MONTHYEARML17083A9832017-03-22022 March 2017 Orau Independent Confirmatory Survey Summary, Results, and In-Process Inspection for the Interim On-Site Storage Building and Surrounding Area at the Rancho Seco Nuclear Generating Station ML17065A0342017-02-28028 February 2017 Final Status Survey Summary Report ML17065A0602017-02-24024 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Embedded Pipe, Survey Unit F8300123 ML17065A0612017-02-0909 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Loading Dock, Survey Unit F8300071 ML17065A0712017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Hot Cell Pipe, Survey Unit F8300111 ML17065A0722017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Office Area, Survey Unit F8300133 ML17065A0702017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Truck Bay, Survey Unit F8300053 ML17065A0682017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 2, Survey Unit F8300142 ML17065A0632017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Main Sump, Survey Unit F8300103 ML17065A0662017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 3, Survey Unit F8300143 ML17065A0552017-01-30030 January 2017 Final Status Survey Summary Report, December 27, 2016, Iosb Cell Deck, Survey Unit F8300093 ML17065A0652017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017 Iosb Hot Cell Class 2, Survey Unit F8300062 ML17065A0642017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Hot Cell, Survey Unit F8300061 ML17065A0692017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 1, Survey Unit F8300141 ML17065A0472017-01-30030 January 2017 Final Status Survey Summary Report, October 3, 2016, Iosb Roof, Survey Unit F8300153 ML17065A0582017-01-26026 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb Cask Wash Down Area, Survey Unit F8300323 ML17065A0462017-01-26026 January 2017 Final Status Survey Summary Report, October 21, 2016, Iosb Exterior Surfaces, Survey Unit F8300313 ML17065A0562017-01-24024 January 2017 Final Status Survey Summary Report, December 28, 2016, Iosb DAW Staging Bay, Survey Unit F8300023 ML17065A0592017-01-10010 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb DAW Staging Bay Class 2, Survey Unit F8300042 ML17065A0572017-01-10010 January 2017 Final Status Survey Summary Report, January 5, 2017, Iosb DAW Staging Bay Class 1, Survey Unit F8300031 ML17065A0482017-01-0404 January 2017 Final Status Survey Summary Report, November 7, 2016, Iosb Storage Cell B-3, Survey Unit F8300213 ML17065A0372016-12-30030 December 2016 Final Status Survey Report, October 20, 2016, Iosb Storage Cell A-3, Survey Unit F8300183 ML17065A0542016-12-29029 December 2016 Final Status Survey Summary Report, December 13, 2016, Iosb Storage Cell E-3, Survey Unit F8300303 ML17065A0532016-12-22022 December 2016 Final Status Survey Summary Report, December 12, 2016, Iosb Storage Cell D-3, Survey Unit F8300273 ML17065A0522016-12-15015 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell C-3, Survey Unit F8300243 ML17065A0512016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell D-2, Survey Unit F8300263 ML17065A0492016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell E-2, Survey Unit F8300293 ML17065A0352016-11-23023 November 2016 Final Status Survey Report, September 26, 2016, Iosb Storage Cell B-2, Survey Unit F8300203 ML17065A0402016-11-17017 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell B-1, Survey Unit F8300193 ML17065A0412016-11-14014 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell C-1, Survey Unit F8300223 ML17065A0362016-11-10010 November 2016 Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013 ML17065A0382016-11-0808 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell A-1, Survey Unit F8300163 ML16208A1092016-07-14014 July 2016 Sacramento Municipal Utility District (Smud), Rancho Seco Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Biennial Report for May 2014 - April 2016 ML14310A1972014-10-30030 October 2014 Biennial Update to Rancho Seco License Termination Plan ML14219A3272014-07-24024 July 2014 Biennial Report ML14099A2572014-03-31031 March 2014 Report on Irradiated Fuel Management Funding Status ML12321A0302012-11-0505 November 2012 Radioactive Material Storage and Decommissioning Safety Analysis Report Amendment 1 ML12165A4722012-05-31031 May 2012 and Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2010 Through April 30, 2012 ML0920502152009-07-21021 July 2009 Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station ML0914701032009-05-0707 May 2009 Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) ML0913504682009-05-0606 May 2009 Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0912805482009-04-30030 April 2009 Draft Confirmatory Survey Report for the Rancho Seco Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0904805822008-08-29029 August 2008 Confirmatory Survey Results for Activities Performed in April and May 2008 for the Rancho Seco Nuclear Generating Station ML0814903302008-05-19019 May 2008 Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2006 Through April 30, 2008 ML0905100292008-03-12012 March 2008 Confirmatory Survey Results for Activities Performed in December 2007, Rancho Seco Nuclear Generating Station ML0734505732007-12-0707 December 2007 Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Dated December 7, 2007 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0622203512006-08-0303 August 2006 Historical Site Assessment, Revision 1 ML0614600982006-04-30030 April 2006 License Termination Plan, Rev 0, Table of Contents ML0614302132006-04-30030 April 2006 Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station License Termination Plan, Rev. 0. Chapter 2 - Site Characterization to Chapter 5 - Final Status Survey Plan 2017-03-22
[Table view] Category:Technical
MONTHYEARML17065A0342017-02-28028 February 2017 Final Status Survey Summary Report ML17065A0602017-02-24024 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Embedded Pipe, Survey Unit F8300123 ML17065A0612017-02-0909 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Loading Dock, Survey Unit F8300071 ML17065A0712017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Hot Cell Pipe, Survey Unit F8300111 ML17065A0722017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Office Area, Survey Unit F8300133 ML17065A0702017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Truck Bay, Survey Unit F8300053 ML17065A0682017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 2, Survey Unit F8300142 ML17065A0632017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Main Sump, Survey Unit F8300103 ML17065A0662017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 3, Survey Unit F8300143 ML17065A0552017-01-30030 January 2017 Final Status Survey Summary Report, December 27, 2016, Iosb Cell Deck, Survey Unit F8300093 ML17065A0652017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017 Iosb Hot Cell Class 2, Survey Unit F8300062 ML17065A0642017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Hot Cell, Survey Unit F8300061 ML17065A0692017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 1, Survey Unit F8300141 ML17065A0472017-01-30030 January 2017 Final Status Survey Summary Report, October 3, 2016, Iosb Roof, Survey Unit F8300153 ML17065A0462017-01-26026 January 2017 Final Status Survey Summary Report, October 21, 2016, Iosb Exterior Surfaces, Survey Unit F8300313 ML17065A0582017-01-26026 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb Cask Wash Down Area, Survey Unit F8300323 ML17065A0562017-01-24024 January 2017 Final Status Survey Summary Report, December 28, 2016, Iosb DAW Staging Bay, Survey Unit F8300023 ML17065A0592017-01-10010 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb DAW Staging Bay Class 2, Survey Unit F8300042 ML17065A0572017-01-10010 January 2017 Final Status Survey Summary Report, January 5, 2017, Iosb DAW Staging Bay Class 1, Survey Unit F8300031 ML17065A0482017-01-0404 January 2017 Final Status Survey Summary Report, November 7, 2016, Iosb Storage Cell B-3, Survey Unit F8300213 ML17065A0372016-12-30030 December 2016 Final Status Survey Report, October 20, 2016, Iosb Storage Cell A-3, Survey Unit F8300183 ML17065A0542016-12-29029 December 2016 Final Status Survey Summary Report, December 13, 2016, Iosb Storage Cell E-3, Survey Unit F8300303 ML17065A0532016-12-22022 December 2016 Final Status Survey Summary Report, December 12, 2016, Iosb Storage Cell D-3, Survey Unit F8300273 ML17065A0522016-12-15015 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell C-3, Survey Unit F8300243 ML17065A0492016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell E-2, Survey Unit F8300293 ML17065A0512016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell D-2, Survey Unit F8300263 ML17065A0352016-11-23023 November 2016 Final Status Survey Report, September 26, 2016, Iosb Storage Cell B-2, Survey Unit F8300203 ML17065A0402016-11-17017 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell B-1, Survey Unit F8300193 ML17065A0412016-11-14014 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell C-1, Survey Unit F8300223 ML17065A0362016-11-10010 November 2016 Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013 ML17065A0382016-11-0808 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell A-1, Survey Unit F8300163 ML0920502152009-07-21021 July 2009 Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station ML0914701032009-05-0707 May 2009 Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) ML0913504682009-05-0606 May 2009 Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0622203512006-08-0303 August 2006 Historical Site Assessment, Revision 1 ML0520202442005-07-13013 July 2005 Decommissioning Technical Basis Document ML0233803882002-11-26026 November 2002 Defueled Safety Analysis Report, Amendment 5 NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2017-02-09
[Table view] |
Text
Rancho Seco Final Status Survey Summary Report Octoher 3, 2016 IOSB ROOF Survey Unit F8300153 Prepared ey:_s_*+-j _G_*_____ Date: I .f'Z--
FSS Engineer
/. t2-t]'
--- Approved By: ___dJ:::-~--~~----- Date:
' .t*, '
Manager, Rancho Seco Assets
FINAL STATUS SURVEY F8300153 Survey Unit:
F8300153, Interim Onsite Storage Building (IOSB) Roof Survey Unit
Description:
Operating History: The current roof of the IOSB is not the original surface material. The roof surface material has been replaced since construction. The roof is occasionally exposed to high wind conditions and damage has occurred as a result. Additionally, a portion the roof is the closest horizontal surface to the IOSB ventilation stack. However, no records indicating measurable releases of radioactivity had been discovered. In March of 2016, the center section of the roof was replaced following a wind storm that removed most of the original material. The removed material was surveyed as material and equipment in accordance with SMUD's procedures and released for disposal.
Site Characterization: Static measurements were made of the surface of the roof, to confom the absence or presence of plant-derived radionuclides. Static measurements showed a mean gross beta activity level of2,496/100 cm 2 and a maximum value of3,766 dpm/J 00 cm 2
- Based on the levels of gross activity reported, the area was determined to be a Class 3 area.
Survey Unit Design Information:
The Survey Unit Design Parameters are presented in Table 1 below. The survey unit and measurement locations are depicted on the maps in Attachment 1. Static measurement locations were randomly determined and approximately 1% of the area scanned. The instrumentation used for the survey along with the MDC values are listed in Table 2-1 .
FSS IOSB Roof F8300153
FINAL STATUS SURVEY F8300153 Table 1, Survey Unit Design Parameters
- ..-)*...~, .::'*/. 'i 'Ey'iti'U'aHon";j~put v~1ife~*;:;:-'*' >.::** . ":; - ::::'::\:: .. . ' .. }
": >*cornrnenfifv.,, .* ')\ / *":*' -
. !:"\
t.{,>I *
,-.':,;* *,:{*:
Survey Packaqe: F830 IOSB Roof Survey Unit: 015 Class 3 SU Area (m 2) 1735 Evaluator: JR
'DCGLw: 43,000 Gross Activity DCGL Area Factor N/A Class 3 Design DCGLemc (dpm/1 OOcm 2 ): N/A Class 3 DCGLemc: N/A Class 3 LBGR: 21,500 Default= 50% DCGL Sigma: Scoping Survey Data for Roof 707 Type I error: 0.05 Type II error: 0.05 Predominant Nuclide Cs-137 Sample Area (m2) N/A Total Instrument Efficiency: 0.129 Total Area Scanned (m2): 22.85
- ~ *.. .
Scan Coveraqe (%) *~ \.. *: .. ::;1'.b~J:'. Class 3 Material Type: N/A ChoosinQ 'NIA' sets material backqround to "O"
- c'*".::.*;,_:*:~.:~:)q~f¢:~1at~~fvaiff~s'*§,, ..,, '*.x*;'i:~P; .%;,fr:'::.***').;,:>;:
- *," .,!¢Q'l1Jrll'eH(~'.:'Yf\\ . .??~L:::/ . :....**'.'.' .::
Z1"'{l: 1.645 Z1-a: 1.645 Siqn p: *0.9986'5 Calculated Relative Shift: 30.4 Relative Shift Used: 3.0 Uses 3.0 if Relative Shift >3 N-Value: 11 N-Value+20%: 14 2 FSS IOSB Roof F8300153
FINAL STATUS SURVEY F8300153 Survey Results:
A total of 15 direct measurements were made in F8300153. The results of the static measurements are shown in Table 2. All of the static measurements were less than the DCGL. The western roof is an asphalt surface verses the membrane surface for the center and eastern roofs. The asphalt portion results in higher activity (locations I - 3) than the membrane sections. None of the scan measurements indicated areas of elevated activity.
