.3.6.5 Resurvey Following an investigation, if a survey unit is reclassified to a more restrictive classification or if remediation activities were performed, a resurvey is performed in accordance with approved procedures. If a Class 2 area had contamination greater than the DCGLw, it should be reclassified to a Class 1 area.' If the average value of Class 2 direct survey measurements was less than the DCGLw, the scan MDC was sensitive enough to detect the DCGLEMc and there Page 5-30

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 were no areas greater than the DCGLEmc, the survey redesign may be limited to obtaining a 100% scan without having to re-perform the static measurements or soil sample analyses. This condition assumes that the sample density meets the requirements for a Class 1 area.

5.4 Survey Methods and Instrumentation 5.4.1 Survey Measurement Methods Survey measurements and sample collection are performed by personnel trained and qualified in accordance with the applicable procedure. The techniques for performing survey measurements or collecting samples are specified in approved procedures. FSS measurements include surface scans, direct surface measurements, and gamma spectroscopy of volumetric materials. Methods not specifically described may also be used for final status surveys. If so, Rancho Seco Will give the NRC 30 days notice to provide an opportunity to review the associated basis document.

On-site lab facilities are used for gamma spectroscopy, liquid scintillation and gas proportional counting in accordance with applicable procedures. Off-site facilities are used, as necessary.

No matter which facilities are used, analytical methods will be administratively established to detect levels of radioactivity at 10% to 50% of the DCGL value.

5.4.1.1 Structures Structures will receive scan surveys, direct measurements and, when necessary, volumetric sampling.

5.4.1.1.1 Scan Surveys Scanning is performed in order to locate small, elevated areas of residual activity above the investigation level. Structures are scanned for beta-gamma radiation with appropriate instruments such as those listed in Table 5-11. The measurements will typically be performed at a distance of 1 cm or less from the surface and at a scan speed of 5 cm/sec for hand-held instruments. Adjustments to scan speed and distance may be made in accordance with approved procedures. In situ gamma spectroscopy may be effectively substituted for scanning

.surveys in accordance with DTBD-06-003, "Use of In Situ Gamma Spectroscopy for Final Status Surveys," [Reference 5-10].

5.4.1.1.2 Direct Measurements Direct measurements are performed to detect surface activity levels. Direct measurements are conducted by placing the detector on or very near the surface to be counted and acquiring data over a pre-determined count time. A count time of one minute is typically used for surface measurements and generally provides detection levels well below the DCGL., (The count time

,may be varied provided the requed detection level is achieved).

5.4.1.1:31 Concrete With Activated Radionuclides, withi activated building materials will be measured volumetrically.

.Residual radioactivity Following remediation of activated concrete and rebar down to the activated concrete DCGL, the remaining surface will be volumetrically, sampled by coring or other means. DCGLs for activated concrete have been determined and are provided in LTP Chapter 6, Table 6-10. Per Page 5-31

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Table 5-12, the gamma spectroscopy instrumentation achieves an MDC much lower than the DCGL. Q 5.4.1.1.4 Volumetric Concrete Measurements Volumetric sampling of contaminated concrete, as opposed to direct measurements may be necessary if the efficiency or uncertainty of the gross beta measurements are too high.

Volumetric concrete samples will be analyzed by gamma spectroscopy. The results will either be evaluated by 1) calculating the derived total gross beta dpnu/l00 cm2 in the'sample and comparing the gross beta results directly to the gross beta DCGL or 2) by using the radionuclide specific results to derive the surface activity equivalent and determine compliance using the unity rule. Use of the unity rule will require.the use of a surrogate calculation to account for the radionuclides in the'mixture not identified by gamma spectroscopy. This will be accomplished using the nuclide mixtures listed in Tables 2-16 or 2-19 in Chapter 2 of this LTP, as appropriate.

Volumetric samples analyzed by gamma spectroscopy will detect the presence of radioactivity below the surface. Such sampling is typically performed following removal of paint and other surface coatings during remediation. After analysis, the data may be converted to equivalent surface activity for crack or rough Surface analysis.

5.4.1.2 Soils Soil will receive scan surveys at the coverage level described in Table 5-6 and volumetric samples will be taken at designated locations. Surface soil samples will normally be taken at a depth of 0 tol5 cm. Areas of subsurface soil contamination may require sampling at a depth exceeding 15 cm. The possibility of sub-surface contamination will be considered during the survey design process and the survey design package will contain requirements for sampling soil below 15 cm. Samples will be collected and prepared in accordance with approved procedures.

5.4.1.2.1 Scans Open land areas are scanned for gamma emitting nuclides. The gamma emitters are used as surrogates for the HTD radionuclides. Sodium iodide detectors are typically used for scanning.

For detectors such as the SPA-3, the detector is held within 2.5 to 5 centimeters of the ground surface and is moved at a speed of 0.5 m/sec, traversing each square meter 5 times. The area covered by scan measurements is based on the survey unit classification as described in Section 5.3.2.

5.4.1.2.2 Volumetric Samples Soil materials are analyzed by gamma spectroscopy. Soil samples of approximately 1,500 grams are normally collected from the surface layer (top 15 cm). If contamination below 15 cm is suspected, split spoon sampling or similar methods, will be used for the final survey. Sample preparation includes removing extraneous material, homogenizing, and drying the soil for gamma isotopic analysis. Separate containers are used for each sample and each container is moved through the analysis process following site procedures. Samples are split when required by the applicable quality control procedures.

If a survey area has already been excavated and remediated to the soil DCGL, this area will be treated as a surface soil, and the FSS will be performed on the excavated area. Soil samples will Page 5-32

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 be collected to depths at which there is high confidence that deeper samples will not result in higher concentrations. Alternatively, a sodium-iodide detector or intrinsic germanium detector of sufficient sensitivity to detect DCGL concentrations may be utilized to identify the presence or absence of subsurface contamination, and the extent of such contamination. If the detector identifies the presence of contamination at a significant fraction of the DCGL, confirmatory investigation and analyses of soil samples of the suspect areas will be performed. All subsurface sampling will be performed in accordance with the guidance in Section.Ci*2.1 of NUREG-1757, Volume 2.ý The sample size for subsurface samples will be determined using the same methods described for surface soil. Per NUREG-1757,Volume 2, scanning is not applicable to subsurface areas; however, Rancho Seco FSSs will employ scanning techniques commensurate with the survey unit classification. Scanning on subsurface soils, where accessible as an excavated surface, will demonstrate compliance with site release criteria.

5.4.2 Specific Survey Area Considerations 5.4.2.1 Pavement-Covered Areas Survey of paved areas will be required along the roadways providing ingress and egress to the site. Evaluation has determined that paved roadways are Class 3 areas. The survey design of paved areas will be based on soil survey unit sizes since they are outdoor areas where the exposure scenario is most similar to direct radiation to surface soil. The applicable DCGL will be the soil DCGL. Scan and static gamma and beta-gamma surveys are made as determined by the survey unit design. If the potential exists for sub-surface contamination under pavement, either the pavement/asphalt will be removed prior to the FSS or samples/measurements obtained through the pavement. Paved areas may be separate survey units or they may be incorporated into surveys of other adjacent open land areas of like classification. Surveys of paved areas may include road right-of-ways to check for radioactivity relocated from water runoff. Right-of-ways may also be separate survey units.

5.4.2.2 Stored Excavated Soil The primary method for evaluation of excavated soils originating from Class 1 and Class 2 areas will follow the guidance provided in MARSSIM for FSS of Class I areas. Excavated soil will be evaluated in accordance with Rancho Seco procedures to determine suitability for transport and final status evaluation. Prior to performing a FSS, excavated soil will be characterized to determine suitability for transport to an area dedicated for excavated soils.

Soils that do not contain residual radioactivity greater than DCGL values will be relocated to an area dedicated for soil evaluation and graded to a maximum depth of one meter. A Class 1 final status survey will then be conducted with soil measurements averaged over the total depth of soil. Sample/measurement density will be equal to that needed for a surface soil survey of the same volume. Surface scanning and volumetric analyses will be directly compared with'DCGL values. Any measurement location identifying residual radioactivity above the DCGL will be investigated and remediated as necessary, Controls will be instituted to prevent mixing of soils from different survey areas prior to evaluation. Soils satisfying the criteria for unrestricted release will be stockpiled'for use as onsite backfill material. (Class 2 material could be used in either Class 1 or 2 areas and Class 1 material could only be used in Class 1 areas.):

The radiological evaluation of soils resulting from minor trenching and digging efforts in Class 3 defined areas (no reasonable potential for subsurface contamination) will be performed by characterization survey in accordance with site procedures. Excavated soils that demonstrate Page 5-33

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 residual radioactivity consistent with Class 3 status will be released for use as onsite excavation backfill.

5.4.2.3 Embedded Piping and Buried Piping Residual radioactivity on internal surfaces, such as floor drains, embedded piping, and buried piping may be inaccessible or difficult to measure directly using field survey detectors and established techniques. Where no remediation has occurred, inaccessible or difficult to measure internal surfaces are assumed to have the same level of residual radioactivity as that found on accessible internal surfaces. No special measurement methods are applied.

