ML19319C735

From kanterella
Revision as of 05:10, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Amend 43 to Application for Ol.Contains Update to Application to Include Latest Info Re Core Power Level. Proposed Page Replacement List Encl
ML19319C735
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/31/1974
From: Rodgers J
FLORIDA POWER CORP.
To:
Shared Package
ML19319C733 List:
References
NUDOCS 8003030851
Download: ML19319C735 (4)


Text

{{#Wiki_filter:-- -__. 7 9 R+~'!McT @ Ofj' , BEFORE THE . __ l.Q_-SE 7 Y UNITED STATES ATOMIC ENERGY COMMISSION AMENDMENT NO. 43 TO APPLICATION BY FLORIDA POWER CORPORATION FOR A SECTION 104b CONSTRUCTION PERMIT AND LICENSE FOR A UTILIZATION FACILITY DOCKET NO. 50-302 Florida Power Corporation, a corporation organized and existing under the _ laws of the State of Florida, applicant for an operating license and con:truction permit for Crystal River Unit 3 Nuclear Generating Plant, hereby amends its Application Volume titled " Application for Licenses" by the filing of Amendment No. 43. Amendment No. 43 contains a revision to this volume to include the latest information. This amendment to the Application contains no restricted data or other defense information. 800sogg(>$7( A

>- -                                               ^

DOCKET 50 -302 o

   .-^ ,

FLORIDA POWER CORPORATION l CRYSTAL RIVER UNIT 3 APPLICATION FOR LICENSES AMENDMENT NO. 52 W A/ \ s  : Florida fgweg c

 ..                m                                 -

Amendment No. 43 Page 2 IN WITHNESS WHERE0F, the applicant has caused its name to be hereunto signed by J. T. Rodgers, Asst. Vice President - Quality and Environmental, and its corporate seal to be hereunto affixed by Betty M. Clayton, Asst. Secretary, thereunto duly authorized the 31st day of October,1974. FLORIDA POWER CORPORATION By J. T. Rodgers F Asst. Vice President - Quality and Environmental ATTEST:

        /    h.               j.

Betty W Clayten / Asst. Secretary / I (CORPORATE SEAL) Sworn to and subscribed before me this 31st day of October,1974. b ar. ~k 9ftary Public [ l My Comission Expires: Notary Public State of Florida at Large My Commission Expires May 1,1976. (NOTARIAL SEAL)

                                                                    , _ - . - . _     ~
     ?                                                                            ,.

n ;. P

  '/3 Docket 50-302 r-        ,

October 31, 1974

                                                                          - .r x               I s 13 J .-
- 2 ,g ,

a - F-s, [3 s\b ( .

                                 \               'AMENDKENT No. 43
                                     \       FLORIDA POWER CORPORATION CRYSTAL RIVER PLANT UNIT 3 s
                                                     \'

The following sheet of the Florida Power Corporation's " Application for Licenses" 10-31-74. is to be deleted and replaced with revised sheet dated 1 Insert the following sheet: Remove the following sheet: Page 4 under General Information. Page 4 under General Information. 4 h

                                                                                               \
                                                                                                \
                                                                                                  \
                                                                                                    \
                                                                                                         \.
                                                                                                            \
                                                                                                              \
                                                                                                                \

N

                                                                                                                             \
                                                                                                                                 n k

5

                                                                       -.            -      _            ,               m4#-

-5 h pttC>e>3eh [*'F d l M '-{ U N

  \..\        .

bPPW D r LlCe^CT O - 3 I -M Sc-3cz Richard C. Johnson St. Petersburg, Florida

         'N N

Rober( M. King St. Petersburg, Florida

                \

A. P. P'erez St. Petersburg, Florida

                   \

R. E. Raym'ond - Senior Vice President St. Petersburg, Florida

                      \

Harry M. Smith Winter Garden, Florida

                          \
                            \

Applicant fu not owned, controlled or dominated by any alien, any foreign corporation, or

                                \    y foreign government. It is msking this applica-tion in its own behalf and'not as agent or representative of any other person.

(e) Class and Period of Lice'nse Applied for and Use to Which Facility

                                          \

Will Be Put \\ The license hereby applied. for is a class 104(b) construction permit and operating license for said Facility as defined by 10 CFR E 50.21. It is

                                                  \

requested that the term of the license bA for a period of forty (40) years.

     -Applicant further requests such additional source, special nuclear, and by-product material licenses as may be necessary or appropriate to the acquisi-tion, construction, possession and operation of the licensed facility. The Babcock & Wilcox Company will supply fabrication for the first fuel core.

Feed material for the,first core will be provided by Applicant through private acquisition. The Facility will be an addition to an existing 2 unit oil-fueled plant (converted from coal-fuel) consisting of a 387 MWe unit and a 510 MWe unit. The facility will include a pressurized water reactor. Applicant s plans for Unit.3 to be capable of an ultimate output of 2560 MWt '(including

                                                                                .\

16 MWt contribution from reactor coolant pumps) Mrresponding to a' gross

                                                                                   'l electrical capability of about 885 MWe. At the une Unit 3 goes into service
                                                                                    .\
                                                                                      \

4 Am. 41 (8-26-74)

                                                                                             ~%}}