|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17300B3791999-10-0808 October 1999 Proposed Tech Specs,Waiving Requirement to Perform SR 3.8.4.8 for Unit 1 Channels A,B & C on One Time Basis ML17300B3521999-09-29029 September 1999 Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7 ML17300B3321999-09-14014 September 1999 Marked-up Tech Specs Pages to TS 5.5.2 & 5.6.2,making Noted Administrative Changes ML17313B0601999-08-31031 August 1999 Rev 1 to PVNGS TS Bases Implemented Between Aug 1998 & Jul 1999 ML17313A9571999-05-26026 May 1999 Proposed Tech Specs,Reducing Spurious Reactor Trip Hazards Associated with Setpoints While Maintaining Plant Protection ML17313A4181998-06-0909 June 1998 Proposed Improved Tech Specs Sections 3.5.1 & 3.5.2,revising Safety Injection tanks-operating & Safety Injection Tanks Shutdown ML17313A1141997-11-0707 November 1997 Improved TS Pages for Section 3.0, LCO & SR Applicability, Section 3.1, Reactivity Control & Section 3.2, Power Distribution Limits. Generic Change to NUREG-1432,Rev 1 Incorporated Into Section 3.0 & 3.1 ML17312B6411997-08-28028 August 1997 Proposed Tech Specs,Allowing one-time Extension of Required Surveillance Interval for Msi Sys Portion Only of ESFAS Logic ML20217Q6801997-08-22022 August 1997 Proposed Tech Specs,Clarifying Wording in TS Bases 3/4.6.1.4, Internal Pressure ML20141H7831997-07-18018 July 1997 Proposed Improved Tech Specs Section 3.8, Electrical Power Sys ML20141H7461997-07-18018 July 1997 Proposed Tech Specs,Providing Addl Info Re Improved TS Section 3.4, Rcs ML17312B0311996-11-0606 November 1996 Proposed Tech Specs 3/4.8.1.1 Re A.C. Sources - Operating ML17300B2651996-06-17017 June 1996 Proposed Tech Specs,Changing Section 1.10 & 3.2.8 & Associated Bases for Obtaining Thyroid Dcfs Used in Definition of Dose Equivalent I-131 ML17312A6491996-04-0101 April 1996 Proposed Tech Specs,Revising TS 3/4.9.6 to Temporarily Allow Use of Hoist Instead of Refueling Machine for Movement of Fuel Assembly at Core Location A-07 ML17312A6401996-03-26026 March 1996 Proposed Tech Specs 3/4.9.6,increasing Refueling Machine Overload Cut Off Limit to 2,000 Lb,In 50 Lb Increments,For Removal of Stuck Fuel Assembly from Core Location A-06 ML17312A6321996-03-26026 March 1996 Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants. ML17312A6371996-03-23023 March 1996 Proposed Tech Specs,Revising TS SR 4.8.2.1.e, DC Sources, to Suspend Provision of TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Entry Into Mode 4 Following Sixth Refueling Outage ML17312A5011996-01-17017 January 1996 Revised Page 5-1 Changing Section 5.2.2 to Include Description of Material Used for Control Element Assemblies ML17311B3221995-12-20020 December 1995 Proposed Tech Specs,Reducing Setpoint for MSIS & Rt on Low SG Pressure ML17311B0301995-07-0303 July 1995 Proposed Tech Specs Re Temp Method to Respond to Sustained Degraded Switchyard Voltage ML17311A9771995-06-21021 June 1995 Proposed Tech Specs,Modifying Tables 3.3-4 & 3.3-5 of Section 3/4.3.2 of Esfa Sys Instrumentation ML17311A8651995-05-0202 May 1995 Proposed TS 3.1.2.6,Figure 3.1-1, Min Borated Water Vols, Relocating Elevations That Correspond to Min Required Water Vols for Spent Fuel Pool Into Site Procedures ML17311A8231995-04-18018 April 1995 Proposed Tech Specs Section 3/4.4.4 Re Sleeving Process for SG Tube Repair ML17311A5631994-12-28028 December 1994 Proposed TS Sections 3.9.6 & 4.9.6.1 Re Refueling Machine ML17311A5021994-12-0707 December 1994 Proposed Tech Specs,Changing Note 5 to Table 4.3-1 of TS 3/4.3.1 to Allow Verification of Shape Annealing Matrix Elements Used in Core Protection Calculators ML17311A4341994-11-30030 November 1994 Proposed TS 3/4.4.2,changing Pressurizer Code Safety Valve Lift Setting from 2,500 Psia to 2,475 Psia in LCOs 3.4.2.1 & 3.4.2.2 ML17311A3851994-10-31031 October 1994 Proposed Tech Spec Sections 3.9.6 & 4.9.6.1, Refueling Machine. ML17311A3341994-10-0909 October 1994 Proposed Tech Specs Suspending TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Mode 4 Following Fifth Refueling Outage ML17311A2171994-08-18018 August 1994 Proposed Tech Specs Adding Analytical Method Suppl Entitled, Calculative Methods for CE Large Break LOCA Evaluation Model for Analysis of CE & W Designed Nsss. ML17310B4511994-07-12012 July 1994 Proposed Tech Specs Amend to Add One Action Statement to Table 3.3-3,entry 8 ML17310B4151994-07-0101 July 1994 Proposed Tech Specs Re Reactor Coolant Cold Leg Temperature Vs Core Power Level of TS 3.2.6 ML17310B4331994-06-20020 June 1994 Proposed Tech Specs Sections 5.3.1 & 5.6.1, & New TS Section 3/4.9.13 & Bases 3/4.9.13 ML17310B4091994-06-17017 June 1994 Proposed Tech Specs Removing Five Tables of Component Lists Per GL-91-08 ML17310B1661994-03-28028 March 1994 Proposed Tech Specs Re Min Condensate Storage Tank Indicated Level ML17310B0611994-02-18018 February 1994 Proposed Tech Specs Figure 3.2-1,Section 3/4.1.1.4 & Bases 3/4.1.1.4,establishing Min Temp for Criticality at 545 F for Facilities ML17310B0001994-01-19019 January 1994 Proposed Tech Specs of AF Automatic Actuation Logic Surveillance Frequency Extension ML17310A8361993-11-16016 November 1993 Proposed Tech Specs Table 4.2-4, Min Staffing Requirements for PVNGS Emergencies, in Support of Proposed Rev to Emergency Plan ML17310A7351993-10-26026 October 1993 Proposed Tech Specs Changing Maximum Nominal Enrichment of Fuel Allowed to Be Used in Reactor Core ML17310A6161993-09-0808 September 1993 Proposed Tech Specs Section 6.9.1.10 Re Sys 80 Inletflow Distribution to List of Methods Used to Determine Core Operating Limits ML17310A5211993-08-0505 August 1993 Proposed Tech Specs Requesting to Change Word Pressurizer to RCS for Item #4 in Both Tables 3.3-10 & 4.3-7 ML17310A5151993-08-0505 August 1993 Proposed Tech Specs Changing Surveillance Frequency from Monthly to Quarterly for Channel Functional Tests for RPS & ESFAS Instrumentation ML17310A4211993-06-30030 June 1993 Proposed Tech Specs Requesting Addl Operating Margin in Time Response of Turbine Driven AF Pump to SG Low Level Signal ML17310A2981993-05-20020 May 1993 Proposed TS 4.7.9 Re SR to Ensure Operability of Snubbers ML17306B2671993-01-25025 January 1993 Proposed Tech Specs,Reflecting Revised Train a Kw Value to Be Rejected & Load Designation & Incorporation of Provisions Discussed in 920508 Ltr Re DG Full Load Rejection Testing ML17306B1451992-11-20020 November 1992 Proposed Tech Specs Revising TS 3.2.1 Lhr, & TS 3.2.4, DNBR Margin, Increasing Action from 1 H to 4 H for COLSS Allowed Out of Svc Time Before Requirements Based on More Restrictive Core Protection Calculator Limits Apply ML17306A6491992-04-13013 April 1992 Proposed TS 3.4.8.3 Re RCS - Overpressure Protection Sys ML17306A4731992-02-14014 February 1992 Proposed Tech Specs Re Implementation of Generic Ltr 89-01, Implementation of Programmatic Controls for Radiological Effluent TS in Administrative Controls Section of TS & Relocation of Procedural Details of RETS to Odcm.... ML17306A4031992-01-16016 January 1992 Proposed Tech Specs Amend to TS Section 3.6.3,table 3.6-1 Deleting Type C Testing Requirements for Eight Valves ML17306A3701991-12-30030 December 1991 Proposed Tech Spec Table 6.2-1 Re Min Shift Crew Composition ML17306A3781991-12-30030 December 1991 Proposed Tech Spec Section 3.6.1.7 Re Containment Purge Supply & Exhaust Valves 1999-09-29
