ML19329D594

From kanterella
Revision as of 21:32, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Amend 37 to OL Application,Containing FSAR Revisions Resulting from 731128 & 29 Meeting W/Nrc,Miscellaneous Update Pages & Revised App 14C Incorporating New Meteorological Data Collected 720101 Through 721231
ML19329D594
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/24/1974
From: Rodgers J
FLORIDA POWER CORP.
To:
Shared Package
ML19329D569 List:
References
NUDOCS 8003160186
Download: ML19329D594 (4)


Text

deb -

BEFORE THE UNITED STATES ATOMIC ENERGY COMMISSION AMENDMENT NO. 37 TO APPLICATION BY FLORIDA POWER CORPORATION FOR A SECTION 104b CONSTRUCTION PERMIT AND LICENSE FOR A UTILIZATION FACILITY DOCKET No. 50-302 Florida Power Corporation, a corporation organized and existing under the laws of the State of Florida, Applicant for an operating license and construction permit for Crystal River Unit 3 Nuclear Generating Plant, here-by amends its Application by the filing of Amendment No. 37.

Amendment No. 37 consists of updated pages to the Final Safety Analysis Report . Specifically, Amendment No. 37 contains revisions that resulted from the meeting with members of your staff on November 28 and 29,1973; miscellaneous FSAR update pages; and a complete revision of Appendix 14C Meteorological Analysis of Periodic Venting to reflect the new meteorological data that was collected during the period from January 1,1972 to December 31, 1972. -

This amendment to the Application contains no restricted data or other defense information.

80 031 co 1 T4

b Amendment No. 37 Page 2 IN WITNESS WHEREOF, the applicant has caused its name to be hereunto signed by J. T. Rodgers , Asst. Vice President - Generation Engineering, and its corporate seal to be hereunto affixed by Betty M. Clayton, Asst. Secretary, thereunto duly authorized the 24th day of January,1974.

FLORIDA POWER CORPORATION By J. 't. Rodger4/

fC(h Asst. Vice President -

Generation Engineering ATTEST:

s' : i _. i /

Eetty.M. Clayton/

Asst.' Secretary /

(r^t20 RATE SEAL)

Sworn to and subscribed before me this 24th day of January,1974.

u -

. g '-, ,. %,. _.% ~%

~

Notary Public My Commission Expires:

Notary Public State of Florida at Large My Commission Expires May 1,1976 (NOTARIAL SEAL)

Docket 50-302

. February h, 197h

~(<

AMENDMEIfr NO. 37 c~m %//4

/ /

FLORIDA POWER CORPORATION CRYSTAL RIVER PLANT UNIT 3 Amendment 37 to the Florida Power Corporation's Final Safety Analysis Report includes additional information, updated pages, and completely revised Appendix 1hC.

Th following sheets of the Florida Power Corporation's Final Safety Analysis.

Report are to be deleted and replaced with revised sheets dated 2 h-Th.

Remove the following sheets: Insert the following sheets:

Pa_ge : M vord - F-3 (Volume 1 only). Page: vord - F-3 (Volume 1 only).

Page: Table of Contents - xi. (One each Pace: ~ble of Contents - xi. (One involgs1,2,3,h,5,6,7,and e n Volumes 1, 2, 3, h, 5, 6, 7, Technical Specifications.) an Technical Specifications. )

Aa P es: 1 h , 1 h6, 1 h6a, 1-58a, 1-58b, Pages: 1 h , 1 46, 1 h6a, 1-58a, 1-56b, 1-581, j, 1-58k, 1-581, 1-59, 1-60, 1-581, 1 j, 1-58k, 1-581, 1-59, 1-60, 1-65, na 1-66. 1-65, .d 1-66.

Figures: , 1-2k, and 1-28. Figures: -14:23, 1-2h, and 1-28.

P_aage s,: and 6-lh. Pages: M 3 and 6-lh.

. ages: M and 8-12. Pages: 4=f0a, 8-11, 8-11a, and 8-12.

