Monthly Operating Rept for Apr 1982
ML20052E398
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/07/1982
From: Jackie Cook
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20052E394 List:
References
NUDOCS 8205110082
Download: ML20052E398 (9)


Text

r OPERATING DATA REPORT DOCKET NO. 50-333 DATE MAY 1982 COMPLETED BY _ J . COOK TELEPilONE ( 315 ) 342-3840 OPERATING STATUS FitzPatrick Notes

1. Unit Name:
2. Reporting Peried: 20401 - 320430
3. Licensed Thermal Power (MWt): 2436
4. Nameplate Rating (Gross MWe): 883
5. Design Electrical Rating (Net MWe): 021
6. Maximum Dependable Capacity (Gross MWe): 830
7. Maximum Dependable Capacity (Net MWe): 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

NONE

9. Power Lesel To Which Restricted,If Any (Net MWe): NONE
10. Reasons For Restrictions,if Any:

This Month Yr.-to Date Cumulatise I1. Ilours In Reporting Period 719 2879 59256

12. Number Of Ilours Reactor Was Critical 719 1306.3 40857.5
13. Reactor Resene Shutdown llours 0 o o I4. Ilours Generator On.Line 719 1220 5 39664.1
15. Unit Resene Shutdown flours 0 0 0
16. Gross Thermal Energy Generated (MWil) 1711104 2592696 80994010 11 Gross E!cetrical Energy Generated (MW}il 590460 887240 27647850
18. Net EIcetrical Energy Generated (MWil) 572355 859465 26764195
19. Unit Service Factor 100% 42.4% 66 9%
20. Unit Availability Factor 100% 42.4% 66.9%
21. Unit Capacity Factor (Using MDC Net) 96 3% 36.9% 60.0%
22. Unit Capacity Factor (Using DER Net, 97.0% 36.4% 55.0%
23. Unit Forced Outage Rate 0% 2.1% 16.6%
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
25. If Shut Down At En:1 Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION 8205110092 820507 PDR ADOCK 05000333 R PDR

e--

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP __

DATE MAY 1982

. C0YPLETED BY ( 315) 342-3840 TELEPHONE MONDI APRIL 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 786 17 812 2 674 is 815 3 588 19 815 4 727 20 814 5

808 21 814 6 813 22 814 12 23 809 7

8 809 - 24 811 9 810 25 770 10 810 26 811 3, 812 27 812 12 812 28 815 13 812 29 811 i4 812 30 810 1

3 813 3, 16 809

SUMMARY

The FitzPatrick plant operated at or near. full

. rated thermal power for this reporting period. .

I

7 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-393 UNIT N AME .lAFNPP DATE - MAY 1082 COMPLETED BY J. COOK REPORT MONTil APRIL 1982 TELEPilONE ( 315 ) 342-3640

~.

- E c

, 5g g jYE Licensee ,E-r, ye, Cause & Corrective No. Date g 3g g jj5 H

Event

{? gO3 Action to f5 5 5@g Report a mV o Prevent Recurrence e v Q

NONE I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G Instructions A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2. Manual Scram. Entry Sheets for Lice;;see C Refueling 3. Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction Other (Explain) 0161)

E Operator Training & License Examination F-Administrative 5 G Operational Error (Explain)

Exhibit ! - Same Source ll Other (Explain)

I POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE APRIL, 1982 The unft operated at near full thermal power during this reporting period.

Power was slightly reduced on April 2, 1982 for main steam isolation valve limit switch repair.

At the end of the reporting period the unit is operating at approximately 840 mwe.

, 7 POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAFt POWER PLANT ,

SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE

SUMMARY

APRIL 1982 DATE EO E SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ET 3/2/8; 16 15093 Torus None Torqued tie down studs 228 forus saddle modification ble down Phase II 2/7/8E 16 15207 N/A N/A Opened hatches for drywell access 1858.75 Jrywell during refuel outage aquipment

Tatches 2/23 00 15704 Outage N/A Weld preparations for pipe & 12,8 0 8. ' j

! angers hanger ISI 3/2/82 02 16001 (PV N/A N/A RPV disassembly & reassembly 1501 for refuel

e. . w-

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

APRIL 1982 WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM H D UECTED TO PRECLUDE TIME COMPONENT # MALFUNCTION MALFUNCTION RECURRENCE HOURS 14403 PSC radio moved 4/27 00 TSC radio SEC TSC upgrade None and tested 2 8537 Possible clutch "A" pen Performed ISP-4/26 02 TR-165 OPS aliopage upscale 78, adjusted 10 mero snan 14253 P ssible leaky Low output Replaced 4/2 02 FU-A OPS :nanifold on from flow unit nanifold, 14 7T-110E A 4ecalibrated FT 18440 Jut of calibra- Gut of 'erformed 4/5 02 MV/I-150A JIC tion due to calibration 7-ISP-78 2 3

test eouirmont 18534 Rias out of Preamp on F&L 4/12 02 SRVM OPS adjustment out of spec ,1djusted bias 1

