Pages 2.20-2.32 Inadvertently Omitted from Independent Design Verification Program Final Rept.ML20023B392 |
Person / Time |
---|
Site: |
Fermi ![DTE Energy icon.png](/w/images/5/5b/DTE_Energy_icon.png) |
---|
Issue date: |
05/03/1983 |
---|
From: |
CYGNA ENERGY SERVICES |
---|
To: |
|
---|
Shared Package |
---|
ML20023B385 |
List: |
---|
References |
---|
TR-83021-1-ERR, TR-83021-1-R-ERR, TR-83021-1-R00-ERR, NUDOCS 8305050010 |
Download: ML20023B392 (12) |
|
Similar Documents at Fermi |
---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20153B7921998-08-31031 August 1998 Rev 0 to Fermi 1 Sar ML20197A9921997-12-15015 December 1997 Rev 0 to Efp,Unit 1 Fermi 1 Sar ML20148A3191997-05-0202 May 1997 SE Summary Rept for Fermi 2, Rev 1 ML20137N1261997-03-25025 March 1997 Rev 0 to Leak-Before-Break Evaluation for Three Locations on Recirculation Sys at Fermi 2 ML20133A2311996-12-19019 December 1996 Ferm 2 CR Simulator Four Yr Rept ML20129A3511996-03-15015 March 1996 Rev 0 to Cchvac Duct & Duct Support Qualification ML20134J6241996-03-13013 March 1996 Rev 0 to Tmr 96-0003, Safety Evaluation ML20083A7591995-05-0808 May 1995 Safety Evaluation Summary Rept, Rev 7 NRC-94-0093, Main Turbine-Generator Vibration Monitoring & Balancing During Start-Up After RF041994-10-0707 October 1994 Main Turbine-Generator Vibration Monitoring & Balancing During Start-Up After RF04 ML20076J6211994-10-0606 October 1994 Safety Evaluation of Rev a to Edp 26726 ML20076J5831994-08-31031 August 1994 Turbine Failure Post-Event Earthquake Passive Instrumentation Data Evaluation ML20076J6081994-08-27027 August 1994 Root Cause Analyses of Fermi 2 Main Turbine Generator Event, Executive Summary ML20076J5891994-08-0808 August 1994 Structural Walkdown Final Rept ML20093N4781994-03-0303 March 1994 Gamma Spectroscopy Analysis Rept ML20093N4901994-03-0303 March 1994 Gamma Spectroscopy Analysis Rept ML20064L9841994-02-0404 February 1994 Turbine Failure,Post-Event Earthquake Instrumentation Data Evaluation ML20126J1141992-12-30030 December 1992 Nuclear Training Simulator Certification ML20099B9921992-07-10010 July 1992 Rev 0 to Updated NUREG-0619 Feedwater Nozzle Fatigue Crack Growth Analysis,Fermi Nuclear Power Plant Unit 2 ML20086P2551991-12-31031 December 1991 Nuclear Training Simulator Certification NRC-91-0039, Safety Evaluation Summary Rept 19901991-03-18018 March 1991 Safety Evaluation Summary Rept 1990 NRC-90-0041, Safety Evaluation Re as-built Notices1989-12-31031 December 1989 Safety Evaluation Re as-built Notices NRC-90-0104, Rev 1 to Decommissioning Cost Study of Enrico Fermi Atomic Power Plant Unit 11989-11-0808 November 1989 Rev 1 to Decommissioning Cost Study of Enrico Fermi Atomic Power Plant Unit 1 ML19354D4801989-10-20020 October 1989 Rev 1 to Safety Evaluation. ML19324B7551989-09-30030 September 1989 Radioiodine & Particle Transmission Through Sampling Lines for Standby Gas Treatment Sys Effluents at Fermi 2, Final Rept ML20248E7021989-09-30030 September 1989 Control Sys Common Power Source Failure Analysis Evaluation Rept for Enrico Fermi Atomic Power Plant Unit 2 ML20247H8991989-08-31031 August 1989 Control Sys Common Sensor Line Failure Analysis Evaluation Rept for Enrico Fermi Atomic Power Plant Unit 2 ML20245B3851989-06-13013 June 1989 ATWS Alternate Rod Insertion & Recirculation Pump Trip Response to NRC Rule 10CFR50.62 ML20235J4271987-09-30030 September 1987 Supplemental Environ Info Enrico Fermi Atomic Power Plant, Unit 1 ML20235G3041987-09-29029 September 1987 Partially Withheld, Preliminary Investigation of Enrico Fermi II Nuclear Power Plant ML20237K6061987-07-31031 July 1987 Suppl 1 to Dcrdr ML20236C8291987-06-29029 June 1987 Preimplementation Audit Rept for Dcrdr for Fermi-2 ML20234C9821987-05-21021 May 1987 Insp Followup of Failure of South Reactor Feed Pump Turbine,Fermi Unit 2 Nuclear Power Plant, Technical Review Rept ML20236C8601987-05-11011 May 1987 Post-Implementation Audit Rept for Fermi-2,SPDS ML20204F1701987-01-31031 January 1987 Maint,Mod & Outage Mgt Monthly Rept. Maint/Mods for Period Ending 870222, Manpower Tracking - Labor Distribution & Period Ending 870125, Hours by Craft Rept, Also Encl