ML19162A116

From kanterella
Revision as of 11:15, 1 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529
ML19162A116
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/22/2019
From: Ed Miller
Special Projects and Process Branch
To: Richards D
South Texas
References
Download: ML19162A116 (2)


Text

NRR-DRMAPEm Resource From: Miller, Ed Sent: Wednesday, May 22, 2019 12:20 PM To: nboehmisch@stpegs.com; Richards, Drew

Subject:

FW: Acceptance Review Results: STP License Amendment Request regarding TSTF-529 By letter dated May 1, 2019, STP Nuclear Operating Company submitted a license amendment request for South Texas Project, Units 1 and 2. The amendment would revise Technical Specifications in Section 3.0 and Section 4.0 regarding limiting condition for operation and surveillance requirement usage consistent with TSTF-529. An acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies. The purpose of this e-mail is to provide the results of that review.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances where additional information is required for the NRC staff to complete its review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> to complete. The NRC staff expects to complete this review by your requested date of January 1, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with a revised estimate will be communicated at that time through your assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change due to several factors, including requests for additional information, unanticipated additions to the scope of review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me at (301) 415-2481 or ed.miller@nrc.gov. Thank you.

Ed Miller (301) 415-2481 1

Hearing Identifier: NRR_DRMA Email Number: 39 Mail Envelope Properties (BN7PR09MB275536722326E9042F27F1F6E9000)

Subject:

FW: Acceptance Review Results: STP License Amendment Request regarding TSTF-529 Sent Date: 5/22/2019 12:19:48 PM Received Date: 5/22/2019 12:19:00 PM From: Miller, Ed Created By: Ed.Miller@nrc.gov Recipients:

"nboehmisch@stpegs.com" <nboehmisch@stpegs.com>

Tracking Status: None "Richards, Drew" <amrichards@STPEGS.COM>

Tracking Status: None Post Office: BN7PR09MB2755.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2431 5/22/2019 12:19:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: