MONTHYEARML17132A3622017-05-12012 May 2017 NRC Participating in a Public Meeting of the Vermont Nuclear Decommissioning Citizen Advisory Panel ML17012A3732017-01-12012 January 2017 Closed Meeting Notice of Entergy Pre-Submittal Meeting with NRC Staff for Discussion of Proposed Changes to the Physical Security Plan (Docket 50-271, License DPR-28) ML15082A3172015-04-0606 April 2015 2/19/15 Notice of Public Meeting to Discuss the Vermont Yankee Nuclear Power Station, Post - Shutdown Decommissioning Activities Report ML15021A1952015-01-21021 January 2015 Notice of Public Webinar Meeting on 02/05/15 to Discuss the Decommissioning Process for Nuclear Power Reactors and How It Relates to Vermont Yankee Nuclear Power Station ML14127A3452014-05-0707 May 2014 5/28/2014 - Notice of Category 3 Public Meeting to Discuss Entergy Performance at Vermont Yankee During Cy 2013 ML13150A2182013-05-31031 May 2013 6/12/13 Notice of Conference Call with Entergy Nuclear Operations, Inc. to Discuss Draft Request for Additional Information for Vermont Yankee NRC Order Number EA-12-049 Related to Mitigation Strategies ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML13098A0972013-04-0808 April 2013 Notice of Public Meeting on April 30, 2013 ML12298A0882012-10-24024 October 2012 Forthcoming Meeting to Discuss Proposed License Amendment Request to Revise 10 CFR 50.63 Alternate AC Power Source to SBO EDG ML13225A3362012-09-24024 September 2012 Meeting Notice on Vermont Yankee LAR - Steam Dryer Review ML12121A6282012-04-30030 April 2012 5/23/2012 - Notice of Public Meeting to Discuss the Nrc'S Assessment of Safety Performance at Vermont Yankee ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1115702702011-06-0606 June 2011 Notice of Public Meeting, June 22, 2011 ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1015403312010-06-0303 June 2010 Notice of Public Meeting with Entergy Nuclear Operations, Inc., Vermont Yankee, to Discuss Assessment of Safety Performance of VY for 2009 ML1009707962010-04-0707 April 2010 Notice of Public Meeting Vermont Yankee Question & Answer ML1008802692010-03-29029 March 2010 Notice of Meeting with Entergy Nuclear Operations, Inc., to Answer the Public'S Questions Concerning Tritium, and to Provide a Perspective on the Potential Public Health Risk ML1008201642010-03-23023 March 2010 Entergy Nuclear Operations (Entergy) Notice of Meeting with NRC ML0827606282008-10-0202 October 2008 Notice of Meeting with Energy Nuclear Operating, Inc, to Discuss the Results of the Nrc'S Special Inspection of the July 11, 2008 Vermont Yankee Nuclear Power Station Cooling Tower Circulating Water System Leakage ML0811601732008-04-25025 April 2008 Notice of Meeting with Entergy Nuclear Operations, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Vermont Yankee Nuclear Power Station for the Calendar Year 2007 ML0736007382007-12-28028 December 2007 01/08/2008 Notice of Forthcoming Meeting with Entergy Nuclear Operations, Inc., to Discuss Requests for Additional Information in the License Renewal Review for Vermont Yankee Nuclear Power Station ML0721406672007-08-0202 August 2007 08/13/07, Forthcoming Meeting with Entergy Nuclear Operations, Inc., (Entergy) Regarding License Renewal for the Vermont Yankee Nuclear Power Station ML0713005992007-05-10010 May 2007 Notice of Licensee Meeting with Entergy Nuclear Operations, Inc., to Inform Licensee of the Results of NRC Team Inspection Covering Scoping and Aging Management Portions of Vermont Yankee Application for a Renewed License ML0712001462007-04-30030 April 2007 Notice of Public Meeting with Entergy Nuclear Operations, Inc., Regarding Nrc'S Assessment of the Safety Performance of the Vermont Yankee Nuclear Power Station for Calendar Year 2006 ML0702404502007-01-23023 January 2007 02/02/2007 Notice of Meeting Cancellation with Entergy Nuclear Vermont Yankee, LLC, to Discuss Issues Related License Renewal Review ML0702204652007-01-23023 January 2007 02/02/2007 Forthcoming Meeting with Entergy Nuclear Vermont Yankee, LLC, on License Renewal for Vermont Yankee Nuclear Power Station ML0636000342006-12-29029 December 2006 01/31/2007, Forthcoming Meeting with Vermont Yankee Nuclear Power Station to Discuss the Draft Supplement Environmental Impact Statement for the License Renewal ML0618600402006-07-0303 July 2006 07/20/2006 Forthcoming Audit Status Public Meeting with Entergy Nuclear Operations, Inc. on the License Renewal Application for Vermont Yankee