Where remediation has occurred, representative samples of the inaccessible internal surfaces are obtained, an assessment of pre-remediation survey data is performed, or other appropriate measures are taken (e.g., calibrated detectors extended intolpiping runs in a controlled manner) such that a reasonable approximation of the residual radioactivity on the inaccessible internal surfaces can be made. Accessible internal surfaces are surveyed the same as other structural surfaces. Scale and sediment samples may be obtained, if appropriate.

5.4.2.4 Cracks, Crevices, Wall-Floor Interfaces and Small Holes Surface contamination on irregular structure surfaces (e.g., cracks, crevices, and holes) are difficult to survey directly. Where no remediation has occurred and residual activity has not been detected above background, these surface blemishes may be assumed to have the same level of residual activity as that found on adjacent surfaces.i The accessible surfaces are surveyed in the same manner as other structural surfaces and no special corrections or adjustments have to be made.

In situations where remediation has taken place or where residual activity has been detected above background, a representative sample of the contamination within the crack or crevice may be obtained or an adjustment for instrument efficiency may be made ifjustifiable. If an instrument efficiency adjustment cannot be justified based on the depth of contamination or other geometry factors, volumetric samples will be collected. The total dpm/100 cm2 contained in the volumetric sample that is attributable to the beta emitting radionuclides used to determine the DCGL will be compared directly to the concrete gross activity DCGL. As an alternative, radionuclide specific analysis, coupled with application of the unity rule may be used.

Volumetric samples analyzed by gamma spectroscopy will detect the presence of radioactivity below the surface. Such sampling is typically performed following removal of paint and other surface coatings during remediation. After analysis, the data may be converted to equivalent surface activity.

The accessible surfaces are surveyed in the same manner as other structure surfaces except that they are included in areas receiving judgmental, scans when scanning is performed over less than 100% of the area.

5.4.2.5 Paint Covered Surfaces Final status surveys will consider the effect of painted surfaces on instrument efficiency in accordance with DTBD-05-0 10, "Beta Detection Including Beta Energy and Source Efficiency," [Reference 5-11]. Gross measurements will not be used in areas covered by thick paints or coatings. The surfaces will be volumetrically sampled or the coating will be removed Page 5-34

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 prior to survey. No special consideration must be given to wall or ceiling areas painted before plant startup and which have'not been subjected to repeated exposure to materials that would have penetrated the painted surface.

5.4.2.6 Reactor Building Liner Because concrete from the shield walls and floors is being removed, FSS surveys of the interior of the reactor building will be limited to direct measurements and scans of the steel liner.

Instrument efficiency will be adjusted following the method described in NUREG-1507 to account for the effects of surface coatings, if necessary. Remaining concrete or structural features will be surveyed as described above.

5.4.3 Instrumentation Radiation detection and measurement instrumentation for the FSS is selected to provide both reliable operation and adequate sensitivity to detect the radionuclides identified at the site at levels sufficiently below-the DCGL. Detector selection is based on detection sensitivity, operating characteristics and expected performance in the field. The instrumentation will, to the extent practicable, use data logging with bar code scanning capability.

Commercially available portable and laboratory instruments and detectors are typically used to perform the three basic sur'vey measurements: 1) surface scanning; 2) direct surface contamination measurements; and 3) spectroscopy of soil and other bulk materials, such as concrete.

Radiation Protection procedures and Decommissioning Survey Implementing Procedures (DSIPs) control the issuance, use, and calibration of instrumentation. Records supporting the instrumentation program are maintained in accordance with site document control procedures.

5.4.3.1 Instrument Selection Radiation detection and measurement instrumentation is selected based on the type and quantity of radiation to be measured. The instruments used for direct measurements are capable of detecting the radiation of concern to a Minimum Detectable Concentration (MDC) of between 10% and 50% f the applicable DCGL., The use of 10% to 50% of the DCGL is an administrative limit only. Any value below the DCGL is acceptable in Class I or 2 survey units. MDCs of less than 50% of the DCGL allow detection of residual activity in Class 3 survey units at an-investigation level of 0.5 times the DCGL.- Instruments used for scan-'

measurements in Class 1 areas are required to'be'capable of detecting radioactive material at the DCGLEmc. Instrumentation currently proposed for use in the FSS is listed in Table 5-11.

Instrument MDCs are discussed in Section 5.4.3.4 and nominal MDC values are also listed in Table 5-12.

Other measurement instruments or techniques may be utilized. The acceptability of alternate instruments or technologies for use in the FSS Program wouldbe justified in a technical basis evaluation document. Technical basis evaluations for alternate final status survey instruments or techniques will be provided for NRC review 30 days prior to use. An instrument technical analysis wll include the following:

. Description of the conditions under which the method would be used;

  • Description of the measurement method, instrumentation and criteria; Page 5-3.5

Rancho Seco License Termination Plan Revision 0 Chanter 5. Final Status Survey Plan April 2006

  • Justification that the technique would provide the required sensitivity for the given survey unit classification in accordance with Table 5-10; and Demonstration that the instrument provides sufficient sensitivity for measurement below the release criteria with Type I error equivalent to 5% or less.

Table 5-11 Typical FSS Survey Instrumentation

... Effective Detector Measurement Detector Type Area dec Instrument and Detector Model Type Type ~ ~Window Density AraadModel >Moe 126 cm2 Alpha Scan Gas-flow proportional 0.8 mg/cm2 Ludlum 2350-1 Ludlum 43-68 proportional "Aluminized Mylar 0.8mg/cm -

Alpha Scan a Scintillation 1 mg/cm Ludlum 2350-1 Ludlum 43-90 ZnS(Agq) 125cm _, ___... ___ _ _ _ _

