Monthly Operating Rept for Aug 1980
ML19343A125
Person / Time
Site: Pilgrim
Issue date: 09/11/1980
From: Whitney G
BOSTON EDISON CO.
To:
Shared Package
ML19343A119 List:
References
NUDOCS 8009160271
Download: ML19343A125 (6)


Text

,i o L .;

OPERATING DATA REPORT DOCKET NO. 50-293 DATE 9-Il-80 COSfPLETED BY G.G. Whitney TELEPHONE A'7-766 7900 OPERATING STATUS

1. Unit Name:
2. Reporting Period: AUGUST,1980 1990'
3. Licensed Thermal Power (>IWt):
4. Nameplate Rating (Gross atWe): 678.

J. Design Electrical Rating (Net 31We): 655.

6. Sfaximum Dependable Capacity (Gross 5tWe): 690.
7. Siaximum Dependable Capacity (Net 31We): 670.

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NONE

9. Power Level To Which Restricted. If Any (Net SIWE): NONE
10. Reasons For Restrictions. If Any:

N/A This 51onth Yr.-to-Date Cumulative

!!. Hours in Reporting Period 744.0 5855.0 _ 67751.0

12. Number Of Hours Reactor was Critical 668.3 2536.8 47517.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Uours Generator On.Line 640.2 2397.1 45949.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (StWH) 1202352.0 4260552.0 77351664.0 17 Gross Electrical Energy Generated (AtWH) 408230.0 , _ , 1449290.0 25614124.0
18. Net Electrical Energy Generated (5tWH) 392436.0 1393419.0 24599542.0
19. Unit Service Factor F6.0 40.9 67.8
20. Unit Availability Factor 86.0 40.9 67.8
21. Unit Capacity Factor (Using 3tDC Net) 78.7 35.5 54.2
22. Unit Capacity Factor (Uting DER Net) 80.5 36.3 55.4
23. Unit Forced Outage Rate 8.2 4.I 10.3
24. Shutdowns Scheduled Over Next 6 Sionths (Type. Date, and Duration of Eachi:

NONE

25. If Shut Down At End Of Report Period. Estunated Date of Startup: UNIT OPERATING
26. Units In Test Status (Prior to Commercial Operationk Foreca>t Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY CONT 31ERCIAL OPERATION 1

l l

'""='

8009160 27[

AVERAGE DAILY UNIT POWER LEVEL DOC'L rT NO. 50-293 g31T PILGRIM I DATE 9-11-80 COMPLETED BY C'C' * '"*7 TELEPHONE 617-746-7900 MONTH August, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net) (MWe. Net) 1 228. g7 632.

, O. 594.

, - 18 31, 661.

3 39 466. 030*

4 20 " "

y 644. 3 535.

6 664 = 529.

. 665. ,

527,

  • 550.

3 24 9

665. 43 629.

658. ,5 626.

10 _

11 640.  ;- 611.

g, 594. 33 572.

g3 664. ,9 639.

14 663. 30 27.

15 662. 33 0.

~

655.

16 INSTRUCTIONS .

On th:s format. list :he average d2Hy unit power leve!in MWe. Net for each day in the reporting month. Campute to the nearest whole meg 2 watt.

to/77)

BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION Summarv of Operations for August, 1980 On August 1, 1980 the power 1.' vel was reduced to 86% due to high conductivity in the vessel caused by a resin breakthrough from 'D' demin. The unit was subsequently shut down at 1008 hrs. 'D' Relief Valve was tested at normal operating pressure and temperature and it failed to open. During the outage,

'D' Relief Valve was repaired, and the condenser was cleaned. 'D' Relief Valve was tested o.k. and the vessel conductivity within specs. The unit was back on the line at 19 30 hrs. on 8-3-80. Power was increased to 100% and maintained until Tuesday 8-12-80, when the power was reduced to 50% to backwash the condenser.