Figures: and 8-5 Figures: d and 8-5 P_ ages : 9 9-12a, 9-12b, 9-15, 9-16, Pages: 9-12a, 9-12b, 9-15, 9-16, and.9-59 9-59, and 9-60. -

h: -21 and 11-21a. Pages: d 21 and 11-21a.

Pages: 12-1,and 12-2. Pages: M i, 12-1, and 12-2.

Figures: -1, 12.1-2, and 12.1-3. Figures: , 12.'.-2, and 12.1-3.

M:

12A-2f,12A-1,

-1, 12A-2, 12A-3, 12A h, Pages: 12A-1, 12A -1, 12A-2', ' 12A-3, 12A- , 12A-h7, 12A h8, 12A-k9, 12A-4, 12A-29, 1 % 12A h7, 12A 48, 12A-70, -51, 12A-52, 12A-55, 12A-56, 12A h9, 12A- , 12A-51, 12A-52, 12A-55, 12A- 12A-58, 12A-69, 12A-70, 12A-83, 3SA-56 -57, 12A-58, 12A-69, 12A-70, and 12A-8h. 1 - 3, and 12A-8h.

~

Remove the following sheets: Insert the following sheets:

Pages: 12B-11, 12B-iii, 12B-iv, 12B-v, Pages: 12B-11, 12 B-iii , 12B-iv , 12B-v ,

12B-5,12B-6[12B-7,12B-8,12B-9,12B-10, 12B-5, 12B-6, 12B-7, 12B-8, 12B-9, 12B-11, 12 '12, 12B-13, 12B-13a, 12B-13b, 12B-10,'12B-ll, 12B-11a, 12B-12, 12B-13, 12B-13c, 2B-13d, 12B-13e, 12B-lh, 12B- a, 12B-13b, 12B-13c, 123-13d, 2B-22, 12B-23, 12B-2h, 12B-26, 12 -13e, 12B-lh, 12B-21, 12B-22, 12B-23, 12B-2[1.

12B-2 12B-28, 12B-29, 12B-30, 12B-31, ,B-2h, 12B-26, 12B-27, 12B-28, 12B-29, 123-32, 12B-33, 12B-3h, 12B-35, 12B-36, 12B-30, 12B-31, 12B-32, 123-33, 12B-34, 12B-39, 12B-kO, 12B-kl, and 12B h2. 12B-35,12B-36,12B-39,12B h0,12B kl, a.nd 12B h2.

Figures: 12 .1, 12B-2.2 12B-2.2B, Figures: -2.1, 12B-2.2, 12B-2.2B, 12B-2.3, -2.h, and 12B h.1. 12B-2.T, 12B-2.h, and 12B h.l.

Pages: 1 1, 12B-Al-2, 12B-Al-3, Pages :,, -I2B-Al-1, 123-Al-2, 12B-Al-3, 12B-Al h , and lo -Al-5. 12B-Al-4, 12B-Al-5, and 12B-Al-6.

Pages: lo. B1-ii, 12B-B1-1, 12B-B1-2, Pagep reb-B1-ii,12B-B1-1,12B-B1-2, 12B-B1-5, 12B-B1-6, 12B-B1-19, and 12B-B1-5, 12B-B1-6, 12B-B1-19, and 123-B1-20. 12B-B1-20.

M: l'

/

C-1, 12B-C-2, and 12B-C-3. Pag es: /12B-C-1, 12B-C-2, and 12B-C-3.

Pages: 13- , 13-12, 13-37, 13-38, 13 h6, Pages: ,.13-11, 13 7 , 13-37, 13-38,

, 13-47,1 - 8,13 h8a,13 h9,13-50, and 134,13 h7,13 F ,13 48a,13 h9, 13-51. 13-50, and 13-51.

Figures: -2, and 13-3. Figur m 13-1,13-2, and 13-3.

/

Pages: R ove complete Appendix 14C. Pages: nsert completely revised Appe- x 1hC, including 6 pages of text and 13 figures.

Technical Specifications (Section 15)

Pages: 15 9 and 15-151. Pare / 1 129 and 15-151. --

- _