Notice of Postponement of Meeting Between NRC and Entergy to Present Results of NRC Special Inspection Regarding Two Spent Fuel Rod Pieces That Were Misplaced in the Vermont Yankee Spent Fuel Pool
ML043130186
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/08/2004
From: Anderson C
NRC/RGN-I/DRP/PB5
To:
References
MN 04-29, Rev 1
Download: ML043130186 (3)


Text

MN No. 04-29 Rev. 1 November 8, 2004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING NOTICE OF POSTPONEMENT Licensee: Entergy Nuclear Operations, Inc.

Facility: Vermont Yankee Nuclear Power Station Docket: 50-271 Date /Time: November 9, 2004 at 3:00pm This meeting has been postponed. The NRC is working with the local, state and federal officials to identify a suitable location and forum for a future meeting, and the public will be notified of the final arrangements.

Purpose:

Meeting between the NRC and Entergy to present the results of NRCs Special Inspection regarding two spent fuel rod pieces that were misplaced in the Vermont Yankee spent fuel pool.

Public Participation: For information on the NRC rules for public participation at this and other NRC meetings, please see our public meeting brochure located on our webpage:

http://www.nrc.gov/reading-rm/doc-collections/nuregs/brochures/br0297/

Accession Number for ADAMS Meeting Package is ML042950624 The NRCs online document library, ADAMS, is temporarily unavailable due to a security review. When ADAMS access is restored, this document will be retrievable through the NRC Website at http://www.nrc.gov/reading-rm/adams.html.

Meeting

Contact:

Clifford Anderson, Chief Projects Branch 5 610-337-5227 E-mail: cja@nrc.gov.

Approved by: /RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

2 Distribution:

Mr. Jay Thayer, Site Vice President State of Vermont, SLO Designee Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

3 Distribution (Via E-Mail):

RI, EDO Coordinator, OEDO, (RIDSEDOMAILCENTER)

Executive Director for Operations, OEDO, (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

R. Ennis, Project Manager, NRR W. Lanning, DRS R. Crlenjak, DRS K. Farrar, Regional Counsel D. Screnci, PAO, RI N. Sheehan, OPAO, RI R. Bores, ORA G. Matakas, ORA C. Anderson, DRP T. Jackson, DNMS D. Florek, DRP D. Pelton, SRI -VY B. Sienel, RI-VY PMNS WEBWORK ADAMS Meeting Notice DOCUMENT NAME: E:\Filenet\ML043130186.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP NAME CAnderson/CJA DATE 11/08/04 OFFICIAL RECORD COPY