ML19329D597
| ML19329D597 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/13/1974 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19329D571 | List: |
| References | |
| NUDOCS 8003160189 | |
| Download: ML19329D597 (4) | |
Text
/\\C
, -7 ~..
ND. g, re,y f y U R N ! 15 % f i:,
g2
~j C
iw gi:
V-:-
j 1
/
..n
.22 BEFORE THE UNITED STATES
/-
ATOMIC ENERGY COMMISSION "J#
AMENDMENT N0. 38 TO APPLICATION BY FLORIDA POWER CORPORATION FOR A SECTION 104b CONSTRUCTION PERMIT AND LICENSE FOR A UTILIZATION FACILITY DOCKET N0. 50-302 Florida Power Corporation, a corporation organized and existing under the laws of the State of Florida, Applicant for an operating license and construction permit for Crystal River Unit 3 Nuclear Generating Plant, hereby amends its Application by the filing of Amendment No. 38.
Amendment No. 38 consists of updated pages to the Final Safety Analysis Report which reflect revisions to Section 14.0, Safety Analysis; and revisions to Appendix 12B, Emergency Plan, which include the Letter of Agreement between Shands Teaching Hospital and Florida Power Corporation, and Tab 4, Appendix II, Evacuation Procedures Related to the Crystal River Nuclear Plant Site, of the State of Florida Radiological Response Plan (Attachment B-2 of Appendix 12B).
In addition, Amendment No. 38 contains a completely revised Appendix 148, Evaluation of Purging as a Means of Controlling Post Accident Hydrogen Accumulation to reflect the
~
new meteorological data that was collected during the period from January 1, 1972 to December 31, 1972.
This amendment to the Application contains no restricted data or other defense information.
8003160)I8) 35'3
Amendment No. 38 Page 2 IN WITNESS WHEREOF, the applicant has caused its name to be hereunto signed by J. T. Rodgers, Asst. Vice President - Generation Engineering, and its corporate seal to be hereunto affixed by Betty M. Clayton, Asst.
Secretary, thereunto duly authorized the 13th day of March,1974.
FLORIDA POWER CORPORATION By 2M J. T.rRodgers Asst.VicePre(s/
ident -
Generation Engineering ATTEST:
/
a lY/.b'?i//NL Betty Mj~Clayton,y Asst. Secretary,&
(CORPORATE SEAL)
Sworn to and subscribed before me this 13th day of March,1974.
3 L c-.c - a d. /k + L
_ _ en Notary Public My Commission Expires:
Notary Public State of Florida at Large My Commission Expires July 9, 1974 (NOTARIAL SEAL) 4 *3 L v
~~
m
~
Docket 50-302 March 25,197h J
c 'f7 Y c4 AMENDMENT No. 38 FLORIDA POWER CORPORATION A'
CRYSTAL RIVER PLANT UNIT 3 Amendment 38 to the Florida Power Corporation's Final Safety Analysis Report includes additional information, updated pages, and completely revised Appendix 1hB.
The following sheets of the Florida Power Corporation's Final Safety Analy sis Report are to be deleted and replaced with revised sheets dated 3-25-Th.
Remove the following sheets:
Insert the following sheets.
Pare: Foreword - F-h (Volume 1 y).
Pages:
1-M 1-d 1-h 6 ' 1- ( 1-Pages: 1 and((-581.1-3 b h6a, 1-3 and 1- %
1-W, 1-584, Pages: 2-W 2- [
and 2 Pages: 2-47
-h and 2-8b.
Pares: 3-Yand 3-Pages: 3 and 3-3a.
Pages: h
, h-4-2d,h-h Pages:
h
-2 h-
, k-and 4 h.
and h '
Paresp 5-
,5-2[5-3'.(5-6 d
Pages:, 5-
,5-29(5-3(5-6 nd 5-6'fa'.
5-65a.
Pages:
and 8-Pages:
8-d 8-a.
Paaes:
9-and 9-3 Pages:
a 9
Pages: 11 ^
d 11-Pages: 11-fg 11-la.
Pagec: 12B-vi 123-B2-11, 12B-B2-12, Pages: 12B-vi, 2B-A2-1, 12B-A2-2, 12B-B2-13, 1 B2-lh, 12B-B2-15, 12B-A2-3, 12
12B-B2-16, 2B-B2-17, 12B-B2-18, 12B-B2-19, 12B-32-19 I eletion sheet), 12B-B2-19a, and 12B-
-20.
12B-B2-10, 12B-B2-19c, 12B-B2-19d, 123-B2-9e, 12B-B2-19f, 12B-B2-19g, 12B-
-19h, and 12B-B2-20.
Pages:
Pages:
1h-i, 14-ii, lh-iv, 1k-vii, 14-viii, ih-ix, lb., ik-19, 1h-19a, 14-viii, ik-ix, '
-x, 1h-19, lh-19a, 1h-19b, 1h-20, 1h-Oa, 1h-21, 1h-27, 1k-19b, 14-20,
-20a, 1h-21, 1h-27, 1h-28, 1h-29, ik ^ a, 14-30, 1h-31, 1h-32, 1h-28, ih-:'8a, b-29/1h-50 (deletion 14-33, 1h-34, 1h-5, 1h-36, 1h-37, 1h-38, sheet ), 1h-51 1h-51a, ih-51b, 1h-52, 1h-39, lb ho, lh 1, ih h2, 1h-h3, ik-kh, 1h-52c, 1h-5', ik-53a, lh-73, 1h-74/
1h h5, lb h6, lh h7, 14 h8, 1h-49, 1h-50, 1h-77 (deleNon sheet),1k-78, ik-80, 1h-51, 1h-51a, 4-51b, lh-52, 1h-52c, 1h-81/1h-8 (deletion sheet), 1h-83a, 1h-53, 1h-53a 14-73, 1k-74, 1h-75, 1h-76, 1h-89 an 1h-90.
14-77, 1h-78 14-80, 1h-81, 1h-82, 1h-83, 1h-83a, lh-89, and 1h-90. !
N o
/
Remove the following sheets:
Insert the followi'ng sheets:
/
Figures:
14-31, 1h-33, 1h-33, 1h-3h, Figures: 1h-31/and 1h-73.
1h-35, 1k-36, 1h-37, 1h-38, 1h-39, lb ho, 1h 41, 14 h2, lb h3 lb-kh, 14 h5, 1h h6, lh hT, lb h8, ik LS 1h-50, 1h-51, 14-52, 14-53, lh-Sh, lh-
, 14-56, lh-57, 14-58, lh-59, IL-60, lh 61, 1h-62, th-63, ik-6h, lh-65, 1h-66,
-67, lh-68, 1h-69, 1h-70, 1k-71, 1k-72 and 1h-73.
Pac d Figures: Delete entire Appendix Pages and Firur sert completely 12%.
new Appendi B.
Supplement 1 Page:
Pg:
h.
, Technical Specifications (Section Pages:
s-5, 15-12, 1,7-16, 15-29, 15-61, Pages 15-5, 15-12, 15-16, 15-29, and 15 3 15-
, and 15-63.
7
(
.