MONTHYEARML17083A9832017-03-22022 March 2017 Orau Independent Confirmatory Survey Summary, Results, and In-Process Inspection for the Interim On-Site Storage Building and Surrounding Area at the Rancho Seco Nuclear Generating Station ML17065A0342017-02-28028 February 2017 Final Status Survey Summary Report ML17065A0602017-02-24024 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Embedded Pipe, Survey Unit F8300123 ML17065A0612017-02-0909 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Loading Dock, Survey Unit F8300071 ML17065A0712017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Hot Cell Pipe, Survey Unit F8300111 ML17065A0722017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Office Area, Survey Unit F8300133 ML17065A0702017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Truck Bay, Survey Unit F8300053 ML17065A0682017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 2, Survey Unit F8300142 ML17065A0632017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Main Sump, Survey Unit F8300103 ML17065A0662017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 3, Survey Unit F8300143 ML17065A0552017-01-30030 January 2017 Final Status Survey Summary Report, December 27, 2016, Iosb Cell Deck, Survey Unit F8300093 ML17065A0652017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017 Iosb Hot Cell Class 2, Survey Unit F8300062 ML17065A0642017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Hot Cell, Survey Unit F8300061 ML17065A0692017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 1, Survey Unit F8300141 ML17065A0472017-01-30030 January 2017 Final Status Survey Summary Report, October 3, 2016, Iosb Roof, Survey Unit F8300153 ML17065A0582017-01-26026 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb Cask Wash Down Area, Survey Unit F8300323 ML17065A0462017-01-26026 January 2017 Final Status Survey Summary Report, October 21, 2016, Iosb Exterior Surfaces, Survey Unit F8300313 ML17065A0562017-01-24024 January 2017 Final Status Survey Summary Report, December 28, 2016, Iosb DAW Staging Bay, Survey Unit F8300023 ML17065A0592017-01-10010 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb DAW Staging Bay Class 2, Survey Unit F8300042 ML17065A0572017-01-10010 January 2017 Final Status Survey Summary Report, January 5, 2017, Iosb DAW Staging Bay Class 1, Survey Unit F8300031 ML17065A0482017-01-0404 January 2017 Final Status Survey Summary Report, November 7, 2016, Iosb Storage Cell B-3, Survey Unit F8300213 ML17065A0372016-12-30030 December 2016 Final Status Survey Report, October 20, 2016, Iosb Storage Cell A-3, Survey Unit F8300183 ML17065A0542016-12-29029 December 2016 Final Status Survey Summary Report, December 13, 2016, Iosb Storage Cell E-3, Survey Unit F8300303 ML17065A0532016-12-22022 December 2016 Final Status Survey Summary Report, December 12, 2016, Iosb Storage Cell D-3, Survey Unit F8300273 ML17065A0522016-12-15015 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell C-3, Survey Unit F8300243 ML17065A0512016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell D-2, Survey Unit F8300263 ML17065A0492016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell E-2, Survey Unit F8300293 ML17065A0352016-11-23023 November 2016 Final Status Survey Report, September 26, 2016, Iosb Storage Cell B-2, Survey Unit F8300203 ML17065A0402016-11-17017 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell B-1, Survey Unit F8300193 ML17065A0412016-11-14014 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell C-1, Survey Unit F8300223 ML17065A0362016-11-10010 November 2016 Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013 ML17065A0382016-11-0808 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell A-1, Survey Unit F8300163 ML16208A1092016-07-14014 July 2016 Sacramento Municipal Utility District (Smud), Rancho Seco Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Biennial Report for May 2014 - April 2016 ML14310A1972014-10-30030 October 2014 Biennial Update to Rancho Seco License Termination Plan ML14219A3272014-07-24024 July 2014 Biennial Report ML14099A2572014-03-31031 March 2014 Report on Irradiated Fuel Management Funding Status ML12321A0302012-11-0505 November 2012 Radioactive Material Storage and Decommissioning Safety Analysis Report Amendment 1 ML12165A4722012-05-31031 May 2012 and Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2010 Through April 30, 2012 ML0920502152009-07-21021 July 2009 Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station ML0914701032009-05-0707 May 2009 Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) ML0913504682009-05-0606 May 2009 Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0912805482009-04-30030 April 2009 Draft Confirmatory Survey Report for the Rancho Seco Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0904805822008-08-29029 August 2008 Confirmatory Survey Results for Activities Performed in April and May 2008 for the Rancho Seco Nuclear Generating Station ML0814903302008-05-19019 May 2008 Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2006 Through April 30, 2008 ML0905100292008-03-12012 March 2008 Confirmatory Survey Results for Activities Performed in December 2007, Rancho Seco Nuclear Generating Station ML0734505732007-12-0707 December 2007 Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Dated December 7, 2007 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0622203512006-08-0303 August 2006 Historical Site Assessment, Revision 1 ML0614600982006-04-30030 April 2006 License Termination Plan, Rev 0, Table of Contents ML0614302132006-04-30030 April 2006 Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station License Termination Plan, Rev. 0. Chapter 2 - Site Characterization to Chapter 5 - Final Status Survey Plan 2017-03-22
