MONTHYEARML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 2024-09-03
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information2023-05-0808 May 2023 Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information ML23096A1972023-04-0606 April 2023 License Amendment Request - Application of Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure - Response to Request for Additional Information ML23096A2982023-04-0606 April 2023 Units 1 and 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion ML23089A3542023-03-30030 March 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML23044A0392023-02-11011 February 2023 Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles Response to Request for Additional Information ML23025A1252023-01-25025 January 2023 Response to Request for Additional Information License Amendment Request, NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure ML22343A0002022-12-0909 December 2022 Response to Request for RAI on ASME Operation & Maintenance Code Inservice Testing Program - Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing ML22342A4242022-12-0707 December 2022 Response to 3/12/2012 Request for Information Enclosure 2, Recommendation 2.0, Flooding Focused Evaluation Integrated Assessment Submittal Revised Commitment Completion Date ML22312A4432022-11-0707 November 2022 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI ML22300A1882022-10-27027 October 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability Response to Request for Additional Information ML22220A2162022-08-0808 August 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater (AFW) Cross-Connect Capability Supplemental Information ML22164A8532022-06-13013 June 2022 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Confirmation ML22153A1352022-06-0202 June 2022 Proposed License Amendment Request (LAR) - Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Additional Information ML21292A3022021-10-19019 October 2021 Response to Question on License Amendment Request to Revise Reactor Core Safety Limit ML21259A0852021-09-15015 September 2021 North Ann, and Surry, Units 1 and 2, Millstone, Units 2 and 3, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Qualification of the Framatome BWU-I CHF Correlation in the Vipre-D Computer Code Response to Request for Addition ML21133A4212021-05-13013 May 2021 Response to NRC Request for Additional Information Regarding Proposed License Amendment Request Update of LOCA Alternative Source Term Dose Analysis ML21133A2852021-05-13013 May 2021 Stations, Units 1 & 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix E Fleet Report DOM-NAF-2-A Qualification of the Framatome Bwui CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21098A2612021-04-0808 April 2021 Subsequent License Renewal Application, Response to Request for Additional Information Re Environmental Review ML21084A2732021-03-24024 March 2021 License Amendment Request - Application of Leak-Before-Break Methodology to Reactor Coolant System Branch Piping - Response to Request for Additional Information and Clarification ML21056A5412021-02-25025 February 2021 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Final Supplemental Response ML21042B9262021-02-11011 February 2021 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative Requests S1-I5-ISl-05 and S2-I5-ISl-06 - Response to Request for Additional Information ML22040A1012021-02-0909 February 2021 Response to Request for Additional Information 2021 Steam Generator Inservice Report ML20296A7272020-10-22022 October 2020 Stations Units 1 & 2 - Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break LOCA Supplement to the Response to Request for Additional Information ML20247J6352020-09-0303 September 2020 Virginia Electric & Power Co - Subsequent License Renewal Application (SLRA) Environmental Review, Response to Request for Additional Information Concerning Aquatic Resources ML20181A4222020-06-29029 June 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Response to Request for Additional Information ML20181A3082020-06-23023 June 2020 Response to Request for Additional Information on 2019 Steam Generator Inservice Inspection Report ML20269A4072020-06-0202 June 2020 Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 2 of 3 ML20269A4062020-06-0202 June 2020 Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 3 of 3 ML20269A4082020-06-0202 June 2020 Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 1 of 3 ML20149K6942020-05-28028 May 2020 Response to Request for Additional Information, to Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break Loss of Coolant Accident ML20034F0532020-01-31031 January 2020 Proposed License Amendment Request: Allowed Outage Time Extension for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F Response to Request for Clarification and Additional Information ML19350A0042019-12-12012 December 2019 License Amendment Request Addition of 24-Hour Completion Time for an Inoperable Reactor Trip Breaker Response to NRC Request for Additional Information ML19283B6222019-10-10010 October 2019 Subsequent License Renewal Application Safety Review - Documentation of Draft Third Round Requests for Additional Information ML19291B0342019-10-0101 October 2019 Response to March 12, 2012 Request for Information Enclosure 2, Recommendation 2.1, Flooding Focused Evaluation/Integrated Assessment Submittal ML19269B7342019-09-19019 September 2019 Subsequent License Renewal Application - Response to Requests for Additional Information - Sets 3 and 4 Revised SLRA Mark-Ups ML19267A0422019-09-16016 September 2019 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information Set 2 ML19253B3302019-09-0303 September 2019 Response to Requests for Additional Information - Sets 3 and 4 - Subsequent License Renewal Application ML19249B7672019-08-29029 August 2019 Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs ML19204A3572019-07-17017 July 2019 Subsequent License Renewal Application Response to Request for Additional Information - Set 2 ML19198A0592019-07-11011 July 2019 Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML19183A3862019-06-27027 June 2019 Subsequent License Renewal Application - Response to Requests for Additional Information - Set 1 ML19148A4212019-05-10010 May 2019 All Enclosures with Coversheets ML18304A3302018-10-25025 October 2018 Proposed License Amendment Request TSTF-490 & Update of Alternative Source Term Analyses Response to Request for Additional Information & Revised Proposed Technical Specifications ML18302A1212018-10-18018 October 2018 Response to Request for Additional Information, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules ML18303A2882018-10-18018 October 2018 Response to Request for Additional Information Regarding Relief Request S2-I5-LMT-P01 Examination Category R-A, Preservice Weld Examinations 2024-05-07
[Table view] |
Text
.