Nuclear Power Station ML0613006692006-05-10010 May 2006 06/07/2006 - Forthcoming Meeting to Discuss the Environmental Scoping Process for Vermont Yankee Nuclear Power Station (Vynps), License Renewal Application (LRA) ML0609401902006-04-0404 April 2006 Meeting Notice with Vermont Yankee Annual Assessment Nuclear Power Station, to Discuss Nrc'S Assessment of the Safety Performance of the Vermont Yankee Nuclear Power Station ML0604107072006-02-10010 February 2006 03/01/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC) Staff to Describe the License Renewal Process ML0526200022005-09-19019 September 2005 09/21/2005 Notice of Forthcoming Closed Meeting with Entergy Nuclear Vermont Yankee, LLC and General Electric Company Regarding Void Reactivity Coefficients ML0525503042005-09-12012 September 2005 09/14/2005 and 09/15/2005 Forthcoming Closed Meetings with Entergy Nuclear Vermont Yankee, LLC (Entergy) and General Electric Company (GE) to Discuss Reactor Neutronic & Thermal/Hydraulic Analysis for Proposed Extended Power Uprate for Plan ML0517500892005-06-24024 June 2005 06/30/2005 Notice of Forthcoming Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) and GE Nuclear Energy (Gene) ML0517400742005-06-23023 June 2005 06/30/2005 Revised Forthcoming Meeting with Entergy Nuclear Vermont Yankee, LLC and GE Nuclear Energy - Re Room Location Change ML0516800092005-06-17017 June 2005 06/30/2005 Forthcoming Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) and GE Nuclear Energy (Gene) ML0516601582005-06-16016 June 2005 08/16-18/2005 - Notice of Significant Meeting with Region I Power Reactor Licensees and Members of Mid-Atlantic Nuclear Training Group (Mantg) on Issues Related to Operator Licensing Requirements ML0511600632005-04-26026 April 2005 05/09/2005 Notice of Forthcoming Meeting with Entergy Nuclear Vermont Yankee, LLC Purpose Extended Power Uprate ML0507400842005-03-15015 March 2005 Notice of Meeting Mn 05-003, Rev. 2 with Vermont Yankee Regarding Annual Assessment ML0506902312005-03-10010 March 2005 Revised Vermont Yankee Annual Assessment Meeting Notice ML0506203192005-03-0303 March 2005 Annual Assessment Meeting Notice ML0431301862004-11-0808 November 2004 Notice of Postponement of Meeting Between NRC and Entergy to Present Results of NRC Special Inspection Regarding Two Spent Fuel Rod Pieces That Were Misplaced in the Vermont Yankee Spent Fuel Pool ML0431301752004-11-0808 November 2004 Notice of Postponement of Meeting Between the NRC and Entergy to Present the Results of Nrc'S Engineering Team Inspection ML0430304042004-10-29029 October 2004 11/09/2004 Vermont Yankee Meeting Between the NRC and Entergy to Present the Results of Nrc'S Engineering Team Inspection ML0430203142004-10-28028 October 2004 Notice of Meeting with Entergy to Present Results of NRC Special Inspection Two Spent Fuel Rod Pieces That Were Misplaced in the Vermont Yankee Spent Fuel Pool ML0425400082004-09-14014 September 2004 09/29/2004 Notice of Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) to Discuss the Steam Dryer Analysis Associated with the Proposed Extended Power Uprate ML0419100212004-07-0909 July 2004 07/21/2004 Notice of Partially Closed Meeting with Entergy Nuclear Operations Regarding Vermont Yankee Nuclear Power Station ML0416702662004-06-17017 June 2004 07/22/2004 Notice of Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) and GE Nuclear Energy (Gene) to Discuss the Steam Dryer Analysis Associated with the Proposed Extended Power Uprate for Vermont Yankee Nuclear Power Station 2017-05-12
[Table view] |
Text
MN No. 10*016 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 7, 2010 Licensee: Entergy Nuclear Operations, Inc.
Facility: Vermont Yankee Nuclear Power Station Docket No.
Date and Time: April 19. 2010 Open House [Cafeteria]
1:00 p.m. - 4:00 p.m. & 5:00 p.m. - 6:00 p.m.
Question & Answer Meeting [Auditorium]
6:00p.m. 9:00 p.m.
Location: Brattleboro Union High School 131 Fairground Rd Brattleboro, VT 05301
Purpose:
During the Open House, NRC staff will meet informally with Federal, State, and local officials and the public concerning groundwater contamination at Vermont Yankee and provide the NRC's perspective on the potential public health and safety impact. The staff also will address regulatory requirements related to tritium and how the NRC fulfills its mission. A number of information stations will be available to address a broad range of questions associated with Vermont Yankee.