0.8 mgIcm 2 -

  • ..... 1.2 mg/cm Alpha Static . a Scintillation

... . 1 mg/cm .,r :. Ludlum 2350-1

~~~ZnS(Ag* Ludlum

43-90

___________ 125 cm 1.2 mg/cm' Beta ScanBetaScan I* Sintilatin "Scintillation!

0Scintillation

.01" Plastic Ludlum 2350-1 Ludlum 44-116

_ "__ :125 cm2 1.2 mg/cm2 (%p-I Beta Static f3 Scintillation 0.01" Pllatic Ludlum 2350-1 Ludlum 44-116 Scintillation 125 cm2 Beta Scan G-Mcm Ludlum 2350-1 Ludlum 44-40-2 15.5 cm 0cm Beta Static G-M SLmL Ludlum 2350-1 Ludlum 44-40-2 G-M 1.7155mSa n15.5 cm Ludlum 2350-1 Ludlum 44-9 1.7 mg/cm2 Beta Static Betatati

+G-MG-M  :+1.7 mg/cm22 Ludlum 2350-1 Ludlum 44-9

~31 cme Beta-Gamma' "Gas-flow 0.8 mg/cm2 Ludium 235031 Ludlum 43-51 Scan proportional Aluminized Mylar 31 cmý Beta-Gamma- Gas-flow 31c Static propo-ionalo 0.8 mg/cm2 Ludlum 2350-1 Ludlum 43-5 1

_tatic proportional Aluminized Mylar._

A Beta-Gamma Gas-flow 55 cm Scan proportional 0.8 mg/cm2 Ludlum 2350-i' LuduI 43-116-1 Aluminized Mylar " . .. " "

Gfo 55cm2..

Beta-Gamma Gas-fo 55c proporna-flo 0.8 mg/cm 2 Ludlum 2350-1 Ludlum 43-116-1 Static 'proportional uminized Myar Page 5-36

Rancho Seco License Termination Plan Revision 0 Chanter S. Final Status Survev Plan April 2006 Table 5-11 Typical FSS Survey Instrumentation Mea.urement Effective Detector Instrument and Type Detector Type Area and, Detector Model Window Density 126 cm Beta-Gamma Gas-flow 0.8 mg/cm22 Ludlum 2350-1 Ludlum 43-68 Scan proportional mlu m l ud

" ~584 cm2 Beta-Gamma AuiizedMl r_ _

Gas-flow 58 m 2 Scan proportional 0.8 mg/cm Ludlum 2350-1 Ludlum 43-37 584 em'Mylar Aluminized Beta-Gamma Gas-flow 0.8 mg/cm2 : Ludlum 2350-1 Ludlum 43-37 iStatic proportional.+* Auiie ya.

2" diameter x 2" Ludlum 44-10 or Gamma Scan- Scintillation Ludlum 23 50-1 Eberline SPA-3

_______length _______

a G o 126 cm' Static Surface Contamination pGas-flow proportionalAuizeMya" 0.8 mg/cm 2 Ludlum 2350-1 Ludlum 43-68

_luminied Myl_

Static Surface S 126 cm2 L . " Ludlum 43-90 2 Ludlum 2350-14-116 Contamination Scintillation 1.2 mg/cm Mylar Ludlu__44-116 Aluminized Soil, Structure N/A Canberra Lab or N/A Surfacesuande Surfaces and High-purity

-Bulk Material Germanium In Situ Detector CsI 0.75" x 0.75" Ludlum 44-159 NaI 2" x 2" Ludlum 44-157 Gamma Pipe Na! 3" x 3" Ludlum 44-162 Scans and Nai 0.75" x 3" Ludlum 2350-1 Bicron 1062000 Directs Gas-Flow 181 cm2 Ludlum 43-98 Gas-Flow 122 cm2 Ludlum 43-111 Gas-Flow 60 cm2

  • Ludlum 43-94 Page 5-37

Rancho Seco License Termination Plan Revision 0 Chanter 5. Final Status Survey Plan April 2006 Table 5-12 Typical FSS Detection Sensitivities BakrudInstrument Instruments Background Backgrond EIcnrenyb Count Time Static MDCC22cm )n S MC Radiation Count Time Efficien (minutes) (dpm and Detectors" (Cpm) - 100,c

_________ ________ (minutes) (cm ________________ NJ)________

Model 43-68. Alpha 10 1 0.074e 5.0 26 Model 43-68 Beta-Gamma "1 300 0.1469 1.0 454 1082_

Model 44-116 Beta 1 300 0.162h 1.0 413 1063d Model 43-90 Alpha 10 3 0.077C 5.0 39 N/At 1 200 0.0991 1.0 1,262 5,547d Model 43-116-1 Beta-Gamma Model 43-51 Beta-Gamma 1 _37 . 0.071' 1.0 1,395 4,734d Model 43-37 Beta-Gamma 1 1,200 0.138' 1.0 204 635a Model 44-9 Beta-Gamma 1 36 0.215h 1.0 926 2,719d Model 44-40-2 Beta-Gamma 1 27 0.204e 1.0 858 2,481a*

Model 44-10 Gamma 1 8,000 N/A 0.02 N/A 5.2 pCi/gW Model SPA-3 Gamma 1 8,000 N/A 0.02' N/A 5.2 pCi/ge

  • '005 pCi/g 2000 to 4000 dpm/100 em2 HPGe Gamma Up to 60 N/A : 0.40 relative .: 10-60 volumetric v mi/ . 0.15-0.30 00.3m

.... __pCale vol.

Canberra Inspector 10000 Gamma Up to 60 N/A 0.085 relative 1-60 N/A N/A Beckman Liquid H-3 30 & 60 40 dpm 0.40 30 & 60 800 pCi/L N/A Scintillation I -3 60_ _40_dpm I0_&

Tennelec Low Alpha 10 0.1 0.41- 110 <11' N/A Bkg Counter Beta 10 1.0 0.48 < 16 N/A Pipe Detectors:

Model 44-1591 Gamma 1 677 0.024 1 5,200 N/A7 Model 44-157' Gamma 1 6,300 0.224 1 1,445 N/A" Model 44-162' Gamma 1 16,000 0.568 1 1,041 N/A0 Model 1062000' Gamma 1 1,250 0.050 1 3,321 N/A .

Model 43-98 Beta-Gamma 1 290 0.160"m 1 284 N/A7 Model 43-111 Beta-Gamma 1 100 0.151 m 1 266 N/A!

Model 43-94 Beta-Gamma 1 44 0.227"m 1 248 N/An Pag&e5-38 C) C, C

Cncho Seco License Termination Plan- Ref ,n 0 Chapter 5, Final Status Survey Plan April 2006 a Detector models listed are used with the Ludlum 2350-1 Data Logger bCalibration sources are Tc-99 and Pu-239. The efficiency is determined by counting the source with the detectorin a fixed position from the source (reproducible geometry). The et value is based on ISO-7503-1, "Evaluation of Surface Contamination - Part 1: Beta Emitters and Alpha Emitters (first edition)," [Reference 5-12] and conditions noted for each detector.

cStatic MDC is calculated per Equation 5-7 and is the same as Brodsky and Gallagher in Table 3.1 of NUREG-1507. For conditions where the background and sample count time differ, the formula from Strom and Stanbury in Table 3.1 of NUREG-1507 is used.

dScan MDC, in dpm/1 00 cm 2, is calculated per Equation 5-8 assuming a scan rate of 5.08 cm/sec, which is equivalent to a count time of 1.73 seconds (0.028 minutes) using a detector width of 8.8 cm. The 43-37 detector assumes a scan rate of 12.7 cm/s and results in a count time of 1.05 seconds (0.0 18 minutes) for a detector width of 13.34 cm. The 44-116 detector's width is 7.5 cm and results in a count time of 1.48 seconds at 5.08 cm/s scan speed. The 43-116-1 detector's width is 2.54 cm and results in a count time of 0.5 seconds at a scan speed of 5.08 cm/s. The 43-51 detector's width is 3.81 cm and at a scan rate of 5.08 cm/s results in a count time of 0.75 seconds. Both the 44-9 and 44-40-2 have window fields of vision of 5.08 cm wide and result in a 1.0 second count time for a scan speed of 5.08 cm/s.

I he et value for the alpha mode of the 43-68 and 43-90 detectors is the 21c value as defined in ISO-7503-1 times the Standard's e, value of 0.25 for Pu-239 fUsing the approach described in Section 6.7.2.2 of MARRSIM and a scan alpha DCGL value of 60 dpm/lO00 cm2 results in a 21% probability for a surveyor to audibly detect 1 cpm, then acquire a static count for approximately 15 seconds to confimn the presence of alpha activity. A low probability of detection at the typical DCGL level implies that alpha scanning may not be practical.

gThe ej used for the beta mode of the 43-68 is determined from analysis of concrete samples at Rancho Seco. The evaluation and results are found in DTBD-05-010.

hThe et value for the 44-116, 44-9 and 44-40-2 beta detectors is the 27r value as defined in ISO-7503-1 times the Standard's e3 value of 0.50 for Cs-137.

'The 43-116, 51 and 37 are gas flow proportional detectors (GFPD) of the.same type and window thickness as the 43-68 detector. The e, value for these detectors was derived from the concrete study performed using 43-68 detectors.

JScan MDC in pCi/g is calculated using the approach described in Section 6.7.2.1 of MARSSIM for a Cs-137 nuclide fraction of 0.95 and a Co-60 fraction of 0.05 with a determined detector sensitivity of 1000 and 430 cpm per mR/hr for each radionuclide respectively. The weighted MicroShield-determined conversion factor was 0.282 pCi/g per uR/hr.

kIn situ spectroscopy HPGe uses the "count to MDA" function in order to achieve the required MDC.

'The efficiency varies for the pipe detectors depending on the pipe diameter used. The efficiency used for the table is the averaged efficiency value for the pipe diameters. The detectors and diameters are: model 44-159: 2-4 in. dia., model 1062000: 1-4 in. dia., model 44-157: 4-8 in. dia.,

model 44-162: 8-12 in. dia.

Page 5-39

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 mThe 43-94, 98 and 111 are GFPD pipe detectors and the efficiency used is the el value. The source used is a metal source and the piping area of interest will be cleaned metal surfaces.

'Piping surveys may be conducted without scanning. Direct measurements will be acquired at intervals of 6 to 12 inches.

°Portable MCA multi-faceted instrument to be used to perform field spectrum analysis in varied data collection modes which may include in-situ object calibration software (ISOCS). Site procedures, instructions and as required, DTBD's will define the analysis parameters.

Page 5-40

Rancho Seco License Termination Plan Revision 0 Chapter 5. Final Status Survey Plan April 2006 5.4.3.2 Calibration And Maintenance Instruments and detectors are calibrated for the radiation types and energies of interest at the site. The calibration source for beta survey instruments is Cs-137 because the average beta energy (188 keV) approximates the beta energy of the radionuclides found on surfaces or in piping on site (average beta energy of 166 keV). The alpha calibration source when used is Pu-239 that has an appropriate alpha energy for plant-specific alpha emitting nuclides. Gamma scintillation detectors are typically calibrated using Cs-137.

Instrumentation used for final status survey will be calibrated and maintained in accordance with RP.3 11.11.03, Ludlum 23 50-1 Datalogger Calibration procedure. Radioactive sources used for calibration are traceable to the National Institute of Standards and Technology (NIST) and have been obtained in standard geometries to match the type of samples being counted. When characterized HPGe detectors are used, suitable NIST-traceable sources are used for calibration, and the software is set up appropriately for the desired geometry. If vendor services are used, these will be obtained in accordance with purchasing requirements for quality related services, to ensure the same level of quality, 5.4.3.3 Response Checks Instrumentation response checks are conducted to assure proper instrument response and operation. An acceptable response for field instrumentation is an instrument reading within

+/-20% of the established check source value. Laboratory instrumentation standards will be within +/-3 sigma as documented on a control chart. Response checks are performed daily before instrument use and again at the end of use. Check sources contain the same type of radiation as that being measured in the field and are held in fixed geometry jigs for reproducibility. If an instrument fails a response check, it is labeled with a Rancho Seco "Radiac Repair Tag" and is removed from service until the'problem is corrected in accordance with applicable procedures.

Measurements made between the last acceptable check and the failed check are evaluated to determine if they should remain in the data set.

5.4.3.4 Minimum Detectable Concentration (MDC)

The MDC is determined for the instruments and techniques used for final status surveys (Table 5-12). The MDC is the concentration of radioactivity that an instrument can be expected to detect 95 percent of the time.

5.4.3.4.1 Static MDC For Structure Surfaces For static (direct) surface measurements, with conventional detectors, such as those listed in Table 5-12, the MDC is calculated by Equation 5-7 as follows:

