AVERAGE DAILY UNIT POWER LEVEL O
50-293 DOCKET NO.
g3j7 Pilgritt I 07/07/80 DAE COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 June, 1980 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe. Net)
(Mwe. Net) 514 620.
g g.,
492.
33' 646.
666.
3 534.
39
~~
4 563.
29 669.
549.
632.
y
,3 6
545-22 666.
666.
526.
,3 3
01-24 665.
4 19.
657.
9
,3 10 462-26 656.
625.
n 513.
7
[2 sna
- g 544.
663.
13 482.
,9 491.
661.
g4 30 0.
15 486.
3g
^
16 513-INSTRUCTIONS On this formst.!ist the average daily unit power levelin MWe Net for each day in the repomng month. Compute to the nearest whole megswatt.
(o/77) 8007150 %
OPERATING DATA REPORT w
DOCKET NO. 50-293 DATE 7/07/80 COMPLETED BY U.G.
wn1cnet TELEPHONE o1i-74o-e900 OPERATING STATUS
- 1. Unit Name:
Pilgrim I Notes
- 2. Reporting Period:
June, 1980 1990*
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Grosa MWe):
Y' D##*
- 5. Design Electrical Rating (Net MWe):
690.
- 6. Maximum Dependable Capacity (Gross MWe):
670.
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons.
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions. lf Any:
N/A This Month Yr..to-Date Cumuiauve 720.0 4367.0 66263.0
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 711.0 1159.0 46139.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 702.3 lobo.o o a.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1221120.0 1730328.0 74621440.0 416870.0 586740.0 24751574.0
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 401031.0 563775.0 23769898.0
- 19. Unit Service Factor 97.5 24.4 67.3
- 20. Unit Availability Factor 97.5 24.4 67.3
- 21. Unit Capacity Factor (Using MDC Net) 83.1 19.3 53.5
~~~
- 22. Unit Capacity Factor (Using DER Net) 85.0 19.7 54.8
- 23. Unit Forced Outage Rate 1.3 3.2 10.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
NONE
~
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unit Operating
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
50-293 UNIT SilulDOWNS AND POWER REDtM.110NS DOCKET No.
UNIT NAME Pilgrim I DATE 7/7/80 COMPLElED gy G. G. Whitney REN)RT MON 111
'IEl.EPHONE 617-746-7900 I
n.
.$ E 3
E*
Licensee h
t, Cause A Corrective No; Date g,
3g i
jg5 Event F'g 3
Action to e$c Report #
ut t, gu Picsent Recurrence F
$5 5
3 v
6 3
80/05/26 F
0.0 H
4 N.A.
IIG DEMINX.
liigh D/P Across Condensate 0
//
0.0 Demineralizers due to rust buildup in lines during outage.
4 80/06/08 F
9.0 11 N.A.
IIC HTEXCH Reactor scrammed at 0451 ON O
//
0.0 6/8/80 due to low vacuum during condenser backwash.
i 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data ll-Maintenance of Test 2-Manual Scram.
Entry Shecis for tjecusee C Refueling 3 Autondlic Scram.
Evens Report (LER) Fde tNilHI G-D Regulatory Restriction 4-Other (Explain) 0161)
E-Opesator Training a license lixamination F Administrative 5
G-Operational Enor (Explain)
Eshibit I - Same Source 19/77)
Il Other (Explain)
R_
M e
m s
=
s e
I u
=
e G
I O'
D E
TA I
C A.
G O
N S
0 S
8 A
9 1
E M
~
O r
Ne h
Or 9
t I r n
To o
Cn H
AJ g
m n
Er i
Vn k
I r
Tm o
Cu w
Er Rv 1
Rn 1
On i
Cu t
S nT 9
E s
t N C r
O N a
I A
E p
T N C
A E N
f T T A
o S N N
I E
l t
l A
E M n
au l
W l
e O D A
n
~
9 P E I
I e
T R
R A A L E E L R CU Y N T s
E g
M F E
n D
i I
A S
nr R S U
ra C
A oe L R C
I O
W B _.
4 P
T M
N O
I T
g C
n N
i _
t U
F a.
r _.
L b
A i
M V
p mu T
P N
E W
N S
O S
PM "E
O C
l 1
E 2
T S
f
7 BOSTC!: CDISC:! COMPANY PILGRI:t ?!UCLEAR P0k'ZR STATICt!
Surmary of Onerations for June. 1980 The average power level for the first seven days of the sonth was 83%.
A reactor scram occurred at 0451 on 6-8-80 due to low vacuum during condenser backwash. The unit was back on the line at 2312 on 6-B-80.
Power level at 0800 was 67% and being incransed under the direction of the Reactor Engineer.
The unit was brought to 100% power at 1241 on 6-18-80, and was maintained until 2200 on 6-27-80, when the power was reduced to 50% to backwash the condenser.
Power was increased to 92% at 0800 on 6-28-80, and 100% power was reached at 0145 on 6-29-80, and remained there for the remainder of the month.
1 a
3 4
RIERTG nt?C?2ii.p0N Tho felle'.-isg refueling infor=a:ic is included in tha li:::hly Report as reques:ed in a le::ar := lir. G. C. Andognini dated Januarf 13, 1973:
Ic:'ycur cc:venience, :he infor=a:10 supplied has been e===erated so that ct.ch nunber cc: esponds :s aquivales: no ta:1== utilized in the request.
1.
Tus ma=c cf this facili:y is Pilgri= Nuclea: Power Station, rocke: No.
50-293.
~
2.
Scheduled da:e for nex: Refueling Shutdown: Septa =ber, 1981 3.
Scheduled da:e for res.2:: foll wi=g rafueling:
,~.
5.
Due to their sd d 'irity, requests 4, 5, & 6 are responded o collectively.
5.
~..e fuel, which has been loaded duri=g :he preses: scheduled refueling outage, is of :he new FSx3R design, consis:ing of approxi=a:ely 64 ?SDR3232 assemblies and 120 PSDR3255 assedlies.
7.
(2) hare are 520 fuel asse:blies in de cera.
(S) here are 754 fuel asse_blies in the spen fuel ;ccl.
3.
(a) 2e sea ica is presently licensed to s:cre 2320 spe : fuel asse=blies.
~e.e actual spe : fuel s:crage capaci:7 is 1770 fuel asse=blies at preses:.
('o)
The planned spen: fuel s:orage capacity is 2320 fuel asse:blies.
9.
'Jith presen: speut fuel in s:crage, the spent fuel pool scw has :he capa-city to accc _.cda:e an additic-*' 1006 fuel asse=blies.
e
'W g
l'