[Table view] Category:Technical
MONTHYEARML17065A0342017-02-28028 February 2017 Final Status Survey Summary Report ML17065A0602017-02-24024 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Embedded Pipe, Survey Unit F8300123 ML17065A0612017-02-0909 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Loading Dock, Survey Unit F8300071 ML17065A0712017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Hot Cell Pipe, Survey Unit F8300111 ML17065A0722017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Office Area, Survey Unit F8300133 ML17065A0702017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Truck Bay, Survey Unit F8300053 ML17065A0682017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 2, Survey Unit F8300142 ML17065A0632017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Main Sump, Survey Unit F8300103 ML17065A0662017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 3, Survey Unit F8300143 ML17065A0552017-01-30030 January 2017 Final Status Survey Summary Report, December 27, 2016, Iosb Cell Deck, Survey Unit F8300093 ML17065A0652017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017 Iosb Hot Cell Class 2, Survey Unit F8300062 ML17065A0642017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Hot Cell, Survey Unit F8300061 ML17065A0692017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 1, Survey Unit F8300141 ML17065A0472017-01-30030 January 2017 Final Status Survey Summary Report, October 3, 2016, Iosb Roof, Survey Unit F8300153 ML17065A0462017-01-26026 January 2017 Final Status Survey Summary Report, October 21, 2016, Iosb Exterior Surfaces, Survey Unit F8300313 ML17065A0582017-01-26026 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb Cask Wash Down Area, Survey Unit F8300323 ML17065A0562017-01-24024 January 2017 Final Status Survey Summary Report, December 28, 2016, Iosb DAW Staging Bay, Survey Unit F8300023 ML17065A0592017-01-10010 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb DAW Staging Bay Class 2, Survey Unit F8300042 ML17065A0572017-01-10010 January 2017 Final Status Survey Summary Report, January 5, 2017, Iosb DAW Staging Bay Class 1, Survey Unit F8300031 ML17065A0482017-01-0404 January 2017 Final Status Survey Summary Report, November 7, 2016, Iosb Storage Cell B-3, Survey Unit F8300213 ML17065A0372016-12-30030 December 2016 Final Status Survey Report, October 20, 2016, Iosb Storage Cell A-3, Survey Unit F8300183 ML17065A0542016-12-29029 December 2016 Final Status Survey Summary Report, December 13, 2016, Iosb Storage Cell E-3, Survey Unit F8300303 ML17065A0532016-12-22022 December 2016 Final Status Survey Summary Report, December 12, 2016, Iosb Storage Cell D-3, Survey Unit F8300273 ML17065A0522016-12-15015 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell C-3, Survey Unit F8300243 ML17065A0492016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell E-2, Survey Unit F8300293 ML17065A0512016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell D-2, Survey Unit F8300263 ML17065A0352016-11-23023 November 2016 Final Status Survey Report, September 26, 2016, Iosb Storage Cell B-2, Survey Unit F8300203 ML17065A0402016-11-17017 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell B-1, Survey Unit F8300193 ML17065A0412016-11-14014 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell C-1, Survey Unit F8300223 ML17065A0362016-11-10010 November 2016 Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013 ML17065A0382016-11-0808 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell A-1, Survey Unit F8300163 ML0920502152009-07-21021 July 2009 Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station ML0914701032009-05-0707 May 2009 Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) ML0913504682009-05-0606 May 2009 Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0622203512006-08-0303 August 2006 Historical Site Assessment, Revision 1 ML0520202442005-07-13013 July 2005 Decommissioning Technical Basis Document ML0233803882002-11-26026 November 2002 Defueled Safety Analysis Report, Amendment 5 NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2017-02-09
[Table view] |
Text
~ ... ., ' t*. ~'-'
Rancho Seco Final Status Survey Summary Report November 7, 2016 IOS8 Storage Cell 8-3 Survey Unit F8300213 FSS Engineer Approved By: d:>, ;t.~,.._ . Date:
1 N/,1 Manager, Rancho Seco Assets
,FINAL STATUS SURVEY F8300213 Survey Unit:
F8300213, Interim Onsite Storage Building (IOSB) Storage Cell B-3 Survey Unit
Description:
Operating History: Designed primarily to store packaged radioactive waste containers safely, protected from the elements, and maintain radiological dose as low as reasonably achievable (ALARA), each storage cell possibly stored media of many types, including filters, resins, contaminated chemicals, DAW, activated reactor components, contaminated plant components and other contaminated items.
