MONTHYEARML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19284A5162019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses. (Encl. 1 Non-Proprietary Version) ML19255F0222019-09-12012 September 2019 Audit of NuScale Documents Related to Change in Iab Operating Range and Cram ML19225B5942019-08-22022 August 2019 Audit Plan for the Regulatory Audit of the NuScale Power, LLC, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19207A2992019-07-30030 July 2019 Audit Plan for the Regulatory Audit of the NuScale Power, LLC, Containment Isolation Valves and Reactor Safety Valves ML19203A2492019-07-24024 July 2019 Audit Plan for the Regulatory Audit of the NuScale Power, LLC, Component Design Specifications ML19158A4442019-06-12012 June 2019 Audit Plan for the Audit of Nuscale Power, Llc., Helical Steam Generator Tube Modal Testing ML19150A3212019-06-0505 June 2019 Audit Plan for the Regulatory Audit of NuScale Power, LLC Human Factors Engineering Verification and Validation Results Summary Report Supporting Analyses and Confirmatory Item Closure Verification ML19150A2842019-05-31031 May 2019 Regulatory Audit Plant for the Audit of NuScale Documents Associated with Accident Source Term and Pass Exemption Request ML19116A2152019-04-29029 April 2019 Plan for Regulatory Audit of NuScale Power, LLC, Component Design ML19108A4002019-04-26026 April 2019 Hfe ITAAC and Di Implementation Review Audit Plan ML19067A1432019-03-20020 March 2019 Plan for Regulatory Audit of Nuscale Power, LLC, Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items ML19060A2712019-03-0404 March 2019 Phase 4 Audit Plan for the Audit of NuScale Power, Llc., Documents Related to Reactor Internals Comprehensive Vibration Assessment Program ML19018A1122019-01-28028 January 2019 Regulatory Audit of Nuscale Design Certification Application, Final Safety Analysis Report, Tier 1 and Tier 2, Section 3.5.3 Barrier Design Procedures. ML19058A5232019-01-27027 January 2019 Audit Plan - Neutron Fluence Bioshield-Containment Final Rev 1 ML18348A9862019-01-0808 January 2019 Regulatory Audit Plan for the Audit of Nuscale Documents Associated with EQ and Radiation Protection Neutron Source Term ML18348B0762019-01-0707 January 2019 Audit Plan - Nuscale Chapter 20 - RAI 9486 ML19008A3552018-12-28028 December 2018 Audit Plan for the Regulatory Audit of Nuscale Power, LLC, Topical Report Loss of Coolant Accident Evaluation Model. ML19004A0982018-12-20020 December 2018 Audit Plan for the Regulatory Audit of Nuscale Power, LLC Design Certification Application, Chapter 15, Transient and Accident Analyses ML18344A1512018-12-13013 December 2018 Phase 2 Audit Plan for the Audit of NuScale Power, LLC Documents Related to Reactor Internals Seismic Analysis ML18324A5512018-11-26026 November 2018 Audit Plan for Regulatory Audit of Nuscale Design Certification Application, Final Safety Analysis Report, Tier 2, Section 3.7 Seismic Design and Section 3.8 Design of Category I Structures ML18323A4452018-11-20020 November 2018 Audit Plan for the Regulatory Audit of NuScale Power, LLC Topical Report TR-0516-49416, Non-Loss-Of-Coolant Accident Analysis Methodology, Revision 1 - Memo ML18284A2592018-10-12012 October 2018 Audit Plan for the Second Regulatory Audit of Environmental Report for NuScale Power LLC Regarding the Severe Accident Mitigation Design Alternative Analysis ML18243A2962018-09-0606 September 2018 Audit Plan for the Phase II Regulatory Audit of the Design Basis Failed Fuel Fraction for NuScale Power, LLC Design Certification Application ML18236A5332018-08-28028 August 2018 Phase 2 Audit Plan for the Audit of Nuscale Power, LLC Documents Related to Reactor Internals Comprehensive Vibration Assessment Program ML18235A5092018-08-28028 August 2018 Audit Plan for the Follow-Up Regulatory Audit of Nuscale Power, LLC; Sections 3.9.4, Control Rod Drive System, and 4.6, Functional Design of Control Rod Drive System ML18114A0552018-08-25025 August 2018 Phase 2 Audit Plan for Design Specifications Meb May - June 2018 ML18229A1142018-08-22022 August 2018 Audit Plan for Regulatory Audit of Nuscale Power, LLC Design Documents for Containment Isolation Valves and Reactor Safety Valves ML18177A0872018-06-28028 June 2018 Addenda to the NuScale Containment and Ventilation System Audit Plan ML18158A1642018-06-12012 June 2018 Audit Plan for the Phase II Regulatory Audit of the Pool Leakage Detection System for the Ultimate Heat Sink for Nuclear Power, LLC ML18144A7582018-06-0404 June 2018 June 26-28 2018 NuScale Hfe Audit Plan ML18074A0792018-03-14014 March 2018 Audit Plan for NuScale Computer Codes Section 3.9.1 March - April 2018 ML18067A1292018-03-0808 March 2018 Audit Plan NuScale Chapter 4 ML18053A2162018-03-0505 March 2018 2018 SPRA-NuScale Audit Plan ML18060A0682018-03-0505 March 2018 Audit Plan for the Regulatory Audit of ECCS Valves Design and FMEA Analysis, March - May 2018 ML17356A1202017-12-27027 December 2017 Audit Plan for Nuscale Power, LLC, Final Safety Aanalysis Report - Chapter 20, Mitigation of Beyond Design-Basis Events ML17264A6772017-09-27027 September 2017 Audit Plan for the NuScale SBO Transient Sensitivity Analysis November 2017 ML17255A8992017-09-26026 September 2017 June 2017 Chapter 8 Audit Report 2020-03-02
[Table view] Category:Memoranda
