Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
.
REFUELING INFORMATION The following refueling information is included in the Ebnthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
- 1. The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
- 2. Scheduled date for next Refueling Shutdown: September, 1981
- 3. Scheduled date for restart following refueling:
4.
- 5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
- 6. The fuel, which had been loaded /.uring the 1980 scheduled refueling outage, is of the new P8x8R der,1gn, consisting of approximately 64 P8DR3282 assemblies and 120 PSDR3265 assemblies.
- 7. (a) There are 580 fuel assemblies in the core. ,
(b) There are 764 fuel assemblies in the spent fuel pool.
- 8. (a) The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.
- (b) The planned spent fuel storage capacity is 2320 fuel assemblies.
- 9. With present spent fuel in storage, the spent fuel pool now has the
' capacity to acco=modate an additional 1006 fuel assemblies.
.
i
!
!
,
8102180$6
.
, , , . . - - - - , ~ ~ ..w. - ~ ,. , - . . . ,- , ,,,..m., , . , , , - ,--,----,s --
- - .,,
.
.. . _ . . -.
.
OPERATING DATA REPORT DOCKET NO. 50-29 3 DATE 2/11/81 COMPLETED BY C- G. Whitney TELEPHONE 617-746-7900 OPERATING STATUS Pilgri:n I Notes
- 1. Unit Name:
- 2. Reporting Period: Januarv. 1981 1998.
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 678.
- 5. Design Electrical Rating (Net MWef: 655.
- 6. Maximum Dependable Capacity (Gross MWe): 690.
- 7. Maximum Dependable Capacity (Net MWe): 670.
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,if Any (Net MWe): None
- 10. Reasons For Restrictions.If Any:
N/A
,
This Month Yr. to-Date Cumulative i1. Hours In Reporting Period 744.0 744.0 71424.0
- 12. Number Of Hours ReactorWas Critical 726.I 726.1 50010.7
'
0.0 0.0 O.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 716 . 3 716.3 49223.2 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1296936.0 1296936.0 83586312.0 .
- 17. Gross Electrical Energy Generated (MWH) 444410.0 _ _ .
444410.0 27773774.0
[
- 18. Net Electrical Energy Generated (MWH) 427360.0 427360.0 26677967.0 l 68.9
- 19. Unit Service Factor 96.3 96.3 l 96.3 96.3 68.9 l 20. Unit Availability Factor ,
- 21. Unit Capacity Factor (Using MDC Net) 85.7 85.7 55.7 87*7 07*7 57'O
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 3.7 3.7 10.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
l l None
- 25. If Shur Down At End Of Report Period. Estimated Date of Startop: Unit Operatine
,
! 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved
'
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (0/77) l t
I.-. . . _ _ _ - , _ , . _ _ . . _ _ , . - - . . _ . _ _ . .
_
_ , . . _ , . - _ . . . . . , _ , , , , , , _ . . , _ , . _ , _ . - . . _ , ..._,_,_m. , . . , _ _ ,__. , , _ , _ . _
-
AVERAGE D A!LY UNIT POWER LEVEL
.
,
DCCKET NO. 50-293 UNIT Pilerim I DATE 2/II/81
.
COMPLETED BY C' C* M '"*Y TELEPHONE 617-746-7900 January, 1981 MONTH
'
DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LD'IL (MWe-Net) (MWe-Net) 671 g. 663 g
671 13 421 2
610 19 150 3
"
'o' 20 191 4
y 654 21 518 646 ,; 587 .
6
- 669 ,3 661
'
670 24 573 3
669 25 666 9
669 26 664 10
- j 670 7 665 671 ,3 316 12 l
666 ,9 10 3 g3 668 361 14 - 30 668 3j 453 15
'
16 668
.
.
INSTAUCTIONS -
On this format.!ist :he average d25y unit power levelin MWe Net for each day in the reperting month. Campute to the nearest whole me;2 wart.
. (o/77)
.
