Letter Sequence Draft Other |
---|
|
Results
Other: ML20055D883, ML20055E009, ML20057E559, ML20057E560, ML20087G852, ML20087H514, ML20184A247, ML20184A248, ML20240A318, ML20240A322, ML20254A128, ML20254A272, ML20268A322, ML20268B437, ML20268C197, ML20274A136, ML20279A331, ML20297A306, ML20300A556, ML20301A632, ML20302A234, ML20302A235, ML20303A011, ML20303A016, ML20307A010, ML20307A019, ML20321A279, ML20322A350, ML20323A018, ML20325A031, ML20328A162, ML20329A432, ML20329A442, ML20350B716, ML20350B723, ML20350B739, ML20350B785, ML21012A270, ML21025A073, ML21025A143, ML21025A403, ML21025A405, ML21025A414, ML21040A471, ML21040A483, ML21043A207, ML21050A084, ML21050A119, ML21050A227, ML21056A220... further results
|
MONTHYEARML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) Project stage: Draft Other ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test Project stage: Draft Other ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions Project stage: Other ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) Project stage: Other ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) Project stage: Other ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key Project stage: Other ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key Project stage: Draft Other ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) Project stage: Draft Other ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) Project stage: Other ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) Project stage: Draft Other ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other 2020-03-12
[Table View] |
|
---|
Category:License-Operator
MONTHYEARML24011A2112023-12-14014 December 2023 Post Examination Comments and List of Technical References ML24017A3022023-12-14014 December 2023 Post Exam Comments Resolution ML24011A1812023-12-14014 December 2023 Final QA Related Forms ML23249A1002023-09-0606 September 2023 Requalification Program Inspection RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21307A2872021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21231A1052021-08-19019 August 2021 Requalification Program Inspection ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) ML21105A5352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1472020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) 2023-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24011A1812023-12-14014 December 2023 Final QA Related Forms ML24011A2112023-12-14014 December 2023 Post Examination Comments and List of Technical References ML24017A3022023-12-14014 December 2023 Post Exam Comments Resolution RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17090A3662017-01-17017 January 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17075A3832017-01-16016 January 2017 Handouts to Applicants, Limerick (Folder 3) ML17075A3822017-01-16016 January 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17069A4202017-01-16016 January 2017 Draft Written Exam 2023-06-16
[Table view] |
Text
ES-301 Operating Test Review Worksheet Form ES-301-7 Facility: Exam Date:
1 2 3 4 5 6 ADMIN Attributes Job Content LOD Admin JPMs Topic and U/E/S Explanation (1-5) I/C Critical Scope Perf.
K/A Job Cues Overlap Key Minutia Focus Steps (N/B) Std. Link RO -- RCIC VALVE STROKE TIME COO EVALUATION G2.1.20 2 S (LOJPM6762)
RO -- DETERMINE MAXIMUM COO GENERATOR G2.1.25 3 S VARS (LOJPM6729)
RO -- EVALUATE ST-6-047-370-1, PRE-CONTROL EC ROD G2.2.12 3 S WITHDRAWAL CHECK (LOJPM6752)
RO -- GASEOUS EFFLUENT DOSE RC RATE G2.3.11 2 S DETERMINATION (LOJPM6706)
EVALUATE VALVE STROKE DATA COO G2.1.25 3 S (SRO)(LOJPM6766)
PERFORM A SHIFT COO TURNOVER G2.1.3 2 S (SRO)(LOJPM6754)
PRE-CONTROL ROD EC WITHDRAWAL G2.2.12 2 S CHECK (LOJPM6753)
REVIEW AND APPROVE RELEASE RC FROM EQUIP. DRAIN G2.3.11 2 S TO C.T. BLOWDOWN LINE (LOJPM6726)
ERP CLASSIFICATION AND REPORTING EP (Time Critical) G2.4.41 3 S (LOJPM3153)
Simulator/In-Plant Safety Function JPMs and K/A Align 1C SLC Pump for SF 1 Automatic Operation; 211000A1.09 3 S (LOJPM3767)
Manually Place 3rd SF 2 Reactor Feed Pump in 2 S Service (LOJPM3753) 259001A4.02 Response to EHC SF 3 Leaks - ISV 3 S (LOJPM3149) 241000A4.09
ES-301 Operating Test Review Worksheet Form ES-301-7 Transfer HPCI from Pressure Control to SF 4 Level Control 206000A4.04 3 S (LOJPM3756)
Vent the Drywell SF 5 (LOJPM3106) 223001A4.07 3 S Transfer D14 from 201 SF 6 to 101 (LOJPM3532) 264000A4.04 3 S Scram Channel A1 and SF 7 A2 Functional Test 212000A4.02 2 S (LOJPM3006)
Align ESW to Unit 1 SF 8 TECW Heat Exchanger 400000A2.01 2 S (LOJPM3053)
T-214, Manual Initiation SF 1 of ARI (LOJPM2208) 295037EA1.03 2 S Maximize CRD Flow after Shutdown During SF 2 Emergency Conditions 295031EA1.10 3 S (LOJPM2269)
Install Air Jumper to Provide Long Term ADS Operation from SF 3 D*1 D/G Air 218000A2.03 3 S Compressor (LOJPM2231)
ES-301 3 Form ES-301-7 Instructions for Completing This Table:
Check or mark any item(s) requiring a comment and explain the issue in the space provided using the guide below.
