Final - Section C Operating Exam (Folder 3)
ML063240343
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/10/2006
From:
Exelon Generation Co
To: Todd Fish
Operations Branch I
Sykes, Marvin D.
References
Download: ML063240343 (52)


Text

Appendix D Operator Action Form ES-D-2 SCENARIO #I

1. SIMULATOR OPERATOR INSTRUCTIONS A. INITIAL SIMULATOR SETUP

-J ITEM / MALFUNCTION / REMOTE FUNCTION / CONDITION Prepare simulator per TQ-AA-106-0301, Simulator Training Practices Job Aid Reset simulator to IC-40

- 100% Power

- RClC out of service Apply Information Tags on the following RClC components:

- HV49-lF008, OUTBD PClV

- HV49-1F076, Warmup Bypass

- HV49-1FOIO, CST Suction

- HV49-I F012, Discharge Valve

- HV49-1FOI9, Min Flow Valve

- HV49-1F029, Suppression Pool Suction

- HV50-1F045, Steam Supply MOV

- HV50-1F060, Turbine Exhaust W Obtain key and close HV49-1F008, RClC OUTBD PClV Take out of FREEZE and ensure the following:

- Reactor Power is 100%

- IB CRD pump is running.

- 1B Drywell Chiller is running.

- With the exception of RCIC, all other equipment is OPERABLE.

Page 1 of 19

Appendix D Operator Action Form ES-D-2 If not embedded in IC-40, load Scenario ILT NRC Scenario #I from floppy disk labeled 2006 NRC EXAM using A: drive. Ensure the following malfunctions are loaded:

- MNSl60A, active Iminute after trigger 1 is activated.

- MFW245C, active 12 minutes after Group 7A isolation (trigger I).

- MED263D, trigger 2 active when plant is stable after RFP secured.

- MAD147E, trigger 3 active after CRD pump and drywell chiller started.

- MRR441, trigger 4 active when mode switch in shutdown.

- MFW252B, trigger 5 active when drywell pressure at 2psig.

- MHP449, trigger 6 active when HPCl flow is at 3000 gpm.

- MCR412A, trigger 7 active when drywell pressure at 2psig.

- MHP448B, active immediately.

- MSLI 97, active immediately.

Page 2 of I 9

Appendix D Operator Action Form ES-D-2 W Reset any annunciators that should not be present Page 3 of 19

Appendix D Operator Action Form ES-D-2 B. INSTRUCTIONS FOR SIMULATOR OPERATOR EVENT 1: Perform ST-6-047-200-1, SDV Valve Exercise Test 141 MALFUNCTION / REMOTE FUNCTION I REPORT H Respond to request for assistance as appropriate.

EVENT 2: Inadvertent Isolation of PClG MALFUNCTION / REMOTE FUNCTION / REPORT I Ensure trigger #I timer activates appropriately.

H If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report that the Instrument Gas compressors are not running.

If I&C / WWM contacted, report that the isolation will be investigated promptly.

EVENT 3: RFP B High Vibration 1 J I MALFUNCTION / REMOTE FUNCTION / REPORT I

~~ ~

H Ensure RFP vibration trigger timer activates appropriately.

H If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report that the 9 RFP is shaking badly.

H If WWM contacted, report that the RFP vibration will be investigated promptly by engineering and maintenance personnel.

Page 4 of 19

Appendix D Operator Action Form ES-D-2 EVENT 4: D14 Bus Overcurrent / Loss of D14 Bus J I MALFUNCTION/ REMOTE FUNCTION / REPORT I Activate trigger #2 when instructed by evaluator.

If Equipment Operator / Floor Supervisor contacted to investigate the D14 bus, wait 5 minutes and report to the crew that the B and C phase overcurrent relays are tripped on the D14 bus.

If Equipment Operator / Floor Supervisor contacted to perform pre-start checks on the IA Drywell Chiller, wait 5 minutes and report to the crew that the chiller is readv to start.

1 Respond appropriately to a request for running checks on the D14 diesel and the I A Drvwell Chiller.

If Equipment Operator / Floor Supervisor contacted to perform pre-start checks on the 1 A CRD pump, wait 5 minutes and report to the crew that the IA CRD pump is ready to start.

~

to a request for running checks on the 1 A CRD

~ ~ ___ ~

Respond to request for other assistance as appropriate.

EVENT 5: SRV L Fails Open Mechanically 141 MALFUNCTION / REMOTE FUNCTION / REPORT I H Activate trigger #3 when instructed by evaluator.

11 WHEN Main Turbine inlet pressure has been lowered to 900 psig, remove malfunction MAD147E to close SRV L.

Wait 2 minutes and insert mzunction MAD147E to reopen SRV I.

If Equipment Operator / Floor Supervisor is contacted to pull fuses for SRV L IAW OT-I 14, wait 8 minutes, remove the fuses (RAD214 Toggle Out),

and report that the fuses are removed.

If requested to open HV51-1F068B (due to the power loss), wait 15 minutes and report the valve cannot be opened manually.

Page 5 of 19

Appendix D Operator Action Form ES-D-2 EVENT 6: Coolant Leakage / B Feedwater Line Rupture Inside Primary Containment J MALFUNCTION / REMOTE FUNCTION I REPORT I1 W Ensure triggers ##4and 5 activate appropriately.

I W Respond to request for assistance as appropriate.

l W If requested, perform the appropriate field actions of SE-I 0:

-Reset RHRSW Rad Monitor

-Reset RE ARMS

-Reset shunt trips

-Perform running checks on the diesel generators EVENT 7: HPCl Controller Fails Low in AUTO / HPCl Turbine Trip (1 J 1 MALFUNCTION / REMOTE FUNCTION / REPORT l 4 If requested, wait 10 minutes and report that the cause of the HPCl trip is unknown.

Page 6 of 19

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 1 Event No.: 1 Event

Description:

Perform ST-6-047-200-1, SDV Valve Exercise Test 1 Time I Position I Applicant's Actions or Behavior I CRS RO/PRO I Direct the RO and PRO to perform ST-6-047-200-1, SDV Valve Exercise Test Obtain two stop watches and coordinate the starting of the stop watches with the depressing of both TEST pushbuttons.

RO/PRO At the conclusion of the test, report successful completion of ST 047-200-1 to the CRS.

CRS Acknowledge completion of ST-6-047-200-1 Page 7 of 19

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 1 Event No.: 2 Event

Description:

Inadvertent Isolation of PClG (TS)

Time I Position I Applicants Actions or Behavior Recognize that PClG has isolated and report the failure to the CRS.

Reference ARC for annunciator 111 RECIRC A 5 , l A RECIRC PUMP MOTOR WINDING COOLING WATER LO FLOW AND /OR Reference ARC for annunciator 112 CLEANUP A5, 1B RECIRC PUMP MOTOR WINDING COOLING WATER LO FLOW I CRS I Reference GP-8, PRIMARY AND SECONDARY CONTAINMENT ISOLATION VERIFICATION AND RESET.

I CRS I Determine that no actual isolation signal is present and the isolation of PClG is inadvertent.

I Ro 1 If Reactor Recirc Pump motor high temperature alarms, monitor pump motor temperatures on BOP DAS monitor using S43.0.D.

II I Place the B loop of drywell chill water in service to restore cooling water to the Reactor Recirc Pump motors.

CRS Direct the PRO to bypass the isolation of PClG using GP-8.5.

PRO Bypass and restore PClG IAW GP-8.5:

o Position switch HSS-57-191A to BYPASS o Position switch HV-59-129A to CLOSE o Reposition valves that isolated to desired position.

I CRS I Direct the RO to contact 1&C / WWM to investigate the inadvertent PClG isolation.

I RO I Contact I&C / WWM to investigate the inadvertent PClG isolation.

CRS Reference T.S. LCO 3.6.3 for inoperable PCIVs following PClG isolation bypass per GP-8.5. Recognize that inoperable valves must be restored to OPERABLE within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or the penetration must be isolated, otherwise must be in HOT SHUTDOWN within next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Page 8 of 19

Appendix D Operator Action Form ES-D-2 Position Applicants Actions or Behavior RO/PRO Recoanize 1B RFP is vibrating and report the failure to the CRS.

RO Reference ARC for annunciator 102 FEED B2, 1B RFPT HI VIBRATION.

CRS Direct the PRO to investigate high vibration on the VMS computer

~~ ~

PRO Monitor IB RFP vibration on the VMS computer and recognize that B RFP vibration is on the rise.

~~

CRS Direct dispatching EO / Floor Supervisor to investigate the I B RFP high vibration. ____ ~

RO/PRO Dispatch EO / Floor Supervisor to investigate the I B RFP high vibration.

RO/PRO Recognize at >5 mils on two vibration probes for a single bearing, the ARC directs feedpump speed be raised / lowered as necessary to clear the alarm. At >8 mils on two vibration probes for a single bearing, the feedpump must be removed from service.

CRS Direct the crew to prepare to remove the I B RFP from service when two vibration probes read greater than 8 mils on a single feedpump bearing.

CRS Direct the PRO to reduce Reactor power per GP-5 Appendix 2 below the capacity of the two remaining feedpumps ( I 3 Mlbm/hr feed flow).

PRO Reduce Reactor power with recirc to below 13 Mlbmlhr total feed flow.

RO Remove the IB RFP from service IAW S06.2.C U/1:

o Ensure HIC-006-106B for offgoing RFP in AUTO.

o For RFPs remaining in service, verify respective speed controller in AUTO and sufficient maneuvering room available.

o Place the I B RFP speed controller in manual (MAN).

o Slowly lower the speed of the 1B RFP to standby.

o Verify HV-006-105B, discharge check valve, is closed.

Page 9 of 19

Amendix D 0Derat0r Act ion Form ES-D-2 Op-Test No. ILT05-I Scenario No. 1 Event No.: 9 Event

Description:

D14 Bus Overcurrent / Loss of D14 Bus Time Position Applicants Actions or Behavior Recognize loss of the D14 Bus and report the failure to the CRS.

Enter E-Dl4 and E-D144.

I CRS Direct dispatching EO / Floor Supervisor to investigate loss of D14.

I ROlPRO Dispatch EO / Floor Supervisor to investigate loss of D14.

Recognize that IB CRD pump is not running and report to CRS.

~~

Direct RO to start the I A CRD pump.

~ ___

Dispatch EO / Floor Supervisor to perform pre-start checks on the I A CRD pump.

Start the IA CRD pump IAW S46.1 .A:

0 Verify HV-46-1F003, Drive Water Pressuie Control Valve, is OPEN.

0 Verify the CRD flow controller is in MANUAL and closed.

0 Verify CRD flow control valves IF002A and 1F002B are closed.

0 Verify CRD PUMP SUCTION LO PRESS annunciator clear.

0 Start the 1 A CRD pump.

0 Ensure EO slowly opens the 1A CRD pump discharge valve.

0 Verify charging water pressure is adequate.

0 Verify suction and drive water filter alarms are clear.

0 Verify accumulators are charged and alarms are clear.

0 Open the CRD flow control valve to establish 50 to 63 gpm flow.

0 Throttle close HV-46-1F003 to establish system pressure of 255 to 265 PSI.

0 When system pressure and flow are normal, place the CRD flow controller in AUTO.

0 Verify system flow indicates 50 to 63 gpm, drive water flow indicates zero gpm, and stabilizing flow indicates 5.8 to 6.2 gpm. ~~

Page I O of 19

Amendix D ODerator Action Form ES-D-2 Op-Test No. ILTO5-1 Scenario No. 1 Event No.: 4 Event

Description:

D14 Bus Overcurrent I Loss of D14 Bus Time Position Applicants Actions or Behavior PRO Recognize that 1B Drywell Chiller is not running and report to CRS.

CRS Direct PRO to start the IA Drywell Chiller and restore drywell cooling.~~ ~

PRO Dispatch EO I Floor Supervisor to perform start / running checks on the 1A Drywell Chiller.

~~ ~

PRO Start the 1 A Drywell Chiller IAW S87.1.A:

o Place 1 A Drywell Chiller to START.

o Verify the chiller discharge valve opens.

o Immediately place a drywell chilled water pump in START.

o Verify flow is established.

o Verify chiller START light lit.

o Start the second chilled water pump.

o After 50 seconds, verify the 1 A Drywell Chiller start.

RO I PRO Dispatch EO / Floor Supv. to perform running checks on the D14 diesel.

CRS Reference T.S. LCO 3.8.3.1 for loss of D14 bus.

PRO Recognize the 1D Core Spray and 1D RHR pumps are inoperable.

CRS Reference T.S. LCO 3.5.1 for loss of ECCS pumps.

