ML20040H414
ML20040H414 | |
Person / Time | |
---|---|
Site: | Palo Verde, 05000000, 05000539, Yellow Creek |
Issue date: | 02/10/1982 |
From: | Scherer A ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
To: | Haass W Office of Nuclear Reactor Regulation |
References | |
LD-82-013, LD-82-13, NUDOCS 8202180226 | |
Download: ML20040H414 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999
[Table view]Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML17313B0991999-10-14014 October 1999
[Table view]Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08 Category:VENDOR/MANUFACTURER TO NRC MONTHYEARML19325E9001989-10-19019 October 1989
[Table view]Forwards Text of Info Communicated to All Util W/ Westinghouse NSSS Design on Pressurizer Safety Valve Set Pressure Deviation Info Request Response ML19327A8441989-10-11011 October 1989 Forwards Pleadings,Motions & Orders Filed in Alchemie Reorganization Action.Alchemie Currently Preparing Reorganization Plan Which Will Serve as Framework for Future Company Business Activities ML19327B2491989-10-0606 October 1989 Forwards Justification for Extension of Applicability of 890807 SER Re Acceptance of BAW-10175, Rod Exchange Methodology Topical Rept. ML19327A8511989-10-0505 October 1989 Forwards Wh Arowood 890907 Ltr & Other Supplemental Info to Replace Info Previously Filed ML20247F4121989-08-31031 August 1989 Advises That Response to Order Modifying Licenses & Order to Show Cause Why Licenses Should Not Be Revoked Will Be Sent. Responses to NRC Three Basic Questions Re Status of Licensee Finances & Rationale for Having License Provided ML20246B1671989-08-0808 August 1989 Forwards Response to 890717 Request for Info Re Filings W/ Us Bankruptcy Court & Financial Capabilities.Ownership of Unclassified Equipment Remains Unchanged ML20247Q5521989-05-24024 May 1989 Notifies That J Smelser Contract Ended,Effective 890517. Mgt of Company by Listed Board of Director Members Will Continue Until New Chief Executive Officer Selected ML20247P8071989-04-0404 April 1989 Forwards Ltr in Which Concerns for Potential Significant Deficiency Under 10CFR21 Expressed ML20247G4991989-03-30030 March 1989 Forwards Proprietary BAW-10175P, Rod Exchange Methodology, Developed for Calculating Parameters While Performing Control Rod Measurements Using Rod Exchange Technique to Be Used at Plants.Rept Withheld (Ref 10CFR2.790) ML17304B0511989-02-23023 February 1989 Requests That Sending of NRR Correspondence W/Util Re Plant to Recipient Continue,In Response to 890216 Ltr ML19324C3151989-02-20020 February 1989 Informs of Change in Vendor Plans for Inspecting Fuel Rods Containing Fuel Pellets Supplied by Ge.Ultrasonic Insp of Fuel Rods at Oconee 1 Found No Failed Rods in three-cycle, Discharged Fuel Assemblies ML20235M8971989-02-10010 February 1989 Requests Withholding of Proprietary WCAP 12125, Catawba Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per 10CFR2.790 ML20206D6241988-11-11011 November 1988 Forwards Projected Decommission Costs of Centrifuge Machines to Be Transferred to New Facility at Oliver Spring,Tn. Licensee Will Be Able to Offset Total Decommissioning Costs by Setting Aside Annual Decommissioning Cost Plus Reserve ML20205Q6331988-11-0202 November 1988 Forwards Revised Proprietary Pages to BAW-10164P, RELAP5/Mod2-B&W,Advanced Computer Program for LWR LOCA & Non-LOCA Transient Analysis. Cso Film Boiling Correlation Replaced w/Condie-Bengston IV Correlation & Typos Corrected ML20205P9511988-11-0101 November 1988 Forwards Rev 6 to Security Plan for Alchemie Facility 1 - Cpdf,Oak Ridge,Tn & Rev 6 to Security Plan for Alchemie Facility 2 - Oliver Springs,Oliver Springs,Tn. Revs Withheld (Ref 10CFR2.790(d)) ML20195E4291988-10-31031 October 1988 Forwards Numbers 1-5 of Rev 5 to Alchemie Security Plans. Requests Replacement of Pages 23-25 & 35 & Encl Rev Page ML20205N3301988-10-27027 October 1988 Forwards Sketch of Feed Sys,Withdrawal Sys Refrigeration Cart & Typical Withdrawal,Large & Small,Pumping Stations ML20195B6091988-10-21021 October 1988 Forwards Summary