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17300B3791999-10-0808 October 1999 Proposed Tech Specs,Waiving Requirement to Perform SR 3.8.4.8 for Unit 1 Channels A,B & C on One Time Basis ML17300B3521999-09-29029 September 1999 Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7 ML17300B3321999-09-14014 September 1999 Marked-up Tech Specs Pages to TS 5.5.2 & 5.6.2,making Noted Administrative Changes ML17313B0601999-08-31031 August 1999 Rev 1 to PVNGS TS Bases Implemented Between Aug 1998 & Jul 1999 ML17313B0081999-07-14014 July 1999 Rev 2 to Inservice Insp Program Summary Manual for PVNGS Unit 1. ML17313A9571999-05-26026 May 1999 Proposed Tech Specs,Reducing Spurious Reactor Trip Hazards Associated with Setpoints While Maintaining Plant Protection ML17313A7511998-12-16016 December 1998 Rev 2 to ISI Program Summary Manual, for PVNGS Unit 3 ML17313A4181998-06-0909 June 1998 Proposed Improved Tech Specs Sections 3.5.1 & 3.5.2,revising Safety Injection tanks-operating & Safety Injection Tanks Shutdown ML17313A1141997-11-0707 November 1997 Improved TS Pages for Section 3.0, LCO & SR Applicability, Section 3.1, Reactivity Control & Section 3.2, Power Distribution Limits. Generic Change to NUREG-1432,Rev 1 Incorporated Into Section 3.0 & 3.1 ML17312B6411997-08-28028 August 1997 Proposed Tech Specs,Allowing one-time Extension of Required Surveillance Interval for Msi Sys Portion Only of ESFAS Logic ML20217Q6801997-08-22022 August 1997 Proposed Tech Specs,Clarifying Wording in TS Bases 3/4.6.1.4, Internal Pressure ML20141H7831997-07-18018 July 1997 Proposed Improved Tech Specs Section 3.8, Electrical Power Sys ML20141H7461997-07-18018 July 1997 Proposed Tech Specs,Providing Addl Info Re Improved TS Section 3.4, Rcs ML17312B0311996-11-0606 November 1996 Proposed Tech Specs 3/4.8.1.1 Re A.C. Sources - Operating ML17300B2651996-06-17017 June 1996 Proposed Tech Specs,Changing Section 1.10 & 3.2.8 & Associated Bases for Obtaining Thyroid Dcfs Used in Definition of Dose Equivalent I-131 ML17312A9451996-05-14014 May 1996 Rev 3 to Significant Condition Investigation. ML17312A6491996-04-0101 April 1996 Proposed Tech Specs,Revising TS 3/4.9.6 to Temporarily Allow Use of Hoist Instead of Refueling Machine for Movement of Fuel Assembly at Core Location A-07 ML17312A6401996-03-26026 March 1996 Proposed Tech Specs 3/4.9.6,increasing Refueling Machine Overload Cut Off Limit to 2,000 Lb,In 50 Lb Increments,For Removal of Stuck Fuel Assembly from Core Location A-06 ML17312A6321996-03-26026 March 1996 Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants. ML17312A6371996-03-23023 March 1996 Proposed Tech Specs,Revising TS SR 4.8.2.1.e, DC Sources, to Suspend Provision of TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Entry Into Mode 4 Following Sixth Refueling Outage ML17312A5691996-03-0505 March 1996 Revised Pages to ISI Program Summary Manual ML17312A5011996-01-17017 January 1996 Revised Page 5-1 Changing Section 5.2.2 to Include Description of Material Used for Control Element Assemblies ML17311B3221995-12-20020 December 1995 Proposed Tech Specs,Reducing Setpoint for MSIS & Rt on Low SG Pressure ML17311B3181995-12-20020 December 1995 Revised Pages to ISI Program Summary Manual ML17311B0301995-07-0303 July 1995 Proposed Tech Specs Re Temp Method to Respond to Sustained