ML20209B8231987-01-30030 January 1987 Rev a to Heavy Loads Handling Review,Control of Heavy Loads Over or in Close Proximity to Irradiated Fuel or Critical Safety Sys Components ML20214Q4521986-11-30030 November 1986 Dcrdr Summary Rept,Fermi 2 ML20211D4211986-10-0303 October 1986 Preliminary Steam Bypass Line Structural Evaluation ML20211D3961986-10-0303 October 1986 Preliminary Rept on Main Steam Bypass Piping Fatigue Analysis & Life Expectancy ML20214J8391986-08-31031 August 1986 Final Rept on Metallurgical Investigation of Various Defects on Surfaces of Diesel Engine Aluminum-Tin Bearings ML20209E7591986-07-0202 July 1986 Response to Independent Overview Committee ML20213A5901986-06-30030 June 1986 Investigation of Surface Scoring of Main Bearings:Fairbanks Morse 38TD8-1/8 Diesels at Fermi II Power Plant ML20209E7791986-06-26026 June 1986 Program to Evaluate & Resolve Engineering Issues ML20141M9441986-01-30030 January 1986 Evaluation of Detroit Edison Mgt at Fermi 2 ML20237J4711985-08-31031 August 1985 Rev 1 to Enrico Fermi Atomic Power Plant Unit 2 Primary Containment Negative Pressure Analysis ML20128B7251985-06-30030 June 1985 Rev 4 to Evaluation of Containment Coatings A10089, Investigation of Engine Bearing Distress in Fairbanks-Morse Emergency Diesel Generators at Fermi-II Power Plant, Phase 1:Insp & Preliminary Conclusions1985-02-28028 February 1985 Investigation of Engine Bearing Distress in Fairbanks-Morse Emergency Diesel Generators at Fermi-II Power Plant, Phase 1:Insp & Preliminary Conclusions ML20115F3901985-02-28028 February 1985 Transfix Sys Description. W/Four Proprietary Drawings 8911-M-2000,2001,2006 & 9402-M-2100 Re Transfix Sys P&Id. Drawings Withheld (Ref 10CFR2.790) ML20115F4381985-02-28028 February 1985 Comparison of NUS Process Svcs Corp Mobile Radwaste Processing Sys W/Guidelines of Us NRC Reg Guide 1.143 ML20117D5201985-01-31031 January 1985 Rev 0 to Mark I Wetwell to Drywell Differential Pressure Load & Vacuum Breaker Response for Fermi Atomic Power Plant Unit 2 ML20106G1221985-01-31031 January 1985 Evaluation of Fire Detection Placement at Fermi 2 1998-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N4381999-10-25025 October 1999 Safety Evaluation Supporting Amend 17 to License DPR-9 ML20217P3551999-10-22022 October 1999 LER 99-S01-00:on 990922,loaded 9mm Handgun Was Discovered on Truck Cargo Area of Vehicle Inside Protected Area.Caused by Inadequate Vehicle Search.Guidance in Procedures & Security Training to Address Multiple Vehicle Searches Was Provided NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fermi 2.With NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fermi 2.With NRC-99-0065, Monthly Operating Rept for July 1999 for Fermi 2.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fermi 2.With NRC-99-0088, Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with1999-06-30030 June 1999 Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with NRC-99-0064, Monthly Operating Rept for June 1999 for Fermi 2.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fermi 2.With NRC-99-0062, Monthly Operating Rept for May 1999 for Fermi 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fermi 2.With ML20206J9301999-05-10010 May 1999 SER Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Powered-Operated Gate Valves ML20206G5081999-05-0505 May 1999 Safety Evaluation Approving Request for Relief PR-8,Rev 2 on Basis That Licensee Committed to Meet All Related Requirements of ASME OM-6 Std & PR-12 on Basis That Proposed Alternative Will Provide Acceptable Level of Safety NRC-99-0022, Monthly Operating Rept for Apr 1999 for Fermi 2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fermi 2.With ML20205Q7141999-04-15015 April 1999 Safety Evaluation Supporting Amend 16 to License DPR-9 ML20205P9721999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fermi 2 ML20204E0371999-03-17017 March 1999 Safety Evaluation Accepting Licensee Request for NRC Approval of Alternative Rv Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5) for Plant,Unit 2 for 40-month Period ML20204D0361999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fermi 2 ML20198S3341999-01-0606 January 1999 Safety Evaluation Supporting Amend 15 to License DPR-9 NRC-99-0005, Monthly Operating Rept for Dec 1998 for Fermi 2.