ML16118A133

From kanterella
Revision as of 03:24, 5 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - Fermi 2- Acceptance Review for Relief Request- PRR-007 (MF7573)
ML16118A133
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/27/2016
From: Sujata Goetz
Plant Licensing Branch III
To: Jonathan Haas
DTE Electric Company
References
MF7573
Download: ML16118A133 (2)


Text

NRR-PMDAPEm Resource From: Goetz, Sujata Sent: Wednesday, April 27, 2016 9:38 AM To: Jason R Haas Cc: Wrona, David; Wolfgang, Robert; Goetz, Sujata

Subject:

Fermi 2- acceptance review for Relief Request- PRR-007 (MF7573)

Mr. Haas By letter dated April 5, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16097A172), DTE Electric Company submitted a request for relief (proposed alternative) for Fermi 2.

The Relief Request proposes to test Residual Heat Removal Service Water pumps to within +/- 20% of pump best efficiency point flow rate instead of at the +/- 20% of pump design accident flow rate as approved by the U.S. Nuclear Regulatory Commission (NRC) previously in a letter dated July 6, 2010 (ADAMS Accession No. ML101670372).

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Section 50.55a(z)(1) of Title 10 of the Code of Federal Regulations, the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-8004.

Thank you, Sujata Goetz Project Manager NRC, Office of Nuclear Reactor Regulation NRC/NRR/DORL/LPL3-1, O8C10 Washington, DC 20555-0001 301.415.8004, 301.415.3313 (fax)

Mail Stop O8H4A 1

Hearing Identifier: NRR_PMDA Email Number: 2805 Mail Envelope Properties (6d39015d3e08498a9f4c4a9f90f98fb2)

Subject:

Fermi 2- acceptance review for Relief Request- PRR-007 (MF7573)

Sent Date: 4/27/2016 9:37:47 AM Received Date: 4/27/2016 9:37:47 AM From: Goetz, Sujata Created By: Sujata.Goetz@nrc.gov Recipients:

"Wrona, David" <David.Wrona@nrc.gov>

Tracking Status: None "Wolfgang, Robert" <Robert.Wolfgang@nrc.gov>

Tracking Status: None "Goetz, Sujata" <Sujata.Goetz@nrc.gov>

Tracking Status: None "Jason R Haas" <haasj@dteenergy.com>

Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 2343 4/27/2016 9:37:47 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Goetz, Sujata Sent: Wednesday, April 27, 2016 9:38 AM To: Jason R Haas Cc: Wrona, David; Wolfgang, Robert; Goetz, Sujata

Subject:

Fermi 2- acceptance review for Relief Request- PRR-007 (MF7573)

Mr. Haas By letter dated April 5, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16097A172), DTE Electric Company submitted a request for relief (proposed alternative) for Fermi 2.

The Relief Request proposes to test Residual Heat Removal Service Water pumps to within +/- 20% of pump best efficiency point flow rate instead of at the +/- 20% of pump design accident flow rate as approved by the U.S. Nuclear Regulatory Commission (NRC) previously in a letter dated July 6, 2010 (ADAMS Accession No. ML101670372).

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Section 50.55a(z)(1) of Title 10 of the Code of Federal Regulations, the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-8004.

Thank you, Sujata Goetz Project Manager NRC, Office of Nuclear Reactor Regulation NRC/NRR/DORL/LPL3-1, O8C10 Washington, DC 20555-0001 301.415.8004, 301.415.3313 (fax)

Mail Stop O8H4A 1

Hearing Identifier: NRR_PMDA Email Number: 2805 Mail Envelope Properties (6d39015d3e08498a9f4c4a9f90f98fb2)

Subject:

Fermi 2- acceptance review for Relief Request- PRR-007 (MF7573)

Sent Date: 4/27/2016 9:37:47 AM Received Date: 4/27/2016 9:37:47 AM From: Goetz, Sujata Created By: Sujata.Goetz@nrc.gov Recipients:

"Wrona, David" <David.Wrona@nrc.gov>

Tracking Status: None "Wolfgang, Robert" <Robert.Wolfgang@nrc.gov>

Tracking Status: None "Goetz, Sujata" <Sujata.Goetz@nrc.gov>

Tracking Status: None "Jason R Haas" <haasj@dteenergy.com>

Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 2343 4/27/2016 9:37:47 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: