04/12/2006 Slides for Annual Assessment Meeting Cy 2005ML061150551 |
Person / Time |
---|
Site: |
Hatch |
---|
Issue date: |
04/12/2006 |
---|
From: |
NRC/RGN-II |
---|
To: |
|
---|
Shared Package |
---|
ML061150533 |
List: |
---|
References |
---|
Download: ML061150551 (17) |
|
Similar Documents at Hatch |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24313A1052024-11-13013 November 2024 November 13, 2024, Hatch Pre-Submittal Public Meeting Slides (Southern Co.) ML24317A0292024-11-13013 November 2024 November 13, 2024 Hatch Pre-Submittal Public Meeting Slides (NRC Staff Presentation) ML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20217L4312020-08-13013 August 2020 Edwin I Hatch, Units 1 and 2; and Vogtle Electric Plant, Units 1, 2, 3, and 4 - Meeting Slides a License Amendment Request for the Emergency Plan (EPID Nos L-2020-LLA-0150 and L-2020-LLA-051 ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18234A4712018-08-23023 August 2018 NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018 ML18136A8902018-05-16016 May 2018 May 21, 2018 Slides for Public Teleconference Regarding Changes to Hatch, Farley, and Vogtle TS 5.2.2.g ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17009A3832017-01-0909 January 2017 Degraded Voltage Pre-Submittal Public Meeting Slides ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML13025A3012013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Hatch ML13015A2682012-12-17017 December 2012 Draft Submittal Order EA-12-049 - February 2013 FLEX Integrated Plan- Hatch ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML11090A0912011-04-0505 April 2011 Plant Hatch Fire Risk Monitoring ML1028105222010-10-0808 October 2010 September 29, 2010 Summary O Public Meeting with Farley to Discuss Corrective Actions Associated with Two White Regulatory Performance Public Meeting Summary ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML1019404512008-08-20020 August 2008 RA Drop-In Briefing Sheet - Hatch, Dated August 20, 2008 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0810704522008-04-0909 April 2008 Annual Assessment Public Meeting of Attendee List ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0715902092007-05-31031 May 2007 Enclosure 7 - Definitions: SSE (Safe Shutdown Earthquake) & OBE (Operating Basis Earthquake) ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0536202702005-12-12012 December 2005 Enclosure 4 to Summary of Public Meeting with the Boiling Water Reactor Owner'S Group to Discuss 10 CFR Part 21 Report on Safety Limit 2.1.1.1 of NUREG 1433/34 ML0534700922005-11-29029 November 2005 Hatch, Units 1 & 2, Enclosure, Meeting Summary, Generic Letter 2003-01 2024-09-19
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24317A0292024-11-13013 November 2024 November 13, 2024 Hatch Pre-Submittal Public Meeting Slides (NRC Staff Presentation) ML24313A1052024-11-13013 November 2024 November 13, 2024, Hatch Pre-Submittal Public Meeting Slides (Southern Co.) ML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23206A0412023-08-0202 August 2023 SNC Slides - Public Pre-Submittal Meeting on Aug 02, 2023 - Request for 45-Day Limited Extension of Risk Informed Completion Time (RICT) Program Backstop for TS 3.7.1 & 3.7.2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21271A2022021-10-0505 October 2021 Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 Supplement LAR (SNC Slides) ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML21083A2872021-03-24024 March 2021 Pre-Submittal Meeting - Quality Assurance Topical Report Revision to Allow Application of Remote Assessment Techniques During Exigent Conditions ML21021A2462021-01-21021 January 2021 Slides - SNC Slides - Pre-Submittal Meeting on January 26, 2021 - Hatch NFPA-805 LAR ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17324A3462017-11-15015 November 2017 Meeting Slides for 11/15/2017, Public Meeting Between NRC and SNC Regarding Hatch License Amendment Request - Application of TSTF-423 to Drywell Spray Function Technical Specification End State ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML16169A0602016-06-17017 June 2016 SNC Draft Letter to NRC Regarding Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML1020105352009-10-29029 October 2009 Tritium Meeting, Southern Nuclear, Hatch ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0622804942006-08-0909 August 2006 Hatch Tritium Public Meeting Power Point Slide Attachment ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0610704022006-04-12012 April 2006 Edwin I. Hatch Annual Assessment Meeting Cy 2005- Slides ML0535403442005-12-12012 December 2005 Submittal of Power Point Presentation Proposed Solutions to Part 21 on Safety Limit 2.1.1.1, NUREG-1433/34 ML0511501332005-04-13013 April 2005 Annual Assessment Meeting Cy 2004, Edwin I. Hatch Nuclear Plant - NRC Region II, Vidalia, Ga, April 13, 2005 ML0410406802004-04-0606 April 2004 Meeting Presentation for Edwin I. Hatch Annual Assessment Meeting, Reactor Oversight Program - Cy 2003 2024-09-19