3 +4.654kB Equation 5-7

-where:

AMDCtj, minimum detectable concentration for direct counting (dpni/100 cm),

B = number of background counts during the count interval t, Page 5-41

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 t = count interval (for paired observations of sample'and blank, usually I minute), and 2

K calibration constant (counts/mm per dpm/100 cm ).

The value of K includes correction factors for efficiency (ei and sE). The value of e, is dependent on the material type. Corrections for radionuclide absorption have been made.

5.4.3.4.2 Structural Surface Beta-Gamma Scan MDCs Following the guidance of Sections 6.7 and 6.8 of NRG-1507, MDCs for surface scans of structural surfaces for beta and gamma emitters will be computed by Equation 5-8 below. For determining scan MDCs, a rate of 95% of correct detections is required and a rate of 60% of false positives is determined to be acceptable: therefore, a sensitivity index value of 1.3 8 was selected from Table 6.1 of NUREG-1507 and Equation 5-7 becomes:

Dn ,af, (dpm /100 cm2 ) = 1.38 4 A Equation 5-8 where:

B= number of background counts during the count interval t, p surveyor efficiency, el = instrument efficiency for the emitted radiation (cpm per dpm),

e, = source efficiency (intensity) in emissions per disintegration, A = sensitive area of the detector (cm2), and t = time interval of the observation while the probe passes over the source (minutes).

The numerator in Equation 5-8 represents the minimum detectable count rate that the observer would "see" at the performance level represented by the sensitivity index. The surveyor efficiency (p) will be taken tobe 0.5, as recommended by Section 6.7.1 of NUREG-1507. The factor of 100 corrects for probe areas that are not 100 cm2 . In the case of a scan measurement, the counting interval is the time the probe is actually over the source of radioactivity. This time depends on scan speed, the size of the source, and the fraction of the detector's sensitive area that passes over the source; with the latter depending on the direction of probe travel. The source efficiency term (e,) in Equation 5-8 may be adjusted to account for effects such as self-absorption, as appropriate.

5.4.3.4.3 Total Efficiency (et) and Source Efficiency (4s) for. Concrete Contamination The source term inventory on contaminated concrete appears to be primarily located within the first millimeter of the concrete surface. Various fixed point measurement alternatives for -

determining the source term were evaluated including gross beta measurements on the surfaces, volumetric concrete sampling and in situ gamma spectroscopy. Gross beta fixed point measurements were determined to be cost-effective and technically defensible under the Page 5-42

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 assumption that the instrument efficiencies for concrete could be satisfactorily calculated using the methods recommended in NUREG-1507. Determination of the average beta energy and detector response for structure surveys is described in DTBD 05-010.

For scan surveys, gross beta measurements appear to be a practical method. Under certain conditions, in situ gamma spectroscopy may be a reasonable method for replacing beta scan surveys.

The methods for determining efficiency in NUREG-1507 were specifically developed to address situations when the source, in this case concrete, affects radiation emission rate due to self-attenuation, backscatter, thin coverings, etc. This method accounts for these source effects by separating the efficiency calculation into two components, i.e., instrument efficiency ei and source efficiency e,. The total efficiency et, is the product of ei and cs as shown below.

8, = ( 1X" . )

Equation 5-9 The el was determined by calibration to a NIST traceable, large area Cs-137 source. The e, value was determined empirically through measurements of concrete cores and volumetric samples collected from representative site locations. Samples were taken from each of the buildings. The sample nuclide activities were determined by gamma spectrometry, then the pCi/g result was multiplied by the mass of the core sample and converted to total gross beta dpm. Detector response in c/m was divided by the sample activity in dpm to determine the e*.

Dividing etby ilresulted in the empirically derived s,. The empirically derived c, value of 0.46 compares reasonably with the ISO standard default value of 0.5 for beta energies greater than 0.4 MeV, considering most of the concrete activity is Cs-137 with a beta energy greater than 0.4.

The method used to adjust theefficiency for the effect 'ofsurface-coatings was taken from NUREG-1705 and is discussed in DTBD 05-010.

5.4.3.4.4 Structural Surface Alpha Scan MDCs In cases where alpha scan surveys are required, MDCs must be quantified differently than those for beta-gamma surveys because the background count rate from a typical alpha survey instrument is nearly zero (1 to 3 counts per minute typically).I Since the time that an area of alpha activity is under'the probe varies and the background count rates of alpha survey instruments is so low, it is not practical to determine a fixed MDC for scanning. Instead, it is more useful to determine the probability of detecting an area of contamination at a predetermined DCGL for given scan rates.

For alpha'survey instrumentation with a background around one'to three counts per minute, a single count will give a surveyor sufficient cause to stop and investigate further. Thus, the probability of detecting given levels of alpha emitting radionuclides can be calculated by use of Poisson summation statistics. Doing so (see MARRSIM Section 6.7.22 and Appendix J for details), one finds that the probability of detecting an area of alpha activity of 300 dpm/100 cm' at a scan rate of 3 cm per second (roughly 1 inch per second) is 90% if the probe dimension in the direction of the scan is 10 cm. If the probe dimension in the scan direction is halved to 5 cm, the detection probability is still 70%. Choosing appropriate values for surveyor efficiency, instrument and surface efficiencies will yield MDCs for alpha surveys for structure Page 5-43

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan -April 2006 surfaces. If for some reason: lower MDCs are desired, then scan speeds can be adjusted, within

'- practical limits, via the methods of Section 6.7.2.2 and Appendix J of MARSSIM. K 5.4.3.4.5 Open Land Area Gamma Scan MDCs In addition to the MDCR and detector characteristics, the scan MDC (in pCi/g) for land areas is based on areal extent of the hot spot, depth of the hot spot, and the radionuclide (i.e., energy and yield of gamma emissions). If one assumes constant parameters for each of the above variables,

'with the exception of the specific radionuclide in question, the scan MDC may be reduced to'a function of the radionuclide alone.

The evaluation of open land areas requires a detection methodology of sufficient sensitivity for the identification of small areas of potentially elevated activity. Scanning measurements are performed by passing a 2" x 2" NaI(TI) gamma scintillation detector in gross count rate mode across the land surface under investigation. The centerline of the detector is maintained at a source-to-detector distance of less than 10 cm and moved from side to side in a 1-meter wide pattern at a rate of 0.5 m/sec. This serpentine scan pattern is designed to cross each survey cell (one square meter) five times in approximately ten seconds with a maximum separation of less than 150 cm between any path. The audible signal is monitored for detectable increases in count rate. An observed count rate increase results in further investigation to verify findings and define the level and extent of residual radioactivity.

This method represents the Stage I and Stage 2 surface scanning process for land areas defined in NUREG-1507 and is the basis for calculation of the scanning detection sensitivity (scan MDC). The sensitivity of this counting system has been verified by empirical measurements (DTBD 05-012, "Eberline SPA-3 and Ludlum 44-10 Detector Sensitivity (MDC),"

[Reference 5-13]). The sensitivity is only slightly affected by the relative amounts ofCs-137 and Co-60 in the soil giving typical scan MDC values in the range of 5 to 6 pCi/g (approximately 10 percent of the soil DCGL) for instrument backgrounds of 8,000 to 10,000 cpm. Alternate methods of sufficient sensitivity for the identification of small areas of elevated radioactivity may be used where appropriate.

An aprioridetermination of scanning sensitivity is performed to ensure that the measurement system is able to detect concentrations of radioactivity at levels below the regulatory release limit. Expressed in terms of Scan MDC, this sensitivity is the lowest concentration of radioactivity for a given background that the measurement system is able to detect at a specified performance level and surveyor efficiency. The scan MDC value (in pCi/g) for open land area surface scanning is developed in the following steps following the guidance of MARSSIM, Section 6.7.2.1.

With a desired performance level of 95% correct detections and 60% false positive rate, the sensitivity index has a value of 1.38 resulting in a minimum detectable count rate (MDCR) of:

MDCR = 1.38 4b7 x (60 sec/i min)

Equation 10 where:

b,= background counts in the observation interval.

Page 5-44

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Introducing the human factor performance element of surveyor efficiency, the surveyor minimum detectable count rate becomes:

S.AdDCR 4,.,yor='-MDCR Equation 11 where:

MDCR.,ryo, = Minimum detectable surveyor count rate (cpm), and

'k "p = Surveyor efficiency = 0.5.

A corresponding minimum detectable exposure rate can be determined for a specified detector and radionuclide by dividing the MDCRs,,o, value by the detector manufacturer's count rate to exposure rate ratio (cpm per IiR/h) to give a minimum detectable exposure rate in units of IiR/h.

The minimum detectable exposure rate is then used to determine the minimum detectable radionuclide concentration (i.e., the Scan MDC) by modeling a specified small area of elevated activity using MicroShieldTM to yield a conversion factor of ItR/h per pCilg. The minimum detectable exposure rate is then divided by the MicroShieldrmconversion factor to give a Scan MDC in units of pCi/g.

5.4.3.4.6 HPGe Spectrometer Analysis' The onsite chemistry laboratory maintains two gamma isotopic spectrometers that are calibrated to various sample geometries, including a one-liter marinelli geometry for soil analysis. These systems are calibrated using a NIST-traceable mixed gamma source. Both detectors are manufactured by Canberra and operate using the Genie PC platform from Canberra Industries.

