ML18340A089

From kanterella
Revision as of 09:15, 28 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Notification of NRC Initial Operator Licensing Examination 05000458/2019301
ML18340A089
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/06/2018
From: Vincent Gaddy
Operations Branch IV
To: Maguire W
Entergy Operations
References
Download: ML18340A089 (3)


See also: IR 05000458/2019301

Text

December 6, 2018

Mr. William F. Maguire, Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 U.S. Highway 61N

St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000458/2019301

Dear Mr. Maguire:

In a meeting on November 28, 2018, between Messrs. G. Kimich, Initial Exam Lead, and J.

Kirkland, Chief Examiner, arrangements were made for the administration of licensing

examinations at River Bend Station during the week of November 18, 2019.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 11, and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power

Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your

staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

examination outlines by June 17, 2019. The written examinations, operating tests, and

supporting reference materials identified in Attachment 3 to ES-201 will be due by

September 2, 2019. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal

Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall

approve the outlines, examinations, and tests before they are submitted to the NRC for review

and approval. All materials shall be complete and ready-to-use. We request that any personal,

proprietary, sensitive unclassified, or safeguards information in your response be contained in a

separate enclosure and appropriately marked. Any delay in receiving the required examinations

and reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of October 21, 2019.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff shall retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

W. Maguire 2

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) by October 28, 2019. If the applications

are not received at least 30 days before the examination date, a postponement may be

necessary. Signed applications certifying that all training has been completed should be

submitted by November 4, 2019.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a

copy of this letter will be available electronically for public inspection in the NRCs Public

Document Room or from the Publicly Available Records (PARS) component of the NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the electronic Reading Room page of the NRCs public Web site at

http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Kimich has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Kirkland at 817-200-1771 or myself at

817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket No.: 50-458

License No.: NPF-47

cc: Electronic Distribution to Riverbend Station

ML18340A089

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JKirkland Yes No Publicly Available Sensitive NRC-002

OFFICE SOE:OB C:OB

NAME JKirkland VGaddy

SIGNATURE /RA/ /RA/

DATE 12/04/18 12/06/18