- 1. Check each JPM for appropriate administrative topic requirements (COO, EC, Rad, and EP) or safety function requirements and corresponding K/A. Mark in column 1.
(ES-301, D.3 and D.4)
- 2. Determine the level of difficulty (LOD) using an established 1-5 rating scale. Levels 1 and 5 represent an inappropriate (low or high) discriminatory level for the license that is being tested. Mark in column 2 (Appendix D, C.1.f)
- 3. In column 3, Attributes, check the appropriate box when an attribute is not met:
The initial conditions and/or initiating cue is clear to ensure the operator understands the task and how to begin. (Appendix C, B.4)
The JPM contains appropriate cues that clearly indicate when they should be provided to the examinee. Cues are objective and not leading. (Appendix C, D.1)
All critical steps (elements) are properly identified.
The scope of the task is not too narrow (N) or too broad (B).
Excessive overlap does not occur with other parts of the operating test or written examination. (ES-301, D.1.a, and ES-301, D.2.a)
The task performance standard clearly describes the expected outcome (i.e., end state). Each performance step identifies a standard for successful completion of the step.
A valid marked up key was provided (e.g., graph interpretation, initialed steps for handouts).
- 4. For column 4, Job Content, check the appropriate box if the job content flaw does not meet the following elements:
Topics are linked to the job content (e.g., not a disguised task, task required in real job).
The JPM has meaningful performance requirements that will provide a legitimate basis for evaluating the applicant's understanding and ability to safely operate the plant. (ES-301, D.2.c)
- 5. Based on the reviewers judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)nhancement, or (S)atisfactory? Mark the answer in column 5.
- 6. In column 6, provide a brief description of any (U)nacceptable or (E)nhancement rating from column 5.
Save initial review comments and detail subsequent comment resolution so that each exam-bound JPM is marked by a (S)atisfactory resolution on this form.
ES-301 4 Form ES-301-7 Facility: Scenario: Exam Date:
1 2 3 4 5 6 7 8 9 10 Required Verifiable Scen.
Event Realism/Cred. LOD TS CTs U/E/S Explanation Actions actions Overlap 2016E--1 X S 2016E--2 X S 2016E--3 S
2016E--4 X S 2016E--5 X S 2016E--6 S
2016E--7 S 3005E -- 1 X S 3005E -- 2 X S 3005E -- 3 S
3005E -- 4 X S 3005E -- 5 S
3005E -- 6 S
3005E -- 7 X S 3005E -- 8 S
3005E -- 9 X S 4058E -- 1 S
4058E -- 2 X S 4058E -- 3 S
4058E -- 4 X S 4058E -- 5 X S 4058E -- 6 XX S 4058E -- 7 S
ES-301 5 Form ES-301-7 4058E -- 8 S
6221E -- 1 S
6221E -- 2 S
6221E -- 3 X S 6221E -- 4 S
6221E -- 5 X S 6221E -- 6 S
6221E -- 7 XX S 6221E -- 8 X S 6221E -- 9 S
ES-301 6 Form ES-301-7 Instructions for Completing This Table:
Use this table for each scenario for evaluation.
2 Check this box if the events are not related (e.g., seismic event followed by a pipe rupture) OR if the events do not obey the laws of physics and thermodynamics.
3, 4 In columns 3 and 4, check the box if there is no verifiable or required action, as applicable. Examples of required actions are as follows: (ES-301, D.5f)
- opening, closing, and throttling valves
- starting and stopping equipment
- raising and lowering level, flow, and pressure
- making decisions and giving directions
- acknowledging or verifying key alarms and automatic actions (Uncomplicated events that require no operator action beyond this should not be included on the operating test unless they are necessary to set the stage for subsequent events. (Appendix D, B.3).)
5 Check this box if the level of difficulty is not appropriate.
6 Check this box if the event has a TS.
7 Check this box if the event has a critical task (CT). If the same CT covers more than one event, check the event where the CT started only.
8 Check this box if the event overlaps with another event on any of the last two NRC examinations. (Appendix D, C.1.f) 9 Based on the reviewers judgment, is the event as written (U)nacceptable (requiring repair or replacement), in need of (E)nhancement, or (S)atisfactory? Mark the answer in column 9.
10 Record any explanations of the events here.
In the shaded boxes, sum the number of check marks in each column.
- In column 1, sum the number of events.
- In columns 2-4, record the total number of check marks for each column.