Site Characterization: Static measurements were made of the interior surfaces of the storage cell, to confirm the absence or presence of plant-derived radionuclides. Static measurements showed a mean gross beta activity level of 1,959 dpm/100 cm 2 and a maximum value of 2,239 dpm/100 cm 2
- Based on the levels of gross activity reported, the area was determined to be a Class 3 area.
Survey Unit lleslgn Information:
The Survey Unit Design Parameters are presented in Table 1 below. The survey unit and measurement locations are depicted on the maps in Attachment 1. Static measurement locations were randomly determined and approximately 33% of the area scanned. The instrumentation used for the survey along with the MDC values are listed in Table 2-1 .
FSS Storage Cell B-3 F8300213
FINAL STATUS SURVEY F8300213 Table 1, Survey Unit Design Parameters
. .'*'. ~
Survey Packaoe: F830 Storaoe Cell B-3 Survey Unit: 21 .
Class 03 SU Area (m2) 23 Evaluator: JR DCGLw: 43,000 Gross Activity DCGL Area Factor NIA Class 3 Design DCGLemc (dpml100cm 2 ): NIA Class 3 DCGLemc: NIA Class 3 LBGR: 21,500 Default= 50% DCGL Sioma: 136 Scopino Survey Data Type I error: 6.d5' Type II error: 0.05 Predominant Nuclide Cs-137 Sample Area (m2) NIA Total Instrument Efficiency: 0.129 Total Area Scanned (m 2): 7.51 Scan Coverage (%) <1')~~3:0/~~', Class 3 Choosing 'NIA' sets material Material Tvpe: NIA background to "O"
Sign p: *0.99865 Calculated Relative Shift: 158.0.
Relative Shift Used: 3.*o Uses 3.0 if Relative Shift >3 N-Value: *H N-Value+20%: .. 1.4 2 FSS Storage Cell B-3 F8300213
FINAL STATUS SURVEY F8300213 Survey Results:
A total of 15 direct measurements were made in F8300213. The results of the static measurements are shown in Table 2. All of the static measurements were less than the DCGL. None of the scan measurements indicated areas of elevated activity. Swipe data did not indicate elevated activity levels above the MDA.
Table 2, Static Measurement Results
. .*- . :P*1e#*
1 F8300213X00001 261 1,977 2 F8300213X00002 248 1,879 3 F8300213X00003 223 1,689 4 F8300213X00004 269 2,038 5 F8300213X00005 253 1,917 6 F8300213X00006 246 1,864 7 F8300213X00007 278 2,106
- 8. F83002l3.XOO_OQ8 27.7 . 2,098 9 F8300213X00009 252 1,909 10 F8300213X00010 264 2,000 11 F8300213X00011 243 1,841 12 F8300213X00012 239 1,811 13 F8300213X00013 245 1,856 14 F8300213X00014 277 2,098 15 F8300213X00015 238 1,803 Table 3 contains the statistical summary of the static measurement data for the Storage Cell B-3.
Table 3, Beta Summary Statistics Beta Static 8-3 Mean 1,926 Median 1,909 Standard Deviation 124 Minimum 1,689 Maximum 2,106 Count 15 3 FSS Storage Cell B-3 F8300213
FINAL STATUS SURVEY F8300213 Survey Unit Data Assessment:
The survey design required 14 static measurements for the Sign Test. A total of 15 static measurements were collected. The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL.
Table 4, Data Assessment Results Number of Samples: 15 Median: 1,909 Mean: 1,926
- Static Data Standard Deviation: .1.24 Maximum: 2,Jci6
- . '.*;,;:. ::*~,,,:_ *. :. ...:.*. *. :~Han~t~§i:R~~µit~.;J*;~,;:/\;;;;:;\.<'.~tq{:*. ;.- . ~:-*. *:; ¢.!lihift~rits!; **;.:/;'.r:'>. :>
Adjusted N Value: 14 S+ Value: ..
