ML18067A430
| ML18067A430 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/27/2018 |
| From: | Brian Fuller Operations Branch I |
| To: | Exelon Generation Co |
| Shared Package | |
| ML17138A091 | List: |
| References | |
| U01956 | |
| Download: ML18067A430 (1) | |
Text
JPM POST NRC Review/Comments JPM Comment I Change In-Plant 2204 No comment/changes requested 2210 No comment/changes requested 2260 No comment/changes requested Simulator 3119 No comment/changes requested 3530 No comment/changes requested 3140 No comment/changes requested Operator used OT-102 in MGR 3020 Added note below step #3 that min flow valve opens on HPCI system low flow with a T/D of 15-45 seconds 3037 No comment/changes requested 3525 No comment/changes requested 3129 Added new step 10 to JPM to incorporate procedure step 4.10 3514 No comment/changes requested Admin RO 6704 Added to steps 3 and 4 date (Sunday 10/07) and calculator available 6714 No comment/changes requested 6708 No comment/changes requested 6718 Added CUE's to steps 1 and 2 and revised location of channel #9 AdminSRO 6725 No comment/changes requested 6727 Added to initial conditions "Unit 1 control rod pattern adjustment" 6708 No comment/changes requested 6718 Added CUE's to steps 1 and 2 and revised location of channel #9 3101 Added "beyond site boundary" to cue
- IC -125 Perform 3037 and 3530 together and 3119 separate