Revised Vermont Yankee Annual Assessment Meeting Notice
ML050690231
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/10/2005
From: Anderson C
NRC Region 1
To:
Shared Package
ML050620251 List:
References
MN 05-003/1
Download: ML050690231 (5)


Text

MN No.05-003 Rev. 1 March 10, 2005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Entergy Nuclear Operations, Inc.

Facility: Vermont Yankee Nuclear Power Station Docket No.: 50-271 Date/Time: March 17, 2005 at 2:00 p.m.

Location: Governor Hunt House 320 Governor Hunt Road Vernon, VT 05354

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss NRCs assessment of the safety performance of the Vermont Yankee Nuclear Power Station for calendar year 2004. NRCs assessment is documented in a letter dated March 2, 2005. The meeting is also intended to provide an opportunity for the NRC to engage interested stakeholders in discussions on Entergys performance at Vermont Yankee and the role of the agency in ensuring safe plant operations. Meeting Notice is re-issued to include NRC Annual Assessment Meeting Slides.

Attendees*:

NRC: B. Holian, Deputy Director, Division of Reactor Projects, Region I C. Anderson, Chief Projects Branch 5, Region I D. Pelton, Senior Resident Inspector at Vermont Yankee B. Sienel, Resident Inspector at Vermont Yankee Licensee: J. Thayer, Site Vice President W. Maguire, General Manager Plant Operations J. Dreyfuss, Manager of Operations R. Wanczyk, Director of Safety Assurance Public Participation: This is a Category 1 Meeting. Following the business portion of the meeting, members of the public will have an opportunity to discuss Entergys performance at Vermont Yankee and the role of the NRC in ensuring safe operations at the plant.

NRCs assessment letter, meeting agenda (attachment to this notice) and NRC Slides can be found in ADAMS (Accession Number ML050610121, ML050690231, ML050690139). ADAMS is accessible for the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Pilgrim Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Meeting

Contact:

Clifford Anderson, Chief Projects Branch 5 610-337-5227 E-mail: cja@nrc.gov.

C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 14, 2005, via telephone to the NRC meeting contact.

/RA/

Approved by: _______________________

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects cc w/encl:

J. K. Thayer, Site Vice President M. R. Kansler, President, Entergy Nuclear Operations, Inc.

G. J. Taylor, Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President and Chief Operating Officer D. L. Pace, Vice President, Engineering B. OGrady, Vice President, Operations Support J. M. DeVincentis, Manager, Licensing, Vermont Yankee Nuclear Power Station Operating Experience Coordinator - Vermont Yankee Nuclear Power Station J. F. McCann, Director, Nuclear Safety Assurance M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.

J. M. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.

S. Lousteau, Treasury Department, Entergy Services, Inc.

Administrator, Bureau of Radiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.

D. R. Lewis, Esquire, Shaw, Pittman, Potts & Trowbridge G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)

D. Katz, Citizens Awareness Network (CAN)

R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Sniezek, PWR SRC Consultant R. Toole, PWR SRC Consultant Commonwealth of Massachusetts, SLO Designee State of New Hampshire, SLO Designee State of Vermont, SLO Designee

3 Distribution:

Mr. J. Thayer, Site Vice President State of Vermont, SLO Designee Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist

4 Distribution: (Via E-Mail)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

S. Lee, RI EDO Coordinator J. Boska, Project Manager, NRR R. Ennis, NRR (Backup)

W. Lanning, DRS J. Lubinski, DRS Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

K. Farrar, Regional Counsel D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA C. Anderson, DRP D. Florek, DRP D. Pelton, SRI - Vermont Yankee B. Sienel, RI - Vermont Yankee G. Matakas, ORA PMNS SISP Review Complete: (Reviewers Initials)

DOCUMENT NAME: G:\BRANCH5\MEETINGS\VY EOC Meeting Notice 3-17-05.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /

NAME DFlorek/ CAnderson/

DATE 03/10/05 03/10/05 03/ /05 03/ /05 03/ /05 OFFICIAL RECORD COPY

Annual Assessment Meeting Agenda:

C Introduction C Review of Reactor Oversight Process C National Summary of Plant Performance C Discussion of Plant Performance Results C Licensee Response and Remarks C NRC Closing Remarks C Break C NRC available to address public questions