MONTHYEARML17083A9832017-03-22022 March 2017 Orau Independent Confirmatory Survey Summary, Results, and In-Process Inspection for the Interim On-Site Storage Building and Surrounding Area at the Rancho Seco Nuclear Generating Station ML17065A0342017-02-28028 February 2017 Final Status Survey Summary Report ML17065A0602017-02-24024 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Embedded Pipe, Survey Unit F8300123 ML17065A0612017-02-0909 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Loading Dock, Survey Unit F8300071 ML17065A0712017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Hot Cell Pipe, Survey Unit F8300111 ML17065A0722017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Office Area, Survey Unit F8300133 ML17065A0702017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Truck Bay, Survey Unit F8300053 ML17065A0682017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 2, Survey Unit F8300142 ML17065A0632017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Main Sump, Survey Unit F8300103 ML17065A0662017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 3, Survey Unit F8300143 ML17065A0552017-01-30030 January 2017 Final Status Survey Summary Report, December 27, 2016, Iosb Cell Deck, Survey Unit F8300093 ML17065A0652017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017 Iosb Hot Cell Class 2, Survey Unit F8300062 ML17065A0642017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Hot Cell, Survey Unit F8300061 ML17065A0692017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 1, Survey Unit F8300141 ML17065A0472017-01-30030 January 2017 Final Status Survey Summary Report, October 3, 2016, Iosb Roof, Survey Unit F8300153 ML17065A0582017-01-26026 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb Cask Wash Down Area, Survey Unit F8300323 ML17065A0462017-01-26026 January 2017 Final Status Survey Summary Report, October 21, 2016, Iosb Exterior Surfaces, Survey Unit F8300313 ML17065A0562017-01-24024 January 2017 Final Status Survey Summary Report, December 28, 2016, Iosb DAW Staging Bay, Survey Unit F8300023 ML17065A0592017-01-10010 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb DAW Staging Bay Class 2, Survey Unit F8300042 ML17065A0572017-01-10010 January 2017 Final Status Survey Summary Report, January 5, 2017, Iosb DAW Staging Bay Class 1, Survey Unit F8300031 ML17065A0482017-01-0404 January 2017 Final Status Survey Summary Report, November 7, 2016, Iosb Storage Cell B-3, Survey Unit F8300213 ML17065A0372016-12-30030 December 2016 Final Status Survey Report, October 20, 2016, Iosb Storage Cell A-3, Survey Unit F8300183 ML17065A0542016-12-29029 December 2016 Final Status Survey Summary Report, December 13, 2016, Iosb Storage Cell E-3, Survey Unit F8300303 ML17065A0532016-12-22022 December 2016 Final Status Survey Summary Report, December 12, 2016, Iosb Storage Cell D-3, Survey Unit F8300273 ML17065A0522016-12-15015 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell C-3, Survey Unit F8300243 ML17065A0512016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell D-2, Survey Unit F8300263 ML17065A0492016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell E-2, Survey Unit F8300293 ML17065A0352016-11-23023 November 2016 Final Status Survey Report, September 26, 2016, Iosb Storage Cell B-2, Survey Unit F8300203 ML17065A0402016-11-17017 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell B-1, Survey Unit F8300193 ML17065A0412016-11-14014 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell C-1, Survey Unit F8300223 ML17065A0362016-11-10010 November 2016 Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013 ML17065A0382016-11-0808 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell A-1, Survey Unit F8300163 ML16208A1092016-07-14014 July 2016 Sacramento Municipal Utility District (Smud), Rancho Seco Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Biennial Report for May 2014 - April 2016 ML14310A1972014-10-30030 October 2014 Biennial Update to Rancho Seco License Termination Plan ML14219A3272014-07-24024 July 2014 Biennial Report ML14099A2572014-03-31031 March 2014 Report on Irradiated Fuel Management Funding Status ML12321A0302012-11-0505 November 2012 Radioactive Material Storage and Decommissioning Safety Analysis Report Amendment 1 ML12165A4722012-05-31031 May 2012 and Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2010 Through April 30, 2012 ML0920502152009-07-21021 July 2009 Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station ML0914701032009-05-0707 May 2009 Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) ML0913504682009-05-0606 May 2009 Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0912805482009-04-30030 April 2009 Draft Confirmatory Survey Report for the Rancho Seco Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0904805822008-08-29029 August 2008 Confirmatory Survey Results for Activities Performed in April and May 2008 for the Rancho Seco Nuclear Generating Station ML0814903302008-05-19019 May 2008 Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2006 Through April 30, 2008 ML0905100292008-03-12012 March 2008 Confirmatory Survey Results for Activities Performed in December 2007, Rancho Seco Nuclear Generating Station ML0734505732007-12-0707 December 2007 Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Dated December 7, 2007 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0622203512006-08-0303 August 2006 Historical Site Assessment, Revision 1 ML0614600982006-04-30030 April 2006 License Termination Plan, Rev 0, Table of Contents ML0614302132006-04-30030 April 2006 Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station License Termination Plan, Rev. 0. Chapter 2 - Site Characterization to Chapter 5 - Final Status Survey Plan 2017-03-22
