ML20023B384

From kanterella
Jump to navigation Jump to search
Forwards Pages 2.20-2.32 Inadvertently Omitted from Independent Design Verification Program Final Rept
ML20023B384
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/03/1983
From: Ferg D
CYGNA ENERGY SERVICES
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20023B385 List:
References
83021.037, NUDOCS 8305050004
Download: ML20023B384 (1)


Text

--

y

        • ]

150 North Wacker Dnve, Chicago, IL 60506 312 236-5701 83021.037 g

May 3, 1983 Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Mr. B.J. Youngblood, Chief Director of Nuclear Reactor Regulation

Subject:

Final Report Independent Design Verification Program Detroit Edison Company - Enrico Fermi Unit 2 Docket #50-341 Job No. 83021

Reference:

Cygna letter to Mr. B.J. Youngblood, dated April 29, 1983

Dear Sir:

The above referenced letter transmitted forty (40) copies of the Enrico Fermi Unit 2 Independent Design Verification Final Report.

The exhibits for Section 2 of the report were inadvertently omitted.

Please insert one set of the attached exhibits into Section 2, Volume 1 of each copy.

We apologize for any inconvenience this may have caused. Feel free to call if there are any questions.

Very truly yours, I

%.1n d w fn D. A. Ferg Project Manager DAF/ta

Enclosures:

40 sets, of Exhibits 2.1 through 2.13 cc: Mr. W.F. Colbert (w/o attach.)

Mr. M.D. Lynch (w/ 2 copies of Exhibits 2.1 through 2.13) 8305050004 830503 PDR ADGCK 05000341 R

PDR San Francisco Boston Los Angeles Chcago Kennewick San Jose San Diego