e RICHMOND, VIRGIN IA 23261 March 7, 1978 Mr. Edson G. Case, Director Serial No .. 059/012478 Nuclear Reactor Regulation PO&M/TAP:dgt U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D. C. 20555 50-281 Attention: Mr. Albert Schwencer, Chief License Nos. DPR-32 Operating Reactors Branch No. 1 DPR-37
Dear Mr. Case:
This letter is in response to your letter of January 24, 1978, regarding your continuing review of the consequences of a fuel handling.accident inside the containment. (FHAIC)
We desire to.be in compliance with your guidelines in that any systems required to keep the results of an accident within the guidelines of 10CFRlOO should be Engineered Safeguards Features (ESF). We discussed with your staff that the electrical portion of the purge isolation circuit meets most of the current ESF design criteria, and that efforts have.been made to upgrade it to full compliance. However, we find *this is not a beneficial venture in that any further modification to the electrical system will not significantly en-hance its reliability, but further modification would be required to fully comply. We have decided not to pursue this modification any further.
Our efforts will be directed toward upgrading the auxiliary building vent-ilation system and its associated filters, dampers and ducting. This will be of benefit to the station.
Our letter of July 5, 1977, shows that with the filters and not the purge isolation circuit, the consequences of the postulated Fuel Handling Accident in Containment is much less than 10CFRlOO. A preliminary system description and analysis of the modified ventilation system is attached and further information will be made available as it is developed by our architect engineer.
Very truly yours, Zo. m. -xft.at&i:,:,d C. M. Stallings Vice President-Power Supply and Production Operations Attachment
e PRELIMINARY CONTAINMENT PURGE AND FILTER SYSTEM SURRY POWER STATION - UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY DESCRIPTION The System The contairnnent purge and filter subsystem, which is a part of the total auxiliary ventilation system, consists of a supply circuit and an exhaust circuit.
The supply circuit consists of two SO percent capacity supply fans (F-4A and B),
powered off the normal station bus, which draw outdoor air through low efficiency roughing filters and a heating coil, if required, and deliver the air to the con-
'tairnnent thro~gh *ductwork and two isolation butterfly valves, The valves are seismic and powered off the normal station bus. The valves are normally kept closed except during unit shutdown when they are opened for ventilation, heating, and purging.
The exhaust circuit consists of ductwork and two containment isolation butterfly valves connecting to the ESF filter trains through two isolation trip dampers in series. The butterfly valves are seismic and powered off the normal station bus.
The manipulator crane monitor and the containment gas and particulate.monitor are wired to close the butterfly valves on a high radiation signal.
The ESF filter train system to which the purge exhaust circuit connects, consists of two 36,000 cfm trains, each train consisting of roughing filters, HEPA filters, charcoal adsorbors, and a fan (F-58) which discharges through a stack in the wake of Unit 2 containment, The design flow condition for the filter trains is a LOCA when the exhaust from the safeguards building of the unit with the LOCA and the exhaust from the cubicles of three charging pumps are drawn through the filter for treatment of ECCS .leakage. The fans, filters, ducts, and isolation dampers are seismic. The fans are powered off the emergency buses; one fan off Unit 1 orange bus, the other fan off Unit 2 orange bus. (orange= H Bus/purple - J Bus)
The two isolation trip dampers in series connecting the purge exhaust circuit to the ESF filter inlet header are air operated (AOD), designed to fail in the closed position on loss of air.
