ML12065A399

From kanterella
Revision as of 22:25, 5 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2/14/2012 - Summary of Public Meeting with Tennessee Valley Authority Regarding the Project Schedule for Watts Bar Nuclear Plant, Unit 2
ML12065A399
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/14/2012
From: Justin Poole
Watts Bar Special Projects Branch
To:
Bavol, Bruce
References
Download: ML12065A399 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 March 14, 2012 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF FEBRUARY 14, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING THE PROJECT SCHEDULE FOR WATIS BAR NUCLEAR PLANT, UNIT 2 On February 14, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the operating license application review, including major milestones and potential challenges that may impact the project schedule. A list of participants is enclosed.

The meeting consisted of the NRC and TVA staff discussing the licensing review along with construction inspection activities and other key challenges.

Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of PartiCipants cc w/encl: Distribution via Listserv

LIST OF PARTICIPANTS FEBRUAY 14. 2011. PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY THE PROJECT SCHEDULE FOR WATTS BAR NUCLEAR PLANT. UNIT 2 Positionffitle Organization Bruce Boger Deputy Director Office of Nuclear Reactor Regulation Steve Campbell Branch Chief Watts Bar Special Projects Branch (LPWB)\

Division of Operating Reactor Licensing (DORL)

Robert Haag Branch Chief R-II\ Division of Construction Projects L. Raghavan Sr. Project Manager LPWB\DORL Patrick Milano Sr. Project Manager LPWB\DORL Justin Poole Sr. Project Manager LPWB\DORL Tennessee Valley Authority (TVA)

Participants:

Gordon Arent Licensing Manager TVA Watts Bar Unit 2 William Crouch Engineering TVA Watts Bar Unit 2 Enclosure

1\1arch 14, 2012 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 2

SUBJECT:

SUMMARY

OF FEBRUARY 14, 2011, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING THE PROJECT SCHEDULE FOR WATTS BAR NUCLEAR PLANT, UNIT 2 On February 14, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA) at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the operating license application review, including major milestones and potential challenges that may impact the project schedule. A list of participants is enclosed.

The meeting consisted of the NRC and TVA staff discussing the licensing review along with construction inspection activities and other key challenges.

Members of the public did not participate in the meeting.

Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.

IRA!

Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

List of Participants cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn2MailCenter Resource LPWB R/F RidsNrrlLABClayton (Hard copy) RidsOpaMail Resource CSteger, NRR RidsNrrPMWatlsBar2 Resource RidsAcrsAcnw_MaiICTR Resou rce MKotzalas, EDO RidsNrrDorlLp_WB Resource RidsOgcMailCenter Resource RidsNrrOd Resource RidsNrrDorl Resource RHaag, RII LRaghavan, NRR ADAMS Accession No'.. ML12065A399 OFFICE LPWB\PM LPWB\LA LPWB\BC NAME JPoole BClavton SCampbell DATE 03/07/12 03/05/12 03114112 OFFICIAL RECORD COpy