ML20046C208

From kanterella
Revision as of 08:51, 11 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 1 to LER 93-004 Re Inoperability of Power Range Nuclear Instrumentation Safety Channel D to Correct Editorial Error in Event Description & Updates Status of Corrective Action
ML20046C208
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/30/1993
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20046C209 List:
References
LIC-93-0197, LIC-93-197, NUDOCS 9308090344
Download: ML20046C208 (1)


Text

-

s  :

. . '..,.....;.j....,.:I_?

4 Omaha Public Power District P.O. Box 399 Hwy.75- North of Ft. Calhoun Fort Calhoun, NE 68023-0399 402/636-2000 July 30, 1993 LIC-93-0197 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station PI-137 Washington, DC 20555

References:

1. Docket No. 50-285
2. LER 93-004 Revision 00 from OPPD (W. G. Gates) to NRC (Document Control Desk) dated March 31,1993(LIC-93-0055) .

Gentlemen:

Subject:

Licensee Event Report 93-004 Revision 01 for the Fort Calhoun Station Please find attached Licensee Event Report 93-004 Revision 01 dated July 30, 1993. This revision corrects an editorial error in the event description and updates the status of a corrective action. Revisions to the -

text are denoted by vertical lines in the right margin. This report is being submittedpursuantto10CFR50.73(a)(2)(i)(B). If you should have any questions, please contact me.

Sincerely,

&. 5.

W. G. Gates Vice President WGG/jrg Attachment c: J. L. Milhoan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager '

R. P. Mullikin, NRC Senior Resident Inspector INP0 Records Center p

020035 i cs suo 9308090344 930730 PDR ADOCK 05000285 f s 4 S PDR by