Page 11 of 19

Appendix D 0perator Action Form ES-D-2

~~~ ~

Op-Test No. ILT05-1 Scenario No. Event No.: 5 Event

Description:

SRV 1L Fails Open Mechanically Time 1 Position Applicants Actions or Behavior t Recognize 1L SRV has failed open and report failure to CRS.

Place both loops of Suppression Pool Cooling in service:

o o

o Start both loops of RHRSW IAW S12.1 .A.

Start a spray pond room fan for each loop of RHRSW.

Start an RHRSW pump in loop A and B.

o Throttle open the RHR heat exchanger RHRSW outlet Val\

for each loop (HV-51-1F068A & B).

Recognize that the B RHRSW heat exchanger outlet valve has lost power, and report to the CRS that only the A loop of Suppression Pool Cooling is available.

PRO Continue placing the Aloop of RHR in Suppression Pool Coolin o Open the 1A RHR heat exchanger RHRSW inlet valve (1 51-1 F014A).

o Maintain maximum attainable RHRSW system flow withou exceeding 11,000 gpm, with a discharge pressure of 75 to psig.

o Start the I A RHR pump.

o Open the full flow test valve (HV-51-1F024A) to maintain 8000 to 8500 gpm RHR flow.

o Close the 1 A RHR heat exchanger bypass valve (HV IF048A).

1

~ ~~ ~

CRS Enter OT-I 14, Inadvertent Opening of a Relief Valve Provide confirmation of the open SRV.

I CRS Direct RO to reduce turbine inlet pressure to 900 psig.

~~ ~ ~

Reduce turbine inlet pressure to 900 psig.

Recognize I L SRV closed and report to CRS.

I CRS Enter GP-3.

I PRO/RO

~~ ~

Recognize 7 L SRV reopened and report to CRS.

Page 12 of 19

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 1 Event No.: 5 Event

Description:

SRV 1L Fails Open Mechanically Time Position Applicants Actions or Behavior CRS Enter GP-4.

CRS Direct PRO to transfer house loads.

PRO Transfer house loads.

CRS Direct the PRO / RO to runback recirc to minimum.

PRO/RO Runback recirc to minimum.

I CRS I Direct RO to scram the Reactor at nominal 60% core flow.

CT RO Manually scram the Reactor.

CRS Enter T-I01 on low Reactor level.

Page 13 of 19

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 1 Event No.: 6 Event

Description:

Coolant Leakaqe / B Feedwater Line Rupture Inside Priman/

Containment I

I Time Position Amlicants Actions or Behavior i-- RO/PRO CRS Reference ARC for annunciator 107 REACTOR F-2,DRYWELL HI /

LOW PRESS.

Enter OT-101, High Drywell Pressure.

~~ ~

CRS Direct PRO to maximize drywell cooling and terminate Primary

~~

Containment inerting

~

PRO Verify Drywell cooling maximized and Primary Containment inerting is not in progress CRS Direct PRO to perform section 3.1 1 of OT-101:

o Ensure MSL sample valves are closed.

o Ensure Recirc. sample valves are closed.

o Stop RWCU and ensure the following RWCU valves are closed:

HV-44-1F033,l FOOI , 1F004,l FIOO, and 1F105.

o Ensure MSL drains are closed.

o When time permits. perform S44.2.A to shutdown RWCl CRS Enter T-102 when Suppression Pool temperature reaches 95 degrees F. (stuck open SRV)

~~ ~~~

CRS Re-enter T-I 01 and enter T-I 02 on high drywell pressure.

~~ ~ ~ ~ ~

CRS Direct PRO to bypass and restore drywell cooling when drywell air temperature reaches 145 degrees F.

PRO Bypass and restore drywell cooling.

RO Recognize feedwater is not injecting into RPV and report to CRS.

CRS Direct PRO / RO to verify isolations.

I CRS 1 Re-enter T-101 on low Reactor level.

1 CRS i Direct PRO to spray the Suppression Pool per T-225 using RHR before Suppression Pool pressure reaches 7.5 psig.

~~ ~

Page 14 of 19

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 1 Event No.: 6 Event

Description:

Coolant Leakage / B Feedwater Line Rupture Inside Primaw Containment Time Position Applicants Actions or Behavior PRO Spray the Suppression Pool per T-225:

o Ensure the I A RHR pump suction valve open (HV IF004A).

o Ensure the following RHR valves are closed:

HV-51-1F006A, 1FOI 5A, 1F016A, and IFOI7A.

o Verify IA RHR pump is running (suppression pool cooling).

o Ensure the following RHR valves are open:

HV-51-1F047A and 1F003A.

o Open HV-51-1F027A to establish suppression pool spray.

o Throttle HV-51-1F024A to maintain 8000 to 8500 gpm total system flow.

CRS Enter T-I 1I, Level Restoration, when it is determined RPV level cannot be maintained above -1 61.

PRO Secure the I A and 1B recirc pumps due to loss of cooling water.

CRS Direct PRO / RO to inhibit auto ADS.

CT PRO / RO Inhibit auto ADS.

CRS Direct PRO / RO to start alternate injection sub-systems.

RO Attempt to start SLC, recognize squib valve failure, and report failure to CRS.

CRS Direct PRO / RO to start injection sub-systems.

RO / PRO Start iniection sub-systems.

RO Conserve water by attempting to isolate feedwater lines.

~~

CRS Enter T-I 12 when Reactor level reaches -161 when required by the PSP curve in T-102.

CRS Direct the RO / PRO to prevent uncontrolled injection with low pressure systems.

CRS Direct PRO to open 5 ADS valves.

CT PRO Open 5 ADS valves.

Page 15 of 19

Amendix D ODerator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 1 Event No.: 6 1 Event

Description:

Coolant Leakage / "B" Feedwater Line Rupture Inside Primarv Containment Time Position Applicant's Actions or Behavior I I CRS I Enter SE-10 for the LOCA signal.

I 1 PRO I Re-energize busses in MCR per SE-10.

RO / PRO Dispatch EO / Floor Supervisor to perform SE-10 actions in the field.

Page 16 of I 9

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 1 Event No.: 7 Event

Description:

HPCl Controller Fails Low in AUTO / HPCl Turbine Trip Time Position Applicant's Actions or Behavior PRO Recognize HPCl has an initiation signal, but is not injecting, and

~~

report problem with controller to CRS.

CRS Direct HPCl controller be placed in manual.

PRO Place the HPCl controller in manual and ensure speed is greater than 2200 RPM.

CRS When HPCl injection is required, direct the PRO to inject with HPCl in manual control.

II PRO Raise HPCl speed in manual to begin controlled injection to the RPV.

Recognize HPCl trip and report trip to the CRS.

PRO Contact EO / FSV to investigate loss of HPCI.

Page 17 of 19

Appendix D Operator Action Form ES-D-2 TERMINATION POINT The scenario will be terminated when the following criteria are met:

1 . An Emergency Blowdown has been performed per T-I12 and RPV level has been stabilized.

Page 18 of 19

Appendix D Operator Action Form ES-D-2 SCENARIO #I INITlAL CONDITIONS Unit 1 is at 100% power INOP I OUT OF SERVICE EQUIPMENT RClC is out of service for bearing replacement. Estimated out of service time is approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. A regulatory log entry has been completed.

PLANNED EVOLUTlONS Maintain 100% power Perform ST-6-047-200-1, SDV Valve Exercise Test.

Page 19 of 19

Appendix D Operator Action Form ES-D-2 SCENARIO #2 I. SIMULATOR OPERATOR INSTRUCTIONS A. INITIAL SIMULATOR SETUP