of B&W Fuel Co Position Re Small Break LOCA Calculations Contained in Util FSARs for Upcoming Reload Cores Which Will Contain Fuel Mfg by B&W ML20154K3841988-09-12012 September 1988 Forwards Enhanced Facts Re Adequacy of Funding for Decontamination & Decommissioning (D&D) of Facilities. Intends to Establish Funded Reserve for D&D at Completion of Sale of Unclassified Equipment Not Needed for Production ML20154E6451988-08-31031 August 1988 Requests That 880722 & 0812 Ltrs Re Security Sys Components Be Withheld from Public Disclosure (Ref 10CFR2.790(d)) ML20207L7651988-08-30030 August 1988 Requests That Proprietary WCAP 11935, McGuire Unit 2 Evaluation for Tube Vibration Induced Fatigue, Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20151H9381988-07-25025 July 1988 Forwards Proprietary BAW-10168P, B&W LOCA Evaluation Model for Recirculating Steam Generator Plants ML20151L3321988-07-20020 July 1988 Forwards DOE Ltr Indicating Acceptance of Classified Matter. Licensee Agrees to Remove Any Toxic or Hazardous Matl from Classified Equipment Prior to Transfer to DOE for Disposal ML20151M9211988-07-20020 July 1988 Responds to 880621 Request for Addl Info Re Enrichment of Naturally Occurring radioisotopes.Te-123 Will Be Enriching Approx 60 G to About 50% ML20151G9761988-07-14014 July 1988 Forwards Rev 2 to Security Plan for Shipment of Classified Matter.Rev Withheld (Ref 10CFR2.790) ML20150F1561988-07-0808 July 1988 Advises of Changes to Alchemie Board of Directors,Per 880618 Annual Stockholders Meeting ML20155F4441988-05-0404 May 1988 Responds to NRC & Request at 880504 Meeting Describing GE Program to Reconfirm Design Adequacy of Associated Circuits in GE Bwrs.Upon Completion of Phases 1 & 2 of Evaluation of Bwrs,Ge Will Submit Summary by 881104 ML20151F7661988-03-29029 March 1988 Forwards Updated Pages to Proprietary BAW-10171P, REFLOD3B- Model for Multinode Core Reflooding Analysis, Per ECCS Methodology for Facilities Reloads.Mod Removes Henry Quench Temp Criteria & Potential Conflict in Logic.Pages Withheld ML20234C2231987-12-28028 December 1987 Forwards Proprietary BAW-10164P, RELAP5/MOD2-B&W,Advanced Program for LWR LOCA & Non-LOCA Transient Analysis. Rept Describes Computer Code Used to Analyze RCS Behavior During Blowdown Phase of LOCA Transient.Rept Withheld ML20234D1101987-12-14014 December 1987 Forwards Proprietary BAW-10171P, REFLOD3B,Model for Multinode Core Reflooding Analysis. Rept Describes Computer Code That B&W Will Be Using to Analyze RCS Behavior During Refill of LOCA Transient.Rept Withheld ML20237C3611987-11-24024 November 1987 Requests That Proprietary Rev 2 to WCAP-11386, Byron/ Braidwood T-Hot Reduction Final Licensing Rept, Be Withheld (Ref 10CFR2.790(b)(4)) ML20236C0261987-10-22022 October 1987 Forwards Proprietary BAW-10165P, FRAP-T6-B&W:Computer Code for Transient Analysis of LWR Fuel Rods. Rept Describes Computer Code That B&W Will Be Using for Future Transient Analyses of LWR Fuel Rods.Rept Withheld (Ref 10CFR2.790) LD-87-056, Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request1987-09-18018 September 1987 Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request ML20236H4971987-07-29029 July 1987 Forwards Draft Proprietary Topical Rept BAW-10166P, Beach Computer Code for Reflood Heat Transfer During Loca. Draft Submitted to Permit Interaction Between B&W,Nrc & Util. Affidavit for Withholding Encl.Fee Paid ML17303A4851987-07-13013 July 1987 Forwards Steam Generator Tube Vibration Evaluation Program Progress Rept,Per Gw Knighton 870327 Ltr & Author 870410 Commitment.Rept Provides General Description of Program, Results to Date & Anticipated Direction of Future Efforts ML20236B4141987-07-13013 July 1987 Forwards Proprietary Draft 1 of BAW-10168P, ...B&W LOCA Evaluation Model for Recirculating Steam Generator Plants, to Be Used for LOCA Analysis of Catawba & McGuire Reload Fuel Cycles.Rept Withheld (Ref 10CFR2.790).Fee Paid ML20196K1621987-07-0909 July 1987 Partially Deleted Ltr Submitting Addl Info in Response to NRC 861230 & 870211 Requests Re 860918 