Degraded Switchyard Voltage ML17311A9771995-06-21021 June 1995 Proposed Tech Specs,Modifying Tables 3.3-4 & 3.3-5 of Section 3/4.3.2 of Esfa Sys Instrumentation ML17311A8651995-05-0202 May 1995 Proposed TS 3.1.2.6,Figure 3.1-1, Min Borated Water Vols, Relocating Elevations That Correspond to Min Required Water Vols for Spent Fuel Pool Into Site Procedures ML17311A8231995-04-18018 April 1995 Proposed Tech Specs Section 3/4.4.4 Re Sleeving Process for SG Tube Repair ML17312A9381995-02-0303 February 1995 Corrective Action Program. ML17311A5631994-12-28028 December 1994 Proposed TS Sections 3.9.6 & 4.9.6.1 Re Refueling Machine ML17311A5021994-12-0707 December 1994 Proposed Tech Specs,Changing Note 5 to Table 4.3-1 of TS 3/4.3.1 to Allow Verification of Shape Annealing Matrix Elements Used in Core Protection Calculators ML17311A4341994-11-30030 November 1994 Proposed TS 3/4.4.2,changing Pressurizer Code Safety Valve Lift Setting from 2,500 Psia to 2,475 Psia in LCOs 3.4.2.1 & 3.4.2.2 ML17311A3851994-10-31031 October 1994 Proposed Tech Spec Sections 3.9.6 & 4.9.6.1, Refueling Machine. ML17311A3341994-10-0909 October 1994 Proposed Tech Specs Suspending TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Mode 4 Following Fifth Refueling Outage ML17311A2171994-08-18018 August 1994 Proposed Tech Specs Adding Analytical Method Suppl Entitled, Calculative Methods for CE Large Break LOCA Evaluation Model for Analysis of CE & W Designed Nsss. ML17310B4511994-07-12012 July 1994 Proposed Tech Specs Amend to Add One Action Statement to Table 3.3-3,entry 8 ML17310B4151994-07-0101 July 1994 Proposed Tech Specs Re Reactor Coolant Cold Leg Temperature Vs Core Power Level of TS 3.2.6 ML17310B4331994-06-20020 June 1994 Proposed Tech Specs Sections 5.3.1 & 5.6.1, & New TS Section 3/4.9.13 & Bases 3/4.9.13 ML17310B4091994-06-17017 June 1994 Proposed Tech Specs Removing Five Tables of Component Lists Per GL-91-08 ML17310B1661994-03-28028 March 1994 Proposed Tech Specs Re Min Condensate Storage Tank Indicated Level ML17310B0911994-03-0202 March 1994 SG Tube Insp Plan. ML17310B0771994-02-24024 February 1994 PVNGS Unit 1 Cycle 5 Startup Rept. ML17310B0611994-02-18018 February 1994 Proposed Tech Specs Figure 3.2-1,Section 3/4.1.1.4 & Bases 3/4.1.1.4,establishing Min Temp for Criticality at 545 F for Facilities ML17310B0251994-01-27027 January 1994 Unit 2 Steam Generator Tube Insp Plan Addendum. ML17310B0001994-01-19019 January 1994 Proposed Tech Specs of AF Automatic Actuation Logic Surveillance Frequency Extension ML17310A8361993-11-16016 November 1993 Proposed Tech Specs Table 4.2-4, Min Staffing Requirements for PVNGS Emergencies, in Support of Proposed Rev to Emergency Plan ML17310A7421993-10-27027 October 1993 Revised Unit 1 SG Tube Insp Plan. ML17310A7351993-10-26026 October 1993 Proposed Tech Specs Changing Maximum Nominal Enrichment of Fuel Allowed to Be Used in Reactor Core ML17310A6501993-09-17017 September 1993 Unit 1 SG Tube Insp Plan. ML17310A6161993-09-0808 September 1993 Proposed Tech Specs Section 6.9.1.10 Re Sys 80 Inletflow Distribution to List of Methods Used to Determine Core Operating Limits 1999-09-29
[Table view] |
Text
~ ' >> '+
~>~
t t '
~ KI'> If ~
C> 5>> "f
~ I >> > '
~ la
~Ega I
~ I~I
~
) ~
"4 tj 1y u
/
4 I
W5 ~
'l h
V
f@PI
~ ~ ~
~ . 'Cg>> ~ Wg
~ t
~ ' ~
~ ~
V re g% ~
~ ff I
~ ~ ~
W
~W4 Jf&lWt t)$
IIt~ ve
\~
' ~'
~
IAgtJQ 1 ~ ,Q ~ C'>>
~ ~ ~ r ~ ~
~'
C+
4
Il I -~ ~ I '
~ II I lAV' ~
If/
Hfa. '
I
~I ~
CV ~
4 1g~ I'0 ~ t tI < r I
tf I
~ Oa
~ ' '
~ + I
~ ~ e ~
~)l 0 ~. '
I
~ ~
I ~ t 1'
I 7y 4 ji '
"i
~i 1
0)!
~CA h l
lP l
j 'c~,
~
'<4I
~ r) sli t~.
'1&
rrll pl rh'~' ~
~ 'H Wt ~ I ~. I ~ ~
.~ '.
.~ '
0
'C ~C ~~
'~l
.~
~ ~
1 a ~ '
le ~ o' I
~ ~ ~ ~ ~ ~ ~ ter ~ I
II C
"(
<II" t
gr 0 7
~ '
- P, P'
VICE PRESIDEHT
- NUCLEAR PRODUCTION ASSISTANT DIRECTOR PLAHT MANAGER PLANT MAHAGER PLANT MAHAGER VICE PRESIDEHT STANDARDS 8 MANAGER>>
UNIT 1 UNIT 2 UNIT 3 NUCLEAR PROD. TECH. SUPPORT NUCLEAR SUPPORT FUEL
'WATER REC. PLANT STAN. SUPERVISOR OPERATIONS OPERATIONS OPERATIONS FACILITY DARDS & CONT. OPERATIONS MANAGER MANAGER MANAGER MANAGER MANAGER STNDS.
OUTAGE ENGINEERING SUPERVISOR MAINTENANCE MAINl'ENANCE MAINTENANCE MANAGEHEHT EVALUATIONS MECH. MAINT.
HANAGER HANAGER HANAGER MANAGER MANAGER STNDS.
WORK WORK WORK CEHTRAL OPERATIONS SUPERVISOR CONTROL CONTROL CONTROL MAINTENANCE COMPUTER SYS ELEC. MAINT.
MANAGER MANAGER MANAGER MANAGER MANAGER STNDS.
RAD I AT I OH RAD I AT ION RAD I ATION RADWASTE RADIATION <<~ SUPERVISOR PROTECTIOH PROTECTION PROTECTION SUPPORT PROTECTION 4 I 4 C STNDS.
MANAGER MANAGER MANAGER MAHAGER CHEMISTRY I MANAGER I 1
I CENTRAL I MATRIX ...
CHEMISTRY CHEMISTRY CHEMISTRY RAD I ATION COMPLIANCE I
- Located Offsite MANAGER MANAGER MANAGER PROTECTION I
- Designated Regulatory Guide 1.8 Radiation MANAGER Protection Manager I I
--.Dotted Lines Indicate Programnatic Procedural. Direction and Problem Resolution ONSITE ORGANIZATION Figure 6.2-2
h "li.
l I
P,1
VICE PRESIDENT ~
NUCLEAR PRODUCTION ASSISTANT .
DIRECTOR PLANT MAHAGER PLANT MANAGER PLANT MAHAGER VICE PRESIDENT STANDARDS EI MANAGER*
UNIT 1 UNIT 2 UNIT 3 NUCLEAR PROD. TECH. SUPPORT NUCLEAR SUPPORT FUEL MATER REC. PLANT STAN. SUPERVISOR OPERATIONS OPERATIONS OPERATIONS FACILITY DARDS Ic COHI', OPERATIONS MANAGER MANAGER MANAGER MAHAGER MANAGER STNDS.