Compressed air is supplied to the AOD's either from the station compressed air system (QA Category II) or through redundant QA Category I compressed air accumu-lators sized to store sufficient air to keep the dampers open for two hours.
Compressed air is supplied to each AOD through two 3-way solenoid-operated valves (SOV) piped in series. The power supplies to the two SOV's of the orange AOD are from Unit 1 orange and Unit 2 orange buses. The power supplies to the two SOV's of the purple AOD are from Unit 1 purple and Unit 2 purple buses. De-energized SOV's d:irect compressed air to the AOD to open, Energized SOV's vent compressed air from the AOD to close.
Page 2 of 6
The fuel building exhaust circuit is connected to the ESF filter inlet header through two isolation trip dampers in a manner identical to the purge.
O:eeration
- 1. Normal Power Generation and Clean Fuel Building During Normal Station Operation The containment purge system (RC) is not _in operation, and the fuel building (F). is exhausted at 35,000 cfm by the normal exhau*st fans (F-7 A and B) bypass-iqg the filters. The isolation trip dampers of both the RC and F streams are kept closed by energized SOVs.
- 2. Normal Power*Generation and Contaminated Fuel Building If radioactivity levels within the fuel building require the filtration of the F stream, the SOVs of the isolation trip dampers of the F stream are de-energized by a hand selector switch (HSS). This supplies compressed air to the AODs which open. The F stream is drawn through the filters by the filtered exhaust fans.
A LOCA signal in Unit i (or Unit. 2) will override the HSS and energize the SOVs which.vent the compressed air from the AODs. The AODs fail
.closed and allow the filters to treat the air exhausted from ECCS equipment areas. If one AOD does not close, the other one in series will. If a Unit 1 (or Unit 2) orange SOV does not vent the orange AOD, the Unit 1 (or Unit 2) purple SOV will vent and close the purple AOD.
- 3. Unit 1 Purging Prior to Refueling - Unit 2 On-Line During the shutdown of Unit land prior to refueling, the purge air exhaust stream (RC) is routed through the filters~ The SOVs of the isolation trip dampers of the RC stream are de-energized by an HSS, This .supplies compressed air to the AODs which open. The RC stream is drawn at 30,000 cfm through the filters *by the filtered exhaust fans.
A LOCA signal in Unit 2 will override the HSS and energize the S0Vs which vent the compressed air from the AODs. The AODs fail closed and allow the filters to treat the air exhausted from ECCS equipment areas *
. If one AOD does not close, the other one in serieslwill. If the Unit 2 orange SOV docs not vent the orange AOD, then Hnit 2 purple SOV will vent and close the purple AOD.
..... Pal 3 of 6 3
4, Unit 1 Refueling - Unit 2 On-Line Before starting Unit 1 refueling, both the RC and F streams are aligned through the two filters. The S0Vs of the isolation trip dampers of both the RC and F streams are de-energized by HSSs. Then, power to the SOVs is removed from the control ro*om. The de-energized SOVs supply compressed air to the AODs which open. Both the RC and F streams are drawn through both filters by the two filtered *exhaust fans. .
The *capacity of the filtered exhaust fans l-VS-F-58A and Bis automatically control1ed by pneumatically operated inlet vanes to draw the design flow rates. The fan inlet vanes are arranged to fail in the wide open position on loss of compressed air.
A refueling accident inside the containment or the fuel builcing will leave the system alignment unchanged, allowing filtration of the exhaust of both buildings through the two filter trains. Loss of station compressed air will not terminate filtration of the refueling accident puff release, since
. the compressed air accumulators are sized to keep the isolation trip dampers open for two hours. Loss of station compressed air will result in loss of fan capacity control * . With inlet vanes wide open, the fans will draw the F and RC streams at a higher rate than their respective design rates but no higher than filter design capacity.
No single active failure can close the isolation trip da~pers since there is no required mechanical movement of a component.
No passive failure in the short term (two hours) is postulated to close the isolation trip dampers.
No spurious signal can close the isolation trip dampers since the SOVs are de-energized and electrically disconnected from the control room.
Failure of an emergency bus cannot close the isolation trip dampers since the SOVs are already de-energized.
Loss of a filter train (whether due to loss of an emergency bus, fan, or fan back-:-draft damper) will tr:ip the fans {F-4, F-6, and F-J9) of the venti-lation supply air systems of both the containment and the fuel building,
- This will leave one filter train to exhaust and treat the air from both buildings at a lower rate than design. It will also prevent overpres-surization of the two buildings.