- 10 Sufficient samples collected: Pass:
Maximum value <DCGLw:
- Pass Median value <DCGLw: ** Pass Mean value <DCGLw: .p~~s Maximum value <DCGLemc: NIA Sign test results: Pass*
The survey unit passes all conditions: Pass Survey Unit Investigations and Results:
No investigations were required for either direct or scan measurements and no investigation results are reported.
ALARA Statement:
As stated in Chapter 4 of the LTP, as long as the residual activity within the survey unit is less than the DCGL, the ALARA criterion has been met.
Changes in Initial Survey Unit Assumptions:
The survey unit was designed as a Class 3 survey and the sample results are consistent with that classification. The variability of the survey results was less than the characterization data used for survey design which would result in a larger relative shift value. Since both values are in excess of 3 the difference in the variability does not affect the power of the survey. No potential areas of elevated activity were detected.
4 FSS Storage Cell B-3 F8300213
-* :.:. --- -= =* ~:
'.""'_ . .: =- -_: _ _.:_**
FINAL STATUS SURVEY F8300213
==
Conclusion:==
The FSS of this survey unit was properly designed as a Class 3 survey based on the results of the scoping survey. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. All of the static measurements were less than the DCGL. No investigations were required.
The static measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met.
It is concluded that survey unit f 8300213 meets the release criteria of 10CFR20.l402.
5 FSS Storage Cell B-3 F8300213
Attachment 1 Maps November 7, 2016 Survey Unit F8300213
- . - .: . . .*. ;:-. ___ ::. - ~ -* -: - ~ . ~ . ~- :' - ..:: ~ - -=- ::'::: =--- ~
A- 1 B-1 A-2 B-2
~
B-3 CEII Stora g eC-3 C-1 C-2
- ~ FS3002 I 000~
(\ 911 Jpm/100 cm*
D-1 O<? 0-3 f 830l'.IZ13X0004 ~
( 2 038 dp'll/100 an' E- 1 E-2 E-3 I I F8300:?1~X l t4 ~Fil< _ 1 XOOO
. , '<nl"ll 011ooan> I - 19, -dpmjtOO cm
~ I .v F83Cc.~ 13X0003
$Fe.?00213XOOl I F 'J00213X0009 F0:'0021 JA()()( 7
- I a.41 oipmllOO"Gm ~1"' ! 909 1pm/1CO c n' fl= :.1oc opm 1 oci~ r = j 68!1<Jpm/100 cni' F5300~11X() 12 FBJ00213X001J ~ ~i< 1 s111p 11oocm 11 ~ 111'6oorn/100cm' ~
F83CC213X001~
( - ~ 3il!l'>l100rm
~
~
F8JOCW~X0006 I = I 864 dpmlJOO an' SMUDll TIDEW ATER I NC INTERIM ONSITI!: STORAGI!: BUll..OING <IOSBI tra ~t No,: 4;.e.:te'.H *1h
- SMUD FS 00 I D<OOCe l ocation : Y u hu ..... *-1n ~ = 098dp<r-1100cm roP : , ,,i.1 1 ' ' *H**** AoprOYed by.
FSJOO ~XQO(T.'
<!> (. 1 St9 <Jprh/100 a ~*
ApproWll dct~
Do t ~
ACY No. :
Page I Att. I Maps F8300213
Attachment 2
- Instrumentation November 7, 2016 Survey Unit F8300213
Table 2-1. Survey Unit Instrumentation M~asi.11:em.ent . .'Migi;niun DetectableAdivity" Detector Caiibratfon
. ',,. fy,pe
'( .
.**Effi.cie~~ies
. ! . * 'b
- ,Dt1e Da.te.
Beta Static Ludlum Model Beta - 531 dpm/100 cm2 13.2% 317897/331972 Measurement 2350-1 2/10/17 Ludlum Model 44-1 l 6 B Detector Swipe Ludlum Model 2929 Beta - 79 dpm/l 00 cm 2 43.4% 182597I188736 Measurements Ludlum Model 44- 5/13/17 10-1
- Minimum detectable activities for the count rate instrumentation were calculated in accordance with NUREG-1507, "Minimum Detectable Concentrations with Typical Radiation Survey Instruments for Various Contaminants and Field Conditions" (U.S. NRC, 1997).
b Detectors are required to be calibrated once every 12 months. Calibration due date indicates the date by which the detector must be calibrated again.
