MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
,i o L .;
OPERATING DATA REPORT DOCKET NO. 50-293 DATE 9-Il-80 COSfPLETED BY G.G. Whitney TELEPHONE A'7-766 7900 OPERATING STATUS
- 1. Unit Name:
- 2. Reporting Period: AUGUST,1980 1990'
- 3. Licensed Thermal Power (>IWt):
- 4. Nameplate Rating (Gross atWe): 678.
J. Design Electrical Rating (Net 31We): 655.
- 6. Sfaximum Dependable Capacity (Gross 5tWe): 690.
- 7. Siaximum Dependable Capacity (Net 31We): 670.
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NONE
- 9. Power Level To Which Restricted. If Any (Net SIWE): NONE
- 10. Reasons For Restrictions. If Any:
N/A This 51onth Yr.-to-Date Cumulative
!!. Hours in Reporting Period 744.0 5855.0 _ 67751.0
- 12. Number Of Hours Reactor was Critical 668.3 2536.8 47517.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Uours Generator On.Line 640.2 2397.1 45949.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (StWH) 1202352.0 4260552.0 77351664.0 17 Gross Electrical Energy Generated (AtWH) 408230.0 , _ , 1449290.0 25614124.0
- 18. Net Electrical Energy Generated (5tWH) 392436.0 1393419.0 24599542.0
- 19. Unit Service Factor F6.0 40.9 67.8
- 20. Unit Availability Factor 86.0 40.9 67.8
- 21. Unit Capacity Factor (Using 3tDC Net) 78.7 35.5 54.2
- 22. Unit Capacity Factor (Uting DER Net) 80.5 36.3 55.4
- 23. Unit Forced Outage Rate 8.2 4.I 10.3
- 24. Shutdowns Scheduled Over Next 6 Sionths (Type. Date, and Duration of Eachi:
NONE
- 25. If Shut Down At End Of Report Period. Estunated Date of Startup: UNIT OPERATING
- 26. Units In Test Status (Prior to Commercial Operationk Foreca>t Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY CONT 31ERCIAL OPERATION 1
l l
'""='
8009160 27[
AVERAGE DAILY UNIT POWER LEVEL DOC'L rT NO. 50-293 g31T PILGRIM I DATE 9-11-80 COMPLETED BY C'C' * '"*7 TELEPHONE 617-746-7900 MONTH August, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net) (MWe. Net) 1 228. g7 632.
, O. 594.
, - 18 31, 661.
3 39 466. 030*
4 20 " "
y 644. 3 535.
6 664 = 529.
. 665. ,
527,
3 24 9
665. 43 629.
658. ,5 626.
10 _
11 640. ;- 611.
g, 594. 33 572.
g3 664. ,9 639.
14 663. 30 27.
15 662. 33 0.
~
655.
16 INSTRUCTIONS .
On th:s format. list :he average d2Hy unit power leve!in MWe. Net for each day in the reporting month. Campute to the nearest whole meg 2 watt.
to/77)
BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION Summarv of Operations for August, 1980 On August 1, 1980 the power 1.' vel was reduced to 86% due to high conductivity in the vessel caused by a resin breakthrough from 'D' demin. The unit was subsequently shut down at 1008 hrs. 'D' Relief Valve was tested at normal operating pressure and temperature and it failed to open. During the outage,
'D' Relief Valve was repaired, and the condenser was cleaned. 'D' Relief Valve was tested o.k. and the vessel conductivity within specs. The unit was back on the line at 19 30 hrs. on 8-3-80. Power was increased to 100% and maintained until Tuesday 8-12-80, when the power was reduced to 50% to backwash the condenser.
Power returned to 100% by 0800 on 8-12-80 and maintained until Monday 8-18-80 when the power was reduced to 50% to backwash the condenser. Power was in-creased to 96.2% at 0800 on 8-18-80 and continued to be increased to 100%
and maintained until Thursday 8-21-80. Reduced the power level to 50% on 8-22-80 and backwashad the condenser.