At the question and answer meeting, following a brief opening statement, NRC staff will respond to questions from the public and the electedl appointed officials in a more formal format. For the safety of attendees, the number of individuals will be limited to that permitted by local government fire code requirements.
The meeting was rescheduled from April 1ih to April 19th due to the availability of a facility that has sufficient capacity to accommodate a large attendance and provides for enhanced stakeholder participation at the meetings.
2 Attendees:
NRC: B. Mallett, Deputy Executive Director for Reactor and Preparedness Programs S. Collins, Regional Administrator, Region I D. Roberts, Director, Division of Reactor Safety, Region I D. Jackson, Chief, Projects Branch 5, Region I J. White, Chief, Plant Support Branch 2, Region I Representative, Groundwater Contamination Task Force Others as assigned Public Participation*: This is a Category 3 Meeting. The Open House will provide the public the opportunity to talk with the NRC staff on an informal basis. Following the Open House, a question and answer meeting will be held to provide a further opportunity to ask questions of the NRC staff.
The NRC's Groundwater Contamination Task Force Charter can be located in ADAMS with Accession Number ML100640188. ADAMS is accessible from the NRC Web Site at:
http://www.nrc.gov/reading-rm/adams.html.
Meeting
Contact:
Donald E. Jackson, Chief Projects Branch 5 (610) 337-5306 E-mail: donald.jackson@nrc.gov
- The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format, please notify the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 14, 2010, via telephone to the NRC meeting contact.
Approved by:
IRA! Fred Bower for:
Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ
2 Attendees:
NRC: B. Mallett, Deputy Executive Director for Reactor and Preparedness Programs S. Collins, Regional Administrator, Region I D. Roberts, Director, Division of Reactor Safety, Region I J. White, Chief, Plant Support Branch 2, Region I D. Jackson, Chief, Projects Branch 5, Region I Representative, Groundwater Contamination Task Force Others as assigned Public Participation*: This is a Category 3 Meeting. The Open House will provide the public the opportunity to talk with the NRC staff on an informal basis. Following the Open House, a question and answer meeting will be held to provide a further opportunity to ask questions of the NRC staff.
The NRC's Groundwater Contamination Task Force Charter can be located in ADAMS with Accession Number ML100640188. ADAMS is accessible from the NRC Web Site at:
http://www.nrc.gov/reading-rm/adams.html.
Meeting
Contact:
Donald E. Jackson, Chief Projects Branch 5 (610) 337-5306 E-mail: donald.iackson@nrc.gov
- The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format, please notify the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 14, 2010, via telephone to the NRC meeting contact.
Approved by:
IRAJ Fred Bower for:
Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ Distribution: See next page SUNSI Review Complete: JTH (Reviewer's Initials) ML100970796 DOC NAME: G:IDRPIBRANCH5IMEETINGSITritium workshop Mtg Notice 4 12 10 Revised.doc After declaring this document "An Official Agency Record" it!!!!! be released to the Public.
To receive a copv of this document. indicate in the box: 'C":: Copy without attachment/enclosure 'EO = Copy with attachment/enclosure ' N":o No copy OFFICE RIIDRP I RIIDRP I RI/DRP I NAME JHeinly/JH DJackson/DJ DLew/DL DATE 04/07/10 04/07/10 04/07/10 OFFICIAL RECORD COPY
3 Distribution: (Via E-Mail):
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCE)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCE)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRRlADPR (RIDSNRROD)
Associate Director, Office of Operating Reactor Oversight and Licensing,NRRlADRO (RIDSNRRADRO)
Director, Division of Inspection and Regional Support, NRR (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRRlDORL (RIDSNRRDORL)
Asst. General Counsel Materials Litigation and Enforcement,OGC (RIDSOGCMAILCENTER RESOURCE)
S. Collins, RA N. McNamara, SLO G. Matakas, ORA M. Dapas, DRA D. Tifft, SLO DRS Div Secretary, RI D. Lew, DRP D. Spindler, DRP, SRI DRP Div Secretary, RI J. Clifford, DRP H. Jones, DRP, RI R. Barkley, ORA D. Roberts, DRS A. Rancourt, DRP, OA RI Receptionist P. Wilson, DRS L. Trocine, RI, OEDO PMNS D. Jackson, DRP J. Lubinski, NRR ROPreportsResource(j;i'lnrc.gov T. Setzer, DRP M. Kowal, NRR Region I Docket Rm J. Heinly, DRP J. Kim, PM, NRR L. Pinkham, DRP D. Screnci, PAO J. Boska, PM, NRR D. Bearde. DRS N. Sheehan, PAO J. Thompson, NRR