ML050620319

From kanterella
Jump to navigation Jump to search
Annual Assessment Meeting Notice
ML050620319
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/03/2005
From: Anderson C
NRC/RGN-I/DRP/PB5
To:
Shared Package
ML050620251 List:
References
MN 05-003
Download: ML050620319 (5)


Text

MN No.05-003 March 3, 2005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Entergy Nuclear Operations, Inc.

Facility: Vermont Yankee Nuclear Power Station Docket No.: 50-271 Date/Time: March 17, 2005 at 2:00 p.m.

Location: Governor Hunt House 320 Governor Hunt Road Vernon, VT 05354

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss NRCs assessment of the safety performance of the Vermont Yankee Nuclear Power Station for calendar year 2004. NRCs assessment is documented in a letter dated March 2, 2005. The meeting is also intended to provide an opportunity for the NRC to engage interested stakeholders in discussions on Entergys performance at Vermont Yankee and the role of the agency in ensuring safe plant operations.

Attendees*:

NRC: B. Holian, Deputy Director, Division of Reactor Projects, Region I C. Anderson, Chief Projects Branch 5, Region I D. Pelton, Senior Resident Inspector at Vermont Yankee B. Sienel, Resident Inspector at Vermont Yankee Licensee: J. Thayer, Site Vice President W. Maguire, General Manager Plant Operations J. Dreyfuss, Manager of Operations R. Wanczyk, Director of Safety Assurance Public Participation: This is a Category 1 Meeting. Following the business portion of the meeting, members of the public will have an opportunity to discuss Entergys performance at Vermont Yankee and the role of the NRC in ensuring safe operations at the plant.

NRCs assessment letter and meeting agenda (attachment to this notice) can be found in ADAMS (Accession Number ML050610121 and ML050620319). ADAMS is accessible for the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Pilgrim Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Meeting

Contact:

Clifford Anderson, Chief Projects Branch 5 610-337-5227 E-mail: cja@nrc.gov.

C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 14, 2005, via telephone to the NRC meeting contact.

/RA/

Approved by: _______________________

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

3 Distribution:

Mr. J. Thayer, Site Vice President State of Vermont, SLO Designee Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist

4 Distribution: (Via E-Mail)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

S. Lee, RI EDO Coordinator J. Boska, Project Manager, NRR R. Ennis, NRR (Backup)

W. Lanning, DRS J. Lubinski, DRS Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

K. Farrar, Regional Counsel D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA C. Anderson, DRP D. Florek, DRP D. Pelton, SRI - Vermont Yankee B. Sienel, RI - Vermont Yankee G. Matakas, ORA PMNS WEBWORK SISP Review Complete: Cja (Reviewers Initials)

DOCUMENT NAME: G:\BRANCH5\MEETINGS\VY EOC Meeting Notice 3-17-05.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /

NAME DFlorek/cja CAnderson/

for DATE 03/03/05 03/03/05 03/ /05 03/ /05 03/ /05 OFFICIAL RECORD COPY

5 Annual Assessment Meeting Agenda:

C Introduction C Review of Reactor Oversight Process C National Summary of Plant Performance C Discussion of Plant Performance Results C Licensee Response and Remarks C NRC Closing Remarks C Break C NRC available to address public questions