Table 2, Static Measurement Results j"
'. ~ ,f '*' .. : (
Sample#
.. :.>,,~; ~~~ta}:P~f * .. a.eta (~pm}
1 F8300153Z00001 288 2,233 2 F8300153Z00002 302 2,341 3 F8300153Z00003 297 2,302 4 F8300153Z00004 171 1,326 5 F8300153Z00005 171 1,326 6 F8300153Z00006 253 1,961 7 F8300153Z00007 176 1,364 8 F8300153Z00008 171 1,326 9 F8300153Z00009 171 1,326 10 F8300153Z00010 184 1,426 11 F8300153Z00011 169 1,310 12 F8300153Z00012 143 1, 109 13 F8300153Z00013 184 1,426 14 F8300153Z00014 162 1,256 15 F8300153Z00015 161 1,248 Table 3 contains the statistical summary of the static measurement data for the IOSB Roof.
Table 3, Beta Summary Statistics Beta Static /OSB Roof Mean 1,552 Median 1,326 Standard Deviation 425 Minimum 1,109 Maximum 2,341 Count 15 3 FSS IOSB Roof F8300153
FINAL STATUS SURVEY F8300153 Survey Unit Data Assessment:
The survey design required 14 static measurements for the Sign Test. A total of 15 static measurements were collected. The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL.
Table 4, Data Assessment Results Number of Samoles: 15 Median: 1,3~6
- Mean: 1,552 Static Data Standard Deviation: 425 Maximum: 2,34 f Adiusted N Value: 14 S+ Value: 15 Critical Value: . 10 Sufficient samples collected: Pass Maximum value <DCGLw: Pass Median value <DCGLw: Pass Mean value <DCGLw: Pass Maximum value <DCGLemc: N/A Siqn test results: Pass.
, ?'Jc,:.:*.;;;;;/: /}J,iFi.d~f'st~tll~'-::::r::*;::/,,J* ".:'.:.(~*/!'.).<.': ?'.:<. ':~_~ . :*:. *;*,: .*:;:'.c&rifroe.iits;~*. *: * * *:* * ...**,,*.;**.'*:.).1 ' ..*:
The survev unit oasses all conditions: Pass Survey Unit Investigations and Results:
No investigations were required for either direct or scan measurements and no investigation results are reported.
ALARA Statement:
As stated in Chapter 4 of the LTP, as long as the residual activity within the survey unit is less than the DCGL, the ALARA criterion has been met.
Changes in Initial Survey Unit Assumptions:
The survey unit was designed as a Class 3 survey and the sample results are consistent with that classification. The variability of the survey results was higher than the characterization data used for survey design. However the relative shift exceeded 3 and had to be adjusted. No potential areas of elevated activity were detected.
4 FSS IOSB Roof F8300153
FINAL STATUS SURVEY ,F8300153
==
Conclusion:==
The FSS of this survey unit was properly designed as a Class 3 survey based on the results of the scoping survey. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. All of the static measurements were less than the DCGL. No investigations were required.
The static measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met.
It is concluded that survey unit F8300153 meets the release criteria of I OCFR20. l 402.
5 FSS IOSB Roof F8300153
Attachment 1 Maps October 3, 2016 Survey Unit F8300153
F8300153Z00010 @
(3 = 1.426 dpm/ 100 cm 2
(+/-) F8300153Z00007 (3 = 1 364 dpm/ 100 cm*
{j) F8300153Z00013 13 == 1.426 dpm 100 cmi F8300153Z00004
{!) F8300153Z00003 13 = 1 326 dpm1100 cm* @
13 =2 302 dpm1100 cm 2
(+/-} F8300153Z00009 (3 = 1,326 dpm1100 cm 2
{+/-) F8300153Z00001 F83001 53ZOOOC6 {!)