[Table view] Category:Technical
MONTHYEARML17065A0342017-02-28028 February 2017 Final Status Survey Summary Report ML17065A0602017-02-24024 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Embedded Pipe, Survey Unit F8300123 ML17065A0612017-02-0909 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Loading Dock, Survey Unit F8300071 ML17065A0712017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Hot Cell Pipe, Survey Unit F8300111 ML17065A0722017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Office Area, Survey Unit F8300133 ML17065A0702017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Truck Bay, Survey Unit F8300053 ML17065A0682017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 2, Survey Unit F8300142 ML17065A0632017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Main Sump, Survey Unit F8300103 ML17065A0662017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 3, Survey Unit F8300143 ML17065A0552017-01-30030 January 2017 Final Status Survey Summary Report, December 27, 2016, Iosb Cell Deck, Survey Unit F8300093 ML17065A0652017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017 Iosb Hot Cell Class 2, Survey Unit F8300062 ML17065A0642017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Hot Cell, Survey Unit F8300061 ML17065A0692017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 1, Survey Unit F8300141 ML17065A0472017-01-30030 January 2017 Final Status Survey Summary Report, October 3, 2016, Iosb Roof, Survey Unit F8300153 ML17065A0462017-01-26026 January 2017 Final Status Survey Summary Report, October 21, 2016, Iosb Exterior Surfaces, Survey Unit F8300313 ML17065A0582017-01-26026 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb Cask Wash Down Area, Survey Unit F8300323 ML17065A0562017-01-24024 January 2017 Final Status Survey Summary Report, December 28, 2016, Iosb DAW Staging Bay, Survey Unit F8300023 ML17065A0592017-01-10010 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb DAW Staging Bay Class 2, Survey Unit F8300042 ML17065A0572017-01-10010 January 2017 Final Status Survey Summary Report, January 5, 2017, Iosb DAW Staging Bay Class 1, Survey Unit F8300031 ML17065A0482017-01-0404 January 2017 Final Status Survey Summary Report, November 7, 2016, Iosb Storage Cell B-3, Survey Unit F8300213 ML17065A0372016-12-30030 December 2016 Final Status Survey Report, October 20, 2016, Iosb Storage Cell A-3, Survey Unit F8300183 ML17065A0542016-12-29029 December 2016 Final Status Survey Summary Report, December 13, 2016, Iosb Storage Cell E-3, Survey Unit F8300303 ML17065A0532016-12-22022 December 2016 Final Status Survey Summary Report, December 12, 2016, Iosb Storage Cell D-3, Survey Unit F8300273 ML17065A0522016-12-15015 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell C-3, Survey Unit F8300243 ML17065A0492016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell E-2, Survey Unit F8300293 ML17065A0512016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell D-2, Survey Unit F8300263 ML17065A0352016-11-23023 November 2016 Final Status Survey Report, September 26, 2016, Iosb Storage Cell B-2, Survey Unit F8300203 ML17065A0402016-11-17017 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell B-1, Survey Unit F8300193 ML17065A0412016-11-14014 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell C-1, Survey Unit F8300223 ML17065A0362016-11-10010 November 2016 Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013 ML17065A0382016-11-0808 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell A-1, Survey Unit F8300163 ML0920502152009-07-21021 July 2009 Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station ML0914701032009-05-0707 May 2009 Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) ML0913504682009-05-0606 May 2009 Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0622203512006-08-0303 August 2006 Historical Site Assessment, Revision 1 ML0520202442005-07-13013 July 2005 Decommissioning Technical Basis Document ML0233803882002-11-26026 November 2002 Defueled Safety Analysis Report, Amendment 5 NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2017-02-09
[Table view] |
Text
Rancho Seco Final Status Survey Summary Report December 1, 2016 IOSB Storage Cell C-3 Survey Unit F8300243 Prepared ey:_-.~..::;....f-'c_J~".a..--~ _ _ _ _ Date: 12 . t 2 * 't.P FSS Engineer Approved By: ~ "1:1.<.!!Ac= Date: 1z(,:7/i(,
Manager: ancho Seco Ass~ts
FINAL. STATUS SURVEY F8300243 Survey Unit:
F8300243, Interim Onsite Storage Building (IOSB) Storage Cell C-3 Survey Unit
Description:
Operating History: Designed primarily to store packaged radioactive waste containers safely, protected from the elements, and maintain radiological dose as low as reasonably achievable (ALARA), each storage cell possibly stored media of many types, including filters, resins, contaminated chemicals, DAW, activated reactor components, contaminated plant components and other contaminated items.