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fermi 2.With ML20207B7491998-12-31031 December 1998 1998 Annual Operating Rept for Fermi 2 ML20205Q9621998-12-31031 December 1998 Revised Monthly Operating Rept for Dec 1998 for Fermi 2 NRC-99-0021, 1998 Annual Financial Rept for Detroit Edison Co. with1998-12-31031 December 1998 1998 Annual Financial Rept for Detroit Edison Co. with NRC-98-0153, Monthly Operating Rept for Nov 1998 for Fermi 2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fermi 2.With NRC-98-0160, Monthly Operating Rept for Oct 1998 for Fermi 2.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fermi 2.With ML20154R2331998-10-21021 October 1998 Safety Evaluation Supporting Amend 13 to License DPR-9 ML20154L1031998-10-14014 October 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode NRC-98-0139, Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With ML20154H8161998-09-30030 September 1998 Rev 0 to COLR Cycle 7 for Fermi 2 ML20153B8811998-09-18018 September 1998 Safety Evaluation Accepting Request for Relief from Certain Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2 ML20151X0651998-09-11011 September 1998 Safety Evaluation Re Inservice Testing Program Relief Request VR-63 for Plant NRC-98-0111, Monthly Operating Rept for Aug 1998 for Fermi 2.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fermi 2.With ML20153B7921998-08-31031 August 1998 Rev 0 to Fermi 1 Sar ML20237E1171998-08-25025 August 1998 Safety Evaluation Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Nondestructive Exam Program ML20236X8611998-08-0505 August 1998 SER Related to Revised Feedwater Nozzle Analysis to Facility Operating License NPF-43,Enrico Fermi Nuclear Power Plant, Unit 2 NRC-98-0109, Monthly Operating Rept for July 1998 for Fermi 21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fermi 2 ML20236K3261998-07-0101 July 1998 SER Accepting Licensee Response Related to Revised Feedwater Nozzle Analysis to License NPF-43 for Enrico Fermi Nuclear Power Plant,Unit 2 NRC-98-0097, Monthly Operating Rept for June 1998 for Fermi,Unit 21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fermi,Unit 2 NRC-98-0127, Annual Rept for Period 970701-9806301998-06-30030 June 1998 Annual Rept for Period 970701-980630 NRC-98-0079, Monthly Operating Rept for May 1998 for Fermi 21998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fermi 2 NRC-98-0076, Monthly Operating Rept for Apr 1998 for Fermi 21998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Fermi 2 NRC-98-0072, Monthly Operating Rept for Mar 1998 for Fermi 21998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fermi 2 NRC-98-0050, Monthly Operating Rept for Feb 1998 for Fermi 21998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fermi 2 NRC-98-0019, Monthly Operating Rept for Jan 1998 for Fermi 21998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fermi 2 ML20198L4241998-01-0808 January 1998 Safety Evaluation Accepting Proposed Rev 2 to Relief Request VR-51 Under Fermi 2 Pump & Valve Inservice Testing Program Per 10CFR50.55a(f)(6)(i) for First 10-yr Interval NRC-98-0015, Monthly Operating Rept for Dec 1997 for Fermi 21997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fermi 2 ML20217N3821997-12-31031 December 1997 Annual Operating Rept for 970101-1231 NRC-98-0053, 1997 Annual Financial Rept for Detroit Edison Company1997-12-31031 December 1997 1997 Annual Financial Rept for Detroit Edison Company ML20205Q9601997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Fermi 2 NRC-97-0141, Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility1997-12-23023 December 1997 Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility ML20197A9921997-12-15015 December 1997 Rev 0 to Efp,Unit 1 Fermi 1 Sar NRC-97-0131, Monthly Operating Rept for Nov 1997 for Fermi 21997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fermi 2 ML20248H1151997-10-31031 October 1997 Rev 1 to Colr,Cycle 6 for Fermi 2 1999-09-30
[Table view] |
Text
- EXHIBIT 2.1 O "^aon suuToown COOLING PATH SYSTEM s
I
[ 3r Fan f%
i- ... s ,.
