ML20050D554

From kanterella
Revision as of 02:27, 10 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 82-022/03L-0:on 820305,HPCI Declared Inoperable When Preliminary Design Review Did Not Confirm Loose Mounting Plate on Spring Can Hanger EBB-14-H8.Caused by Degraded Condition of Red Head Concrete Expansion Bolts
ML20050D554
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/02/1982
From: Varner D
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20050D550 List:
References
LER-82-022-03L, LER-82-22-3L, NUDOCS 8204120311
Download: ML20050D554 (2)


Text