Power returned to 100% by 0800 on 8-12-80 and maintained until Monday 8-18-80 when the power was reduced to 50% to backwash the condenser. Power was in-creased to 96.2% at 0800 on 8-18-80 and continued to be increased to 100%

and maintained until Thursday 8-21-80. Reduced the power level to 50% on 8-22-80 and backwashad the condenser.

'4hile the backwash was being completed, isolated 'B' Reactor Feed Pump to replace both seals. Power was increased to 80% on 8-23-80, and maintained until 8-24-80 when the R.F.P. repairs were completed. Backwashed the condenser again, and increased power to 100% by 0800 8-25-80. Power was reduced to about 95% for the next three days due to condenser problems caused by severe tube leaks in the 4th point heater. Power increased to 100% at 1400 on 8-28-80 and maintair.ed until Sat. 8-20-80. The reactor was scrammed and the unit shut down at 0140 on 8-30-80 for the remainder of the month, to repair the 4th point heater.

ps 4 --++ A 4---

l>OCKET NO. 50-293 IINel SilUIDOWNS ANi) POWER REDUCIIONS PILGRIM 1 uni r NAME DALE 9-Il-80 COMPLEIFD BY G.G. Whitney August, 1980 HLPOR I MON ill 'I ELElt NE 617-746-7900 a..

c o 3 u. 5 E

' ""' # $.g Canse a Conective No. Date E. k_$ h ~2 h U g YC"' 2-g t; j 0 s a 8x:

Rep.HI si p, ?

in v guo Attion to p,,,en,gyy,,,ync, o- 2 3 0; g g d

6 80/08/01 F 57.4 A 2 80-04 3/03L-0 llG DEMINX liigh conductivity in reactor water.

Lateral in demineralizer loose.

Plugged and returned to service.

7 80/08/30 S 46.4 A 2 N.A. Cil IITEXCil Scheduled plant outage for 4th point heater tube leak repair.

4

! 2 3 4 F: Iorced Reason: Methtxt: Exhibit G Instsuctions 1

S: Sibeilnied A-liguipment I- .luse(Explain) 1-Manual for Picp.uation of Data It Maintenance of Test 2-Manual Scram. Entiy Sheets foi I.icensee C Refueling 3 Automatic Scram. Eveni Reposi (l.1:R) File (NtlHI G-D-Regulatory Restriction 4-Othes (Explain) 0161) li-Operator Tsaining & l.icense I:xamination F Administsative 5 G-OperalitHlJ! I fluf {bxplain) I xillbli i + SJme Sonlee l'8/ ll) ll Othes (Explain)

r .

PII.CRIll NUCLEAR POWER STATION Montli : August, 1980 MA 10R SAFETY RELATED ltAltlTENAt!CE YSTDI COMPONENT MALTONCTION UNUSE MAINTENANCE CORRECTIVE ACTION ASSOCIATED LER

~.

3 ra unrurtre_ pyrrinnEver Type MOV 1301-16 Motor Failure Unknown Rewound Fhitor 13_ _

Overloads and lleaters Replaced 80-044/03L-0 Type liactery Charge r Con t ro l Coruponen t Unknown Replaced Failed 46 N.A. N.A.

couponents Type "D" Relief Vive Failed to operate Electrical Removed top Sat./ Reassembled 1

Problem 80-047/03L-0 sectlon/ Tested i

O 9

e O

e

I REFUELING INFORMATION The following refueling inJormation is included in the >bnthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:

For your convenience, the information supplied has been enumerated so thac each number corresp'. nds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuclear Power Station, Docket No. 50-293.
2. Scheduled date for next Refueling Shutdown: September, 1981
3. Scheduled date for restart following refueling:

4

5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6. The fuel, which had been loaded during the 1980 scheduled refueling outage, is of the new P8x8R design, consisting of approximately 64 P8DRB282 assemblies and 120 P8DRB265 assemblies.
7. (a) There are 580 fuel assemblies in the core.

(b) There are 764 fuel assemblies in the spent fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel asse=blies.

The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 1006 fuel asuemblies.

- _ , . _ .-