Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 16 June 2023 | Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML23017A112 | 5 December 2022 | Final QA Related Forms | Job Performance Measure |
RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | 25 March 2022 | Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML22045A941 | 14 February 2022 | Senior Reactor and Reactor Operator Initial License Examinations | |
ML20115E461 | 14 February 2022 | NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | Stroke time |
ML22025A372 | 25 January 2022 | NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | |
ML21257A446 | 18 August 2021 | Final QA Related Forms (Folder 1) | Job Performance Measure |
LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) | 9 April 2021 | 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) | |
ML21062A195 | 3 March 2021 | Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) | Shutdown Margin Overtravel |
ML21050A084 | 19 February 2021 | Final Qa/Related Forms (Folder 1) | |
ML21050A119 | 19 February 2021 | Final Written Examination and Operating Test Outlines (Folder 3) | |
ML21050A181 | 19 February 2021 | Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) | Half scram |
ML21050A227 | 19 February 2021 | Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) | Shutdown Margin High Radiation Area Half scram Squib Locked High Radiation Area Overtravel Early Warning Fire Detection Power change |
ML21043A207 | 12 February 2021 | Handouts to Applicants (Folder 3) | |
ML21043A220 | 12 February 2021 | Draft Written Examination and Operating Test Outlines (Folder 2) | |
ML21040A483 | 9 February 2021 | Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) | |
ML21040A471 | 9 February 2021 | Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) | |
ML21012A269 | 12 January 2021 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 | Generic Fundamentals Examination COVID-19 |
ML19352D657 | 16 December 2019 | Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 | Generic Fundamentals Examination |
ML19325C143 | 19 November 2019 | Operator Licensing Examination Approval | |
RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations | 16 May 2019 | Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations | |
ML19107A382 | 17 April 2019 | Senior Reactor and Reactor Operator Initial License Examinations | |
ML18323A315 | 19 November 2018 | Operator Licensing Examination Approval | |
RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations | 25 April 2018 | Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations | |
ML18116A054 | 25 April 2018 | Senior Reactor and Reactor Operator Initial License Examinations | |
ML18088A662 | 27 March 2018 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | Half scram Grab sample Water Inventory Control Probabilistic Risk Assessment Squib Job Performance Measure Power change Unidentified leakage |
ML18088A664 | 27 March 2018 | Final Written Examination and Operating Test Outlines (Folder 3) | Half scram Offsite Circuit |
ML18079A546 | 27 March 2018 | Final Qa/Related Forms (Folder 1) | Probabilistic Risk Assessment Job Performance Measure |
ML18079A812 | 27 March 2018 | Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) | |
ML18067A430 | 27 March 2018 | NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | |
ML18067A416 | 8 March 2018 | Draft Written Examination (Folder 2) | Reactor Vessel Water Level Half scram Grab sample Water Inventory Control Time to boil Missed surveillance Scram Discharge Volume Overtravel Offsite Circuit Power change Unidentified leakage Siren |
ML18067A417 | 8 March 2018 | Draft Written Examination and Operating Test Outlines (Folder 2) | Half scram Offsite Circuit |
ML18038B410 | 6 February 2018 | Final Operating Test (Sections a, B, and C) (Folder 3) | Half scram Grab sample Water Inventory Control Probabilistic Risk Assessment Squib Job Performance Measure Power change Unidentified leakage |
ML18038B436 | 6 February 2018 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Reactor Vessel Water Level Half scram Water Inventory Control Time to boil Missed surveillance Scram Discharge Volume Overtravel Offsite Circuit Power change Unidentified leakage |
ML18005A420 | 3 January 2018 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 | Generic Fundamentals Examination |
ML17346A049 | 14 December 2017 | Operator Licensing Examination Approval | |
ML17277A075 | 3 October 2017 | September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) | Generic Fundamentals Examination |
ML17242A008 | 29 August 2017 | Requalification Program Inspection - Limerick, Units 1 and 2 | |
ML17151A980 | 31 May 2017 | Senior Reactor and Reactor Operator Initial License Examinations | |
RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations | 3 May 2017 | Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
IR 05000352/2017301 | 13 March 2017 | Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 | |
ML17090A365 | 22 February 2017 | Final Qa/Related Forms (Folder 1) | Job Performance Measure |
ML17018A282 | 17 January 2017 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
ML17090A366 | 17 January 2017 | Final Qa/Related Forms - Form ES-401-6 (Folder 1) | |
ML17069A420 | 16 January 2017 | Draft Written Exam | Safe Shutdown Shutdown Margin Half scram Stroke time Squib Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Scram Discharge Volume B.5.b Mitigating Strategies Overtravel Earthquake Power change |
ML17075A382 | 16 January 2017 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Safe Shutdown Shutdown Margin Half scram Stroke time Squib Surveillance Frequency Control Program Scram Discharge Volume B.5.b Mitigating Strategies Overtravel Earthquake Power change |
ML17075A383 | 16 January 2017 | Handouts to Applicants, Limerick (Folder 3) | |
ML17069A418 | 16 January 2017 | NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | |
ML17069A417 | 16 January 2017 | NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) | |
ML17075A384 | 16 January 2017 | Final Operating Test (Sections a, B and C) (Folder 3) | Water Inventory Control Probabilistic Risk Assessment Squib Job Performance Measure Time Critical Operator Action Overtravel Power change |