-J ITEM I MALFUNCTION / REMOTE FUNCTION / CONDITION Prepare simulator per TQ-AA-106-0301, Simulator Training Practices Job Aid Reset Simulator to IC-41 W Take out of FREEZE and ensure the following:

- 95%power If not embedded in IC-41, load Scenario ILT NRC Scenario #2 from floppy disk labeled 2006 NRC EXAM using A: drive. Ensure the following malfunctions are loaded:

- MV1234A, active 1 minute after Trigger # I is activated. This trigger is activated after the thermal limit problem is rectified.

- MCU002B, active immediately.

- RCW219, active 10 minutes after the A RPV pressure instrument fails high (Trigger 1).

- MRR435B, active 1Iminutes after loss of RECW to RWCU (Trigger 1).

- MRR435A, Trigger #2 activated after Tech Specs are referenced for the trip of the 1B recirc pump AND when prompted by evaluator.

- MRP029D, active immediately.

- MRP407C, active immediately.

- MSL559, active immediately.

Page Iof 16

Appendix D Operator Action Form ES-D-2 J ITEM / MALFUNCTION / REMOTE FUNCTION / CONDITION 1-Remotes I W Reset any annunciators that should not be present Page 2 of 16

Appendix D Operator Action Form ES-D-2 B. INSTRUCTIONS FOR SIMULATOR OPERATOR EVENT 1: Raise Power to 100% With Recirc.

I J I MALFUNCTION / REMOTE FUNCTION / REPORT I W If Reactor Engineer is contacted, inform crew to continue raising power with recirc flow. RE will review paperwork later this shift.

W Respond to other requests for assistance as appropriate.

EVENT 2: ARPV Pressure Transmitter (RPS) Fails Upscale 1 J 1 MALFUNCTION / REMOTE FUNCTION / REPORT 1 I W Activate Trigger #I after the crew takes the shift and when prompted by the evaluator. Ensure timer times out correctly.

If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report back that RPS trip unit (PIS-I N678A) is tripped and appears due to being bumped by an 1&C technician performing housekeeping duties.

Recommend that the trip unit be reset.

W If requested to reset trip unit, report back that trip unit (PIS-I N678A) is reset.

If I&C / WWM contacted, report that failure will be investigated promptly.

EVENT 3: RECW Valve to RWCU Non-Regen Heat Exchanger Closes / RWCU Outboard Isolation Valve Does Not Isolate on High Demin Inlet Temp

[ J I MALFUNCTION / REMOTE FUNCTION / REPORT 1 I W Ensure RECW valve closure trigger timer activates appropriately.

W If Equipment Operator / Floor Supervisor contacted, wait 8 minutes and report that nothing appears to be unusual at this time. Will continue to investigate.

W If I&C / WWM contacted, report that failure will be investigated promptly.

Page 3 of 16

Appendix D Operator Action Form ES-D-2 EVENT 4: IB Recirc Pump Trips I J I MALFUNCTION / REMOTE FUNCTION / REPORT H

W Ensure recirc pump 1B trip trigger timer activates appropriately.

W If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report to the crew that the cause of the IB recirc pump trip cannot be determined at this time. Will continue to investigate.

W If I&C / WWM contacted, report that failure will be investigated promptly.

EVENT 5: IA Recirc Pump Trips I ATWS - B RPS Fails to Trip, Both RRCS Channels Fail to Initiate ARI.

J I MALFUNCTION / REMOTE FUNCTION / REPORT

~~

W Activate trigger 2 when prompted by evaluator.

W If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report to the crew that the cause of the IA recirc pump trip cannot be determined at this time.

1 - B If l&C / WWM contacted, report that failure will be investigated promptly.

~

W If requested to perform T-215, remove malfunction MRP029D after the first terminate and prevent with Reactor level stable AND prompt from evaluator.

I W W

If requested to perform T-216, wait 6 minutes and report back to the crew that the air valve is stuck closed.

If requested to perform T-270, load appropriate training scenario with seven minute time delay. When timers time out, report back that 1-270 is complete in the AER.

If requested to perform T-221, wait 11 minutes, load appropriate training scenario and report back that T-221 is complete.

W If requested to perform T-251, wait 6 minutes, call the MCR to verify that HV-55-1F006 is closed, load appropriate training scenario and report back that T-251 is complete.

W Respond to other requests for assistance as appropriate.

Page 4 of 16

Amendix D ODerator Action Form ES-D-2 EVENT 6: SLC Pipe Rupture In Drywell I I MALFUNCTION / REMOTE FUNCTION / REPORT W If Equipment Operator / Floor Supervisor contacted, respond in 10 minutes that there is no evidence of a SLC rupture in the Unit 1 Reactor Enclosure.

W If requested to perform T-209, reply that the MCR will be notified when the field portion of T-209 is complete.

W If I&C / WWM contacted, report that failure will be investigated promptly.

EVENT 7: Main Turbine Bypass Valves Fail Closed I EHC Load Set Runs Back to Minimum I J I MALFUNCTION / REMOTE FUNCTION / REPORT If Equipment Operator / Floor Supervisor contacted, respond in 10 minutes that there is no evidence of an EHC leak or any other problem that would cause the BPVs to close or load set to runback in the Unit 1 Turbine Enclosure or AER.

W If I&C / WWM contacted, report that failure will be investigated promptly.

Page 5 of 16

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 2. Event No.: 1 Event

Description:

Raise Power to 100% With Recirc Flow Time 1 Position I Applicant's Actions or Behavior I CRS I Direct PRO to raise Reactor power to 100% IAW GP-5 utilizing recirc flow.

I PRO I Raise Dower to 100% with recirc flow.

RO Monitor core performance by running period P-I edits.

Page 6 of 16

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-I Scenario No. 2 Event No.: 2 Event

Description:

ARPS Pressure Transmitter (RPS) Fails High Time Position Applicants Actions or Behavior RO Reference ARC for annunciator 107 REACTOR G-I , REACTOR HI PRESS TRIP RO Reference ARC for annunciator 108 REACTOR B-1 , AUTO SCRAM CHANNEL A I RO Recognize that the Reactor high pressure trip signal has resulted in an A RPS half scram.

RO AttemDt to reset the RPS half scram.

CRS Direct dispatching EO I Floor Supervisor to investigate RPS high Reactor pressure trip units in Unit IAER.

RO I PRO Dispatch EO I Floor Supv to AER to investigate RPS high reactor pressure trip units.

CRS When trip unit PIS-I N678A is reset in the AER, direct reset of the half scram.

_ _ ~ ~ ~

RO Reset the half scram.

Page 7 of 16

Appendix D 0perator Act ion Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 2 Event No.: 3 Event

Description:

RECW Valve to RWCU Non-Reqen Heat Exchanger Closes / RWCU Outboard Isolation Valve Does Not Isolate on Hiqh Demin Inlet Temp Time

  • Position Applicant's Actions or Behavior PRO Reference ARC for annunciator 112 CLEANUP H3, RWCU FILTER INLET HIGH TEMP CRS Direct PRO to monitor inlet temperature to the RWCU demins (non-regen heat exchanger outlet temp).

