MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
AVERAGE DAILY UNIT POWER LEVEL O .
.
.
DOCKET NO. 50-293 g3j7 Pilgritt I DAE 07/07/80 COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 June, 1980 MONTH
"
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe. Net) (Mwe. Net) g 514 g .,
620.
- 492. 33' 646.
3 534. 39 666.
~~
4 563. ,, 29
'
669.
y 549.
'
,3 632. *-
6 545- 22 666.
- 526. ,3 666.
3 01- 24 665.
9 4 19. ,3 657.
10 462- 26 656.
n 513. 7 625.
[2 sna ;g 544.
13 482. ,9 663.
g4 491. 30 661.
15 486. 3g 0.
^
16 513-
.
.
INSTRUCTIONS .
On this formst.!ist the average daily unit power levelin MWe Net for each day in the repomng month. Compute to the nearest whole megswatt.
'
(o/77)
'
8007150 %
- - - - - - - - --
. _ _ _ . . . _, _ _ , .
__
,
-
_ _
,
.
OPERATING DATA REPORT w
DOCKET NO. 50-293 DATE 7/07/80 COMPLETED BY U.G. wn1cnet TELEPHONE o1i-74o-e900 OPERATING STATUS Pilgrim I Notes
- 1. Unit Name:
- 2. Reporting Period: June, 1980 1990*
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Grosa MWe): Y' D##*
- 5. Design Electrical Rating (Net MWe): .
- 6. Maximum Dependable Capacity (Gross MWe): 690. ._
- 7. Maximum Dependable Capacity (Net MWe):
670.
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons.
l None
- 9. Power Level To Which Restricted,if Any (Net MWe): None
- 10. Reasons For Restrictions. lf Any:
. N/A l
This Month Yr..to-Date Cumuiauve
- 11. Hours in Reporting Period 720.0 4367.0 66263.0
- 12. Number Of Hours Reactor Was Critical 711.0 1159.0 46139.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 702.3 lobo.o o a .1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1221120.0 1730328.0 74621440.0 .
_ ,, 17. Gross Electrical Energy Generated (MWH) 416870.0 ,
586740.0 24751574.0 ,
- 18. Net Electrical Energy Generated (MWH) 401031.0 563775.0 23769898.0 ,
- 19. Unit Service Factor 97.5 24.4 67.3 ._
- 20. Unit Availability Factor 97.5 24.4 67.3 ~~~
- 21. Unit Capacity Factor (Using MDC Net) 83.1 19.3 53.5 ,
_ _ 22. Unit Capacity Factor (Using DER Net) 85.0 19.7 54.8 ,
- 23. Unit Forced Outage Rate 1.3 3.2 10.5 _
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
~
NONE _
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unit Operating ,
- 26. Units in Test Status (Prior to Commercial Operationi: Forecast Achieved
. INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
, . .. _ ._ _ _ _ . _
_
.
..
' DOCKET No. 50-293 ,
UNIT SilulDOWNS AND POWER REDtM.110NS Pilgrim I UNIT NAME DATE 7/7/80 COMPLElED gy G. G. Whitney REN)RT MON 111 'IEl.EPHONE 617-746-7900
.
I
.
n.
- , .$ E 3 E* Licensee h t, Cause A Corrective No; Date g, 3g i jg5 Event F'g 3 Action to F
$5 5 3 ! ut t, gu e$c Report #
v Picsent Recurrence 6
.
3 80/05/26 F 0.0 H 4 N.A. IIG DEMINX. liigh D/P Across Condensate 0 // 0.0 Demineralizers due to rust buildup in lines during outage.
4 80/06/08 F 9.0 11 # N.A. IIC HTEXCH Reactor scrammed at 0451 ON O // 0.0 6/8/80 due to low vacuum during condenser backwash.
"
.