cm 2 = square centimeters cpm =counts per minute dpm =disintegrations per minute Page 1 Att. 2 Instrumentation F8300213
Static Measurement MDA Variables Beta Survey Type PR331972 Detector Number 208 Background count rate (cpm)
Count Time (min)
- 0. 132 Efficiency 100 Area of Detector (cm 2)
Constants 60 sec/min 2.54 cm/in Assumptions Background count time and sample count time are equivalent Calculate Static MDA St(:ltic ~[),l\ =3_+ 4.6~(Br
- t) 0 *5/t *E * ~~100 (NUR~G 1507)
Where: Br Background Countrate t Count Time (min)
E Efficiency A Area of detector (cm 2)
Static MDA 531 dpm/100 cm 2 Page 2 Att. 2 Instrumentation F8300213
Attachment 3 Investigation November 7, 2016 Survey Unit F8300213 (none required)
Att. 3 Investigation F8300213
Attachment 4 Data Assessment November 8, 2016 Survey Unit F8300213
[Activ~
I Nt.mbetd V~
151 Mil'Wnun 1$89.391 M~. 2.HliOOi so 124.091 Skewr1e1-1 K!.Mi<nit
~MeM 0.01 1.925.76
~M8di&n 1.mmi t
1 0 Let~89'n OMOfe E!i-1!
1700 1750 1792 2042 Page 1 Att. 4 Data Assessment F8300213
Q-Q Plot for Beta Static Activity Cell B*3 Activf)
H*15
- . Mean*192&
"/
Sd* 124.i 5..... 121.2 lrtercec;.1*1926 CccteWior~ R
l!m 1920
~
~
c(
'""' ./_,..
/
19ll
/
ll'Bl
- 1.5 *1.0 -05 00 0.5; 1.0 1.5 Theoretical Quantiles (standard Normal)
Page 2 Att. 4 Data Assessment F8300213
SmeJr _Data_Cakulation_Sheet_l01316 I IOSB Final Status Survey I I
LCl LC2 LC3 LC.1 LC6 LC5 ('CPM f~dpm : Oatefrime of Count Sample Comments
- 1. FBJO 021 J x 00001 SM Cell B-3 47 -6 *10/12/16 1300 2 f.830 021 3 x 00002 SM Cell G-3 39 -25 10/12/16 1301 3 1'830 021 3 x 00003 ~M Cell 0*3 47 -6 10/12/16 1302 4 F830 021 3 x 00004 SM Cell B**3 43 -16 '. 10/12/16 1304 5 Fl:\30 021 3 x 00005 SM Cell 0-3 56 14 .10/12/16 1305 6 1'830 021 3 x 00006 SM Cell 13-3 46 -9 , 10/12/lG 1306 7 F!!30 021 3 x 00007 SM Cell G-3 43 -16 : 10/12/16 .1307 8 FS30 021 3 x 00008 SM (('Ii B*3 44 .13 '10/12/16 1309 9 FIJJO 021 3 x 00009 SM Cell 13-3 48 -4 *10/12/16 1310 10 F8JO 021 3 x 00010 SM Cell G-3 50 0 '.10/12/16 1311 11 FS30 021 3 x 00011 SM Ccll ll-3 52 5 '10/12/16 1312
]/. F830 021 3 x 00012 SM Ccll ll-3 51 3 : 10/12/16 1313 B F830 021 3 x 00013 SM Cell 0*3 56 14 '10/12/16 1314 Jll 1'830 021 3 x 00014 SM (C'll 0*3 44 -13 ;10/12/16 131~.
- JS F830 021 3 x 00015 SM Cell 0*3 46 -9 .10/12/16 1317 Cor11(J'l(*11t~; Rv !.i{~n;ilur*:o !);:*low. th1: tNfui1*..'d ~.ourct* <:hf:<"k ;1~ b.1d:1:rounl'.t ch*!t.ks wt<;~ 'SJll1!.f,1i:toril*,* C)('tlormt"d p1101 1o:m1: ~1f ttw 1n~trL11rn:ut 1dP.rllii"i*!d l:>t:-low.
Ludlum 2929 Bcnchtop Instrument 01:1:
eifiU('lrlCV bk& COIJlll 2929 S/N: 1825~7 f(1t<: 1.im1: MD/\
llDIV/0!
Cl. 0.364 43-10-1 S/N: 18S736 cpin mi1\ dpm 1w.r :lrf!~1 Tech A Sign/ Date '(/.,br(/J~ rZ-Z-lb ~9.8 I 78.6 Tech B Sign/ Date Cal Due Date: 5/1.3/2017 I~ 0.'134 NI;'\ r.pm min tlpm p~r .1f1:~1 Page 3 Att. 4 Data Assessment. F8300213