~~~ ~ ~

PRO Select non-regen heat exchanger outlet temp using the RWCU temperature selector switch and report that the temperature is rising to the CRS.

Recognize that the HV44-1F004, RWCU Outboard Isolation Valve, did not isolate automatically at 140 degrees F and report the failure to the CRS.

Direct the PRO to attempt to close HV44-1F004 with the handswitch.

I Take the handswitch for HV44-I F004 to close and report to the CRS that HV44-1F004 has closed.

I Remove RWCU from service IAW S44.2.A, REACTOR WATER CLEANUP SHUTDOWN CRS Reference T.S. LCO 3.6.3 for the failure of the RWCU PClV to isolate.

Page 8 of 16

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 2 Event No.: 3 Event

Description:

I B Recirc Pump Trips (TS)

Time Position Applicants Actions or Behavior Reference ARC for annunciator 112 CLEANUP E-I, 1B RECIRC M-G DRIVE MOTOR LOCKOUT TRIP II CRS Recognize the 1B recirc pump has tripped and report the trip to the CRS.

Enter OT-I 12, RECIRCULATION PUMP TRIP I CRS Recognize in the Restricted Region of the Power / Flow map.

Direct RO to insert control rods IAW RMSI to exit the Restricted Region of the Power / Flow map.

Insert control rods IAW RMSI.

Direct PRO to close the I B recirc pump discharge valve for 5 minutes.

Close the 1B recirc pump discharge valve for 5 minutes and then reopen the valve.

Reopen the 1 B recirc pump discharge valve 5 minutes after it was closed.

Direct dispatching EO / Floor Supervisor to investigate 1B recirc pump trip.

I PRO Dispatch EO / Floor Supervisor to investigate 1B recirc pump trip.

CRS Reference T.S. LCO 3.4.1.1 for Recirc Pump trip.

Page 9 of 16

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 2 Event No.: 5 Event

Description:

1 A Recirc Pump Trips / ATWS - B RPS Fails to Trip, Both RRCS Channels Fail to Initiate ARI.

Time Position Applicants Actions or Behavior I I Recognize the I A Recirc Pump has tripped and report the failure to the CRS.

I I Reference ARC for annunciator IIIRECIRC E-I , 1A RECIRC M-G DRIVE MOTOR LOCKOUT TRIP I CRS I Direct the RO to manually scram the Reactor.

RO Scram the Reactor and place mode switch in shutdown.

RO Recognize B RPS failed to de-energize.

I RO I Report to crew that the Reactor has failed to scram.

CRS Enter T-I 01 for scram condition with power greater than 4%.

RO Manually initiate RRCS / ARI.

I Ro I Recognize and report that control rods did not insert after initiating RRCS.

RO I Insert SRMs and IRMs.

1 CRS I Direct RO to manually insert control rods and bypass the RWM as necessaw.

CT RO Insert control rods with RWM bypassed.

CRS Direct performance of T-215, DE-ENERGEATION OF SCRAM SOLENOIDS.

I RO/PRO I Contact EO / Floor Supv to perform T-215.

I CRS I Direct performance of T-216, MANUAL ISOLATION AND VENT OF SCRAM AIR HEADER.

I RO/PRO I Contact EO / Floor Supv to perform T-216.

CRS Enter T-I 17, LEVEL / POWER CONTROL.

CRS Direct PRO to inhibit auto ADS.

CT I PRO I Inhibit both divisions of auto ADS.

I Direct performance of T-221 to maintain MSIVs open.

~ ~~

1 CRS Page 10 of 16

Amendix D ODerator Action Form ES-D-2 Op-Test No. ILTO5-1 Scenario No. 2 Event No.: 3 Event

Description:

I A Recirc Pump Trips / ATWS - B RPS Fails to Trip, Both RRCS Channels Fail to Initiate ARI.

Time Position Applicants Actions or Behavior RO/PRO Contact EO / Floor Supv to perform T-221.

CRS Direct performance of T-270 to terminate and prevent injection to the RPV to reduce RPV level to below -50 (with the exception of SLC, CRD, and RCIC).

PRO Perform T-270 to terminate and prevent HPCl injection:

o Shutdown the HPCl turbine by simultaneously depressing the HPCl turbine trip pushbutton and closing HV-55-1F003 (outboard PCIV).

o Verify HV-55-1F003 is closed and release the turbine trip pushbutton.

PRO Contact EO / Floor Supervisor to perform T-270 in the AER to terminate and prevent low pressure ECCS injection.