Laboratory counting systems have software controlled count times which are set to meet a maximum MDC of 0.15 pCi/g for Cs-137 in soil; this is calculated by Equation 5-12 as follows:

MDC (pCi / g) = +4.654k K*V*t Equation 5-12 where:

. -B= number of background counts duringthe count interval t, K proportionality constant that relates the detector response to the activity level in a sample for a given set of measurement conditions, V = mass of sample (g), and "t= count time (minutes)

An HPGe detector has been obtained for in situ gamma spectroscopy of soils and structures. Its sensitivity is similar to that of the lab spectrometer and is documented in DTBD-06-003.

Page 5-45

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 5.4.3.4.7 Pipe Survey Instrumentation Remaining pipe will be surveyed to ensure residual remaining activity is less than the DCGL.

Pipe survey instruments proposed for use with pipe having diameters between 0.75 and 18 inches have been shown to have efficiencies ranging from approximately 0.02 to 0.57 (Table 5-12). This equates to detection sensitivities of approximately 350 dpm/100 cm2 to 5,200 dpm/100 cm 2. This level of sensitivity is adequate to detect residual activity below the embedded pipe DCGL of 100,000 dpm/100 cm2 .

5.5 Data Collection and Processing This section describes data collection, review, validation and record keeping requirements for final status surveys.

5.5.1 Sample Handling and Record Keeping Sample collection and handling requirements are provided for-each sample from the point of collection through obtaining the final results to ensure the validity of the sample data. Sample tracking records are controlled and maintained and, upon completion of the data cycle, are transferred to Document Control, in accordance with applicable procedures.

Each survey unit has a document package associated with it that covers the design and field implementation of the survey requirements. Survey unit records are quality records.

5.5.2 Data Management Survey data are collected from several sources during the data life cycle and are evaluated for validity throughout the survey process. QC replicate measurements are not used as final status survey data. (See Section 5.8.2.4.1 for design and use of QC measurements.) Measurements performed during turnover and investigation surveys can be used as final status survey data if they were performed according to the same requirements as the final status survey data. These requirements are:

  • Survey data shall reflect the as-left survey unit condition; i.e., no further remediation required,
  • The application of isolation measures to the survey unit to prevent recontamination and to maintain final configuration are in effect; and
  • The data collection and design were in accordance with FSS methods and procedures, e.g., scan MDC, investigation levels, survey data point number and location, statistical tests, and EMC tests..

Measurement results stored as final status survey data constitute the final survey of record and are included in the data set for each survey unit used for determining compliance with the site release criteria. Measurements are recorded in units appropriate for comparison to the applicable DCGL. Numerical values, even negative numbers, are recorded. Measurement records include, at a minimum, the surveyor's name, the location of the measurement, the instrument used, measurement results, the date and time of the measurement, any surveyor comments, and records of applicable reviews.

Page 5-46

Rancho Seco License Termination Plan Revision 0 April 2006 Chapter 5, Final Status Survey Plan 5.5.3 Data Verification and Validation The final status survey data are reviewed before data assessment to ensure that they are complete, fully documented and technically acceptable. The review criteria for data acceptability will include at a minimum, the following items:

a) The instrumentation MDC for fixed or volumetric measurements was below the DCGLw or if not, it was below the DCGLEmc for Class 1, below the DCGLw for Class 2 and below 0.5 DCGLw for Class 3 survey units, b) The instrument calibration was current and traceable to NIST standards, c) The field instruments were source checked with satisfactory results before and after use each day data were collected or data was evaluated if instruments did not pass a source check in accordance with Section 5.4.3.3, d) The MDCs and assumptions used to develop them were appropriate for the instruments and techniques used to perform the survey, e) The survey methods used to collect data were proper for the types of radiation involved and for the media being surveyed, f) "Special methods" for data collection were properly applied for the survey unit under review. These special methods are either described in this LTP section or will be the subject Of an NRC notice of opportunity for review, g) The sample was controlled from the point of sample collection to the point of obtaining results, h) The data set is comprised of qualified measurement results collected in accordance with the survey design which accurately reflect the radiological status of the facility, and i) The data have been properly recorded.

If the data review criteria are not met, the discrepancy will be evaluated and the decision to accept or reject the data will be documented in accordance with approved procedures. The Rancho Seco Corrective Action Program will be used to document and resolve discrepancies as applicable.

5.5.4 Graphical Data Review Survey data may be graphed to identify patterns, relationships or possible anomalies which might not be so apparent using other methods of review.- A posting plot or a frequency plot may be made. Other special graphical representations of the data will be made as the need dictates.

5.5.4.1 Posting Plots Posting plots may be used to identify spatial patterns in the data. The posting plot consists of the survey'unit map with the numerical data shown at the location from which it was obtained.

Posting plots can reveal patches of elevated radioactivity or local areas in which the DCGL is exceeded. Posting plots can be generated for background reference areas to point out spatial trends that might adversely affect the use of the data. Incongruities in the background data may be the result of residual, undetected activity, or they may just reflect background variability.

Page 5-47,

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan - April 2006 5.5.4.2 Frequency Plots Frequency plots may be used to examine the general shape of the data distribution. Frequency plots are basically bar charts showing data points within a given range of values. Frequency plots reveal such things as skewness and bimodality (having two peaks). Skewness may be the result of a few areas of elevated activity. Multiple peaks in the data may indicate the presence of isolated areas of residual radioactivity or background variability due to soil types or differing materials of construction. Variability may also indicate the need to more carefully match background reference areas to survey units or to subdivide the survey unit by material or soil type. L 5.6 Data Assessment and Compliance An assessment is performed on the final status survey data to ensure that they are adequate to support the determination to release the survey unit. Simple assessment methods such as comparing the survey data to the DCGL or comparing the mean value to the DCGL are first performed. The statistical tests are then applied to the final data set and conclusions are made as to whether the survey unit meets the site release criterion.

5.6.1 Data Assessment Including Statistical Analysis The results of the survey measurements are evaluated to determine whether the survey unit meets the release criterion. In some cases, the determination can be made without performing complex, statistical analyses.

5.6.1.1 Interpretation of Sample Measurement Results An assessment of the measurement results is used to quickly determine whether the survey unit (")

passes or fails the release criterion or whether one of the statistical analyses must be performed.

The evaluation matrices are presented in Tables 5-13 and 5-14.

Table 5-13 Interpretation of Sample Measurements When the WRS Test Is Used Measurement Results Conclusion Difference between maximum survey unit concentration and Survey unit meets release minimum reference area concentration is less than DCGLw criterion Difference of survey unit average concentration and reference Surey unit fails average concentrations greater than DCGLw Difference between any survey unit concentration and any reference area concentration is greater than DCGLw and the Conduct WRS test and difference of survey unit average concentration and reference elevated measurements test area average concentration is less than DCGLw "_II Page 5-48

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 Table 5-14 Interpretation of Sample Measurements When the Sign Test Is Used Measurement Results Conclusion All concentrations less than DCGLw Survey unit meets release

___________________________________criterion Average concentration greater than DCGLw Survey unit fails Any concentration greater than DCGLw and average Conduct Sign Test and concentration less than DCGLw elevated measurements test When required, one of four statistical tests will be performed on the survey data:

1) WRS Test
2) Sign Test
3) WRS Test Unity Rule
4) Sign Test Unity Rule In addition, survey data are evaluated against the EMC criteria as previously described in Section 5.3.6.3 and as required by NUREG-1757, Volume 2. The statistical test is based on the null hypothesis (H0 ) that the residual radioactivity in the survey unit exceeds the DCGL. There must be sufficient survey data at or below the DCGL to reject the null hypothesis and conclude the survey unit meets the site release criterion for dose. Statistical analyses are performed using a specially designed software package or, if necessary, using hand calculations.

5.6.1.2 Wilcoxon Rank Sum Test, The WRS test, or WRS Unity Rule (NUREG-1505, Chapter 11), may be used when the radionuclide of concern is present in the background or measurements are used that are not radionuclide-specific. In addition, this test is valid only when "less than" measurement results do not exceed 40 percent of the data set.

The WRS test is applied as follows:

1) The background reference area measurements :are adjusted by adding the DCGLw to each background reference area measurement, Xi; i.e., Z4 = Xi + DCGL.
2) The number of adjusted background reference area measurements, m, and the number of,survey unit measurements, n, are summed to obtain N, (N = m + n).