"Solin[T dHR -
RPV / Heat Exchanger b" "Y '
m i A ".. d . :-
[ >" [lii1 RRC Pumo '
i: j;
- g. .
g .._.,._
AHA$W Nm# ji ,
' ~'
ie.w e w.w) 4" Drywell w - r e , _. -
Reservoir t i l RHR Pump RHR COMPLEX REACTOR BLDG.
Legend M = Work Scope O r, 4 pd L iIs 3 Detroit Edison Company 2 .' O L = Independent Design Verification Program lillllilllilllillllllillllilll Final Report No. TR-83021-1; Rev 0 8305050010 830503 PDR ADOCK 05000341 R PDR
o o O -
EXHIBIT 2.2
!!ORIZONTAL REVIEW l Quality Assurance g l l Detroit Edison 7 r--------Detroit 7 r--
g l i l l Licensing Quality Assurance l Edison g l Connitments Program P Design Control _l Design j
g I ,
'i l g l l Program l l g
s __ - . _ _ _ _ . L -- A.__ - g
__ _s -
___J l g-- - - , _q l Detroit l Selected g Edison . Subcontractor y Procurement g
Design Control g l Control Program l Program l
L - J l_
Remaining
I i ,- _2 3si Detroit Edison Company 2-21
.d E.Ji*ii Independent Design Verification Program llllllllllllllll '"""llllll Final Report No. TR-83021-1; Rev 0
EXHIBIT 2.3 VERTICAL REVIEW RHR COOLING SAR/ Conceptual Design 9
p _!___5 Design
___1 _q l I Design g l l Criteria l Criteria g RHR I ! Recirc l I g
l (GE) l (GE) l t____. __ J ! _ __
o System System Design / Design /
Piping Layout Piping Layout RMt Recirc (DECO) (GE) p__ __ __ -
l ll l Piping Analysis Pressure / l e Develop Models l Seismic Temperature _t e Cales I Loads Loads l e Compare Results I ($4L/GE) s s
(GE/ DECO) l with Allowebles I i e Verity esametry I l (GE) I t- I
__ t_ , '
r -- -
g Penetration INozzle lg_/ _I -- I l(-Flued I l Pipe Support i Anchor I l Evaluation ll Equipment Evaluation I gl l Head !l Design l ll Design I g (DECO) I lg Evaluation l l (S&W/GE) lg (54W) I g
- _ _ ! l---
- -(DECO) Ig J w_ - (Tube Turn) l
]l L_ lI g' 1
I Material & Equipment (~ Valve
~1 l
l l Procurement De*1gn (DECO) 9 1 l (Wm.
Powell ___a Co.) l
. Installation (WismerBecker) v
! LEGEIE) As.Butit Drawings (DECO /S&W/
[--~~l - Veri fied Pacific Scientific)
L_J By Cygna O
., Detroit Edison Company 2-22 kk. [jk 1 Independent Design Verification Program lllllllllllllllllll1lllllll!Il Final Report No. TR-83021-1; Rev 0
EXHIBIT 2.4 RHR SHUTDOWN COOLING MODE ELEMENT
- v. %
to,
< 20
,, o l Containment Penetration
,, No. 12
,a
/
o.