Site Characterization: Static measurements were made of the interior surfaces of the storage cell, to confirm the absence or presence of plant-derived radionuclides. Static measurements showed a mean gross beta activity level of 2, 179 dprn/100 cm 2 and a maximum value of 4,674 dprn/100 cm2
- Based on the levels of gross activity reported, the area was determined to be a Class 3 area.
Survey Unit Design Information:
The Survey Unit Design Parameters are presented in Table 1 below. The survey unit and measurement locations are depicted on the maps in Attachment 1. Static measurement locations were randomly determined and approximately 33% of the area scanned. The instrumentation used for the survey along with the MDC values are listed in Table 2-1 .
FSS Storage Cell C-3 F8300243
FINAL STATUS SURVEY F8300243 Table 1, Survey Unit Design Parameters Survey Packaqe: F830 Storaqe Cell C-3 Survey Unit: 24 Class 03 SU Area (m2) 23 Evaluator: JR DCGLw: 43,000 Gross Activity DCGL Are~ Factor N/A Class 3 Design DCGLemc (dpm/100cm 2 ): N/A Class 3 DCGLemc: N/A Class 3 LBGR: 21,500 Default = 50% DCGL Siqma: 365 Scoping Survey Data Type I error: 0.05 Type II error: 0.05 Predominant Nuclide Cs-137 Sample Area (m2) N/A Total Instrument Efficiency: 0.132 Total Area Scanned (m2): 7.51 Scan Coverage (%) .::i::t;_,;:33°/o;' Class 3 Choosing 'NIA' sets material Material Type: NIA background to "O"
>-<*> :.,::*:*+.ji':.;::*,c~Jcufate<tNa"!ue:~:'o:>> *H:::~:.:/'.:'Q;*: .:'~::::;:;~;:r:?;'.*~c:O'.mmenls:.* >.,:_' 1
. *, * . .}
Z1-a: .L645 Z1-a: . 1.64.5 Siqn o: 0:99865 Calculated Relative Shift: 58.9
- Relative Shift Used: *3.b Uses 3.0 if Relative Shift >3 N-Value: 11 N-Value+20%: 14 2 FSS Storage Cell C-3 F8300243
FINAL STATUS SURVEY F8300243 Survey Results:
A total of 15 direct measurements were made in F8300243. 111e results of the static measurements are shown in Table 2. All of the static measurements were less than the DCGL. None of the scan measurements indicated areas of elevated activity. Swipe data did not indicate elevated activity levels above the MDA.
Table 2, Static Measurement Results
- Ni.imber **. S!!m~le.# .** Beta (cpm) * *. J3eta (dpm)
1 F8300243X00001 262 1,985 2 F8300243X00002 275 2,083 3 F8300243X00003 283 2,144 4 F8300243X00004 302 2,288 5 F8300243X00005 262 1,985 6 F8300243X00006 288 2,182 7 F8300243X00007 265 2,008 8 F8300243X00008 256 1,939 9 F8300243X00009 267 2,023 10 F8300243X00010 245 1,856 11 F8300243X00011 282 2;136 12 F8300243X00012 245 1,856 13 F8300243X00013 254 1,924 14 F8300243X00014 275 2,083 15 F8300243X00015 289 2,189 Table 3 contains the statistical summary of the static measurement data for the Storage Cell C-3 Table 3, Beta Summary Statistics Beta Static Storage Cell C-3 Mean 2,045 Median 2,023 Standard Deviation 127 Minimum 1,856 Maximum 2,288 Count 15 3 FSS Storage Cell C-3 F8300243
FINAL STATUS SURVEY F8300243 Survey Unit Data Assessment:
The survey design required 14 static measurements for the Sign Test. A total of 15 static measurements were collected. The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL.