13 = 2 233 dprn1100 cm 2 13 = 1 961 dpm 1100 cm 2 {j) F8300153Z00015 F8300153Z00012 @
(3 = 1 109 dpm/100 cm 2 (3 = 1,248 dpm11 00 c n 2 F8300 53200008 13 = 1,326 dpm/1 00 cm* <+/-)
(+/-} F8300153Z00014
(+/-} F8300153Z00005 (3 = 1 256 dpm' 100 cm*
13 = 1,326 dpm/100 cm*
<+/-) F8300153Z00011 F8300153Z00002 (3 = 1.31 0 dpm/1 00 cm*
(3 = 2.341 dpm/100 cm 2 <+/-)
IOSBROO F SMUD Loca tion* M.* nl* 1 of. .., ._,
IDrowk1a No.: 11"'-ft '- 11 l i rl '" \ , ...... . ...
Ol"OWfl Bv. r ......,
Oc'd: I Ml '\"'* .*'
~Na. :
Page I Att. I Maps F8300153
Attachment 2
'Instrumentation October 3, 2016 Survey Unit F8300153
Table 2-1. Survey Unit Instrumentation
'.*i1\ii~~su;*~me*i1.t :Oete'dor c~.libr~tion *
.' l)iP..~* .* 'Emden*cie~
' /- "v \
~,
.Due Oateb Beta Static Ludlum Model Beta - 512 dpm/100 cm 2 12.9% 317899/331973 Measurement 2350-1 2/10/17 Ludlum Model 44-116 B Detector
- Minimum detectable activities for the count rate instrumentation were calculated in accordance with NUREG-1507, "Minimum Detectable Concentrations with Typical Radiation Survey Instruments for Various Contaminants and Field Conditions" (U.S. NRC, 1997).
b Detectors are required to be calibrated once every 12 months. Calibration due date indicates the date by which the detector must be calibrated again.
cm 2 = square centimeters cpm =counts per minute dpm =disintegrations per minute Page 1 Att. 2 Instrumentation F8300153
Static Measurement MDA Variables Beta Survey Type PR331973 Detector Number 184 Background count rate (cpm) 1 Count Time (min) 0.129 Efficiency 100 Area of Detector (cm 2 )
Constants 60 sec/min 2.54 cm/in Assumptions Background count time and sample count time are equivalent Calculate Static MDA Static MDA =3 + 4.65(Br
Where: Br Background Countrate t Count Time (min)
E Efficiency A Area of detector (cm 2)
Static MDA 512 dpm/100 cm 2 Page 2 Att. 2 Instrumentation F8300153
Attachment 3 Investigation October 3, 2016 Survey Unit F8300153 (none required)
Att. 3 Jnvestigation F8300153
Attachment 4 Data Assessment October 3, 2016 Survey Unit F8300153
Histogram for Beta Static Activity IOSB Roof 1 A cliv~
10 ~I Ul!i>efdValoes ,~
M .....,,
M ~:~~*~\
/ so"""' 42-4 55 SkeMlen l.17 8 Maan
-0.33 1.551 St (3M """ 1,32S.SB (3N" " " ' O -
0Le11 Bir.
0 Mcwe 9iv 3 I
~:~~~:%
~ '
~: r, *~
I ~"'\
..*: *, l * ' ...... ' -
} - \ * ~,. "'t'
- -'t.r . , ,* r *
~< '1:*.:~-t* .' :'_>*, ' .,.'. ~-
1233 15'1 1849 Z157 Page I Att. 4 Data Assessment F8 300153
. ~ .
- ,T ,., >> ,; .
- *,. **...
Q-Q Plot for Beta Static Activity IOSB Roof Activ~
~l
/
Sd*424.6
~looe*3'6.7 lntertePt* 1552 Carre!aliJn.R *0.97 1f00
/
1400 1200
- 1.5 *1.0 -0.5 0.0 0.5 1.0 1.5 Theoretical Quantiles (Standard Normal)
Page 2 Att. 4 Data Assessment F8300153