CT RO Perform T-270 to terminate and prevent condensate and feedwater injection:

o Ensure HV-06-138A, RFP BPV, is closed.

o Ensure LIC-06-138, startup level controller, is in manual with output set at 0%.

o Ensure the LIC-06-120, RFP bypass controller, is in manual.

o Ensure the speed controller for A,B,C RFPTs in manual for all three pumps.

o Depress Emergency Stop for all three RFPs.

o When the Emergency Stop light goes out, depress Auto Start for all three pumps.

o Close the HV-06-108 A,B,C (RFP discharge valves) one at a time UNTIL the desired valves are closed and re-injection to the RPV is necessary.

CRS Provide direction to the RO to re-inject as necessary to maintain RPV level in a band that is above -129 and at or below -50.

RO Re-inject with condensate / feedwater as necessary to maintain RPV level in the band directed by the CRS.

Page 11 of 16

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 2 Event No.: 2 Event

Description:

I A Recirc Pump Trips / ATWS - B RPS Fails to Trip, Both RRCS Channels Fail to Initiate ARI.

Time I Position 1 Applicants Actions or Behavior I Ro I Recognize that T-215 was successful and all control rods have fully inserted. Report all rods in to CRS.

I CRS I Exit T-I 17 and enter T-I 01.

I CRS I Direct RO to maintain a new RPV level band of 12.5 to 54 inches.

RO Re-inject to the RPV to a level band of 12.5 to 54 inches.

Page 12 of 16

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 2 Event No.: fj Event

Description:

SLC Pipe Rupture In Drywell Time Position Applicant's Actions or Behavior RO Manually start or verify automatic start of the SLC pumps, and recognize discharge pressure is significantly below RPV pressure.

Report the failure to the CRS.

Direct the RO to secure the SLC pumps to save boron inventory.

Secure the 3 SLC pumps.

Direct performance of T-209.

RO/PRO Contact EO / Floor Supv to perform T-209.

Page 13 of 16

~

Appendix D 0perat0r Act ion Form ES-D-2 Op-Test No. ILT05-I Scenario No. 2 Event No.: 1 Event

Description:

Main Turbine Bypass Valves Fail Closed / EHC Load Set Runs Back to Minimum Time Position Applicants Actions or Behavior Recognize that RPV pressure is going up and report to the CRS.

Recognize BPVs failing closed and report to the CRS.

I RO/PRO Recognize that the Main Turbine has tripped.

I CRS Direct PRO to control RPV pressure using SRVs with a pressure band of 990 to 1096 psig.

II PRO Operate SRVs as necessary to maintain an RPV pressure band of 990 to 1096 Dsia.

Monitor Suppression Pool temperature and report to CRS when

~~~

temperature exceeds 95 degrees F.

CRS Enter T-I 02, Primary Containment Control, when Suppression Pool temperature exceeds 95 degrees F.

Page 14 of 16

Appendix D Operator Action Form ES-D-2 TERMINATION POINT The scenario will be terminated when the following criteria are met:

1 . T-215 is performed to de-energize RPS resulting in a full Reactor scram.

2. Reactor level is stabilized between 12.5 and 54.

Page 15 of 16

Amendix D ODerator Action Form ES-D-2 SCENARIO #2 INIT1AL CONDlTlONS 0 Unit 1 is at 95% power.

INOP / OUT OF SERVICE EQUIPMENT 0 No inoperable equipment.

PLANNED EVOLUTIONS 0 Raise power to 100% using GP-5, Appendix 2, and OP-AB-300-1003 without a Reactor Engineer present.

Page 16 of 16

Appendix D 0perator Action Form ES-D-2 SCENARIO #3

1. SIMULATOR OPERATOR INSTRUCTIONS A. INITIAL SIMULATOR SETUP ITEM / MALFUNCTION / REMOTE FUNCTION / CONDITION H Prepare simulator per TQ-AA-106-0301, Simulator Training Practices Job Aid H Reset Simulator to IC-42

- 5%Power Place an information tag on the 1 A SRM bypass joystick.

Take out of FREEZE and ensure the following:

- 5%Power

- I A SRM is bypassed If not embedded in IC-42, load Scenario ILT NRC Scenario #3 from floppy disk labeled 2006 NRC EXAM using A: drive. Ensure the following malfunctions are loaded:

- MSR214F, active Iminute after Trigger Iis activated.

- E51-S37-PB, active 10 minutes after IRM channel F fails upscale (Trigger 1).

- VlCl14A, active 15 minutes after RClC initiates (Trigger 1).

- MRR441, trigger 2 manually activated when 1B CRD pump is placed in service AND when prompted by evaluator.

- MMS067, trigger 3 active when drywell pressure exceeds 1.2 psig.

- MRP029C, active immediately.

- MRHI 71A, active immediately.

- MRH574A, active immediately.

- MRHl71B, trigger 4 manually activated when operator opens HV-51-1FOI 6B, B RHR Containment Spray valve.

Page 1 of 17

Amendix D ODerator Act ion Form ES-D-2

-J ITEM / MALFUNCTION / REMOTE FUNCTION / CONDITION H Reset any annunciators that should not be present Page 2 of 17

Appendix D 0perator Act ion Form ES-D-2 B. INSTRUCTlONS FOR SI MULATOR 0PERATOR J MALFUNCTION / REMOTE FUNCTION / REPORT If Equipment Operator is contacted, report that the 1C Condensate Pump is ready to start.

Respond to request for assistance as appropriate.

EVENT 2: Continue to Withdraw Control Rods

~~

I FI ~

MALFUNCTION / REMOTE FUNCTION / REPORT I Respond to request for assistance as appropriate.

EVENT 3: IRM Channel F Fails Uescale I J I MALFUNCTION / REMOTE FUNCTION / REPORT I after crew continues with the startup and when tl H Activate Trigger #I prompted by evaluator.

H If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report back that IRM Channel F indicates failed upscale with no apparent reason.

1 If I&C / WWM contacted, report that failure will be investigated as soon as possible.

EVENT 4: RClC Inadvertent Initiation and RPV Injection l J I MALFUNCTION / REMOTE FUNCTION / REPORT Ensure RClC initiation trigger timer activates appropriately.

If Equipment Operator / Floor Supervisor contacted, report that the RClC start will be investigated immediately.

If I&C / WWM contacted, report that RClC start will be investigated as soon as Dossible.

Respond to other requests for assistance as appropriate.

Page 3 of 17

Appendix D Operator Action Form ES-D-2 EVENT 5: IA CRD Pump High Vibration J I MALFUNCTION / REMOTE FUNCTION I REPORT IW Ensure CRD pump high vibration trigger timer activates appropriately.

W If Equipment Operator / Floor Supervisor contacted to investigate the high vibration, wait 5 minutes and report back that the outboard pump bearing is red hot and the pump is visibly shaking.

W If Equipment Operator / Floor Supervisor contacted to prepare to start the I B CRD pump, wait 5 minutes and report back that the 1B CRD pump is ready to start.

I W After the I open.

B CRD pump is running, toggle B CRD pump discharge valve J MALFUNCTION / REMOTE FUNCTION I REPORT I I W Trigger 2 is activated after the 1B CRD pump is started AND prompt from evaluator.

Respond to request for assistance as appropriate.

Ensure Trigger 3 activates when drywell pressure goes above I.2 psig.

I IW Respond to request for assistance as appropriate.

W If requested, perform the field actions of SE-10.

-Reset RHRSW Rad Monitor

-Reset RE ARMS

-Reset shunt trips

-Perform running checks on the diesel generators EVENT 8: IA RHR Pump Trips on Start Signal I I/ I MALFUNCTION I REMOTE FUNCTION I REPORT W If Equipment Operator / Floor Supervisor contacted to investigate the 1 A RHR pump trip, wait 5 minutes and report back that an overcurrent relay is tripped on the pump breaker on bus D11.

W If I&C / WWM contacted, report that the 1 A RHR pump trip will be investigated promptly.

W Respond to other requests for assistance as appropriate.

Page 4 of 17

Appendix D Operator Action Form ES-D-2 J MALFUNCTION / REMOTE FUNCTION / REPORT H If Equipment Operator / Floor Supervisor contacted to investigate the 1B RHR pump trip, report that the trip will be investigated promptly.

H If I&C / WWM contacted, report that the I B RHR pump will be investigated as soon as possible.

H Respond to other requests for assistance as appropriate.

Page 5 of 17

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 1 Event

Description:

Start the 7 C Condensate Pump for PMT Time Position Applicants Actions or Behavior CRS Direct PRO to start the IC condensate pump.

PRO Start the ICcondensate pump IAW S05. I.B:

o Open HV-005-101C, condensate pump suction valve.

o Ensure HV-005-102C, condensate pump discharge valve, is closed.

o Ensure all local checks are complete at the pump.

o Adjust FV-C-005-103, recirculation valve controller, is adjusted to 7500 gpm.

o Start the 1C condensate pump.

o When starting current has decayed, open HV-005-102C, condensate pump discharge valve.

o Ensure all running checks are complete, including performance of S05.9.A, Routine Inspection of Condensate System.

Page 6 of 17

Appendix D 0perat0r Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 2 Event

Description:

Continue to Withdraw Control Rods I! !I Time Position Applicants Actions or Behavior CRS Direct RO to continue the Reactor startup IAW GP-2.

RO Resume control rod withdrawal IAW GP-2.

Page 7 of 17

Appendix D 0perator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 3 Event

Description:

IRM Channel F Fails Upscale Time I Position I Applicants Actions or Behavior Ro I Recognize that IRM channel Fhas failed upscale resulting in a half scram and report the failure to the CRS.

1 CRS -rDirect RO to stoe rod withdrawal.

I Ro I Reference ARC for annunciator 107 Reactor H-3, IRM UPSCALE /

INOPERABLE.

CRS Direct RO to bypass the F IRM and reset the half scram.

RO Bypass the FIRM.

RO ~~ I Reset the half scram.

CRS Reference Tech Spec 3.3.1and 3.3.6 for the failed instrument.

Page 8 of 17

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 3 Event

Description:

RClC Inadvertent Initiation and RPV I niection Time Position Applicant's Actions or Behavior Recognize that RClC has started and report to CRS.

Direct the PRO to secure RCIC.

Recognize Reactor power goes up slightly and returns to pre-injection power level.

~~

Trip RClC and prevent another unplanned injection by securing IAW S49.2.A, RClC SHUTDOWN FROM AUTOMATIC OR MANUAL INITIATION:

o Ensure RClC barometric condenser vacuum pump is operating.

o Depress and release the RClC turbine trip pushbutton.

o Verify the RClC turbine comes to rest.

o Place the RClC flow controller (FIC-49-1R600) in manual and set to 0%.

o Place HV-50-112, RClC trip throttle valve, to close.

Reference OT-I 04 for unexpected reactivity addition.