[Table view] |
Text
Annual Assessment Meeting CY 2005 Edwin I. Hatch Nuclear Plant Baxley, GA April 12, 2006
Purpose of Todays Meeting
! A public forum for discussion of plant performance
! NRC will address performance issues identified in the annual assessment letter
! Licensee will be given the opportunity to respond to the information in the assessment letter and discuss new or existing programs to maintain or improve their performance
Agenda
! Introduction
! Review of Reactor Oversight Process
! National Summary of Plant Performance
! Discussion of Plant Performance Results
! Licensee Response/Remarks
! Closing Remarks
! NRC available to address public questions
Region II Organization Dr. Willam Travers Regional Administrator Loren Plisco Deputy Regional Administrator Charles Casto Victor McCree Director Division of Reactor Projects Director Division of Reactor Safety Joseph Shea Harold Christensen Deputy Director Deputy Director Joe Brady (acting)
Branch Chief Resident Inspectors (RIs) Project Engineers (PEs)
Douglas Simpkins - Sr. RI Curt Rapp - Sr. PE James Hickey - RI Robert Carrion - PE
NRC Performance Goals PRIMARY GOALS
! Ensure protection of the public health and safety and of the environment
! Ensure the secure use and management of radioactive materials OTHER GOALS
! Openness in the regulatory process
! Regulatory actions are effective, efficient, realistic, and timely
! Excellence in carrying out the NRCs mission
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspections
! Equipment Alignment ~80 hrs/yr
! Fire Protection Program -200 hrs triennially
! Operator Response -125 hrs/yr
! Emergency Preparedness -80 hrs/yr
! Rad Release Controls -110 hrs biennially
! Worker Radiation Protection -90 hrs/yr
! Corrective Action Program -250 hrs biennially
! Corrective Action Case Reviews -60 hrs/yr
Performance Thresholds Safety Significance Green: Very Low Safety Issue White: Low to Moderate Safety Issue Yellow: Substantial Safety Issue Red: High Safety Issue NRC Inspection Efforts Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Increased NRC oversight Red: Increased NRC oversight and other actions
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103
2005 Inspection Activities 3800 hours0.044 days <br />1.056 hours <br />0.00628 weeks <br />0.00145 months <br /> of inspection related activities
! Emergency Preparedness
! Radiation Protection
! Problem Identification and Resolution
! Reactor Operator Licensing Examinations
! Independent Spent Fuel Storage Installation
! Nuclear Material Accountability
Assessment Results Plant Performance was within the Regulatory Response Column of the NRCs Action Matrix
! One White Finding in Emergency Prepardness Cornerstone
< Technical Support Center was removed from service for greater than seven days without obtaining NRC approval.
! All other Findings were Green
! All Performance Indicators were Green
Assessment Summary
! Southern Nuclear Operating Company operated Hatch in a manner that preserved public health and safety
! All cornerstone objectives were met
! NRC plans baseline inspections for the remainder of 2006
Hatch 2006 Scheduled Inspection Activities
! In-Service Inspection
! Triennial Fire Protection
! Radiation Protection
! Biennial Component Design Basis
! Emergency Preparedness
! Independent Spent Fuel Storage Installation
! Licensed Operator Requalification
Annual Assessment Meeting Licensee Response/Remarks
Contacting the NRC
! Report an emergency
< (301) 816-5100 (call collect)
! Report a safety concern
< (912) 367-9881, 9882 (Resident Inspectors)
< (800) 695-7403
< Allegation@nrc.gov
! General information or questions
< www.nrc.gov
< Select What We Do for Public Affairs
Reference Sources
! Reactor Oversight Process
< www.nrc.gov
< Select Nuclear Reactors, Operating Reactors, Oversight, Reactor Oversight Process
! Public Electronic Reading Room
< www.nrc.gov
< Select Electronic Reading Room
! Public Document Room
< 1-800-397-4209 (Toll Free)