MONTHYEARML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19284A5162019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses. (Encl. 1 Non-Proprietary Version) ML19255F0222019-09-12012 September 2019 Audit of NuScale Documents Related to Change in Iab Operating Range and Cram ML19225B5942019-08-22022 August 2019 Audit Plan for the Regulatory Audit of the NuScale Power, LLC, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19207A2992019-07-30030 July 2019 Audit Plan for the Regulatory Audit of the NuScale Power, LLC, Containment Isolation Valves and Reactor Safety Valves ML19203A2492019-07-24024 July 2019 Audit Plan for the Regulatory Audit of the NuScale Power, LLC, Component Design Specifications ML19158A4442019-06-12012 June 2019 Audit Plan for the Audit of Nuscale Power, Llc., Helical Steam Generator Tube Modal Testing ML19150A3212019-06-0505 June 2019 Audit Plan for the Regulatory Audit of NuScale Power, LLC Human Factors Engineering Verification and Validation Results Summary Report Supporting Analyses and Confirmatory Item Closure Verification ML19150A2842019-05-31031 May 2019 Regulatory Audit Plant for the Audit of NuScale Documents Associated with Accident Source Term and Pass Exemption Request ML19116A2152019-04-29029 April 2019 Plan for Regulatory Audit of NuScale Power, LLC, Component Design ML19108A4002019-04-26026 April 2019 Hfe ITAAC and Di Implementation Review Audit Plan ML19067A1432019-03-20020 March 2019 Plan for Regulatory Audit of Nuscale Power, LLC, Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items ML19060A2712019-03-0404 March 2019 Phase 4 Audit Plan for the Audit of NuScale Power, Llc., Documents Related to Reactor Internals Comprehensive Vibration Assessment Program ML19018A1122019-01-28028 January 2019 Regulatory Audit of Nuscale Design Certification Application, Final Safety Analysis Report, Tier 1 and Tier 2, Section 3.5.3 Barrier Design Procedures. ML19058A5232019-01-27027 January 2019 Audit Plan - Neutron Fluence Bioshield-Containment Final Rev 1 ML18348A9862019-01-0808 January 2019 Regulatory Audit Plan for the Audit of Nuscale Documents Associated with EQ and Radiation Protection Neutron Source Term ML18348B0762019-01-0707 January 2019 Audit Plan - Nuscale Chapter 20 - RAI 9486 ML19008A3552018-12-28028 December 2018 Audit Plan for the Regulatory Audit of Nuscale Power, LLC, Topical Report Loss of Coolant Accident Evaluation Model. ML19004A0982018-12-20020 December 2018 Audit Plan for the Regulatory Audit of Nuscale Power, LLC Design Certification Application, Chapter 15, Transient and Accident Analyses ML18344A1512018-12-13013 December 2018 Phase 2 Audit Plan for the Audit of NuScale Power, LLC Documents Related to Reactor Internals Seismic Analysis ML18324A5512018-11-26026 November 2018 Audit Plan for Regulatory Audit of Nuscale Design Certification Application, Final Safety Analysis Report, Tier 2, Section 3.7 Seismic Design and Section 3.8 Design of Category I Structures ML18323A4452018-11-20020 November 2018 Audit Plan for the Regulatory Audit of NuScale Power, LLC Topical Report TR-0516-49416, Non-Loss-Of-Coolant Accident Analysis Methodology, Revision 1 - Memo ML18284A2592018-10-12012 October 2018 Audit Plan for the Second Regulatory Audit of Environmental Report for NuScale Power LLC Regarding the Severe Accident Mitigation Design Alternative Analysis ML18243A2962018-09-0606 September 2018 Audit Plan for the Phase II Regulatory Audit of the Design Basis Failed Fuel Fraction for NuScale Power, LLC Design Certification Application ML18236A5332018-08-28028 August 2018 Phase 2 Audit Plan for the Audit of Nuscale Power, LLC Documents Related to Reactor Internals Comprehensive Vibration Assessment Program ML18235A5092018-08-28028 August 2018 Audit Plan for the Follow-Up Regulatory Audit of Nuscale Power, LLC; Sections 3.9.4, Control Rod Drive System, and 4.6, Functional Design of Control Rod Drive System ML18114A0552018-08-25025 August 2018 Phase 2 Audit Plan for Design Specifications Meb May - June 2018 ML18229A1142018-08-22022 August 2018 Audit Plan for Regulatory Audit of Nuscale Power, LLC Design Documents for Containment Isolation Valves and Reactor Safety Valves ML18177A0872018-06-28028 June 2018 Addenda to the NuScale Containment and Ventilation System Audit Plan ML18158A1642018-06-12012 June 2018 Audit Plan for the Phase II Regulatory Audit of the Pool Leakage Detection System for the Ultimate Heat Sink for Nuclear Power, LLC ML18144A7582018-06-0404 June 2018 June 26-28 2018 NuScale Hfe Audit Plan ML18074A0792018-03-14014 March 2018 Audit Plan for NuScale Computer Codes Section 3.9.1 March - April 2018 ML18067A1292018-03-0808 March 2018 Audit Plan NuScale Chapter 4 ML18053A2162018-03-0505 March 2018 2018 SPRA-NuScale Audit Plan ML18060A0682018-03-0505 March 2018 Audit Plan for the Regulatory Audit of ECCS Valves Design and FMEA Analysis, March - May 2018 ML17356A1202017-12-27027 December 2017 Audit Plan for Nuscale Power, LLC, Final Safety Aanalysis Report - Chapter 20, Mitigation of Beyond Design-Basis Events ML17264A6772017-09-27027 September 2017 Audit Plan for the NuScale SBO Transient Sensitivity Analysis November 2017 ML17255A8992017-09-26026 September 2017 June 2017 Chapter 8 Audit Report 2020-03-02
[Table view] Category:Memoranda
MONTHYEARML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss NuScales Us600 Exemption Request ML20274A1082020-09-30030 September 2020 Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics ML20199M1492020-08-19019 August 2020 Memo Transmitting Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20210M0772020-07-28028 July 2020 Memo - Category 1 Public Meeting - Audit Exit NuScale Emergency Core Cooling System Boron Redistribution Issue and Applicable Design Changes ML20160A2472020-07-28028 July 2020 Audit Summary Memo NuScale ECCS Boron Redistribution Issue ML20176A1582020-07-10010 July 2020 Audit Summary 2019 Memo NuScale Chapter 15 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20140A1892020-05-19019 May 2020 Public Meeting Summary May 14, 2020, NuScale Boron Redistribution Issue ML20114E2162020-05-0404 May 2020 Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20097C2292020-04-0707 April 2020 Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML20076D8852020-03-16016 March 2020 Summary Report for the January 2019 Regulatory Audit of NuScale Chapter 20 ML20072K5232020-03-11011 March 2020 Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) ML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML20054A0602020-02-28028 February 2020 Regulatory Audit Report for NuScale DCA Inadvertent Actuation Block (Iab) Operating Range Change ML20044E3522020-02-18018 February 2020 Memo to ACRS Rod Ejection Accident Methodology SER ML20049H1872020-02-18018 February 2020 Memo to ACRS Rea NON-LOCA TR SE ML20049H5442020-02-18018 February 2020 Letter to NuScale NON-LOCA TR SER ML20042E0242020-02-12012 February 2020 LOCA Topical Report Phase IV Audit Report - Public ML20042E0392020-02-12012 February 2020 NON-LOCA Topical Report Phases 3 and 4 Audit Report ML20010D1312020-01-16016 January 2020 Audit Summary Memo NuScale LOCA TR ML19345E9362020-01-13013 January 2020 Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference ML19340A9712020-01-13013 January 2020 U.S. Nuclear Regulatory Commission Report of the Regulatory Follow-Up Audit Performed Between May 1, 2019, Through September 19, 2019, Regarding the Nuscale Stress and Fatigue Analysis of Major Design Components (Public) ML20006G4202020-01-0808 January 2020 ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapters 2, 8 and 12 ML19343C7562020-01-0808 January 2020 Generator Tube - Siet Audit Report (Public) ML20006G5752019-12-20020 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 8, Electric Power ML19331A3972019-12-20020 December 2019 U.S. Nuclear Regulatory Commission Report of the Regulatory follow-up Audit Performed Between 8/22/19 - 9/24/19, Regarding NuScale Power, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19340A0152019-12-20020 December 2019 U.S. Nuclear Regulatory Commission'S Report of the Regulatory Audit Performed Between March 4, 2019, Through September 10, 2019, for Nuscale Power, LLC, Regarding Nuscale'S Power Module Leakage Flow Instability Analysis - Public Memo ML20006G4892019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters ML19340A0192019-12-19019 December 2019 U.S. Nuclear Regulatory Commission Report - Regulatory Audit Between 03/20/19 - 10/09/19 - Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items NuScale Power, LLC, Standard Plant Design Certification ML20006G7002019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 12, Radiation Protection ML19143A1042019-12-12012 December 2019 DCA - Safety Evaluation with No Open Items for Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors - Memo ML19168A1382019-12-12012 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 3, Design of Structures, Systems, Components and Equipment ML19169A2992019-12-11011 December 2019 Memo to ACRS Transmitting SER - Chapter 15 ML19169A1322019-12-10010 December 2019 Memo to ACRS Transmitting SER ML19165A2792019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 1, Introduction and General Discussion ML19168A1682019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 4, Reactor - Memo ML19168A2002019-12-0909 December 2019 Memo to ACRS Transmitting SER - Chapter 6 ML19169A3142019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 16, Technical Specifications - Memo ML19169A3322019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 20, Mitigation of Beyond-Design-Basis Events - Memo ML19169A2952019-11-26026 November 2019 Memo to ACRS Transmitting SER ML19319C2322019-11-26026 November 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory follow-up Audit of Design Documents for NuScale Containment Isolation Valves and Reactor Safety Valves ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19169A2912019-11-22022 November 2019 Memo to ACRS Transmitting SER ML19169A1192019-11-22022 November 2019 Memo to ACRS Transmitting Phase 4 SER for Chapter 8 ML19162A2732019-11-15015 November 2019 LLC, Design Certification Application Memo - Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19162A0962019-11-13013 November 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters 2024-01-31
[Table view] |
Text
June 4, 2018 MEMORANDUM TO: Samuel Lee, Chief Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors FROM: Prosanta Chowdhury, Project Manager /RA/
Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors
SUBJECT:
AUDIT PLAN FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION HUMAN FACTORS ENGINEERING TOPICS The U.S. Nuclear Regulatory Commission staff plans to conduct an audit of the supporting design and analysis documentation not provided on the docket that supports the NuScale Power, LLC (NuScale) descriptions of the human factors engineering program described in Final Safety Analysis Report Tier 1 and Tier 2, which was submitted in conjunction with the design certification application.
The purpose of the audit is to review, verify, and identify information and documentation that are needed for establishing design and licensing bases in making regulatory findings.
The audit will take place at NuScale Power located in Rockville, Maryland. The staff will also use NuScales electronic reading room during the audit. The audit is scheduled to start on June 26, 2018, and end on June 28, 2018. The audit entrance will be held on June 26, 2018, at the audit location. The audit plan is provided as an enclosure.
Docket No.: 52-048
Enclosure:
As stated cc: DC NuScale Power LLC Listserv CONTACT: Prosanta Chowdhury, NRO/DNRL (301) 415-1647
ML18144A758 *via email NRO-002 OFFICE NRO/DNRL/LB1/PM NRO/DNRL/LB1/LA NRO/DCIP/HOIB: BC NRO/DNRL/LB1/PM NAME PChowdhury* SGreen* LNist* PChowdhury DATE 05/24/2018 05/24/2018 06/01/2018 06/4/2018 U.S. NUCLEAR REGULATORY COMMISSION AUDIT PLAN FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION HUMAN FACTORS ENGINEERING TOPICS APPLICANT: NuScale Power, LLC APPLICANT CONTACT: Steve Mirsky Steve Pope Tim Tovar, et al.
DATE: June 26, 2018 to June 28, 2018 LOCATION: NuScale Power, LLC Office 11333 Woodglen Avenue, Suite 205 Rockville, MD 20852 AUDIT TEAM: Amy DAgostino (RES/DRA/HFRB)
Brian Green (NRO/DCIP/HOIB)
Maurin Scheetz (NRO/DCIP/HOIB)
PROJECT MANAGER: Prosanta Chowdhury (NRO/DNRL/LB1)
PURPOSE The purpose of this regulatory audit is for the U.S. Nuclear Regulatory Commission (NRC) staff to review, verify, and identify information and documentation that are needed for establishing design and licensing bases in making regulatory findings. The staff will review supporting design and analysis documentation not provided on the docket that supports the NuScale descriptions of the human factors engineering (HFE) program in Final Safety Analysis Report Tier 1 and Tier 2, which was submitted in conjunction with the design certification application.
BACKGROUND In May 2017, the staff conducted a regulatory audit of HFE analyses results at the NuScale office in Rockville, MD (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17181A415). One of the goals of that audit was to confirm that the sample of results provided in various docketed HFE technical reports were representative of the much larger body of non-docketed results contained in the HFE databases. The staff found that several HFE analyses were still ongoing.
The NRC staff informed NuScale on June 20, 2017, that the NRC staff will conduct a follow-up audit when the HFE Operating Experience Review (OER), Functional Requirements Analysis (FRA),
Function Allocation (FA), and Task Analysis (TA) are complete such that (1) NuScale has resolved open items in the OER database, (2) identified functions have been allocated, and (3) tasks associated with the plant systems and events described in the Final Safety Analysis Report have been identified and analyzed if the tasks are in the scope of tasks to be analyzed. Following the May 2017 audit, the staff issued Request for Additional Information (RAI) 9123 (ADAMS Accession No. ML17307A448), to request that NuScale provide a timeline for the completion of these HFE analyses. On January 10, 2018, NuScale provided a response to RAI 9123 (ADAMS Accession No. ML18002A554) and proposed a follow-up audit be scheduled after June 4, 2018. In the response to RAI 9123, NuScale also provided the dates during which the integrated system validation (ISV) testing will be performed.
Enclosure
Additionally, the staff issued RAI 9312 (ADAMS Accession No. ML17356A005), requesting that NuScale provide the scenario guides that will be used during the integrated system validation testing for review. On January 25, 2018, NuScale provided a response to RAI 9312 (ADAMS Accession No. ML18011B134) and informed the staff that the scenario guides will be placed in the NuScale electronic reading room by June 1, 2018.
REGULATORY AUDIT BASIS Subpart B of Title 10 of the Code of Federal Regulations (10 CFR) Part 52, License, Certifications, and Approvals for Nuclear Power Plants, Section 52.47, Contents of applications; technical information, requires that information submitted for a design certification (DC) must include the information necessary to demonstrate compliance with any technically relevant portions of the Three Mile Island requirements set forth in 10 CFR 50.34(f), except paragraphs (f)(1)(xii), (f)(2)(ix), and (f)(3)(v). 10 CFR 50.34(f)(2)(iii) requires an applicant to provide, for Commission review, a control room design that reflects state-of-the-art human factor principles prior to committing to fabrication or revision of fabricated control room panels and layouts. Chapter 18 of the Standard Review Plan (NUREG-0800) and NUREG-0711, Human Factors Engineering Review Program, contain guidance the staff uses to assess whether an application complies with HFE-related NRC requirements.
NUREG-0711 describes the twelve elements of a human factors program. These elements include OER, FA, TA, and Verification & Validation (V&V), as well as other portions of the HFE program which are not considered in this audit. NUREG-0711 also provides guidance about the appropriate treatment of human engineering discrepancies (HEDs).
As part of the design certification application, NuScale submitted the following technical reports that are related to this audit:
- Operating Experience Review Results Summary Report (RSR)
- Functional Requirements Analysis/Function Allocation RSR
- Verification and Validation Implementation Plan
- HFE Program Plan REGULATORY AUDIT SCOPE The scope of the audit includes the following activities:
- 1. Verify that the sample of results from human factors analyses (OER, FA, and TA) documented in docketed results summary reports are representative of the full set of HFE results documented in various NuScale databases.
- 2. Confirm that issues identified during the May 2017 audit (ADAMS Accession No. ML17181A415) have been resolved in accordance with the response to RAI 9123 (ADAMS Accession No. ML18002A554).
- 3. Confirm that HEDs identified during HFE analyses have been analyzed and resolved in accordance with NUREG-0711.
- 4. Review the V&V scenario guides to prepare for the integrated system validation audit.
2
INFORMATION AND OTHER MATERIAL NECESSARY FOR THE AUDIT
- 1. Access to the operating experience review, functional requirements analysis/function allocation and task analysis databases.
- 2. Access to NuScale staff who are knowledgeable about the results contained in the databases listed above. NuScale staff may use teleconference and webinar systems.
- 3. Access to the full set of ISV scenario guides in the electronic reading room at least one week prior to the scheduled audit. The staff may request specific scenario guides be printed for use onsite during the audit.
- 4. Access to the HED tracking system including a sample of results.
TEAM ASSIGNMENTS Prosanta Chowdhury is the project manager.
The following team members will be responsible for reviewing human factors technical content:
- Amy DAgostino Other staff members may be added if the need arises.
LOGISTICS The audit will be primarily conducted at the NuScale office in Rockville, MD with support from the NuScale Corvallis office.
The audit is scheduled to begin at noon (EDT) and end by 5 p.m. (EDT) on each day (June 26, 27, and 28, 2018).
The general format of the audit will include teleconferencing and videoconferencing with remotely located NuScale staff and NRC staff.
NRC staff may request documents be put into the electronic reading room prior to, or during the audit.
SPECIAL REQUESTS None.
DELIVERABLES The audit team will issue a regulatory audit summary report within 90 days after the completion of the audit that will be placed on the docket and in ADAMS. The audit outcome could also identify any additional information to be reviewed in a follow-up audit or submitted separately for making regulatory decisions.
REFERENCES 3
- RP-0316-17614 - Human Factors Engineering Operating Experience Review Results Summary Report, (ADAMS Accession No. ML16364A342)
- RP-0316-17615 - Human Factors Engineering Functional Requirements Analysis and Function Allocation Results Summary Report Part 1 & Part 2 (ADAMS Accession Nos. ML16364A342 and ML16364A345)
- RP-0316-17616 - Human Factors Engineering Task Analysis Results Summary Report Part 1
& Part 2 (ADAMS Accession No. ML17004A222)
- RP-0914-8543 - Human Factors Verification and Validation Implementation Plan (ADAMS Accession No. ML16364A348)
- RP-0914-8534 - Human Factors Engineering Program Management Plan (ADAMS Accession No. ML17004A222) 4