Application for Exemption from Requirement to Convert from High Enriched U to Low Enriched U for Reactor Fuel,Per Generic Ltr 86-12 ML20215L0591987-06-22022 June 1987 Responds to Request for Assurance That Facility Neutron Monitoring Sys Design Similar to Design of Other Plants.List of Plants W/Similar Design,Already Reviewed & Approved by Nrc,Encl ML17300A9741987-06-16016 June 1987 Discusses Actions Taken in Investigation of Bechtel Deficiency Rept DER 86-29 Re Cracked Reactor Coolant Inlet Nozzle on Letdown Hx.Utils Should Be Notitified to Perform Visual Exam of Inlet & Outlet Nozzles.Part 21 Related ML20215D4081987-05-15015 May 1987 FOIA Request for Reactor Vessel Surveillance Capsule Repts for Turkey Point 4,Zion 2 & DC Cook 1 ML20237D2761987-04-27027 April 1987 Forwards List of 200 Parameters That Company Will Provide to Offsite Agencies,Per Request to D Schultz.List of Parameters That Will Be Available to NRC Via Zion Data Link During Coming Federal Field Exercise & Dryrun Also Encl ML20212R4711987-04-15015 April 1987 Forward Proprietary Draft 1 to BAW-10171P, REFLOD3B,Model for Multinode Core Reflooding Analysis, for Review of ECCS Methodology for Plants Fuel Reloads,Per . W/Affidavit.Draft Withheld (Ref 10CFR2.790).Fee Paid LD-87-017, Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days1987-04-10010 April 1987 Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days ML20206E7851987-04-0202 April 1987 Confirms Intention to Use FOAM2 Computer Program as Part of ECCS Evaluation Model for Westinghouse Designed Plants. Review of Applicability of Code to Westinghouse Designed Plants Requested Prior to 880701 ML20237D6431987-03-25025 March 1987 Forwards Technical & Cost Proposal for Task Order 009, Continuing Exercise Support to NRC Operations Ctr, Electronic Transmission of Plant Parameters During Exercises, Under Contract NRC-05-86-170 ML20237D6681987-03-0404 March 1987 Forwards Revised Draft Statement of Work Proposed for Task Order 009, Continuing Exercise Support to NRC Operations Ctr,Electronic Transmission of Plant Parameters During Exercises, for Contract NRC-05-86-170 ML20237D6881987-02-14014 February 1987 Forwards Parameters & Computer Points That Author Will Be Attempting to Get Util to Make Available for Transmission to NRC During Federal Field Exercise - 2 ML20205G1591987-01-20020 January 1987 Requests Proprietary Responses to NRC Review Questions Re Resistance Temp Detector Bypass Elimination Be Withheld (Ref 10CFR2.790) NRC-87-3194, Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted1987-01-0707 January 1987 Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted ML20214P1911986-11-19019 November 1986 Forwards Proprietary NEDC-31336, GE Instrument Setpoint Methodology, Per Lrg Instrument Setpoint Methodology Group .Rept Applicable to Listed Plants & Withheld (Ref 10CFR2.790) 1989-08-08 |
Text
r C E Power Cystems Tel. 203/688-1911 Combustion Engineenng, Inc. Telex: 99297 1000 Prospect Hill Road Windsor Connecticut 06095 H POWERSYSTEMS February 10, 1982 LD-82-013 glLTi$
y Mr. Walter P. Haass, Chief Q qL' Quality Assurance Branch ,
3~
Division of Project Management '1) , . ' I 7 7922 1,, 9 U. S. Nuclear Regulatory Commission
,,[]
Washington, D. C. 20555 2 .... g/
j ,
Subject:
C-E Plants Referencing CENPD-210, Revision 3 \;. '/
\
Dear Mr. Haass:
During a February 2, 1982 telephone conversation between you and Mr. Spraul and Messrs. Kennedy and Rogers of my staff, you requested that C-E provide a listing of plants that reference Revision 3 of CENPD-210. C-E connitted to provide that information. Based upon a review of all the PSAR's of C-E plants under construction it appears that only Tennessee Valley Authority (Yellow Creek) and Arizona Public Service (Palo Verde) reference CENPD-210 Revision 3 If there are any questions on this subject, please contact me or Mr. J. E.
Rogers of my staff at (203)688-1911, Extension 3028.
Very truly yours, COMBUSTION ENGINEERING, INC.
A. E. scherer Director Nuclear Licensing AES:ctk Qoo3 s
/b 8202180226 820210 PDR ADOCK 05000566 A PDR
-