. 18738 paulty range Range pot found 3eplaced 3/31 02 PT-1100 JIC aotentiometer ' rough" p actentiometer 1 18740 Paulty strain Not Replaced gauge 4/7 02 PT-spare JIC ggyd functioning and resistor 12 21766 Problems Transmitter not Replaced 4/23 02 exoerienced functioning transmitter FT-110E JIC alth unit 10 4

21805 Instrument None  : Tone 2 4/8 02-3 PA-96 OPS aheck 21853 7aulty select Will not R*Pl "d 4/16 03 ' Rod 38-47 OPS 3 witch 3 witch assembly 10 select 21909 Broken wire on Will not select Reconnected 4/23 03 Rod 26-51 OPS switch rod wire 9

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT .

MAINTENANCE

SUMMARY

APRIL 1982 CAUSE OF RESULTS OF ACTION TAKEN REPAIR WORK REQUEST #

DATE SYSTEM MALFUNCTION MALFUNCTION COMPONENT # CUR H S 21948 Defective Improper power Replaced power 4/28 07 RBM-B OPS capacitor in 5V level supply 24

) nower sunply indication 14598 Indicator Replaced 1/16 11 LI-46, 66 OPS Faulty meter reading 3-4% off meter 8 14193 Excessive heat Will not allow Replaced micro 4/23 13 LS-74 OPS and corrosion 13-AOV-32 shut switch and wireo 39 Pressure gauge- Charged to 21941 reading low 30 PSIA 1 4/27 16 X-104D OPS Leakage No defect, None, performed 13282 RES82-004, 3/29 17 RTS-431 & 2 JIC 82-028 ]. t ent

~ ~

18445 Change of Setpoint from Performed 4/5 17 RM-251A-D JIC setpoint 2400 to 2800mr ISP-64-1 1 18590 Erratic pen 4/26 17 RR-433 RES Out of alignment operation Overhauled 8 21935 2, Sticky slide and Does not show Cleaned slide 4/26 LI-201B OPS assembly loose crue level and tightened 6 23 assembly 18616 Loose 3 mall drips in Tightened as 25-52, 56 OPS connections instrument racks required 6 13364 Faulty ink Replaced ink 4/8 27 RR-104A OPS wheel, nut and lot recording wheel, nat and 3

,nacer snacer

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

MAINTENANCE

SUMMARY

APRIL 1982 DATE SYSTEM

  • K E T# HOW DETECTED U

T COMPONENT # gF C ON MAL I REC R N HUS 18426 Instrument Calibrated 4/22 06 LI-9h OPS drift Oat of specs using ISP-3 4 6 16511 Possible seal Performed 4/22 07 LPRM-44-21 OPS leakage LPRM-downscale IMP-7.22 2 18384 Pos~sible seal Reading Performed 4/22 07 LPRM-44-45 OPS leakage erratic IMP-7.22 2 18408 Possible seal Performed 4/22 07 LPRM-36-45 OPS leakage No response IMP-7.22 2 18418 Possible seal Reads zero at Performed 4/22 07 LPRM-36-05 OPS leakage 50% power IMP-7.22 2 18427 Possible seal LPRM drifted Performed 4/22 07 LPRM-20-37 OPS leakage apwards IMP-7 22 2 18509 Possible seal Performed LPRM drifting IMP-7 22 4/22 07 LPRM-20-13 OPS leakage 2 18607 Possible seal Performed 4/22 07 LPRM-28-45 OPS leakage LPRM drifting IMP-7.22 2 18741 Possible seal Perfromed 4/22 07 LPRM-28-29 OPS leakage DPRM drifting IMP-7.22 2 21757 En-Op light Performed IMP-2 4/12 07 APRM-F OPS 3etpoint drift would not clear 7h4_gggusted g

21936 Enstrument Out of Performed PS 16 4/27 07 APRM-D 1 rift adjustment EMP-7.6

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

MAINTENANCE

SUMMARY

APRTT, 10RP CAUSE OF RESULTS OF ACTION TAKEN REPAIR WORK REQUEST # ,

DATE SYSTEM H D ED MoLFUNCTION MALFUNCTION COMPONENT # R CURRE H RS 14265 Transmitter out Alarms hi on Adjusted zero 4/6 27 PT-101B OPS of tolerance computer gndspanISP 8 14296 ',, Faulty band assy Valves open - Replaced band 44 4/27 27 PCV-122A & B OPS and reset valve allow over prest g gand reset 18532 Switch arm out 10% limit switch Aligned switch 4/2 29 AOV-86B OPS of alignment won't trip arm / calibrated 10 e

_ _-__ ____