Reference T.S. LCO 3.7.3 for RClC out of service.

Page 9 of 17

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 2 Event

Description:

1A CRD Pump High Vibration Time 1 Position I Applicants Actions or Behavior RO Reference ARC for annunciator 107 REACTOR 1-3, VIBRATION ALARM DANGER PRO Investigate high vibration on VMS computer.

PRO Recognize that the I A CRD pump is indicating high vibration.

CRS Direct dispatching the EO / Floor Supervisor to check on the high vibration condition of the IA CRD pump.

RO / PRO Dispatch the EO / Floor Supervisor to investigate the high vibration on the 1 A CRD pump.

CRS When report comes back from the EO stating that the IA CRD pump has a hot bearing and is shaking, direct the RO trip the 1A CRD pump and start the IB CRD pump.

I CRS I Enter ON-I 07, CONTROL ROD DRIVE SYSTEM PROBLEMS.

RO / PRO Direct the EO to perform startup checks on the 1B CRD pump.

RO Start the 1B CRD Pump.

RO Direct EO/ Floor Supervisor to open 1B CRD discharge valve.

Page 10 of 17

Atmendix D ODerator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 6 J

Event

Description:

Coolant Leakage in Drywell / Large Steam Leak in Drywell Time Position Applicants Actions or Behavior PRO Reference ARC for annunciator 115 COOL B B-5, DRYWELL COOLER DRAIN FLOW HIGH RO Reference ARC for annunciator 107 REACTOR F-2, DRYWELL HI I LOW PRESS CRS Enter OT-101, High D w e l l Pressure.

CRS Direct PRO to maximize Drywell cooling and terminate Primary Containment inertina PRO Verify Drywell cooling maximized and Primary Containment inerting is not in progress CRS Direct PRO to isolate RWCU IAW OT-101.

PRO Isolate RWCU.

~

RO Recognize failure of RPS to automatically scram Reactor and report to CRS.

~~ ~~ ~~ ~

RO Insert a manual Reactor scram.

RO Recoqnize manual scram failure and report to CRS.

CRS Enter T-101 for failure to scram and high drywell pressure.

CRS Enter T-I 02 for high drywell pressure.

CRS ~~

Direct RO to manually initiate RRCS I ARI.

~~ ~

CT RO Arm and depress both divisions of RRCS initiation pushbuttons.

RO Recognize that all rods inserted and inform the CRS.

CRS Direct the crew to control RPV injection from ECCS and low pressure systems to prevent uncontrolled RPV flood up.

PRO Control injection into the RPV from ECCS that started.

_ _ _ _ _ _ ~ ~

_ _ _ _ ~ ~

CRS Enter SE-10 for the LOCA signal.

PRO Re-energize busses in MCR per SE-10.

RO I PRO Dispatch EO / Floor Supervisor to perform SE-10 actions in the field.

PRO Secure the IA and 16 recirc pumps due to loss of cooling water.

Page 11 of 17

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.:

Event

Description:

Coolant Leakaqe in Drywell / LarQeSteam Leak in Drywell Time Position Applicants Actions or Behavior CRS Direct PRO to spray the Suppression Pool per T-225 using RHR before Suppression Pool pressure reaches 7.5 psig (see Event #8 for failure of the I A RHR pump and thermal overload trip of HV-51-1F024B)

PRO Spray the Suppression Pool per T-225:

o Ensure the 1 B RHR pump suction valve open (HV 1F004B).

o Ensure the following RHR valves are closed:

HV-51-1F006B, IF015B, 1F016B, and 1F017B.

o Ensure 1B RHR pump is running.

o Ensure the following RHR valves are open:

HV-51-1F047B, 1F003B and 1F048B.

o Open HV-51-1F024B to establish 8000 to 8500 gpm flow.

o Open HV-51-1F027B to establish suppression pool spray.

o Place RHRSW in service per S12.1 .A.

o Close HV-51-1F048B, heat exchanger bypass.

CRS Direct PRO to bypass and restore drywell cooling when drywell air temperature reaches 145 degrees F.

PRO Bypass and restore drywell cooling.

CRS Enter T-I 12 when safe side of T-I 02 curve PCIP-3 cannot be maintained.

CRS Direct RO / PRO to open 5 ADS valves.

CT RO / PRO Open 5 ADS valves.

CRS Direct PRO to spray the Drywell per T-225.

PRO Spray the Drywell per T-225:

o Ensure the 1B RHR pump suction valve open (HV 1F004B).

o Ensure the following RHR valves are closed:

HV-51-1F006B, lF015B, 1F016B, and 1F017B.

o Ensure 1B RHR pump is running.

Page 12 of 17

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 6J Event

Description:

Coolant Leakage in Dtvwell / Large Steam Leak in D w e l l Time Position Applicant's Actions or Behavior Ensure the following RHR valves are open:

HV-51-1F047B and 1F003B.

Trip the reactor recirculation pumps.

Remove the drywell cooling fans from service.

Close HV-51-1F027B to secure suppression pool spray.

Throttle HV-51-1F024B to a flow of 9,250 to 10,500 gpm.

Open HV-51-1F021B, inboard containment spray valve.

Request CRS verify on the SAFE side of Drywell Spray Initiation Limit Curve per T-I 02.

Throttle open HV-51-1FOI6B, outboard containment spray valve.

Page 13 of 17

Appendix D 0Derat0r Act ion Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 8 Event

Description:

I A RHR Pump Trips on Start Signal / Thermal Overload on RHR Valve HV-51-1F024B Time Position Applicants Actions or Behavior PRO Recognize that the Y A RHR pump tripped on overload and report failure to CRS. ~~~

CRS Direct the PRO to use 1B RHR for suppression pool spray.

PRO Recognize that HV-51-1F024B failed to open on thermal overload.

CRS Direct the PRO to attempt to override HV-51-1F024B open.

PRO Recognize that HV-51-1F024B has opened and report to CRS.

PRO Continue placing suppression pool spray in service using B RHR.

Page 14 of 17

Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 9 Event

Description:

I B RHR Pump Trips When lnitiatinq B RHR Containment Spray Time Position Applicants Actions or Behavior

~~

PRO Recognize that the IB RHR Pump has tripped and report failure to CRS.

PRO Report to CRS that drywell spray was not successful with B RHR and an alternate method must be used.

CRS Direct the PRO to spray the drywell utilizing RHRSW IAW T-225.

PRO Spray the drywell IAW T-225 using RHRSW:

Ensure the IB RHR pump is not running.

Ensure the following RHR valves are closed:

HV-51-1F004B, 1F006B, 1FOI5B, 1FOI6B, IFOI 7B, IF024B, 1F027B, 1F047B, 1F048B, and 051-1F098.

Place HSS-OIZ-O02B, B/D RHRSW Hi Rad bypass switch, to BY PASS .

Open the RHRSW to RHR emergency crosstie valves.

Open HV-51-1F021B, inboard containment spray valve..

Request CRS verify on the SAFE side of Drywell Spray Initiation Limit Curve per T-102.

Simultaneously perform the following to maintain RHRSW discharge pressure 75 to 120 psig.

Throttle fully closed HV-51-1F068B, heat exchanger RHRSW outlet valve.

Throttle fully open HV-51-1FOI6B, outboard containment spray valve.

RO Assist the PRO in initiating drywell spray with RHRSW.

RO/PRO Monitor drywell pressure.

Page 15 of 17

Appendix D OPerator Action Form ES-D-2 TERM1NATION POINT The scenario will be terminated when the following criteria are met:

1. Drywell spray is in progress utilizing RHRSW and drywell pressure is lowering.

Page 16 of 17

Appendix D 0perator Action Form ES-D-2 SCENARIO #3 Turnover Sheet INITIAL CONDITIONS Unit 1 is at 5% power with a startup in progress after a refueling outage.

Reactor pressure is 390 psig with 2% BPVs open (pressure set in control) 1 A and IB RFP are in standby with the LIC-006-120 controller in AUTO YA and 1B condensate pumps are running 1 B and 1C circulating water pumps are running Main Turbine is in shell warming Y A and 1B recirculation pumps are at 28% speed YA RWCU pump is in service YA SJAE in service with vacuum at 29 Hg Drywell closure is complete ST-6-092-313-1 has been completed up to and including step 4.12.3.

INOP I OUT OF SERVICE EQUIPMENT 1A SRM is inoperable and bypassed, with repairs in progress.

PLANNED EVOLUTIONS Continue with the startup / heatup at step 3.3.29 of GP-2.

Start the 7 C Condensate Pump for PMT IAW S05.1.B step 4.7.

Control rod withdrawal will continue with rod 18-59 (00 to 12).

Page 17 of 17