^
Reactor Recire. ,
interface g?
o l
l l
l l
l l
O Detroit Edison Company 2-23
.k. N i il
- L. Independent Design Verification Program l llillllllllllllillllillllilll! Final Report No. TR-83021-1; Rev 0 l
i,-- . . . , , - - , - - , + - - - - -
ErHTRIT 2.5 RESPONSIBILITY MATRIX (x
(RHR COOLING)
WM.
POWELL PACIFIC WISMER DECO S&L GE S&W CO. SCI. BECKER
- 1. Conceptual Design X
- 2. Design Criteria X X
- 3. System Design X
- 4. Piping Layout X
- 5. Pipe Stress Analysis X
- 6. Input to Pipe Stress
- a. ARS X X
- b. SAM X X
- c. Hydrodynamic Loads N/A
- d. Support Stiffness X
,, e. Valve Stem Flex X
's 7. a. Nozzle Evaluation X
- b. Equipment Evaluation X
- 8. Pipe Support Design X X
- 9. Pipe Anchor Design X
- 10. Transfer of Load to X X Structure
- 11. Installation X
- 12. Purchase Specification X
- 13. As-Built Drawings
- a. Pipe X
- b. Pipe Supports X X
(,} Detroit Edison Company 2-24 V _
Independent Design Verification Progran
[y . g [gj Final Report No. TR-83021-1; Rev. 0 llll!Il!!I11111111111111ll11ll
EXHIBIT 2.6' VERTICAL REVIEW RHR SW O SAR/
Conceptual Design m ___u-----, Design l g
- l. Criteria g l (DECD/S&L)
System Design /
Piping Layout (S&L) l Piping Analysis q
q' Pressure / Temp I o Develop Models
& Seismic ! e Calcs Loads i e Compare Results (S&L) I I l e with VerifyAllowables Geanetry l l (S&L) I s_____. _ - - I
& 4 l Nozzle / l Pipe l ,- _ Anchor -q l
Equipment Support l l l I g Design l
Evaluation Design l l l g (S&L) g (S&L) l (S&L) I m_______ L__ g l Transfer of g l Loads to g l Structure g l (S&L)
Material & Equipment Procurement (DECO)
I hstallation (Towns nd & Bottus)
LEGEND r-- -
''' '^'-'""*"'" '
f_____~]' By Cygna 1 (S&L) I
-____ l O Detroit Edison Company 2-25
,ib L [ A1 Independent Design Verification Program llllllllllllllllllllllllllilli Final Report No. TR-83021-1; Rev 0
EXHIBIT 2.7 RHR SERVICE WATER ELEMENT To Cooling Tower Pl$ 8 E ll568002A gg, 1" Open Drain f to Reservoir {
f he ,
y, l . i2
- vs so w .,
16" Cold Weather Bypass to Reservoir i
8" Return Lines from Emergency Diesel
', Genera tors C O ^
s ,
i i
Detroit Edison Company 2-26 Lk (-j i f Al Independent Design Verification Program 111111!!!I111111ll11111111llllFinal Report No. TR-83021-1; Rev 0
EYHTRIT 2.8 I') RESPONSIBILITY MATRIX (RHR SW)
Townsend DECO S&L & Bottum
- 1. Conceptual Design X
- 2. Design Criteria X X
- 3. System Design X
- 4. Piping Layout X
- 5. Pipe Stress Analysis X
- 6. Input to Pipe Stress
- a. ARS X
- b. SAM X
- c. Hydrodynamic Loads' N/A
- d. Support Stiffness X
- 7. a. Nozzle Evaluation X
- b. Equipment Evaluation X
- 8. Pipe Support Design X
- 9. Pipe Anchor Design X
- 10. Transfer of Ioad to X Structure
- 11. Installation X
- 12. Purchase Specifications X
- 13. As-Built Drawings
- a. Pipe X
- b. Pipe Supports X l
f l
[ Detroit Edison Company 2-27 l Independent Design Verification Program
, d I
( (t ; g' f j Final Report No. TR-83021-1; Rev. O lllllllllllllllllll!!llllillll l
R E
W O
T 8 G 2 N -
I ) 2 O LL OA OC CI P
RY I
I T R(
n e
A ll . -
A n.
m' -
{
G N
IN WA A 'L RP D
9 P
. TO 2 NO ER
_ T M E ,
I . ll ,: l I l l ! 11 1 l111l a B GX O
.ll ,: l 1 I I NE E ! $1 1 I 111 l A m
I AL a I
X RP r g
E RM o
- AO r0 C P L v AR ne Rl i oR ER i t ;
- N a1 E c-G i1 f2 i0 yr3 K ne8 C aV p
E R D mnT og R Ci .