OUTAGE ENGINEER ING SUPERVISOR MAIHTENAHCE MAINTENANCE MAINTFHANCE MANAGEMENT EVALUATIONS MECH. MAIHT~
MANAGER MANAGER MAHAGER MANAGER MANAGER STHDS.
MORK MORK ISRK CENTRAL OPERATIONS SUPERVISOR CONTROL CON'IROL CONTROL MAINTENANCE COMPUTER SYS ELEC. MAINT.
MANAGER MAHAGER MANAGER MANAGER MANAGER STHDS.
RAD I AT ION RADIATIOH RADIATION RADIIASTE RADIATIOH ** SUPERVISOR PROTECT I OH PROTECTION PROTECTION SUPPORT PROTECTION 4 I T C STNDS.
MAHAGER MAHAGER MANAGER MANAGER CHEMISTRY I MANAGER I
I I CENTRAL MATRIX ...
CHEMISTRY I CHEMI STRY I CHEMI S'TRY I RAD I AT ION COMPLIANCE ~ Located Offsite MANAGER MANAGER MANAGER PROTECTION "~ Designated Regulatory Guide 1.8 Radiation I I I )
I I I MANAGER Protection Manager I )
---Dotted Lines Indicate Progranmatic Procedural Direction and Problem Resolution ONSITE ORGANIZATION Figure 6.2.2
C" I
PRESIDENT CHIEF OPERATING
<<LOCATED ONSITE OFFICER C7 EXECUTIVE VICE PRESIDENT AHPP VICE PRESIDENT DIRECTOR DIRECTOR DIRECTOR NUCLEAR ENGINEERING 4 DIRECTOR NUCLEAR SAFE'TY QUALITY PRODUCTION CONSTRUCTION SITE SERVICES 4 LICENSING ASSURANCE MANAGER MANAGER
- MANAGER MANAGER NUCLEAR QUALITY SYS.
EHGIHEERING SFCURITY SAFETY ENGINEERING MAHAGER MANAGER MANAGER MANAGER PROCUREMENT CONSTRUCTION TRAIHIHG ISEG QUALITY MANAGER MANAGER
- MANAGER COST L EMERGENCY MANAGER QUALI T Y/AUDI TS SCHEDULE PLAN 8 SERVICES L I GENS IHG MOHITOR ING MANAGER MANAGER
- PART MATERIAL TECHNICAL QUALITY ICPANI'ERVICES CONTROL DATA CONTROL MAHAGER ADMIN. MAHAGER SERVICES COMPLIANCE OFFSITE ORGANIZATION Figure 6.2-1
P,h PRESIDENT
(
m *LOCATED OHSITE CHIEF OPERATING OFFICER EXECUTIVE VICE PRESIDENT ANPP VICE PRESIDENT DIRECTOR DIRECTOR DIRECTOR NUCLEAR ENGINEERING 5 DIRECTOR NUCLEAR SAFETY QUALITY PRODUCTION COHSTRUCTIOH SITE SERVICES 8 I.ICENSIHG ASSURANCE MANAGER MANAGER
- MANAGER MANAGER NUCLEAR QUALITY SYS.
ENGINEERING SECURITY SAFETY ENGINEERING MAHAGER MAHAGER MAHAGER MANAGER PROCUREMEHT CONSTRUCTIOH TRAINING ISEG QUALITY MANAGER MANAGER
- COST 4 EMERGENCY MANAGER QUALITY/AUDITS SCHEDULE PLAH 5 SERVICES LICEHSIHG MOHITOR ING MANAGER MAHAGER
- SUPERVISOR MANAGER PARTICPANT MATERIAL TECHNICAL QUALITY SERVICES CONTROL DATA CONTROL MANAGER
- ADMIH. MANAGER SERVICES COMPLIANCE OFFSITE ORGANIZATION Figure 6.2-1
tg VICE PRESIDEHI' NUCLEAR PRODUCTION ASSISTANT DIRECTOR PLANT NANAGER PLANT NANAGER PLANT NANAGER VICE PRESIDENT StANDARDS 4 NAHAGER*
UNIT 1 UNIT 2 UHIT 3 NUCLEAR PRCO. TECH. SUPPORT NUCI.EAR SUPPORT FUEL MATER REC. PLAHT STAN. SUPERVISOR OPERATIONS OPERATIONS OPERAT IOHS FACILITY DARDS 5 CONT. OPERATIONS NANAGER NAHAGER IIANAGER NANAGER HAHAGER STNDS.
