ML102871200

From kanterella
Revision as of 13:04, 6 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Meeting, Davis-Besse Nuclear Power Station Reactor Vessel Head Replacement
ML102871200
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/12/2010
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML102871200 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 12, 2010 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION REACTOR VESSEL HEAD REPLACEMENT MEETING

Dear Mr. Allen:

This letter confirms the discussion between Mr. Mel Holmberg of my staff and Mr.

Patrick J. McCloskey of your staff, for a meeting to be held at 1:00 p.m. CST on Tuesday, November 16, 2010. The purpose of this meeting is to discuss FirstEnergy Nuclear Operating Company (FENOC) plans for the reactor pressure vessel head replacement and will serve to facilitate NRC planning and scheduling of NRC inspections to be conducted as part of Inspection Procedure (IP) 71007, Reactor Vessel Head Replacement Inspection. This meeting will be held at the U.S. NRC Region III Office, located at 2443 Warrenville Road, Suite 210 in Lisle, Illinois, 60532. This meeting will be open to the public. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion but before the meeting is adjourned.

If you have any questions regarding this meeting, please contact Mel Holmberg at (630) 829-9748 Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc w/encl: Distribution via ListServ

Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION REACTOR VESSEL HEAD REPLACEMENT MEETING

Dear Mr. Allen:

This letter confirms the discussion between Mr. Mel Holmberg of my staff and Mr.

Patrick J. McCloskey of your staff, for a meeting to be held at 1:00 p.m. CST on Tuesday, November 16, 2010. The purpose of this meeting is to discuss FirstEnergy Nuclear Operating Company (FENOC) plans for the reactor pressure vessel head replacement and will serve to facilitate NRC planning and scheduling of NRC inspections to be conducted as part of Inspection Procedure (IP) 71007, Reactor Vessel Head Replacement Inspection. This meeting will be held at the U.S. NRC Region III Office, located at 2443 Warrenville Road, Suite 210 in Lisle, Illinois, 60532. This meeting will be open to the public. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion but before the meeting is adjourned.

If you have any questions regarding this meeting, please contact Mel Holmberg at (630) 829 - 9748 Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc w/encl: Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRSIII\DRS\WIP\Ltr. 1013Davis- Besse Head Replacement Public Meeting Confirmation Letter DEH.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII NAME MHolmberg:ls DHills DATE 10/12/10 10/12/10 OFFICIAL RECORD COPY

Letter to Mr. Barry Allen from Mr. David E. Hills dated October 12, 2010.

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION REACTOR VESSEL HEAD REPLACEMENT MEETING Distribution:

Dan Merzke, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR Tim Riley, OCA RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource Steven West, Director, Division of Reactor Projects, RIII Gary Shear, Deputy Director, Division of Reactor Projects, RIII Anne Boland, Director, Division of Reactor Safety, RIII Kenneth OBrien, Deputy Director, Division of Reactor Safety, RIII Jamnes Cameron, DRP Branch Chief J. Rutkowski, SRI, Davis-Besse DRS Branch Chiefs:

Robert Daley David Hills Eric Duncan AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Resource Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP