MONTHYEARML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19284A5162019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses. (Encl. 1 Non-Proprietary Version) ML19255F0222019-09-12012 September 2019 Audit of NuScale Documents Related to Change in Iab Operating Range and Cram ML19225B5942019-08-22022 August 2019 Audit Plan for the Regulatory Audit of the NuScale Power, LLC, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19207A2992019-07-30030 July 2019 Audit Plan for the Regulatory Audit of the NuScale Power, LLC, Containment Isolation Valves and Reactor Safety Valves ML19203A2492019-07-24024 July 2019 Audit Plan for the Regulatory Audit of the NuScale Power, LLC, Component Design Specifications ML19158A4442019-06-12012 June 2019 Audit Plan for the Audit of Nuscale Power, Llc., Helical Steam Generator Tube Modal Testing ML19150A3212019-06-0505 June 2019 Audit Plan for the Regulatory Audit of NuScale Power, LLC Human Factors Engineering Verification and Validation Results Summary Report Supporting Analyses and Confirmatory Item Closure Verification ML19150A2842019-05-31031 May 2019 Regulatory Audit Plant for the Audit of NuScale Documents Associated with Accident Source Term and Pass Exemption Request ML19116A2152019-04-29029 April 2019 Plan for Regulatory Audit of NuScale Power, LLC, Component Design ML19108A4002019-04-26026 April 2019 Hfe ITAAC and Di Implementation Review Audit Plan ML19067A1432019-03-20020 March 2019 Plan for Regulatory Audit of Nuscale Power, LLC, Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items ML19060A2712019-03-0404 March 2019 Phase 4 Audit Plan for the Audit of NuScale Power, Llc., Documents Related to Reactor Internals Comprehensive Vibration Assessment Program ML19018A1122019-01-28028 January 2019 Regulatory Audit of Nuscale Design Certification Application, Final Safety Analysis Report, Tier 1 and Tier 2, Section 3.5.3 Barrier Design Procedures. ML19058A5232019-01-27027 January 2019 Audit Plan - Neutron Fluence Bioshield-Containment Final Rev 1 ML18348A9862019-01-0808 January 2019 Regulatory Audit Plan for the Audit of Nuscale Documents Associated with EQ and Radiation Protection Neutron Source Term ML18348B0762019-01-0707 January 2019 Audit Plan - Nuscale Chapter 20 - RAI 9486 ML19008A3552018-12-28028 December 2018 Audit Plan for the Regulatory Audit of Nuscale Power, LLC, Topical Report Loss of Coolant Accident Evaluation Model. ML19004A0982018-12-20020 December 2018 Audit Plan for the Regulatory Audit of Nuscale Power, LLC Design Certification Application, Chapter 15, Transient and Accident Analyses ML18344A1512018-12-13013 December 2018 Phase 2 Audit Plan for the Audit of NuScale Power, LLC Documents Related to Reactor Internals Seismic Analysis ML18324A5512018-11-26026 November 2018 Audit Plan for Regulatory Audit of Nuscale Design Certification Application, Final Safety Analysis Report, Tier 2, Section 3.7 Seismic Design and Section 3.8 Design of Category I Structures ML18323A4452018-11-20020 November 2018 Audit Plan for the Regulatory Audit of NuScale Power, LLC Topical Report TR-0516-49416, Non-Loss-Of-Coolant Accident Analysis Methodology, Revision 1 - Memo ML18284A2592018-10-12012 October 2018 Audit Plan for the Second Regulatory Audit of Environmental Report for NuScale Power LLC Regarding the Severe Accident Mitigation Design Alternative Analysis ML18243A2962018-09-0606 September 2018 Audit Plan for the Phase II Regulatory Audit of the Design Basis Failed Fuel Fraction for NuScale Power, LLC Design Certification Application ML18236A5332018-08-28028 August 2018 Phase 2 Audit Plan for the Audit of Nuscale Power, LLC Documents Related to Reactor Internals Comprehensive Vibration Assessment Program ML18235A5092018-08-28028 August 2018 Audit Plan for the Follow-Up Regulatory Audit of Nuscale Power, LLC; Sections 3.9.4, Control Rod Drive System, and 4.6, Functional Design of Control Rod Drive System ML18114A0552018-08-25025 August 2018 Phase 2 Audit Plan for Design Specifications Meb May - June 2018 ML18229A1142018-08-22022 August 2018 Audit Plan for Regulatory Audit of Nuscale Power, LLC Design Documents for Containment Isolation Valves and Reactor Safety Valves ML18177A0872018-06-28028 June 2018 Addenda to the NuScale Containment and Ventilation System Audit Plan ML18158A1642018-06-12012 June 2018 Audit Plan for the Phase II Regulatory Audit of the Pool Leakage Detection System for the Ultimate Heat Sink for Nuclear Power, LLC ML18144A7582018-06-0404 June 2018 June 26-28 2018 NuScale Hfe Audit Plan ML18074A0792018-03-14014 March 2018 Audit Plan for NuScale Computer Codes Section 3.9.1 March - April 2018 ML18067A1292018-03-0808 March 2018 Audit Plan NuScale Chapter 4 ML18053A2162018-03-0505 March 2018 2018 SPRA-NuScale Audit Plan ML18060A0682018-03-0505 March 2018 Audit Plan for the Regulatory Audit of ECCS Valves Design and FMEA Analysis, March - May 2018 ML17356A1202017-12-27027 December 2017 Audit Plan for Nuscale Power, LLC, Final Safety Aanalysis Report - Chapter 20, Mitigation of Beyond Design-Basis Events ML17264A6772017-09-27027 September 2017 Audit Plan for the NuScale SBO Transient Sensitivity Analysis November 2017 ML17255A8992017-09-26026 September 2017 June 2017 Chapter 8 Audit Report 2020-03-02
[Table view] Category:Memoranda
MONTHYEARML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss NuScales Us600 Exemption Request ML20274A1082020-09-30030 September 2020 Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics ML20199M1492020-08-19019 August 2020 Memo Transmitting Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20210M0772020-07-28028 July 2020 Memo - Category 1 Public Meeting - Audit Exit NuScale Emergency Core Cooling System Boron Redistribution Issue and Applicable Design Changes ML20160A2472020-07-28028 July 2020 Audit Summary Memo NuScale ECCS Boron Redistribution Issue ML20176A1582020-07-10010 July 2020 Audit Summary 2019 Memo NuScale Chapter 15 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20140A1892020-05-19019 May 2020 Public Meeting Summary May 14, 2020, NuScale Boron Redistribution Issue ML20114E2162020-05-0404 May 2020 Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20097C2292020-04-0707 April 2020 Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML20076D8852020-03-16016 March 2020 Summary Report for the January 2019 Regulatory Audit of NuScale Chapter 20 ML20072K5232020-03-11011 March 2020 Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) ML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML20054A0602020-02-28028 February 2020 Regulatory Audit Report for NuScale DCA Inadvertent Actuation Block (Iab) Operating Range Change ML20044E3522020-02-18018 February 2020 Memo to ACRS Rod Ejection Accident Methodology SER ML20049H1872020-02-18018 February 2020 Memo to ACRS Rea NON-LOCA TR SE ML20049H5442020-02-18018 February 2020 Letter to NuScale NON-LOCA TR SER ML20042E0242020-02-12012 February 2020 LOCA Topical Report Phase IV Audit Report - Public ML20042E0392020-02-12012 February 2020 NON-LOCA Topical Report Phases 3 and 4 Audit Report ML20010D1312020-01-16016 January 2020 Audit Summary Memo NuScale LOCA TR ML19345E9362020-01-13013 January 2020 Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference ML19340A9712020-01-13013 January 2020 U.S. Nuclear Regulatory Commission Report of the Regulatory Follow-Up Audit Performed Between May 1, 2019, Through September 19, 2019, Regarding the Nuscale Stress and Fatigue Analysis of Major Design Components (Public) ML20006G4202020-01-0808 January 2020 ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapters 2, 8 and 12 ML19343C7562020-01-0808 January 2020 Generator Tube - Siet Audit Report (Public) ML20006G5752019-12-20020 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 8, Electric Power ML19331A3972019-12-20020 December 2019 U.S. Nuclear Regulatory Commission Report of the Regulatory follow-up Audit Performed Between 8/22/19 - 9/24/19, Regarding NuScale Power, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19340A0152019-12-20020 December 2019 U.S. Nuclear Regulatory Commission'S Report of the Regulatory Audit Performed Between March 4, 2019, Through September 10, 2019, for Nuscale Power, LLC, Regarding Nuscale'S Power Module Leakage Flow Instability Analysis - Public Memo ML20006G4892019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters ML19340A0192019-12-19019 December 2019 U.S. Nuclear Regulatory Commission Report - Regulatory Audit Between 03/20/19 - 10/09/19 - Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items NuScale Power, LLC, Standard Plant Design Certification ML20006G7002019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 12, Radiation Protection ML19143A1042019-12-12012 December 2019 DCA - Safety Evaluation with No Open Items for Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors - Memo ML19168A1382019-12-12012 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 3, Design of Structures, Systems, Components and Equipment ML19169A2992019-12-11011 December 2019 Memo to ACRS Transmitting SER - Chapter 15 ML19169A1322019-12-10010 December 2019 Memo to ACRS Transmitting SER ML19165A2792019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 1, Introduction and General Discussion ML19168A1682019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 4, Reactor - Memo ML19168A2002019-12-0909 December 2019 Memo to ACRS Transmitting SER - Chapter 6 ML19169A3142019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 16, Technical Specifications - Memo ML19169A3322019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 20, Mitigation of Beyond-Design-Basis Events - Memo ML19169A2952019-11-26026 November 2019 Memo to ACRS Transmitting SER ML19319C2322019-11-26026 November 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory follow-up Audit of Design Documents for NuScale Containment Isolation Valves and Reactor Safety Valves ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19169A2912019-11-22022 November 2019 Memo to ACRS Transmitting SER ML19169A1192019-11-22022 November 2019 Memo to ACRS Transmitting Phase 4 SER for Chapter 8 ML19162A2732019-11-15015 November 2019 LLC, Design Certification Application Memo - Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19162A0962019-11-13013 November 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters 2024-01-31
[Table view] |
Text
June 5, 2019 MEMORANDUM TO: Samuel Lee, Chief Licensing Branch 1 Division of Licensing, Siting and Environmental Analysis Office of New Reactors FROM: Prosanta Chowdhury, Project Manager /RA/
Licensing Branch 1 Division of Licensing, Siting and Environmental Analysis Office of New Reactors
SUBJECT:
AUDIT PLAN FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC HUMAN FACTORS ENGINEERING VERIFICATION AND VALIDATION RESULTS
SUMMARY
REPORT SUPPORTING ANALYSES AND CONFIRMATORY ITEM CLOSURE VERIFICATION The U.S. Nuclear Regulatory Commission staff plans to conduct an audit of the human factors engineering verification and validation results summary report and the supporting databases, to confirm that results in this report are consistent with regulations and applicable regulatory guidance. In addition, staff will verify that activities related to open items associated with other portions of the human factors process have been completed.
The audit will take place at NuScale Power, LLC Rockville office from June 11 - 13, 2019. The audit entrance will be held on June 10, 2019. The audit plan is provided as an enclosure.
Docket No.52-048
Enclosure:
- 1. Audit Plan cc: DC NuScale Power LLC Listserv CONTACT: Prosanta Chowdhury, NRO/DLSE (301) 415-1647
ML19150A321 *via email NRO-002 OFFICE NRO/DLSE/LB1/PM NRR/DIRS/IRAB/BC NRR/DIRS/IOLB/BC NRO/DLSE/LB3/LA NRO/DLSE/LB1/PM C
NAME PChowdhury* AAgrawal* (Acting) CCowdrey* SGreen* PChowdhury DATE 5/30/2019 5/30/2019 5/30/2019 5/31/2019 6/5/2019 U.S. NUCLEAR REGULATORY COMMISSION AUDIT PLAN FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC HUMAN FACTORS ENGINEERING VERIFICATION AND VALIDATION RESULTS
SUMMARY
REPORT SUPPORTING ANALYSES AND CONFIRMATORY ITEM CLOSURE VERIFICATION APPLICANT: NuScale Power, LLC APPLICANT CONTACT: Nadja Joergensen Mark Chitty Tim Tovar, et al.
DATE: June 11, 2019 - June 13, 2019 LOCATION: NuScale Power, LLC Office 11333 Woodglen Avenue, Suite 205 Rockville, MD 20852 AUDIT TEAM: Brian Green (NRR/DIRS/IRAB)
Maurin Scheetz (NRR/DIRS/IOLB)
Niav Hughes (RES/DRA/HFRB)
David Desaulniers (NRR/DIRS)
PROJECT MANAGER: Prosanta Chowdhury (NRO/DLSE/LB1)
PURPOSE The purpose of this regulatory audit is for the U.S. Nuclear Regulatory Commission (NRC) staff to confirm that the results described in the NuScale "Human Factors Engineering Verification and Validation Results Summary Report," RP-1018-61289 (HFE V&V RSR), Revision 0 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19077A330), are consistent with, and derived from, the state-of-the-art human factors principles required by Title 10 Code of Federal Regulations (10 CFR) 50.34(f)(2)(iii) and described in NUREG-0711, Human Factors Engineering Program Review Model, Revision 3.
BACKGROUND On January 6, 20171, NuScale Power, LLC (NuScale) submitted its Standard Plant Design Certification Application (DCA) to the U.S. Nuclear Regulatory Commission (NRC) for review, approval, and granting of standard design certification for the NuScale Standard Plant Design.
(ADAMS Accession No. ML17013A229). The DCA includes Final Safety Analysis Report (FSAR) Tier 2, Chapter 18, Human Factors Engineering, Revision 2, which describes the human factors engineering (HFE) program for the NuScale Power Plant (ADAMS Accession No. ML18310A341).
1 The Design Certification Application was submitted via a transmittal letter dated December 31, 2016.
1 Enclosure
The NRC staff is using the review criteria in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants, Chapter 18, Human Factors Engineering and NUREG-0711 to determine whether the NuScale design complies with HFE-related NRC requirements.
FSAR Tier 2, Section 18.0, Human Factors Engineering - Overview, states the NuScale HFE program incorporates accepted HFE standards and guidelines including the applicable guidance provided in NUREG-0711, Revision 3.
The HFE Program Review Model described in NUREG-0711 consists of 12 elements (refer to Figure 1-1, Elements of the HFE programs review model, of NUREG-0711 for additional information). NuScale submitted two types of technical reports with the DCA to address the 12 elements in NUREG-0711: Human Factors Engineering Design Implementation Plan,"
RP-0914-8544 (DI IP), Revision 2 (ADAMS Accession No. ML19119A378) and V&V RSR, Revision 0. NUREG-0711, Section 1.2.2, Review Elements, explains that IPs describe processes and methods for performing HFE activities, and RSRs describe the results of performing those activities.
NuScale submitted an IP for the HFE verification and validation element and has completed the evaluation activities and analyses associated with this IP. The NRC staff conducted an audit of the associated data collection activities during an audit in July and August of 2018 (ADAMS No. ML18298A190).
NuScale V&V RSR, Revision 0 summarizes the analyses and results of the V&V process. The NRC staff has reviewed the RSR and determined that it is necessary to review certain databases and supporting analyses to confirm that the results in the RSR are consistent with NUREG-0711.
The staff has issued requests for additional information (RAIs) throughout the course of the review. A limited number of the RAIs associated with other NUREG-0711 review elements are currently considered confirmatory items. For instance, RAI 9372 addresses the means of verifying that the function allocations for the plant are appropriate (see Section 4, Functional Requirements Analysis and Function Allocation, of NUREG-0711). The NRC staff recognizes that the data collected during the V&V activities is important to drawing conclusions regarding the allocation of functions; therefore, resolution of this RAI has been delayed until the V&V RSR was complete. The NRC staff intends to use the audit to verify that this confirmatory item and others like it have been completed and if necessary, staff will request information be submitted on the docket.
REGULATORY AUDIT BASIS Subpart B of 10 CFR Part 52, License, Certifications, and Approvals for Nuclear Power Plants, Section 52.47, Contents of applications; technical information, requires that information submitted for a design certification (DC) must include the information necessary to demonstrate compliance with any technically relevant portions of the Three Mile Island requirements set forth in 10 CFR 50.34(f), except paragraphs (f)(1)(xii), (f)(2)(ix), and (f)(3)(v). As required by 10 CFR 50.34(f)(2)(iii), an applicant is to provide, for Commission review, a control room design that reflects state-of-the-art human factor principles prior to committing to fabrication or revision of fabricated control room panels and layouts. Chapter 18 of NUREG-0800 and NUREG-0711 contain guidance the NRC staff uses to assess whether an application complies with HFE-related NRC requirements.
2
As part of the DCA, NuScale submitted the following technical reports that are related to this audit:
- Verification and Validation Results Summary Report
- Verification and Validation Implementation Plan
- Task Analysis Results Summary Report
- Human System Interface (HSI) Design Results Summary Report
- HFE Interface Style Guide
- Generic Technical Guidelines REGULATORY AUDIT OBJECTIVES The objectives of the audit include the following:
- 1. Verify the detailed descriptions of human engineering discrepancies (HEDs) are appropriately documented and prioritized.
- 2. Verify that the RSR and supporting analyses and assessments are accurate and consistent with each other.
- 3. Ensure that design changes that occurred because of the V&V activities do not negatively impact the Integrated System Validation (ISV) results.
- 4. Clarify statements in the RSR regarding simulator fidelity.
- 5. Clarify information regarding other open items/RAIs related to earlier HFE design activities. Below are some examples (not all inclusive):
- a. Clarify how the HSI provides a design capability for remote shutdown of the reactor outside the Main Control Room (MCR), (NUREG-0711, Criterion 8.4.4.5(1)) based on NuScales March 14, 2019, exemption request and application changes for Remote Shutdown System (RSS) functionality.
- b. Verify that automation failures and degraded Instrumentation and Control (I&C)
HSI conditions found during ISV testing were appropriately documented and prioritized and if applicable, resolved.
- c. NRC staffs Chapter 18 Safety Evaluation Report (SER) Open Item 18-1 associated with RAI 9372: Verify that function allocations are supported by the V&V results.
- d. Chapter 18 SER Open Item 18-2 associated with RAI 8747: Ensure the ISV supports the claims of the staffing plan.
3
- e. Chapter 18 SER Open Item 18-3 associated with RAI 9411 and RAI 8847: Verify NuScales updated Human-System Interface Style Guide," ES-0304-1381, Revision 3 (ADAMS Accession No. ML19134A022) conforms to Criterion 8.4.3(3) of NUREG-0711and, ensure the Style Guide and V&V RSR are incorporated by reference in DCA Part 2, Tier 2.
INFORMATION AND OTHER MATERIAL NECESSARY FOR THE AUDIT
- 1. Access to NuScale staff who are knowledgeable about and involved in administering V&V testing/analyses and the simulator.
- 2. Access to NuScale staff who are knowledgeable about the NuScale simulator design, information, analyses and tests used to model plant response in the simulator and the results of simulator performance testing conducted in support of the ISV.
- 3. Access to entries in the HED tracking system and any supporting analyses associated with the HEDs.
- 4. Results of Generic Technical Guidelines validation activities performed in conjunction with ISV and other validation activities.
TEAM ASSIGNMENTS Prosanta Chowdhury is the project manager.
The following team members will be responsible for reviewing human factors technical content:
- Niav Hughes Other staff members may be added if the need arises.
LOGISTICS The audit will be primarily conducted at the NuScale office in Rockville, MD.
The audit is scheduled to begin at 1:00 p.m. (EDT) on June 11, 2019, and end by 5:00 p.m.
(EDT) on June 13, 2019.
The general format of the audit will include reviewing documents, reviewing HEDs in the tracking database, and conducting briefs with the NuScale staff.
The NRC staff may request documents in paper copy and/or be put into the electronic reading room prior to or during the audit.
SPECIAL REQUESTS None.
4
DELIVERABLES The audit team will issue a regulatory audit summary report within 90 days after the completion of the audit that will be placed on the docket and in ADAMS. The audit outcome could also identify any additional information to be reviewed in a follow-up audit or submitted separately for making regulatory decisions.
REFERENCES
- RP-0914-8543 - Human Factors Engineering Verification and Validation Implementation Plan, Revision 5, dated April 29, 2019 (ADAMS Accession No. ML19119A371)
- RP-0914-8534 - Human Factors Engineering Program Management Plan, Revision 5, dated April 29, 2019 (ADAMS Accession No. ML19119A341)
- RP-0316-17619 - Human Factors Engineering Human System Interface Design Results Summary Report, Revision 2, dated April 29, 2019 (ADAMS Accession No. ML19119A397)
- RP-0316-17616, Human Factors Engineering Task Analysis Results Summary Report, Revision 2, dated April 29, 2019 (ADAMS Accession No. ML19119A392) (TA RSR)
- RP-1018-61289, Human Factors Engineering Verification and Validation Results Summary Report, Revision 0, dated March 18, 2019 (ADAMS Accession No. ML19077A330) (V&V RSR)