3) The measurements are pooled and ranked in order of increasing size from 1 to N. If several measurements have the same value, they are assigned the average rank of that group of measurements.
4) The ranks of the adjusted background reference area measurements are summed to obtain Wr.

Page 5-49

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006

5) The value of W, is compared with the critical value in Table 1.4 of MARSSIM. If W, is greater than the critical value, the survey unit meets the site release dose criterion. If W, is less than or equal to the critical value, the survey unit fails to meet the criterion.

5.6.1.3 Sign Test The Sign test and Sign test Unity Rule are one-sample statistical tests used for situations in which the radionuclide of concern is not present in background, or is present at acceptable low fractions compared to the DCGLw. If present in background, the gross measurement is assumed to be entirely from plant activities. This option is used when it can be reasonably expected that including the background concentration will not affect the outcome of the Sign test. The advantage of using the Sign test is that a background reference area is not needed.

The Sign test is conducted as follows:

1) The survey unit measurements, Xi, i = 1, 2, 3, ...N; where N = the number of measurements, are listed.
2) X, is subtracted from the DCGLw to obtain the difference Di = DCGLw - Xi, where i=1,2,3,..., N.
3) Differences where the value is exactly zero are discarded and N is reduced by the number of such zero measurements.
4) The number of positive differences are counted. The result is the test statistic S+. Note that a positive difference corresponds to a measurement below the DCGLw and contributes evidence that the survey unit meets the site release criterion.
5) The value of S+ is compared to the critical value given in Table 1.3 of MARSSIM. The table contains critical values for given values of N and a. The value of a is set at 0.05 during survey design. If S+ is greater than the critical value given in the table, the survey unit meets the site release criterion. If S+ is less than or equal to the critical value, the survey unit fails to meet the release criterion.'

5.6.2 Unity Rule 5.6.2.1 Multiple Radionuclide Evaluations The Cs-137 to Co-60 (or other gamma nuclide) ratio will vary in the final survey soil samples, and this will be accounted for using a "unity rule" approach as described in NUREG-1505 Chapter 11. Unity Rule Equivalents will be calculated for each measurement result using the surrogate adjusted Cs-137 DCGL and the adjusted Co-60 DCGL, as shown in the following Equation 5-13.

Unity Rule Cs-137 Co-60 RN

  • =

Equvaen +...÷ R DCGLc,-137, DCGLc.. 0 F DCGLN Equation 5-13 Page 5-50

Revision 0 RanchoSeco License Termination Plan April 2006 Chapter 5, Final Status Survey Plan where:

Cs-137 and Co-60 are the gamma results,-

DCGLc.-13 7s = the surrogate Cs-137, DCGL, as applicable, DCGLcOo = the Co-60 DCGL, RN any other identified gamma emitting radionuclide, and DCGLN the DCGL for radionuclide N.

is The unity rule equivalent results will be used to demonstrate compliance assuming the DCGL equal to 1.0 using the criteria listed in the LTP, Tables 5-13 and 5-14. If the application of the WRS or Sign test is necessary, these tests will be applied using the unity rule equivalent results and assuming that the DCGL is equal to 1.0. An example of a WRS test using the unity rule is provided in NUREG-1505, Page 11-3, Section 11.4. (If the WRS test were used, or background subtraction were used in conjunction with the Sign test, background concentrations would also be converted to Unity Rule Equivalents prior to performing test.)

The Sign test will be used without background subtraction if background Cs-137 is not considered a significant fraction of the DCGL. Note that the surrogate Cs-137DCGL will be used for both the statistical tests and comparisons with the criteria in LTP Tables 5-13 and 5-14.

to The same general surrogate and unity rule methods described above for soil will be applied for final other materials, such as activated concrete, where sample gamma spectroscopy is used survey as opposed to gross beta measurements.

5.6.2.2 Elevated Measurement Comparison Evaluations be During final surveys, areas of elevated activity (hot'spots) may be detected and they must criteria. The hot evaluated both individually and in total to ensure compliance with the release spots are each compared to the specific DCGLEmc value calculated for the size of the the unityspecific hot spot. If the individual hot spots pass, then they are combined and evaluated under rule.

The average activity of each hot spot is determined as well as the average value for the survey is unit. The survey unit average value is divided by the DCGLw, the survey unit average value subtracted from the hot spot average activity value and the result is divided by the hot spot DCGL_*lc.: Each hot spotnet average activity is evaluated against its DCGLEMc. The fractions are summed and the result'must be less than unity for the survey unit to pass. This is summarized in Equation 5-14 below.

6 -r J

  • '- *'V2 - 8 - o ' -8 <

+

+ +___ <~ I DCG-W DCGLC -DCGL -. DCGLmc.

Equation 5-14 where. ..

J = the survey unit average activity, DCGLw = the survey unit DCGL concentration, Page 5-51

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan 'April 2006

-, = the average activity value of hot spot n, and DCGLEmc, = the DCGLEmc concentration of hot spot n.

5.6.3 Data Conclusions The results of the statistical tests, including application of the EMC, allow one of two conclusions to be made. The first conclusion is that the survey unit meets the site release dose criterion. The data provide statistically significant evidence that the level of residual radioactivity in the survey unit does not exceed the release criterion. The decision to release the survey unit is made with sufficient confidence and without further analysis.

The second conclusion that can be made is that the survey unit fails to meet the release criterion.

The data are not conclusive in showing that the residual radioactivity is less than the release criterion: The data are analyzed further to determine the reason for the failure.

Possible reasons are that:

  • The average residual radioactivity exceeds the DCGLw, The average residual radioactivity is less than the DCGLw; howeverothe survey unit fails elevated measurement comparison,
  • The survey design or implementation was insufficient to demonstrate compliance for unrestricted release, or
  • The test did not have sufficient power to reject the null hypothesis (i.e., the result is due to random statistical fluctuation).

The power of the statistical test is a function of the number of measurements made and the standard deviation in measurement data. The power is determined from 1-J3 where P is the value for Type IIerrors. A retrospective power analysis may be performed using the methods described in Appendices 1.9 and 1.10 of MARSSIM. If the power of the test is insufficient due to the number of measurements, additional samples may be collected as directed by procedure.

A greater number of measurements increases the probability of passing if the survey unit actually meets the release criterion.

If failure was due to the presence of residual radioactivity in excess of the release criterion, the survey unit shall be remediated. Survey unit failure due to inadequate design or implementation shall require investigation and re-initiation of the FSS process.

5.6.4 Compliance The FSS is designed to demonstrate licensed radioactive materials have been removed from Rancho Seco property to the extent that remaining residual radioactivity is below the radiological criteria for unrestricted release. The site-specific radiological criteria presented in this plan demonstrate compliance with the criteria of 10 CFR 20.1402. If the measurement results pass the requirements of Table 5-7 and the elevated areas evaluated per Section 5.3.6.3 pass the elevated measurement comparison, the survey unit is suitable for unrestricted release.

If survey measurements do not meet the criteria specified in Table 5-7, an investigation will be performed. Investigations will include an evaluation of survey design, instrumentation use and Page 5-52

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 calculations, as necessary. All investigations of this nature will be documented using the corrective action process as discussed in Section 5.8.2.

5.7 Reporting Format Survey results and a brief operating history are documented in survey unit release records and in the FSS Report. Other reports may be generated as requested by the NRC.

5.7.1 Operating History A brief operational history including relevant operational and decommissioning data is compiled. The purpose of the history information is to provide additional, substantive data which forms a portion of the basis for the survey unit classification, and hence, the level of intensity of the FSS. The history information includes the following items:

" Operating history.which could affect radiological status,

" Summarized scoping and site characterization data, and

  • Other relevant information, as deemed necessary.

5.7.2 Survey Unit Release Record A separate release record is prepared for each survey unit. The survey unit release record is a stand-alone document containing the information necessary to demonstrate compliance with the site release criteria. This record includes:

  • Description of the survey unit,
  • Survey unit design information,
  • Survey unit measurement locations and corresponding data,
  • Survey unit investigations performed and their results, and
  • Survey unit data assessment results.

When a survey unit release record is given final approval it becomes a quality record.

5.7.3 Final Status Survey Report, Survey results Will be described in a written report to the NRC. The actual structures, land, or piping system included in each written report may vary depending on the status of ongoing decommissioning activities.

The final status survey report provides a summary of the survey results and the overall conclusions that demonstrate that the Rancho Seco facility and site meet the radiological criteria for unrestricted use. Information such as the number and type of measurements, basic statistical quantities, and statistical analysis results are included in the report. The level of detail is sufficient to clearly describe the final status survey program and to certify the results. The format of the final report will contain the following topics:

Page 5-53

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 4 Overview of the Results; e Discussion of Changes to FSS;

  • Final Status Survey Methodology; o Survey unit sample size, o Justification for sample size;