- In column 5, based on the reviewer's judgement, place a checkmark only if the scenario's LOD is not appropriate.
- In column 6, TS are required to be 2 for each scenario. (ES-301, D.5.d)
- In column 7, preidentified CTs should be 2 for each scenario. (Appendix D; ES-301, D.5.d; ES-301-4)
- In column 8, record the number of events not used on the two previous NRC initial licensing exams. A scenario is considered unsatisfactory if there is < 2 new events. (ES-301, D.5.b; Appendix D, C.1.f)
- In column 9, record whether the scenario as written (U)nacceptable, in need of (E)nhancement, or (S)atisfactory from column 11 of the simulator scenario table.
ES-301 7 Form ES-301-7 Facility: Exam Date:
1 2 3 4 5 6 7 8 11 Scenario % Unsat. Explanation Event Events TS TS CT CT Scenario U/E/S Totals Unsat. Total Unsat. Total Unsat.
Elements 2016E 7 0 2 0 2 0 0 S 3005E 9 0 2 0 3 0 0 S 4058E 8 0 2 0 3 0 0 S 6221E 9 0 2 0 3 0 0 S Instructions for Completing This Table:
Check or mark any item(s) requiring comment and explain the issue in the space provided.
1, 3, 5 For each simulator scenario, enter the total number of events (column 1), TS entries/actions (column 3), and CTs (column 5).
This number should match the respective scenario from the event-based scenario tables (the sum from columns 1, 6, and 7, respectively).
2, 4, 6 For each simulator scenario, evaluate each event, TS, and CT as (S)atisfactory, (E)nhance, or (U)nsatisfactory based on the following criteria:
- a. Events. Each event is described on a Form ES-D-2, including all switch manipulations, pertinent alarms, and verifiable actions. Event actions are balanced between at-the-controls and balance-of-plant applicants during the scenario. All event-related attributes on Form ES-301-4 are met. Enter the total number of unsatisfactory events in column 2.
- b. TS. A scenario includes at least two TS entries/actions across at least two different events. TS entries and actions are detailed on Form ES-D-2. Enter the total number of unsatisfactory TS entries/actions in column 4. (ES-301, D.5d)
- c. CT. Check that a scenario includes at least two preidentified CTs. This criterion is a target quantitative attribute, not an absolute minimum requirement. Check that each CT is explicitly bounded on Form ES-D-2 with measurable performance standards (see Appendix D). Enter the total number of unsatisfactory CTs in column 6.
2+4+6 7 In column 7, calculate the percentage of unsatisfactory scenario elements: 100%
1+3+5 8 If the value in column 7 is > 20%, mark the scenario as (U)nsatisfactory in column 8. If column 7 is 20%, annotate with (E)nhancement or (S)atisfactory.
9 In column 9, explain each unsatisfactory event, TS, and CT. Editorial comments can also be added here.
Save initial review comments and detail subsequent comment resolution so that each exam-bound scenario is marked by a (S)atisfactory resolution on this form.
ES-301 8 Form ES-301-7 Site name: Exam Date:
OPERATING TEST TOTALS Total Total Total %
Total Explanation Unsat. Edits Sat. Unsat.
Admin.
9 0 9 JPMs Sim./In-Plant 11 0 11 JPMs Scenarios 4 0 4 Op. Test 24 0 24 0 Totals:
Instructions for Completing This Table:
Update data for this table from quality reviews and totals in the previous tables and then calculate the percentage of total items that are unsatisfactory and give an explanation in the space provided.
- 1. Enter the total number of items submitted for the operating test in the Total column. For example, if nine administrative JPMs were submitted, enter 9 in the Total items column for administrative JPMs.
For scenarios, enter the total number of simulator scenarios.
Enter the total number of (U)nsatisfactory JPMs and scenarios from the two JPMs column 5 and 2.
simulator scenarios column 8 in the previous tables. Provide an explanation in the space provided.
Enter totals for (E)nhancements needed and (S)atisfactory JPMs and scenarios from the previous 3.
tables. This task is for tracking only.
- 4. Total each column and enter the amounts in the Op. Test Totals row.
Calculate the percentage of the operating test that is (U)nsatisfactory (Op. Test Total Unsat.)/(Op. Test 5.
Total) and place this value in the bolded % Unsat. cell.
Refer to ES-501, E.3.a, to rate the overall operating test as follows:
- satisfactory, if the Op. Test Total % Unsat. is 20%
- unsatisfactory, if Op. Test Total % Unsat. is > 20%
Update this table and the tables above with post-exam changes if the as-administered operating test 6.
required content changes, including the following:
- The JPM performance standards were incorrect.
- The administrative JPM tasks/keys were incorrect.
- CTs were incorrect in the scenarios (not including postscenario critical tasks defined in Appendix D).
- The EOP strategy was incorrect in a scenario(s).
- TS entries/actions were determined to be incorrect in a scenario(s).