_
'
i 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data ll-Maintenance of Test 2-Manual Scram. Entry Shecis for tjecusee C Refueling 3 Autondlic Scram. Evens Report (LER) Fde tNilHI G-D Regulatory Restriction 4-Other (Explain) 0161)
E-Opesator Training a license lixamination F Administrative 5 G-Operational Enor (Explain) Eshibit I - Same Source 19/77) Il Other (Explain)
. _ - _ - _ - - _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ - - _ _ - - - _ _ __ _ _ - _ _ - - - - _ . - - __ __
.
.
,
R_ M -
-
e
I I
s s
e u
G =
-
O' D
'
E T
A I
.
C A. G
- O N S
0 S .
8 A 9 _
1
E ,
~
M _ -
'
O
,
r h
Ne t
Or 9 I r n To o Cn H AJ g m n _
Er i Vn k I r _ ,
Tm o Cu w Er Rv 1 Rn 1 On i Cu t S
n T _
_
_
9
_
E s t
N C r O N a I A E p T N C _
.
A E N f T T A o S N N I E l t
l A n a
. E M u
. W l l e O D A n ~ 9 P E I I e T _ R _
R A _
A L E E _ _
L R C
U Y s N T g E
M F E n D
$
i I A S nr R S U ra C A oe L R C I O W B _. 4 P T M
.
. _
.
N O _
I _
T g C n _
N i _
t
.
U a ..
F L b r _.
A i
_
M V .
.
.
.
,'
.
p m
u T P N
E W S
N O S
- P M
O "E C "
-
-
l
.
- E 2 T .
S .
f
7
. .
BOSTC!: CDISC:! COMPANY PILGRI:t ?!UCLEAR P0k'ZR STATICt!
Surmary of Onerations for June. 1980 The average power level for the first seven days of the sonth was 83%.
A reactor scram occurred at 0451 on 6-8-80 due to low vacuum during condenser backwash. The unit was back on the line at 2312 on 6-B-80.
Power level at 0800 was 67% and being incransed under the direction of the Reactor Engineer.
The unit was brought to 100% power at 1241 on 6-18-80, and was maintained until 2200 on 6-27-80, when the power was reduced to 50% to backwash the condenser.
Power was increased to 92% at 0800 on 6-28-80, and 100% power was reached at 0145 on 6-29-80, and remained there for the remainder of the month.
- -
1
. .
'
a 3 4
,
.
.. .-
-
RIERTG nt?C?2ii.p0N ...
Tho felle'.-isg refueling infor=a:ic is included in tha li:::hly Report as reques:ed in a le::ar := lir. G. C. Andognini dated Januarf 13, 1973:
Ic:'ycur cc:venience, :he infor=a:10 supplied has been e===erated so that ct.ch nunber cc: esponds :s aquivales: no ta:1== utilized in the request.
- 1. Tus ma=c cf this facili:y is Pilgri= Nuclea: Power Station, rocke: No.
50-293.
~
- 2. Scheduled da:e for nex: Refueling Shutdown: Septa =ber, 1981 .
- 3. Scheduled da:e for res.2:: foll wi=g rafueling:
,
~.
- 5. Due to their sd d 'irity, requests 4, 5, & 6 are responded o collectively.
- 5. ~..e fuel, which has been loaded duri=g :he preses: scheduled refueling outage, is of :he new FSx3R design, consis:ing of approxi=a:ely 64 ?SDR3232 assemblies and 120 PSDR3255 assedlies.
.
,
- 7. (2) hare are 520 fuel asse:blies in de cera.
(S) here are 754 fuel asse_blies in the spen fuel ;ccl.
- 3. (a) 2e sea ica is presently licensed to s:cre 2320 spe : fuel asse=blies.
~e.e actual spe : fuel s:crage capaci:7 is 1770 fuel asse=blies at preses:.
('o) The planned spen: fuel s:orage capacity is 2320 fuel asse:blies.
- 9. 'Jith presen: speut fuel in s:crage, the spent fuel pool scw has :he capa-city to accc _.cda:e an additic-*' 1006 fuel asse=blies . -
.
,
e
,
,
,
g 'W l'