ML101540331

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Entergy Nuclear Operations, Inc., Vermont Yankee, to Discuss Assessment of Safety Performance of VY for 2009
ML101540331
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 06/03/2010
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To:
Jackson, D E RI/DRP/PB5/610-337-5306
Shared Package
ml100541694 List:
References
Download: ML101540331 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 MN No.10-021 June 3, 2010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OP PUBLIC MEETING Licensee: Entergy Nuclear Operations, Inc.

Facility: Vermont Yankee Nuclear Power Station Docket No. 50-271 Date and Time: June 22.2010 Open House [Auditorium EntrywayJ 4:00 p.m. - 6:00 p.m.

Public Meeting [Auditorium]

6:00 p.m. - 9:00 p.m.

Location: Brattleboro Union High School 131 Fairground Road Brattleboro, VT 05301

Purpose:

During the Open House, NRC staff will meet informally with Federal, State, and local officials and the public concerning the Nuclear Regulatory Commission's assessment of the safety performance of the Vermont Yankee Nuclear Power Station (VY) for calendar year 2009, and the role of the agency in ensuring safe plant operations. In addition, a number of information stations will be available to address a broad range of questions associated with Vermont Yankee.

The public meeting will contain brief presentations on the assessment of the safety performance of VY for 2009, the NRC groundwater contamination task force. and the inspection of the Entergy response to the demand for information issued to VY. Following the presentations, NRC staff will respond to questions from the public and elected/appointed officials. For the safety of attendees, the number of individuals will be limited to that permitted by local government fire code requirements.

2 Attendees:

NRC: S. Collins, Regional Administrator, Region I C. Casto, Deputy Regional Administrator, Region IV D. Roberts, Director, Division of Reactor Safety D. Jackson, Chief, Projects Branch 5 J. White, Chief, Plant Support Branch 2 D. Spindler, Senior Resident Inspector H. Jones, Resident Inspector J. Kim, Vermont Yankee Project Manager T. Setzer, Senior Project Engineer M. McLaughlin, Senior Enforcement Specialist Public Participation"': This is a Category 3 Meeting. The Open House will provide elected officials and the public the opportunity to talk with the NRC staff on an informal basis.

After the Open House, brief presentations will be made by the NRC staff followed by a question and answer session.

The NRC's Annual Assessment Letter for Vermont Yankee Nuclear Power Station can be located in ADAMS with Accession Number ML100621409. ADAMS is accessible from the NRC Web Site at: http://www.nrc.govlreading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performancE~ of Vermont Yankee Nuclear Power Station can be found on the NRC's web site at:

www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Donald E. Jackson, Chief, Projects Branch 5 (610) 337-5306 E-mail: donald.jackson@nrc.gov

  • The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g.

braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by June 17, 2010, via telephone to the NRC meeting contact.

Dr Donald E. J son, Chief Projects Branch 5 Division of Reactor Projects

2 Attendees:

NRC: S. Collins, Regional Administrator, Region I C. Casto, Deputy Regional Administrator, Region IV D. Roberts, Director, Division of Reactor Safety D. Jackson, Chief, Projects Branch 5 J. White, Chief, Plant Support Branch 2 D. Spindler, Senior Resident Inspector H. Jones, Resident Inspector J. Kim, Vermont Yankee Project Manager T. Setzer, Senior Project Engineer M. McLaughlin, Senior Enforcement Specialist Public Participation*: This is a Category 3 Meeting. The Open House will provide elected officials and the public the opportunity to talk with the NRC staff on an informal basis.

After the Open House, brief presentations wi" be made by the NRC staff followed by a question and answer session.

The NRC's Annual Assessment Letter for Vermont Yankee Nuclear Power Station can be located in ADAMS with Accession Number ML100621409. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Vermont Yankee Nuclear Power Station can be found on the NRC's web site at:

www.nrc.gov/NRRlOVERSIGHT/ASSESSlindex.htmL Meeting

Contact:

Donald E. Jackson, Chief, Projects Branch 5 (610) 337-5306 .

E-mail: donald.[ackson@nrc.gov

  • The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g.

braille, large print). please notify the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by June 17, 2010, via telephone to the NRC meeting contact.

Approved by:

IRA!

Donald Jackson, Chief Projects Branch 5 Division of Reactor Projects Distributicm: (See attached SUNS' Review Complete: DEJ (Reviewer'S Initials) ML101540331 DOC NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2009 EOC\Meeting Notices\Vermont ROP 10 Annual Assessment Meeting Notice rev3.doc After declaring this document "An Official Agency Record" it will be released to the Public.

To receive acopy of this document, indicate in the box: *"C* =Copy without attachmentlenclosore "E" Copy with attachment/enclosure 'N' =No copy IOFFICE RIIDRP/lhp JHeinly/jh I RI/ORA I RIIDRP I I NAME DScrencilds DJackson/dj I DATE 06/02/10 6102110 06/03/10 OFFICIAL RECORD COpy

3 Agenda NRC's Open House Vermont Yankee Nuclear Power Station Brattleboro Union High School Auditorium Entryway June 22, 2010 4:00 6:00 p.m.

NRC's Public Meeting Vermont Yankee Nuclear Power Station Brattleboro Union High School Auditorium June 22,2010 6:00 - 9:00 p.m.

Introduction ............. ,................................................................................ NRC (5 minutes)

Reactor OVE!rsight Process and Vermont Yankee Performance during 2009 ............................................................................................ NRC (10 minutes)

Groundwater Task Force Results ........................................................... NRC (10 minutes)

Demand for Information Response Inspection Results ........................... NRC (10 minutes)

ClOSing Remarks ..................................................................................... NRC (5 minutes)

NRC to address questions .............................. NRC/Members of the Public (until 9:00 PM)

4 Distribution: (Via E-Mail):

Executive Difector for Operations, OEDO (RIDSEDOMAILCENTER RESOURCE)

Deputy Executive Director for Reactor Programs, OEDO (RrDSEDOMAILCENTER RESOURCE)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRRlADPR (RIDSNRROD)

Associate Direc;tor, Office of Operating Reactor Oversight and Licensing,NRRlADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Support. NRR (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRRlDORL (RIDSNRRDORL)

Project Directorate 1-1 (PD1/2), NRR (RIDSNRRDORILpI1-2)

Asst. General Counsel Materials Litigation and Enforcement,OGC (RIDSOGCMAILCENTER RESOURCE)

S. Collins, RA N. McNamara, SLO G. Matakas, ORA M. Dapas, ORA D. Tifft, SLO DRS Div Secretary, RI D. Lew, DRP D. Spindler, DRP, SRI DRP Div Secretary, RI J. Clifford, DRP H. Jones, DRP, RI R. Barkley, ORA D. Roberts, DR.S A. Rancourt, DRP, OA RI Receptionist P. Wilson, DRS L. Trocine, RI, OEDO PMNS D. Jackson, DRP J. Lubinski, NRR ROPregortsResource@nrc.gov T. Setzer, DRP M. Kowal, NRR Region I Docket Rm J. Heinly, DRP J. Kim, PM, NRR L. Pinkham, DRP D. Screnci, PAO J. Boska, PM, NRR N. Sheehan,PAO J. Thompson, NRR