E so neN M oD X
- 1) s t it r L d no GA E ep NC de I I t nR LP .;
'j i e ,
OY -, o pl OT C( %r.w9 rea fh td n eni
- DI F
/ f% kg'
- s
- il l l
]_f
~
11 1 l
l l
3 ( 1l 1 l
- 1l l 1
c ,i ll l
l O
l
. 1 1
j=l l l
l l
7Ll l
! i' ! ,! j!
EXHIBIT 2.10 RHR COOLING TOWER FOUNDATION SAR/ Design Concept Building Arrangement (S&L) t-~~- ?
l Design Criteria I I
j l (S&L) 6.____ _I m
I I I I I
Structural Analysis l I Seismic g (S&L) l Analysis l I ._____a I L _ (S&L) l O - -
Other _l Structural Design I. r-- -- ,
i Seismic Loads l Loads ] (S&L) I~ (S&L) l L__________J I' J l Final Design Drawings I I (S&L) I c__ a e
I As-built Drawings I (DECO) I L__ __J uum
- - Verifled
____j By Cygna O Detroit Edison Company 2-29 ikk j g A Independent Design Verification Program lll111lll!llllllllllllllllllll Final Report No. TR-83021-1; Rev 0
EIHIBIT 2.11
() RESPONSIBILITY MATRIX (COOLING WATER FOUNDATION)
DECO S&L
- 1. Conceptual Design X
- 2. Design Criteria X X
- 3. Building Arrangement X
- 4. Seismic Analysis X
- 5. Structural Analysis X
- 6. Input Loads
- a. Ground Spectra X
- b. Other Leads X
- c. Equipment Evaluation
- 7. Structural Design X
- 8. Final Drawings
- 12. Purchasa Specification X X
(_) 13. As-Built Drawings X e
l l
l l
l
() Detroit Edison Company 2-30 (W.' i j ebi ti , g Independent Design Verification Program Final Report No. TR-83021-1; Rev. O lilllllllllllllilillllllllll!!
EXHIBIT 2.12 VERTICAL REVIEW s ELECTRICAL DISCIPLINE SAR/ Design Requi rements h
DNkn~~
Criteria (DECO)
T-----
Piping and Instrumentation Drawings l RHR Cooling Tower l l Fare Motor I I Design Specificatic.n I l l i_ _ _ _ _-(S&L) _2 General l. Sub-Contractor I Equipment Motor Design l Purchase l Qualification Specification i g Order F Requirements (DECO) l (DECO) l (DECO) 6_
O 1
--- _l____J Design Package l
! Document l l
! l (Marley) l g____-- _q y ___?____q l Electrical Power l l Cable Specification g l and Interconnecting W & Routing l
l Diagrams l g Requireme1ts g l (DEC0/S&L)) l l (DECO /S8L) g
, n_____ -_
p__ e _ --__ _ q l Cable Tray and l l Raceway Design I I 58L l I _ (- ._)___J Legend u I
f-"
1 ]aVerified By Cygna l Site Installation lg l (Comstock) g O Detroit Edison Company 2-31 LN. [, $i L A1 Independent Design Verification Program lllllllllililllllilllillllllli Final Report No. TR-83021-1; Rev 0
~
EERIBIT 2.13
('N RESPONSIBILITY MATRIX (ELECTRICAL)
DECO S&L MARLEY COMSTOCK
- 1. Conceptual Design X
- 2. Design Criteria X
- 3. Design Specifications
- a. Motor X X
- b. Cable X
- c. 480 V Switchgear X
- 4. Fan Motor Data Sheets X
- a. Fan Motor Calculations X X
- 5. Electrical Power Distribu- X tion One-lines
- 6. Cable Tray Routing Schedule X X
- 7. Cable Tray Plan X
("}'
- 8. Cable Tray Hangers X Analysis / Design
- 9. Fan Motor Assembly Drawings X
- 10. Installation Criteria X
- 11. Purchase Order X
- 12. Installation X
/)
\
'+/
Detroit Edison Company Independent Design Verification Program 2-32