Public Meeting Kewaunee - Dominion Presentation Slides - to Discuss Improvement Initiatives
ML061840587
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/22/2006
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML061840587 (18)


Text

Excellence Plan Kewaunee Power Station June 22, 2006 Kewaunee Excellence Plan Agenda

  • Excellence Plan Strategy
  • Focus On Four

- Corrective Action

- Safety

- Human Performance

- Equipment Reliability

  • What We Have Done, Where We Are Going and What We Have Learned
  • Closing Comments Kewaunee Excellence Plan Enclosure 2 1

Kewaunee Excellence Plan Kewaunee Excellence Plan Enclosure 2 2

Kewaunee Excellence Plan

  • Strategy is strict implementation of Excellence Plan with intense management oversight leveraging Corrective Action as core business
  • Assistance is being provided by the Dominion fleet, INPO and industry peers
  • The plan is a living document divided into three phases Kewaunee Excellence Plan Phase 1 - Back To Fundamentals
  • Corrective Action

- Internalize as core business

  • Manager & Supervisor Effectiveness

- Alignment with clear goals

  • Safety

- Plant Operations

- Engineering

  • Human Performance

- Standards

- Procedures

- Labeling

- DBDs

- Training

  • Equipment Reliability

- Focus on maintaining the plant Kewaunee Excellence Plan Enclosure 2 3

Focus On Four Corrective Action Excellence Plan Kewaunee Excellence Plan Corrective Action Strategy

  • Corrective Action is Core Business

- NRC Identified Gaps in Our CAP Implementation

- INPO Stream Analysis: CAP Is Driving Site Performance

- Cooper Benchmarking Kewaunee Excellence Plan Enclosure 2 4

Corrective Action -

What We Have Done

  • When In Doubt Fill It Out Campaign

- Increased initiation rate from 450/month to >

800/month

  • Corrective Action Review Board Backlog

- Reduced from >100 in Nov 2005 to no overdue items

  • Apparent Cause Evaluation Quality

- ACEs reviewed by CARB since Jan 2006 are grading at >85 using new grade criteria Kewaunee Excellence Plan Corrective Action -

What We Have Learned

  • Need to improve accountability for timeliness and quality

- Leadership used to drive performance & accountability

- Metrics used to measure success

- Organizational Effectiveness group must set the standard

  • Continue to focus on the quality of evaluations

- Provide additional ACE and RCE training

- Improve Corrective Action Program Department Coordinator performance

  • Need to address growing backlog

- Disposition with todays CAPs today to limit the growth of the backlog

- Develop a separate plan to reduce the backlog Kewaunee Excellence Plan Enclosure 2 5

Focus On Four Manager/Supervisor Excellence Plan Kewaunee Excellence Plan Manager/Supervisor Excellence Strategy

  • Alignment of the Organization with Clear Goals Kewaunee Excellence Plan Enclosure 2 6

Manager/Supervisor Excellence -

What We Have Done

  • Leadership changes deeper in the organization
  • Mentors in Operations, Engineering, and Organizational Effectiveness
  • Continue to emphasize the use of the peer groups
  • Soliciting INPO assistance Kewaunee Excellence Plan Manager/Supervisor Excellence -

What We Have Learned

  • Standards must be consistently enforced

- Alignment through repetitive communication

- Drive down level of oversight

- Break through acceptance culture Kewaunee Excellence Plan Enclosure 2 7

Focus on Four Safety Excellence Plan Kewaunee Excellence Plan Focus On Four Safety Excellence Plan Strategy

  • Maintain Or Improve Margins To Safety Kewaunee Excellence Plan Enclosure 2 8

Safety - Plant Operations -

What We Have Done

  • Dominion Nuclear Operating Standards Implementation
  • Reinforced Standards for Procedure Compliance
  • Accountability for Meeting our Expectations
  • EOP Revisions Drafted
  • Control Room Mentors
  • Site Wide Stand-down Kewaunee Excellence Plan Safety - Plant Operations -

Where We Are Going

  • Additional Standards Implementation
  • Enhance Operations Training

- Standards and Expectations

- Staffing Support

- Focused Simulator Training

  • Procedure Upgrade
  • Reduce Administrative Burden on Shift Managers Kewaunee Excellence Plan Enclosure 2 9

Safety - Plant Operations -

Where Are We Going

  • Fast Track SRO Class
  • Operations Ownership of Plant Issues
  • Fleet Lead Operational Focus Self-Assessment
  • Adopting Millstone Work Hours procedure Kewaunee Excellence Plan Safety - Plant Operations -

Event Review Team Actions

  • Provided management and Fleet observers to oversee startup
  • Stand-down to correct procedures
  • Written expectations for Control Room observers Kewaunee Excellence Plan Enclosure 2 10

Safety - Plant Operations -

Event Review Team Actions

  • Reviewed aggregate operator burden
  • Tested 24 4160 volt circuit breakers
  • Briefed on lessons learned (Stop when unsure, conservative decision making, crew briefs, management notification)

Kewaunee Excellence Plan Safety - Engineering-What We Have Done

  • Design Basis Documents (DBDs) Issued

- HELB, Flooding, AFW

- Started DBD training for Engineering

  • Portal Implemented and Calculations Loaded
  • Staffed System Engineering Kewaunee Excellence Plan Enclosure 2 11

Safety - Engineering -

Where We Are Going

  • Staff Augmentation To Address Backlog
  • Continue DBD Effort
  • Formalizing Expectation For Review Of Vintage Calculations
  • Calculation Upgrade Projects
  • INPO Assist For Engineering Effectiveness Kewaunee Excellence Plan Safety - Engineering -

Where We Are Going

  • Complete DBDs and Training
  • Develop Q-list Improvement Plan
  • Scoping Project For Risk Reduction Initiatives Kewaunee Excellence Plan Enclosure 2 12

Focus On Four Human Performance Excellence Plan Kewaunee Excellence Plan Human Performance Strategy

  • Reduce Error-Likely Situations Kewaunee Excellence Plan Enclosure 2 13

Human Performance -

What We Have Done

  • Established Procedures Upgrade Group
  • Initiated Plant Labeling Upgrade
  • Enhance Expectations For Tool Usage
  • Increased Accountability For Human Performance Tools
  • Conducted Coaches Camp
  • Operations Two Minute Tool Card Kewaunee Excellence Plan Human Performance -

Where We Are Going

  • Continue Procedures Upgrades
  • Continue Plant Labeling Effort
  • Continue To Bring In Outside Expertise Kewaunee Excellence Plan Enclosure 2 14

Focus On Four Equipment Reliability Excellence Plan Kewaunee Excellence Plan Equipment Reliability Strategy

  • Maximize System Availability Kewaunee Excellence Plan Enclosure 2 15

Equipment Reliability -

What We Have Done

  • Focus on Fixing the Plant

- Replaced A MFW pump motor

- 4160 breaker extent of condition

- SW extent of condition repairs

  • Issued Plant Health Report
  • SERT/SERIL
  • System Engineer Walk-downs With Management Kewaunee Excellence Plan Equipment Reliability -

Where We Are Going

  • Reduce Operations Burdens/Distractions

- Upcoming Refueling Outage

  • Complete installation for numerous OBDs
  • Replace RCP motor
  • Replace multiple sections of SW piping
  • Install new ECCS suction strainers
  • AFW system control valves Kewaunee Excellence Plan Enclosure 2 16

Equipment Reliability -

What Have We Learned

  • Focus on fixing the plant

- Leverage the Corrective Action Program Kewaunee Excellence Plan Summary Kewaunee Excellence Plan Enclosure 2 17

Kewaunee Excellence Plan Enclosure 2 18