Table 4, Data Assessment Results
. t'.
Number of Samples: 15 Median: , 2;023 Mean: ** 2,045 Static Data Standard Deviation: .* * **127.
Maximum: 'i,288 Adjusted N Value: .14 S+ Value: * ** 15 Critical Value: * .
- 10 Sufficient samples collected: *
- Pass Maximum value <DCGLw: , :Pass*
Median value <DCGLw: * ,Pass Mean value <DCGLw: 'Pa~s*
Maximum value <DCGLemc: * . *NIA Siqn test results: *. Pass The survey unit passes all conditions: ::Pass.
Survey Unit Investigations and Results:
No investigations were required for either direct or scan measurements and no investigation results are reported.
ALARA Statement:
As stated in Chapter 4 of the LTP, as long as the residual activity within the survey unit is less than the DCGL, the ALARA criterion has been met.
Changes in Initial Survey Unit Assumptions:
The survey unit was designed as a Class 3 survey and the sample results are consistent with that classification. The variability of the survey results was less than the characterization data used for survey design. No potential areas of elevated activity were detected.
4 FSS Storage Cell C-3 F8300243
FINAL STATUS SURVEY F8300243 Conclusfon:
The FSS of this survey unit was properly designed as a Class 3 survey based on the results of the scoping survey. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. All of the static measurements were less than the DCGL. No investigations were required.
The static measurement data support rejection of the null hypothesis, providing high confidence that the survey unit s:atisfied the release criteria and that the data quality objectives were met.
It is concluded that survey unit F8300243 meets the release criteria of 10CFR20.l402.
5 FSS Storage Cell C-3 f 8300243
Attachment 1 Maps December 1, 2016 Survey UnBt F8300243
A- I -2 A-3 000 I ~ Z OC!3 jon '100 cm B*1 B-2 F B*3
~
0 *1 0-2 0-3 E- 1 E-2 E-3 F8300243X0006 F830024 3X0003
$ = :' 144 dpmll cm' I** 2 182 Clf)ni'100 cm*
F8300.'43X001.3
$ F830024 3X0010 $
- p. I 856 o.Jpm/100 a I - 1 :24 dPIT\1100 pn' F830024 001
~ 1 - ? 1 apm1100 cm' F6300:43X0007
- r. = :? 00 dpm/100 cm F8300Z-4-~X F8.300243X0001 - 2 288 dp 100 cm' fi 1 ga~ <JJ:>m/100 c Reference Point
$ F8300.'.'43XOOO:'.
SMUD ~ I - 2 OS dpi 11 cm' f'8300"'43X 14 tract o.: SMUD r = ~ 08..l dPm/100 tr
~proved by:
Fe:>00243XOO :? .*...
I ' dpmt100 cri c:" ** . ~ .
Page I Att. I Maps F8300243
Attachment 2 Instrumentation October 11, 2016 Survey UnBt F8300243
-* ~- -"!"" --~~ - - --~--=---~:=..:....---=- -. - - -------
Table 2-1. Survey Unit Instrumentation Me~surement * * ** * * . Minimum Det_ectabl~ Act_i~_ ity:U. Deteetor Type I_.n. s.tru_ri1e~. t_ T,.. Y*.p_
- e. .* * .Efficiencies
. . . Calibration .
DU,e Dateb Beta Stati(; Ludlum Model Beta - 532 dpm/I 00 cm 2 13.2% 317897/33 I 972 Measurement 2350-1 2/10/17 Ludlum Model 44-116 B Detectot Swipe Ludlum Model 2929 Beta - 79 dpmi' I 00 cm 2 42.8% 166716/I 70380 Measurements Ludlum Model 44* l l/3/16 l 0-1
- Minimum detectable activities for the count rate instrumentation were calculated in accordance with NUREG-1507, "Minimum Detectable Concentrations with Typical Radiation Survey Instruments for Various Contaminants and Field Conditions" (U.S. NRC, 1997).
b Detectors are required to be calibrated*once every 12 months. Calibration due date indicates the date by which the detector must be calibrated again.
