ML19329D581
| ML19329D581 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/27/1973 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19329D564 | List: |
| References | |
| NUDOCS 8003160169 | |
| Download: ML19329D581 (3) | |
Text
O Regulatory File Cy.
Received w/Ur Dated N BEFORE THE UNITED STATES ATOMIC ENERGY COMMISSION AMENDMENT NO. 33 TO APPLICATION BY FLORIDA POWER CORPORATION FOR A SECTION 104b CONSTRUCTION PERMIT AND LICENSE FOR A UTILIZATION FACILITY DOCKET N0. 50-302 Florida Power Corporation, a corporation organized and existing under the laws of the State of Florida, Applicant for an operating license and construction permit for Crystal River Unit 3 Nuclear Generating Plant, hereby amends its Apolication by the filing of Amendment No. 33-.
Amendment No. 33 consists of revised pages to the Final Safety Analysis 4
Report which reflect the changes to Section 15.0, Technical Specifica-tions that resulted from the fuel densification analysis performed by Ha5Foc,k & Wilcox for Crystal River Unit 3.
a 1
This amendment to the Application contains no restricted data or other defense information.
80031 60169
N Amendment No. 33 Page 2 IN WITNESS WHERE0F, the applicant has caused its name to be hereunto signed by J. T. Rodgers, Asst. Vice President - Generation Engineering, and its corporate seal to be hereunto affixed by Betty M. Clayton, Asst. Secretary, tnereunto duly authorized the 27th day vf September,1973.
FLORIDA POWER CORPORATION By J. T. Rodgers V Asst. Vice President -
Generation Engineering ATTEST:
G~~, l pf,
, Betty M. Clayt.on Assts Secretary (CORPORATE SEAL)
Sworn to and subscribed t,efore me this 27th day of September,1973.
O L_.s f n *. ll.. < D u
.1
~~
Notary Public My Commission Expires:
Notary Public State of Florida at Large My Commission Expires July 9,1974.
(NOTARIALSEAL)
N N
Docket 50-302 October 8, 1973 AMENDMENT NO. 33 m// ~ ' 2 FLORIDA POWER CORPORATION
/(j -
CRYSTAL RIVER PLANT UNIT 3 O~N Amandment 33 to the Florida Power Corporation's Final Safety Analysis Report includes insert pages and responses to DRL inquiries.
The following sheets of the Florida Power Corporation's Final Safety Analysis Report are to be 141ete1 and replaced with revised sheets dated 10-8-73 Remove the following sheets:
Insert the following sheets:
Pages: F./ reword - F-3 (Volume 1 only).
Pages: Llidreword - F-3 (Volume 1 only).
Figure: S-19 Figure:
Technical Specifications (Section 15)
/
PaFes: 1541, 1
,1[8,150,15I 9
Pages: hi, 7,1k,156,15-(
IF11, W13,154h,1F66, WJ7, ld-8, 25-11, P5:13,1614,1pT6,1917,4-18,
<f-33, 6 3h, 6 35,406.
LPr$1, pr-52, 53, w-33, #34,15:35, W-T8a, vy-38b,
- 75, 6-76, and v5 4-38c,.MC 8d, h38e, IT 51,19c52, 6.
3 Ff:53, M3a,15-75,.LS-76, and W-10
~
(L _ _ _ _. _. _. _
__