ML071200146

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Entergy Nuclear Operations, Inc., Regarding NRCs Assessment of the Safety Performance of the Vermont Yankee Nuclear Power Station for Calendar Year 2006
ML071200146
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/30/2007
From: Racquel Powell
Division Reactor Projects I
To:
Powell R, RI/DRP/610-337-6967
References
MN 07-013
Download: ML071200146 (5)


Text

MN No.07-013 April 30, 2007 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee:

Entergy Nuclear Operations, Inc.

Facility:

Vermont Yankee Nuclear Power Station Docket No.

50-271 Date/Time:

May 14, 2007 at 6:00 p.m.

Location:

Quality Inn 1380 Putney Road Brattleboro, VT 050301

Purpose:

To discuss NRCs assessment of the safety performance of the Vermont Yankee Nuclear Power Station for calendar year 2006.

Attendees:

NRC:

J. Clifford, Deputy Director, Division of Reactor Projects, Region I R. Powell, Chief, Projects Branch 5, Division of Reactor Projects D. Pelton, Senior Resident Inspector - Vermont Yankee B. Sienel, Resident Inspector - Vermont Yankee Licensee:

T. Sullivan, Site Vice President - Vermont Yankee W. Maguire, General Manager Plant Operations - Vermont Yankee J. Dreyfuss, Director Nuclear Safety - Vermont Yankee N. Rademacher, Director of Engineering - Vermont Yankee Public Participation:

This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding Entergys performance at Vermont Yankee and the role of the agency in ensuring safe plant operations.

Members of the public may provide questions or particular topics of interest for discussion in advance of the meeting to the meeting contact.

NRCs assessment letter can be found in ADAMS with Accession Number ML070610598. The slides for the meeting can be located in ADAMS with an Accession Number of ML071150269.

ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Vermont Yankee can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Raymond Powell, Chief, Projects Branch 5 (610) 337-6967 E-mail: rjp@nrc.gov Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made known by May 11, 2007, via telephone to the NRC meeting contact.

Approved by:

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects cc w/encl:

M. R. Kansler, President, Entergy Nuclear Operations, Inc.

G. J. Taylor, Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President M. Balduzzi, Senior Vice President, Northeastern Regional Operations C. Schwarz, Vice-President, Operations Support O. Limpias, Vice President, Engineering D. Mannai, Manager, Licensing, Vermont Yankee Nuclear Power Station Operating Experience Coordinator, Vermont Yankee Nuclear Power Station W. Maguire, General Manager, Plant Operations, Entergy Nuclear Operations, Inc.

N. Rademacher, Director, Engineering, Vermont Yankee Nuclear Power Station J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.

Assistant General Counsel, Entergy Nuclear Operations, Inc.

J. H. Sniezek, PWR SRC Consultant M. D. Lyster, PWR SRC Consultant S. Lousteau, Treasury Department, Entergy Services, Inc.

D. O Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of New Hampshire W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.

D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau

3 J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission D. Katz, Citizens Awareness Network (CAN)

R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Volz, Chairman, Public Service Board, State of Vermont Chairman, Board of Selectman, Town of Vernon State of New Hampshire, SLO Designee State of Vermont, SLO J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts

ML071200146 Document Name: C:\\FileNet\\ML071200146.wpd SUNSI Review Complete: RJP (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME B Norris R Powell DATE 04/28/07 04/28/07

Agenda NRCs Annual Assessment Meeting Vermont Yankee Nuclear Power Station May 14, 2007 Introduction............................................................ NRC NRC Organization and Performance Goals

.................................... NRC Reactor Oversight Process................................................. NRC National Summary of Plant Performance...................................... NRC Discussion of Vermont Yankee Plant Performance Assessment

.................... NRC Entergy management's response and remarks............................... Entergy NRC's Closing Remarks................................................... NRC Break............................................................ (5 minutes)

NRC to address public questions.......................... NRC/Members of the Public