  • Final Status Survey Results; o Number of measurements taken, o Survey maps, o Sample concentrations, o Statistical evaluations, o Judgmental and miscellaneous data sets;

" Anomalous Data;

  • Conclusion for each survey unit; and
  • Any Changes from initial assumptions on extent of residual activity.

5.7.4 Other Reports Other reports relating to final status survey activities may be prepared and submitted as necessary.

5.8 Final Status Survey Ouality Program Quality is built in to each phase of the FSS Program and measures must be taken during the execution of the plan to determine whether the expected level of quality is being achieved. The FSS Program will ensure that the site will be surveyed, evaluated and determined to be acceptable for unrestricted release if the residual activity results in an annual Total Effective Dose Equivalent (TEDE) to the average member of the critical group of 25 mrem/year or less for all pathways. The following sections provide a description of applicable Rancho Seco quality programs and specific quality elements of the FSS Program.

5.8.1 Rancho Seco Quality Assurance Program The Rancho Seco Quality Assurance Program (QAP) [Reference 5-14] is applied to systems, structures, components and activities important to the safe storage, control and maintenance of spent nuclear fuel and to the monitoring and control of radiological hazards. The Rancho Seco Quality Manual (RSQM) defines the responsibilities and requirements to ensure decommissioning and operation of the ISFSI comply with licenses and applicable regulations (10 CFR 50 and 10 CFR 72). The RSQM addresses organizational responsibilities, staff qualifications, procedure review and approval, design and modification controls, procurement, measurement and test equipment (M&TE) calibration and control, testing of installed equipment, document control, corrective action and other information pertinent to quality.

5.8.2 FSS Quality Assurance Project Plan (QAPP)

The objective of the FSS QAPP is to ensure the survey data collected are of the type and quality needed to demonstrate with sufficient confidence the site is suitable for unrestricted release.

The objective is met through use of the DQO process for FSS design, analysis and evaluation.

The plan ensures the following items are accomplished:

Page 5-54

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006

1) The elements of the final status survey plan are implemented in accordance with the approved procedures,
2) Surveys are conducted by trained personnel using calibrated instrumentation,
3) The quality of the data collected is adequate,
4) All phases of package design and survey are properly reviewed, with QC and management oversight provided, and
5) Corrective actions, when identified, are implemented in a timely manner and are determined to be effective.

The following sections describe the basic elements of the FSS QAPP.

5.8.2.1 Project Management and Organization An FSS organization will be established for the Rancho Seco site in RSAP-1901. This organization will be responsible for planning and implementation of final status surveys. Since the FSS organization has notbeen fully implemented at the time of LTP development, specific job titles may vary over the period of project execution. However, the following descriptions refer to various functional areas of responsibility and do not necessarily correspond to specific job titles. It is also important to note qualified individuals may assume the responsibilities of more than one of the functional positions described below. The FSS organization consists of the following functional areas,:,

5.8.2.1.1 Dismantlement Superintendent - Radiological the Dismantlement Superintendent - Radiological has overall responsibility for program direction, technical content, and ensuring the program complies with applicable NRC regulations and guidance. This supervisor is responsible for preparation and implementation of the FSS procedures. Additional responsibility areas may include resolution of issues or concerns raised by the NRC or other Stakeholders, as well as programmatic issues raised by Rancho Seco site management. The Dismantlement Superintendent - Radiological provides overall FSS project coordination, which may include, but is not limited to, interfaces with site personnel in areas of nuclear licensing, demolition and waste disposal.

5.8.2.1.2 Final Status Survey Technical Specialists Responsibilities of FSS Technical Specialists may include technical support and development of FSS procedures, design of final status surveys, preparation of survey execution instructions, development of specific technical analysis documents supporting FSS activities, and review of survey packages and data collected in support of the FSS..

5.8.2.1.3 Work Planning Coordinators Work Planning Coordinators develop detailed, job-specific work instructions using the site work order process. These individuals are tasked with ensuri g the appropriate interface between various site functional groups is -specified in work order documents. These individuals possess specific knowledge regarding Radiation Protection, FSS, and Industrial Safety requirements.  : !:F -. - ..

Page 5-55

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 5.8.2.1.4 Final Status Survey Field Coordinators Final Status Survey Field Coordinators are responsible for control and implementation of survey packages during field activities. Specific responsibilities are likely to include:

  • Coordination of turnover surveys,
  • Survey area preparation (e.g., gridding),
  • Ensuring final status survey sampling is conducted in accordance with applicable procedures and work instructions,
  • Maintaining access controls over completed FSS survey areas,
  • Determining survey area accessibility requirements,
  • Coordination and scheduling of FSS Technicians to support the decommissioning schedule, and
  • Ensuring all necessary instrumentation and other equipment is available to support survey activities.

5.8.2.1.5 Final Status Survey Data Specialist The FSS Data Specialist is responsible for maintaining the FSS data records in both electronic formats and hardcopy files, as applicable. This includes maintaining survey measurement data and supporting data files and generating reports of survey results. Responsibilities also include maintaining the integrity of the FSS database and implementing FSS Database QA requirements.

5.8.2.1.6 Final Status Survey Technician Final Status Survey Technicians are responsible for performance of final status survey measurements and collection of final status survey samples in accordance with applicable site procedures and survey package instructions. An FSS Technician will be responsible for maintaining the pedigree of instrumentation used in the survey by implementing the procedural requirements for calibration, maintenance and daily checks. Final Status Survey Technicians will be trained and task-qualified for the performance of the final status activities assigned to them. Final Status Survey Technicians may also participate in survey area preparations.

5.8.2.2 Written Procedures Sampling and survey tasks must be performed properly and consistently in order to assure the quality of final status survey results. The measurements willbe performed in accordance with approved, written procedures. Approved procedures describe the methods and techniques used for final status survey measurements. Those procedures have been cited in Sectioii 5.9.1.

5.8.2.3 Training and Qualification Personnel performing final status survey measurements will be trained and qualified. Training will include the following topics:

Page 5-56

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006

.. Procedures governing the conduct of the FSS,

. Operation of field and laboratory instrumentation used in the FSS, and

  • Collection of final status survey measurements and samples.

Qualification is obtained upon satisfactory demonstration of proficiency in implementation of procedural requirements. The extent of training and qualification will be commensurate with the education, experience and proficiency of the individual and the scope, complexity and nature of the activity required to be performed by that individual. Records of training and qualification will be maintained in accordance with approved training procedures 5.8.2.4 Measurement and Data Acquisitions The FSS records have been designated as quality documents and will be governed by site quality programs and procedures. Generation, handling and storage of the original final status survey design and data packages will be controlled by site procedures. Each final status survey measurement will be identified by individual, date, instrument, location, type of measurement, and mode of operation.

5.8.2.4.1 Quality Control Surveys Procedures establish built-in Quality Control checks in the survey process for both field and laboratory measurements, as described in LTP Section 5.8.2.2. For structures and systems, QC replicate scan measurements will consist of resurveys of a minimum of 5% of randomly selected class 1, 2, or 3 survey units typically performed by a different technician with results compared to the original survey result. The acceptance criterion shall be that the same conclusion as the original survey was reached based on the repeat scan. If the acceptance criterion is not met, an investigation will be conducted to determine the cause and corrective action.,

Quality Control for direct surface contamination and/or exposure rate measurements will consist of repeat measurements of a minimum of 5% of the survey units using the same instrument type, taken by a different technician (except in cases where there is only one instrument or specialized training is required to operate the equipment) and the results compared to the original measurements using the same instrument type. The acceptance criterion for direct measurements is specified in approved procedures.

For soil, water and sediment samples, Quality Control will consist of participation in the laboratory Inter-comparison Program. However, as an additional quality measure, approximately 5% of such samples may be subjected to blind duplicate samples and/or third party analyses., The acceptance criterion for blank samples is that no plant-derived radionuclides are detected. The criterion for blind duplicates is that the two measurements are within the value specified by approved procedure. For third party analyses, the acceptance criterion is the same as those for blind duplicates. Some sample media, such as asphalt, will not be subjected to split or blind duplicate analyses due to the lack of homogeneity. These samples will simply be recounted to determine if the two counts are within 20% of each other, when necessary.