cm 2 = square centimeters cpm =counts per minute dpm =disintegrations per minute Page 1 Att 2 Instrumentation f 8300233
Static Mea'Surement MDA Variables Beta Survey Type PR331972 Detector Number 209 Background count ra\te (cpm)
Count Time (min) 0.132 Efficiency 100 Area of Detector (crri2 )
Constants 60 sec/min 2.54 cm/in Assumptions Background count time and sample count time are equivalent Calculate Static MDA Static MDA =3 + 4.65(Br
Where: Br Background Countrate t Count Time (min)
E Efficiency A Area of detector (crri 2)
Static MDA 532 dpm/1 OGl cm 2 Page 2 Att. 2 Instrumentation F8300233
Attachment 3 Investigation December 1, 2016 Survey Uniit F8300243 (none required)
Att. 3 Investigation F8300243
Attachment 4 Data Assessment December 2, 2016 Survey Unit F8300243
Histogram for Beta Static Activity (dpmf100 cm2) Cell C-3 Activ~
I Humbe1ofVDlie1 1~
-~ M"""" 1.856.Cli M"""'" 2.287.BB SD 127.03 Sk"""" Q18 Kuto:h -0.67*
{ti Mc_.,,,
' 0Medi11n 2.022.73!
el Nom\oll Dit~l 0Lett8ii::
0Mae8m 11l57 1"1) 1943 1906 2073 2116 2159
= 2245 2289 Page 1 Att. 4 Data Assessment f 8300243
Q..Q Plot for Beta Static Activity (dpm/100 cm2) C~ll C-3 Aclivty ti" 15 Slope* 131.5 lntoreep1*2045 Cocrelatim.R *O.SSS
~
2160 2100
/:
/. /
1900 /.
1920
//
~/
1860
- 1.0 -0.5 0.0 TheoreUcal QuanUles (Standard Normal)
Q5 1.0 1.5 J Page2 Att. 4 Data Assessment F8300243
Smear_Data_Calculation_Sheet _lOl.31,6 IOSB Final Status Survey LCl . l.C2 .LO .l.C4 LC6 . LCS llCPM lldpm Date/Time of Count Sample Comments J F830 024 3 x 00001 SM Cell C-3 42 -18 10/12/16 1048 2 F830 024 3 x 00002 SM Cell C-3 37 -29 10/12/16 1018 3 F830 024 3 x 00003 SM C~ll C.3 46 .9 10/12/16 0958 4 F830 024 3 x 00004 SM Cell C.3 51 3 10/12/16 1042 5 F!:IJO 024 3 x 00005 SM Cell C-3 48 .4 10/12/16 1008 6 F830 024 3 x 00006 SM Cell C-3 49 -2 10/12/16 0950 7 . F830 024 3 x 00007 SM Ceil C-3 62 28 10/12/16 1039 8 F830 024 3 x 00008 SM Cell C.3 49 -2 10il2/16 1033 9 F830 024 3 x 00009 SM Cell C-3 43 -16 10/12/16 1007 10 F830 024 3 x 00010 SM Cell C-3 53 7 10/12/16 1045 J:I F830 024 3 x 00011 SM Cell C-3 51 3 10/12/16 1025 12 F830 024 3 x 00012 SM Cell C-3 35 -3'1 10/12/16 1004 13 F830 024 3 x 00013 SM Cell C-3 58 19 10/12/1.6 1030 111 F830 024 3 x 00014 SM Cell C-3 37 -29 10/12/16 1016 15 F830 024 3 x 00015 SM CcllC-3 42 -18 10il2/16 0957 Comments By signature below. the r('Quircd source check and background checks were satisractorily;performed prior 10 use ol lhe instrumcni identified below.
Ludlum 2929 Benchtop Instrument bl:i:
~llicienry bl<r. (QU:ll 2929 S/N: 182597 r:nc lir111~ MDI\
C( 0.364
- ~*
~
.>.U l°t. l 11.>
J 43-10-1 S/N: 188736 t:prn 111i11 dpm pc!r arc;i
- J Tech A Sign/ Date <Z:fa,J/V/ H'.J1JI-; 12-2.-1"7 49.8 l 78.6 Jl ~ignf._CJ!l.l.e Cal Due Date: 5/13/7.017 I~ 0.'13~
.Tech i'iJA -- =
cpm min d;.>mpt.*t~:1{*.1 Page 3 Att. 4 Data Assessment F8300243