'4hile the backwash was being completed, isolated 'B' Reactor Feed Pump to replace both seals. Power was increased to 80% on 8-23-80, and maintained until 8-24-80 when the R.F.P. repairs were completed. Backwashed the condenser again, and increased power to 100% by 0800 8-25-80. Power was reduced to about 95% for the next three days due to condenser problems caused by severe tube leaks in the 4th point heater. Power increased to 100% at 1400 on 8-28-80 and maintair.ed until Sat. 8-20-80. The reactor was scrammed and the unit shut down at 0140 on 8-30-80 for the remainder of the month, to repair the 4th point heater.
ps 4 --++ A 4---
l>OCKET NO. 50-293 IINel SilUIDOWNS ANi) POWER REDUCIIONS PILGRIM 1 uni r NAME DALE 9-Il-80 COMPLEIFD BY G.G. Whitney August, 1980 HLPOR I MON ill 'I ELElt NE 617-746-7900 a..
c o 3 u. 5 E
' ""' # $.g Canse a Conective No. Date E. k_$ h ~2 h U g YC"' 2-g t; j 0 s a 8x:
Rep.HI si p, ?
in v guo Attion to p,,,en,gyy,,,ync, o- 2 3 0; g g d
6 80/08/01 F 57.4 A 2 80-04 3/03L-0 llG DEMINX liigh conductivity in reactor water.
Lateral in demineralizer loose.
Plugged and returned to service.
7 80/08/30 S 46.4 A 2 N.A. Cil IITEXCil Scheduled plant outage for 4th point heater tube leak repair.
4
! 2 3 4 F: Iorced Reason: Methtxt: Exhibit G Instsuctions 1
S: Sibeilnied A-liguipment I- .luse(Explain) 1-Manual for Picp.uation of Data It Maintenance of Test 2-Manual Scram. Entiy Sheets foi I.icensee C Refueling 3 Automatic Scram. Eveni Reposi (l.1:R) File (NtlHI G-D-Regulatory Restriction 4-Othes (Explain) 0161) li-Operator Tsaining & l.icense I:xamination F Administsative 5 G-OperalitHlJ! I fluf {bxplain) I xillbli i + SJme Sonlee l'8/ ll) ll Othes (Explain)
r .
PII.CRIll NUCLEAR POWER STATION Montli : August, 1980 MA 10R SAFETY RELATED ltAltlTENAt!CE YSTDI COMPONENT MALTONCTION UNUSE MAINTENANCE CORRECTIVE ACTION ASSOCIATED LER
~.
3 ra unrurtre_ pyrrinnEver Type MOV 1301-16 Motor Failure Unknown Rewound Fhitor 13_ _
Overloads and lleaters Replaced 80-044/03L-0 Type liactery Charge r Con t ro l Coruponen t Unknown Replaced Failed 46 N.A. N.A.
couponents Type "D" Relief Vive Failed to operate Electrical Removed top Sat./ Reassembled 1
Problem 80-047/03L-0 sectlon/ Tested i
O 9
e O
e
I REFUELING INFORMATION The following refueling inJormation is included in the >bnthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:
For your convenience, the information supplied has been enumerated so thac each number corresp'. nds to equivalent notation utilized in the request.
- 1. The name of this facility is Pilgrim Nuclear Power Station, Docket No. 50-293.
- 2. Scheduled date for next Refueling Shutdown: September, 1981
- 3. Scheduled date for restart following refueling:
4
- 5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
- 6. The fuel, which had been loaded during the 1980 scheduled refueling outage, is of the new P8x8R design, consisting of approximately 64 P8DRB282 assemblies and 120 P8DRB265 assemblies.
- 7. (a) There are 580 fuel assemblies in the core.
(b) There are 764 fuel assemblies in the spent fuel pool.
- 8. (a) The station is presently licensed to store 2320 spent fuel asse=blies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.
(b) The planned spent fuel storage capacity is 2320 fuel assemblies.
- 9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 1006 fuel asuemblies.