OUTAGE ENGINEERING SUPERVISOR NAINTEHAHCE NAINTEHAHCE NAIHTEHANCE HANAGENEHT EVALUATIONS NECH. NAINT.
NAHAGER NAHAGER HANAGER NAHAGER NAHAGER STNDS.
MORK MORK MORK CEN'IRAL OPERATIONS SUPERVISOR CONTROL CONTROL CONTROL NAINTEHAHCE CONPUTER SYS ELEC. NAINT.
NANAGER NANAGER NAHAGER NAHAGER NAHAGER STHDS ~
RADIATION RAD I AT I OH RADIATION RADMASTE RADIATION ** SUPERVISOR PROTECTION PROTECTION PROTECTION SUPPORT PROTECTION 5 I & C STNDS.
NAHAGER NAHAGER NANAGER NANAGER CHENISTRY NAHAGER CENTRAL NATR I X ...
CHEHISTRY CHEHISTRY CHENISTRY RADIATION CONPLIAHCE
- Located Offsite MANAGER NANAGER NAHAGER PROTECTION "~ Designated Regulatory Guide 1.8 Radiation I I (
l I NAHAGER Protection Nanager
(
.--Dotted Lines Indicate Progranmatic Procedural Direction and Problem Resolution ONSITE ORGANIZATION Figure 6.2-2
r l~
f
pAESZKNT4:..:
Cl@EF OPEAATM45 OfACfA EXECUTIVE enCS@Wt l'ef LICENSING QAKCTOA
.DSEGTGA b~cQxi kt~KERihG t QQKCTOR HuuEAR OUALlTY SlTE SEAVlCES a ASSURANCE eR~R VCTlOA AlAHAGER LGhHAGER IllClEAR OVALITYSYS.
SAFETY ENGlMEERtla QQlAGER llANAGEA ABC'S tSEG QllhluTY l40lAGER LlMQGM LlJQ4AGEA okra RKlÃEQGV MhHAGER CXlALIVI(thuolTS SCS KOljLE PUQ4
'S&'IKEY l LlCEtlSWG jKMTORRW LCAHAGER A SUPER VlSOA OUALITY EAR TED lfICAL COHTA3L
- t. 'ATA llJCIAGEH uaW,GETS AO LCM.
~IANCE 5EAVICES FIQlRE 6.2-1 OFFSIDE ORGANIZATION
I l
<<'E 'u gl
gl ~ ~ ~
'V+ + ~
~
~
~g ~
S C
~ i~I> &01 I ~ ~
I
~ yQ
~ g ~
o
0 k "4
I;,
I H
I
PRESIDENT CHIEF OPERATING
- LOCATED OHSITE OFFICER EXECUTIVE VICE PRESIDENT AHPP VICE PRESIDENT D IRECTOR DIRECTOR DIRECTOR NUCLEAR ENGINEERING 4 D IREC'TOR NUCLEAR SAFETY QUALITY PRODUCTION CONSTRUCTION SITE SERVICES 8r LICENSIHG ASSURANCE MANAGER HAHAGER
- HAMAGER IIAHAGER NUCLEAR QUALITY SYS.
ENGINEERING SECURITY SAFETY ENGINEERING HAHAGER MANAGER HAHAGER HANAGER PROCUREMENT CONSTRUCTIOH TRAINING ISEG QUALITY NANAGER MANAGER MANAGER
- COST & EMERGENCY MANAGER I QUALI Y/AUDITS SCHEDULE PLAN & SERVICES L ICEHSING MONITOR IHG HAHAGER IIAMAGER SUPERVISOR IIAHAGER PARTICPANT MATERIAL TECHNICAL QUALITY.
SERVICES COHTROL DATA COHTROL HANAGER
MANAGER'OMPLIANCE SERVICES OFFSITE ORGANIZATION Figure 6.2-1
h k~
kl I