Page 4 or t> -~
Compliance with FSAR Criteria for Engineered Safety Features The engineered safety features of the ventilation system, modified as described above, for mitigating the consequences of a ~efueling accident meet and exceed all the safety criteria established in the FSAR.
Compliance with NUREG-75/087 Criteria for Engineered Safety Features The engineered safety features of the ventilation system, modified as described above, for mitigating the consequences of a refueling accident meet all the safety criteria of the NRC Standard Review Plan NUREG-75/087, except Regulatory Guide 1.52, referenced in Standard Review Plan 6.5.1 as listed below.
LIST OF NONCONFORMANCES TO THE POSITIONS OF REGULATORY GUIDE 1.52, REVISION 1
- 1. C. 2 .a ....: The filter trains do not include (a) demisters, (b) HEPA filters after-absorber banks, and (c) heaters.
- 2. C.2.b - The filter trains are not protected from missiles generated by natural phenomenon (tornado).
- 3. C.2.f - Each filter train is 36,000 cfm. However, the filter banks are 3 HEPA filters high.
- 4. C.2.i - The filter trains are not designed for replacement as an intact unit or in a minimum number of segmented sections without removal of individual components.
- 5. C.2.k - Filter ductwork was designed to exhibit on test a leakage rate of approximately one percent of system flow.
- 6. C.3.c - Prefilters neither meet the UL Class 1 requirements nor have a minimum efficiency of 40 percent dust spot.
- 7. C.4.c - No space is provided between upstream HEPA filter and adsorber mounting frames for personnel access.
Page 5 of 6 e
5 8 *. C.5.c_- The station technical specifications require in-place DOP tests on HEPA filter banks to have 99.0 percent efficiency.
- 9. C.5.d - The station technical specifications require in-place halogen tests on adsorber banks to have a 99.0 percent efficiency*
. 10. C.6.a.3 - The station technical specifications. require laboratory testing of samples of used activated carbon to have methyl iodide removal efficiency of 95.0 percent at 25 C and 85 percent relative humidity.
REASONS WHY IT IS NOT NECESSAJW TO RECTIFY HONCONFOID1ANCES LISTED ABOVE Item l(a) - There is no potential for entrained water droplet*in exhaust air streams during a refueling accident.
Item l(b) - The release of radioactively contaminated carbon fines from the adsorbers to the environment is not a station design assumption *.
Omission of dmm.stream HERA filters is, therefore, not an unreviewed safety question.
Item l(c) - Control of relative humidity is not required for the low (less than 70 percent) methly iodide removal efficiencies used in the refueling accident analysis.
Item 2 - The filters and ventilation syste1:i. mitigate the consequences of refueling accidents in two hours before long-term natural phenomenon, such as tornadoes, could take place.
Item 3 - This nonconformance does not affect system safety function.
Item 4 - Cutting the ESF filter system into segments without removal of indi-
- ,.vidual components exposes the local environment and the personnel working in it to unnecessary contamination. When components are individually removed for packaging, shielding, and shipment, operator exposure _is minimized. After all components are removed and the hous-ing has been washed down, it is then determined whether the housing has been satisfactorily decontaminated for reuse or whether cutting for shipment and burial off site is required.
(
. Pag.e 6 of 6 e e
. ~.
6 Item 5 - Since leakage is into ductwork, contamination of personnel is not a_
problem.
Item 6 The combustible material contained in the prefilters is insignificant (less than 10 percent) in compari~on with the charcoal in the adsorbers.
The low efficiency prefilters merely shorten the life of the HEPA filters; they do not affect system safety function.
Item 7 The lack of access space between the HEPA filter and adsorber-mounting*
- frames makes in-place testing less co~venient. It does not affect the system safety function.
Item 8 Sirice dose calculations take credit for 70 percent in particulate removal efficiency, in-place DOP testing to 99.0 percent represents a factor of safety of 30.
Items 9 - The in-place halogen test of 99 percent efficiency combined with the and 10 laboratory analysis of charcoal sa~ples at 95 percent methyl iodide removal efficiency, at 85 percent relative humidity, provides sufficient conservatism in fuel-handling accident dose calculation which takes credit for 70 percent methyl iodide removal effic~ency with no restrictions on relative humidity.
. ..... l~c.!:*