If QC replicate measurements or sample analyses fall outside of their acceptance criteria, a documented investigation will be performed in accordance with approved procedures; and if necessary, the Corrective Action Process described in Section 5.8.3.3 will be implemented. The Page 5-57

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 investigation will typically involve verification that the proper data sets were compared, the relevant instruments were operating properly and the survey/sample points were properly identified and located. Relevant personnel are interviewed, as appropriate, to determine if proper instructions and procedures were followed and proper measurement and handling techniques were used including chain of custody, where applicable. When deemed appropriate, idditional measurements are taken. Following the investigation, a documented determination is made regarding the usability of the survey data and ifthe impact of the discrepancy adversely

-affects the decision on the radiological status of the survey unit.

5.8.2.4.2 Instrumentation Selection, Calibration and Operation Proper selection and use of instrumentation will ensure that sensitivities are sufficient to detect radionuclides at the minimum detection capabilities as specified in Section 5.4.3.4 as well as assure the validity of the survey data. Instrument calibration will be performed with NIST traceable sources using approved procedures. Issuance, control and operation of the survey instruments will be conducted in accordance with the Instrumentation Program procedures.

5.8.2.5 Chain of Custody Responsibility for custody of samples from the point of collection through the determination of the final survey results is established by procedure. When custody is transferred outside of the organization, a chain of custody form will accompany the sample for tracking purposes. Secure storage will be provided for archived samples.

5.8.2.6 Control'of Consumables In order to ensure the quality of data obtained from FSS surveys and samples, new sample containers will be used for each sample taken. Tools used to collect samples will be cleaned to remove contamination prior to taking additional samples. Tools will be decontaminated after each sample collection and surveyed for contamination.

5.8.2.7 Cdntrol of Vendor-Supplied Services Vendor-supplied services, such as instrument calibration and laboratory sample analysis, will be procured from appropriate vendors in accordance with approved quality and procurement procedures.

5.8.2.8 Database Control Software used for data reduction, storage or evaluation will be fully documented and certified by the vendor. The software will be tested prior to use by an appropriate test data set.

5.8.2.9 Data Management Survey data control from the time of collection through evaluation is specified by procedure.

Manual data entries will be secondarily verified. , : , I Page 5-58

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 5.8.3 Assessment and Oversight 5.8.3.1 Assessments FSS self-assessments will be conducted in accordance with approved procedures. The findings will be tracked and trended in accordance with these procedures. In addition, QC will perform assessments of FSS activities in accordance with the Quality Assurance Program.

5.8.3.2 Independent Review of Survey Results Randomly selected survey packages (approximately 5%) from survey units will be independently reviewed by the Quality Assurance personnel to ensure that the survey measurements have been taken and documented in accordance with approved procedures.

5.8.3.3 Corrective Action Process The corrective action process, already established as part of the site's 10 CFR Part 50 Appendix B Quality Assurance Program, will be applied to FSS for the documentation, evaluation, and implementation of corrective actions. The process will be conducted in accordance with approved procedures which describe the methods used to initiate potential deviation from quality (PDQ) reports and resolve self assessment and corrective action issues related to FSS. The PDQ evaluation effort is commensurate with the classification of the PDQ and could include root cause determination, extent of condition reviews, and preventive and remedial actions.

5.8.3.4 Reports to Management Reports of audits and trend data will be reported to management in accordance with approved procedures.

5.8.4 Data Validation and Verification Survey data will be reviewed prior to evaluation or analysis for completeness and for the presence of outliers. Comparisons to investigation levels will be made and measurements exceeding the investigation levels will be evaluated. Procedurally verified data will be subjected to the Sign test, the Unity Sign test, the WRS test, or WRS Unity test as appropriate.

Technical evaluations or calculations used to'support the development of DCGLs will be independently verified to ensure correctness of the method and the quality of data.

5.8.5 Confirmatory Measurements The NRC may take confirmatory measurements to make a determination in accordance with 10 CFR 50.82(aXl 1) that the FSS and associated documentation demonstrate the site is suitable for release in accordance with the criteria for decommissioning in 10 CFR Part 20, subpart E.'

Confirmatory measurements may include collecting radiological measurements for the purpose of confirming and verifying compliance with NRC standards for unrestricted license termination. Timely and frequent communications with the NRC will ensure it is afforded sufficient opportunity for these confirmatory measurements prior to implementing any irreversible decommissioning actions.

Page 5-59

Rancho Seco License Termination Plan Revision 0 Chanter 5. Final Status Survev Plan April 2006 Perform Data Evaluation Yes Conduct statistical test and EMC, as applicable Figure 5-1 FSS Process Overview Page 5-60

0 Rancho Seco License Termination Plan 0 0 Revision 0 Chanter 5. Final Status Survev Plan April 2006 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD Ln If) (0 (n

(N (O If) In tN\I- (N C14 (N (N (Nq (Nx (N (N 25 1000 80000, 250000 500000 1

2490001 I 1

2-4---000-

p. 1-2480001 1 jI 1/ 'I I '~ 4OOQO~

2470001i Il I I I ~ I /

I -I I I I I i 'F 2460001

-I

  • MD SACRAMENTO MUNICIPAL UTILITY' DISTRICT 2WG:F1a~.re 5-2 Figure 5-2 Area Designations DWG:Figure 5-2 Page 5-61 C77

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 5.9 References 5-1 U.S. Nuclear Regulatory Commission NUREG-1757, Vol. 2, "Consolidated NMSS Decommissioning Guidance - Characterization, Survey, and Determination of Radiological Criteria, Final Report," September 2003 5-2 U.S. Nuclear Regulatory Commission NUREG-1575, Revision 1, "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)," August 2000 5-3 U.S. Nuclear Regulatory Commission NUREG-1505, Revision 1, "A Nonparametric Statistical Methodology for the Design and Analysis of Final Status Decommissioning Surveys," June 1998 draft 5-4 U.S. Nuclear Regulatory Commission NUREG-1507, "Minimum Detectable Concentrations With Typical Radiation Survey Instruments for Various Contaminants and Field Conditions,"

June 1998 5-5 U.S. Nuclear Regulatory Commission NUREG-1700, Revision 1, "Standard Review Plan for Evaluating Nuclear Power Reactor License Termination Plans," April 2003 5-6 U.S. Nuclear Regulatory Commission Regulatory Guide 1.179, "Standard Format and Content of License Termination Plans for Nuclear Power Reactors," January 1999 5-7 U.S. Nuclear Regulatory Commission NUREG/CR-5512, Volume 1, Final Report, "Residual Radioactive Contamination from Decommissioning," October 1992 5-8 Rancho Seco Decommissioning Technical Basis Document DTBD-06-002, Revision 0, "Use of a Survey Unit Size of 319 m2 for Class One Structure Surveys at Rancho Seco Nuclear Generating Station" 5-9 Rancho Seco Decommissioning Technical Basis Document DTBD-06-001, Revision 0, "RSNGS Initial Classification of Survey Areas and Survey Design Sigma Values" 5-10 Rancho Seco Decommissioning Technical Basis Document DTBD-06-003, Revision 0, "Use of In Situ Gamma Spectroscopy for Final Status Surveys" 5-11 Rancho Seco Decommissioning Technical Basis Document DTBD-05-010, Revision 0, "Beta Detection Including Beta Energy and Source Efficiency" 5-12 International Organization for Standardization, ISO 7503-1, "Evaluation of Surface Contamination - Part 1: Beta Emitters and Alpha Emitters (first edition)," 1988 5-13 Rancho Seco Decommissioning Technical Basis Document DTBD 05-012, Revision 0, "Eberline SPA-3 and Ludlum 44-10 Detector Sensitivity (MDC)"

5-14 Sacramento Municipal Utility District, Rancho Seco Quality Manual 5.9.1 Applicable Site Procedures For FSS DSIP-0020 Survey Unit Design DSIP-0030 Survey Unit Remediation and ALARA Evaluation Page 5-62

Rancho Seco License Termination Plan Revision 0 Chanter 5. Final Status Survev Plan April 2006 DSIP-0050 Survey Unit Release Controls DSIP-0060 Department Training and Qualification DSIP-0100 Final Status Survey Design DSIP-0110 Final Survey Performance, DSIP-0120 Decommissioning Survey Analysis (DQA) ,

DSIP-0130 Decommissioning Survey Background Reference Area Evaluations DSIP-0200 DEG QC Program DSIP-0210 QC Verification Survey Design DSIP-0220 QC Verification Survey Performance DSIP-0300 Decommissioning Sampling and Controls-Solids DSIP-0500 Instrumentation DSIP-0510 Ludlum 2350 Operation DSIP-0520 Ludlum 2350 Download Procedure QAIP-0601 Procedure Control QAIP-1702 Records Management RP.305 Radiation Protection Plan RP.305.11 Radioactive Source Handling RP.305.22 Departmental Training & Qualification RP.311 Radiation Protection Instrument Control Program RP.3 11.11.03 Ludlum 2350-1 Datalogger Calibration RP.31 .VI.01 RP Counting Statistics RP.311 .VI.02 Radiation Protection Instrument Checks RP.311 .VI.03 Counting Equipment Voltage Plateaus RP.311 .VII.02 Shepard Model 89 Cesium Calibrator RP.311 .VII.02 Verification/Certification of Gamma Calibrators RSAP-0101 Nuclear Organization Responsibilities & Authorities RSAP-0309 Vendor Documentation Requirements, Review, and Approval RSAP-0409 Procurement Program for Defueled Plant.

RSAP-0500 Review, Approval and Changes of Procedures RSAP-0505 Document Control RSAP-0506 Procedure Review RSAP-0601 Nuclear Records Management RSAP-1101 ALARA Manual RSAP-1204 Training Programs RSAP-1301 Corrective Action Program Page 5-63

Rancho Seco License Termination Plan Revision 0 Chapter 5, Final Status Survey Plan April 2006 RSAP-1305 Corrective Action F,equest RSAP-1308 Potential Deviation from Quality RSAP-1310 Deviation from Qu ility RSAP-1501 Controlled Softwarne Change Request RSAP-1702 Quality Assurance for Radiological Monitoring Programs RSAP-1900 Control of Decomn issioning Projects RSAP-1901 Decommissioning Survey Program Page 5-64