NUREG-1575, Forwards Final Status Survey Using Marssim Survey Methodologies at Cushing Refinery Site, for Info

From kanterella
(Redirected from NUREG-1575)
Jump to navigation Jump to search
Forwards Final Status Survey Using Marssim Survey Methodologies at Cushing Refinery Site, for Info
ML20149H934
Person / Time
Site: 07003073
Issue date: 07/18/1997
From: Brown S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Lux J
KERR-MCGEE CORP.
Shared Package
ML20149H936 List:
References
RTR-NUREG-1575 NUDOCS 9707250255
Download: ML20149H934 (2)


Text

.

= -. -

J

]

' July.18J1997.

. Mr. Jeff Lux l Project ManagerJ Kerr-NicGee Corporation Kerr-McGee Center P.O. Box 258611

' Oklahoma City,' OK. 73125:

J

Dear Mr. Lux:

i Recently, the Kerr-McGee Corporation allowed the U.S; Nuclear Regulatory i Commission use.of the Cushing site for field testing survey methodologies described in the "Mulitagency Radiation Survey and Site investigation Manual" (MARSSIM). Our contractor, ORISE, has completed its report of this' effort, l.have enclosed a copy of this report, ' Final Status Survey Using MARSSIM Survey Methodologies at the Cushing Refinery Site," for your

infoimation, If you have any questions, please contact me at (301) 415-6605.

4 Sincerely.

[0riginalsigned-by]

Stewart W. Brown, Project Manager

~

i,

Low-Level Waste and Decommissioning Projects Branch.

Division of Waste Management F

Office of Nuclear Material Safety and Safeguards -

Docket No.: 70-3073:

License No.: SNM-1999 L

Enclosure:

As stated '

cow /encls.: Kerr-McGee, Cushing dist.' list i TICKET: N/A, DISTRIBUTION: \\ Central File LLDP r/f NMSS r/f.

PUBLIC EBrummett

. Ta socehe a copy of this document in emad box on "oFC:"Ine entw: "C" = Copy without attachment / enclosure: "E" = Copy with attachnent/ enclosure:

i'N" = No copy Path & File Name: S:\\QWM\\LLDP\\SM \\CUSH.MSR OFC' LLDP//'

LLDh j LLDRM/ f, Jby SBro h M TCJo on NAME k/h72 7

97-7//h!97 DATE' 7/

^

OFFICIAL RECORD COPY -

~ ACNW: YES _

O Category: Proprietary _ or'CF Only _

L LSS : YES.

(NO-Delete file after distribution: Yes [ No _

ff M ], /

F :IG : YES NO i

9707250255 970718' 1/

PDR ADOCK 07003073 C

PDR NRC fRE 7

~ 'CDPY 1

' ~ ~ ~ -

lh h

h

'l 2

x

1

]

e. :e July18, 1997

.MriJeff Ldx '

. Project Manager H

Kerr-McGee'Corporatio'n -
Kerr-McGee Center

' P.O; Box 25861 i

LOklahoma City, OK 73125

,,, [.1

Dear Mr. Lux:

}

Recently, the Kerr-McGee Corporation allowed the U.S. Nuclear Regulatory

' Commission use of the Cushing site for field testing survey methodologies described in the -

"Mulitagncy Radiation Survey and Site Investigation Manus!". (MARSSIM).: Our contractor, ORISE, nas completed its report of this effortL I have enclosed a copy of this report, " Final tStatus Survey Using MARSSIM Survey Methodologias at the Cushing Refinery Site,". for your l

v' L information. If you have any questioris, please contact me at (301) 415-6605.-

i Sincerely,

[0riginal-signedby].

Stewart W. Brown, Project Manager 9

Low-Level Waste and Decommissioning Projects Branch Division of Waste Management Office of Nuclear Mearial Safety

[

and Safeguards

. Docket No.: 70-3073 r

License No.: SNM-1999 e

\\

f.

Enclosure:

As' stated i

'l cc w/encia.f Kerr-McGee, Cushing dist. list

" TICKET: N/A-l i DlSTRIBUTION: Central File LLDP r/f -

NMSS r/f.

PUBLIC EBrummett 1

- Ta masive a copy of Wde document in emas box on "oFc:" Ine enter: "C" = Copy without ettechment/endoeure;"E" = Copy widt ettechment/enciosure.

7 "N*, = No copy

~ Path & Filo Name: S:\\pWM\\LLDP\\SWE \\CUSH.MSR CFC'

-LLDP[

LLD k ' /

LLDR//// [,

5 2

NA'ME- ' SBroh dTCJo son

- Ji y

z 7/[h7

- 7h97-7/ /h/97 DATE e

c-OFFICIAL RECORD COPY

i ACNW
YES,. O1
Category: Proprietary _, or CF.Only __.

4 2. flG : YES4_.NO l

[ LSS :;YESW NO

. Delete file after distributioni Yes [ No _

~

f 5.1

....i.

e

'S i

? f, j

s 1

~ ~'A

'U-L z u 1

.o

,N

,/i

, ( -.. ;.

94

~

].}

'.'(f.

?

.r(.

r

_g; i

t s