- *- m, , , , - - , , , - --~y- , - y ,- -- , .. r-, , - , , - , , ,. - , - - , - - , , - , . - . - - , - , , - . . , , , .-,.% - , ,
. - _ _ _ _ _ _ _ _ _ _ _ . _ _ __ _ _ _ _ _
IH)CK E I NO. 50-293 tlNil SilUIDOWNS ANI) POWFR REDUCIIONS Pilgrim I UNII NAME DAIE 2/11/81 COMPI.E1 Ell fly C- C- Whitney.
RFPOR I MONIII January, 1981 617-746-7900
,
1 EI.T PIIONE
...
O c g 5g h
1.icensee E*, c-8.g raisse & rotactlive No. Date g 3g @ } q$5h Event g7 1 Attion to H
$6 $ 5MC Report 11 uiU hU U
Present Reciertence
<.
O
{
.
I 1/4/81 S 0.0 B 1 N/A CB CENERA Repair of brushes on A & B reactor recirculation motor-generator sets.
2 1/18/81 S 0.0 B 1 N/a llB llTEXCil Bypass of "B" I,ow pressure heater train and repair of I-2 water box tailpipe.
3 1/28/81 F 27.7 B 4 N/A IIA INSTRU Reactor scram due to inadvertant high water trip during surveillance test.
4 1/29/11 F 0.0 11 1 N/A IIB llTEXCll "B" high and low pressure heater trains have been isolated limiting power to 75%.
.
I 2 3 4 F: forced Reason: Mettual: Exhibit G Instinctions S: Scheduled A-Ljuipment Failure (Explain) 1 -Manual for Preparation oI Data D-Maintenar,ce of Test 2 Manual Scram. Eintsy Sheets for 1.icensee
- C. Refueling 3 Aulomatic Scrarn. Event Repor (1.1-'R) File (NilRI G-D-Regulaimy Restriction 4-Other (Enplain) 0161)
E-Operator Training & l.icense I xamination
- F-Administrative 5 G Operational I:rror (Explain) 1:shibit I - Same Source 19/77) ll Other (Explain)
. .
PILGRIM NUCLLAR l'O'.JER STATION thulli JANUARY 1981 EUOR SAFETY RELATED MAIN 1dNANCE
"
CORRECTIVE ACTION MALFUNCTION CAUSE !!AINTENANCE TO PREVENT RECURRENCE ASSOCIATED L.
iYSTDI COMPONENT
.
10 "B" RIIR lleat Exch llead Gasket Leak Furmanited Furmanite is Permanent 9 Head Flange
- 11 SBLC Pump Leak Rgplaced Head Casket
, 27 1-2 Water Box Pipe Leaking Made Temporary Investigate / Planning 4 Repairs 29 "E" SSWP Check Valve Leak- Replaced Disc ing 27 "D" Screen Bearing Worn Replaced Bear- '
ing 18 "B" Cond. Pump High Vibration Replaced Motor Bearings
.
h
.
O I
.
h
.
-
- BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION Summary of Operations for Januarv , 1981 The month of January began with the unit operating at 100% reactor power. The unit operated at 100% thru January 4th when a unit reduction to 50% power was conducted to repair brushes on A & B reactor recircula-tion motor-generator sets and other minor maintenance. The unit was returned to 100% power and operated at this level until January 18th.
On January 18th the unit power was reduced to 50% power to back-wash the main condenser and bypass the "B" Low Pressure Heater Train.
During this power reduction, a 3b" crack was identified in the 1-2 waterbox (Main Condenser) outlet piping. Power increase was commenced and unit returned to 80% on January 19th.
Problems with control of level in the "B" Low Pressure Heater Train limited reactor power to 80% until January 22nd. On January 23rd, feedwater heaters were returned to service and unit power reached 100%
on January 23rd. Shortly af ter reaching 100%, increased leakage in the 1-2 outlet piping necessitated a power reduction to 55% to remove the waterbox.
Power was increased to 100% on January 24th and continued to operate at this power until 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br /> on January 28th. At this time, the reactor scrammd due to surveillance testing of Reactor High Water Trip. The unit war; started up and synchronized to the grid @l506 hours on January 29th. Power was increased to 75% and limit'ed to that power for the remainder of the month because "B" Low and High Pressure Heater Trains were isolated.
'
l l
l
\
i
!
l l
r 7-
'
l l
l
r i
I