MONTHYEARML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss Nuscale’S Us600 Exemption Request ML20274A1082020-09-30030 September 2020 Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics ML20199M1492020-08-19019 August 2020 Memo Transmitting Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20210M0772020-07-28028 July 2020 Memo - Category 1 Public Meeting - Audit Exit NuScale Emergency Core Cooling System Boron Redistribution Issue and Applicable Design Changes ML20160A2472020-07-28028 July 2020 Audit Summary Memo NuScale ECCS Boron Redistribution Issue ML20176A1582020-07-10010 July 2020 Audit Summary 2019 Memo NuScale Chapter 15 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20140A1892020-05-19019 May 2020 Public Meeting Summary May 14, 2020, NuScale Boron Redistribution Issue ML20114E2162020-05-0404 May 2020 Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20097C2292020-04-0707 April 2020 Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML20076D8852020-03-16016 March 2020 Summary Report for the January 2019 Regulatory Audit of NuScale Chapter 20 ML20072K5232020-03-11011 March 2020 Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) ML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML20054A0602020-02-28028 February 2020 Regulatory Audit Report for NuScale DCA Inadvertent Actuation Block (Iab) Operating Range Change ML20044E3522020-02-18018 February 2020 Memo to ACRS Rod Ejection Accident Methodology SER ML20049H1872020-02-18018 February 2020 Memo to ACRS Rea NON-LOCA TR SE ML20049H5442020-02-18018 February 2020 Letter to NuScale NON-LOCA TR SER ML20042E0242020-02-12012 February 2020 LOCA Topical Report Phase IV Audit Report - Public ML20042E0392020-02-12012 February 2020 NON-LOCA Topical Report Phases 3 and 4 Audit Report ML20010D1312020-01-16016 January 2020 Audit Summary Memo NuScale LOCA TR ML19345E9362020-01-13013 January 2020 Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference ML19340A9712020-01-13013 January 2020 U.S. Nuclear Regulatory Commission Report of the Regulatory Follow-Up Audit Performed Between May 1, 2019, Through September 19, 2019, Regarding the Nuscale Stress and Fatigue Analysis of Major Design Components (Public) ML20006G4202020-01-0808 January 2020 ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapters 2, 8 and 12 ML19343C7562020-01-0808 January 2020 Generator Tube - Siet Audit Report (Public) ML20006G5752019-12-20020 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 8, Electric Power ML19331A3972019-12-20020 December 2019 U.S. Nuclear Regulatory Commission Report of the Regulatory follow-up Audit Performed Between 8/22/19 - 9/24/19, Regarding NuScale Power, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19340A0152019-12-20020 December 2019 U.S. Nuclear Regulatory Commission'S Report of the Regulatory Audit Performed Between March 4, 2019, Through September 10, 2019, for Nuscale Power, LLC, Regarding Nuscale'S Power Module Leakage Flow Instability Analysis - Public Memo ML20006G4892019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters ML19340A0192019-12-19019 December 2019 U.S. Nuclear Regulatory Commission Report - Regulatory Audit Between 03/20/19 - 10/09/19 - Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items NuScale Power, LLC, Standard Plant Design Certification ML20006G7002019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 12, Radiation Protection ML19143A1042019-12-12012 December 2019 DCA - Safety Evaluation with No Open Items for Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors - Memo ML19168A1382019-12-12012 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 3, Design of Structures, Systems, Components and Equipment ML19169A2992019-12-11011 December 2019 Memo to ACRS Transmitting SER - Chapter 15 ML19169A1322019-12-10010 December 2019 Memo to ACRS Transmitting SER ML19165A2792019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 1, Introduction and General Discussion ML19168A1682019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 4, Reactor - Memo ML19168A2002019-12-0909 December 2019 Memo to ACRS Transmitting SER - Chapter 6 ML19169A3142019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 16, Technical Specifications - Memo ML19169A3322019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 20, Mitigation of Beyond-Design-Basis Events - Memo ML19169A2952019-11-26026 November 2019 Memo to ACRS Transmitting SER ML19319C2322019-11-26026 November 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory follow-up Audit of Design Documents for NuScale Containment Isolation Valves and Reactor Safety Valves ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19169A2912019-11-22022 November 2019 Memo to ACRS Transmitting SER ML19169A1192019-11-22022 November 2019 Memo to ACRS Transmitting Phase 4 SER for Chapter 8 ML19162A2732019-11-15015 November 2019 LLC, Design Certification Application Memo - Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19162A0962019-11-13013 November 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters 2024-01-31
[Table view] |
Text
January 7, 2019 MEMORANDUM TO: Samuel Lee, Chief Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Omid Tabatabai, Senior Project Manager /RA/
Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
REGULATORY AUDIT OF NUSCALE POWER, LLC, NON-DOCKETED INFORMATION IN SUPPORT OF THE U.S. NUCLEAR REGULATORY COMMISSION STAFFS REVIEW OF NUSCALE DESIGN CERTIFICATION APPLICATION, PART 2, CHAPTER 20, MITIGATION OF BEYOND-DESIGN-BASIS EVENTS By letter dated December 31, 2016, NuScale Power, LLC., (NuScale) submitted to the U.S.
Nuclear Regulatory Commission (NRC), a Design Control Document for its Design Certification (DC) application of the NuScale design (Agencywide Documents Access and Management System Accession Number ML17013A229). In support of the NRC staffs review of NuScales response to the staffs request for additional information (RAI) 9486, the NRC staff plans to audit NuScales non-docketed information to: (1) gain a better understanding of NuScales assumptions used to prepare its response to RAI 9486; (2) verify information; and (3) identify information that will require docketing to support the basis of the licensing or NRC staffs regulatory decision. Enclosed is the Audit Plan.
Docket No.52-048
Enclosure:
As stated cc w/encl.: DC NuScale Power, LLC Listserv CONTACT: Omid Tabatabai, NRO/DLSE 301-415-6616
ML18348B076 *via email NRO-002 OFFICE NRO/DLSE/LB1: PM NRO/DLSE/LB1: LA NRO/DLSE/LB1 NAME OTabatabai CSmith* OTabatabai (signed)
DATE 12/17/2018 12/31/2018 01/07/2019 UNITED STATES NUCLEAR REGULATORY COMMISSION AUDIT PLAN FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC., DESIGN CERTIFICATION APPLICATION CHAPTER 20, MITIGATION OF BEYOND-DESIGN-BASIS EVENTS RAI 9486 RESPONSE DOCKET NO.52-048 AUDIT PLAN APPLICANT: NuScale Power, LLC. (NuScale)
APPLICANT CONTACT: Carrie Fosaaen DURATION: December 17, 2018, thru January 11, 2019 LOCATION: U.S. Nuclear Regulatory Commission Headquarters (via NuScales electronic reading room (eRR))
Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 NuScale Power, LLC 11333 Woodglen Drive Suite 205 Rockville, MD 20852 AUDIT TEAM: John Budzynski (NRO, Audit Lead)
Jeffrey Schmidt (NRO)
Rebecca Karas (NRO/SRSB, Branch Chief)
Donald Palmrose (NRO)
Timothy Drzewiecki (NRO)
Carl Thurston (NRO)
Ryan Nolan (NRO)
Omid Tabatabai (NRO, Senior Project Manager)
I. BACKGROUND AND OBJECTIVES By a letter dated December 31, 2016, NuScale Power, LLC., (NuScale) submitted to the U.S.
Nuclear Regulatory Commission (NRC), a Final Safety Analysis Report (FSAR) for its Design Certification (DC) application of the NuScale design (Agencywide Documents Access and Management System (ADAMS) Accession Number ML17013A229). The NRC staff initiated the DC review on March 27, 2017.
To facilitate the NRC staffs evaluation of information supporting the FSAR, and to complete its safety review of portions of FSAR Chapter 20, Mitigation of Beyond-Design-Basis Events, and TR-0816-50797, Mitigation Strategies for Extended Loss of AC Power Event; pertaining to the Enclosure
station blackout (SBO) transient analysis, the NRC staff is planning an audit to further evaluate NuScales response to RAI 9486, Question 20.01-17. The audit entrance meeting is scheduled to be held on December 17, 2018, at NuScales Rockville, Maryland office.
The audit is expected to primarily be performed via the NuScale eRR or, if necessary, at NuScales Rockville, Maryland office. During this audit, the NRC staff will examine the documents referenced and analyses mentioned in the FSAR, but not specifically cited, to support the applicants RAI response statements related to RAI 9486, Question 20.01-17.
The objectives of this audit are for the NRC staff to:
- 1. gain a better understanding of the detailed calculations, analyses, and bases underlying NuScales SBO transient analysis thermal-hydraulic parameters of specific time frames during the first 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />,
- 2. better understanding of the methodology and analysis supporting NuScales response that the during equilibrium ECCS operation, the water levels in the riser, downcomer, and containment vessel (CNV) are all closely coupled with oscillations in the downcomer level to cause corresponding oscillations in the reactor recirculation valve (RRV) liquid flow rate with flow reversal and, if necessary,
- 3. develop requests for additional information (RAI).
The NRC staff determined efficiency gains would be realized by auditing documents that support the analysis presented in the FSAR to inform supplemental RAIs. During the audit and interactions with the applicant, the NRC staff may issue detailed RAIs separate from, but informed by, the audit. The staff will apply its enchased safety focused review approach during the audit, and apply audit resources commensurate with the safety/risk significance of the area being audited.
II. REGULATORY AUDIT BASIS Title 10 of the Code of Federal Regulations, Section 52.47(a)(2), states that a DC application must contain an FSAR that includes:
A description and analysis of the structures, systems, and components (SSCs) of the facility, with emphasis upon performance requirements, the bases, with technical justification therefor, upon which these requirements have been established, and the evaluations required to show that safety functions will be accomplished.
JLD-ISG-2012-01 states: Section 3.2.1.7 of Nuclear Energy Institute (NEI) 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 2, specifies that strategies that have a time constraint to be successful should be identified and a basis provided that the time can reasonably be met.
Also, NEI 12-06, Section 3.2.1, General Criteria and Baseline Assumptions, provides the general criteria and assumptions to be used in establishing the baseline coping strategy. Past regulatory precedence have included the need for reactor designs, including other passive designs, to demonstrate the success of the strategies or include the ability to indicate core conditions.
An audit is needed to confirm the basis for the safety conclusions made in the applicants Chapter 20 mitigation strategies for extended loss of AC power transient analyses based on the SBO transient analysis.
III. REGULATORY AUDIT SCOPE The scope of this audit includes information, documents, and supporting calculations related to the FSAR Chapter 20 transient analyses for the mitigation strategies for extended loss of AC power and referenced SBO transient analyses. In addition to the initial set of audit documents and information requested in Attachment A, the NRO staff may request other information as needed to achieve audit objectives. These documents will be listed as references in the audit report prepared by the staff following the conclusion of the audit.
IV. SPECIAL REQUESTS The NRC staff requests the documents listed in Attachment A be available to the NRC auditors in NuScales eRR. Use of eRR allows multiple NRC staff reviewers to examine the same document at the same time, which improves the efficiency and reduces the cost of the audit.
Additional documents may be identified as the review progresses. When the staffs review of the documents associated with a specific issue is complete, the staff will notify NuScale that these documents can be removed from the eRR, thereby minimizing their residence time in the eRR.
In addition, the NRC staff may request in-person audit meetings with NuScale personnel to facilitate the staffs understanding of material to be audited. Such meetings will be scheduled based on mutual availability. The NRC staff requests that document titles identified by the NRC staff that are germane to an in-person audit meeting be made available in the eRR prior to any scheduled in-person audit meeting.
V. REQUESTED DOCUMENTS
- 1. EC-0000-3070, Station Blackout Analysis and any other documentation which supports the development of this document.
- 2. ER_0000_00003573_00, Extended Loss of Alternating Current Power Assessment and any other documentation which supports the development of this document.
VI. AUDIT ACTIVITIES AND DELIVERABLES The NRC audit team is expected to consist of aforementioned individuals covering the technical areas affecting Chapter 20 FSAR Sections covered by the requests in Attachment A. The NRC staff will conduct this audit in accordance with the guidance provided in NRO-REG-108, Regulatory Audits (Reference 2). The NRC staff acknowledges the proprietary nature of the information requested and will handle it appropriately throughout the audit. While the NRC staff will take notes, the NRC staff will not remove hard copies or electronic files from the audit site(s).
The audit will assist the NRC staff in the issuance of RAIs (if necessary) for the licensing review of the FSAR Sections identified above in preparation of the NRC staffs safety evaluation.
If necessary, any concerns related to the conduct of the audit will be communicated to Omid Tabatabai (NRC) at 301-415-6616 or Omid.Tabatabai@nrc.gov.
VII. REFERENCES
- 1. Letter from NuScale Power, LLC, NuScale Power, LLC Submittal of the NuScale Standard Plant Design Certification Application, December 31, 2016 (ML17013A229).
- 2. RAI Response, NuScale Response to NRC Request for Additional Information eRAI No.
9486 (ML18179A530).
- 3. NRO-REG-108, Regulatory Audits, April 2, 2009 (ML081910260).