Assessment Followup Letter - Waterford Steam Electric Station, Unit 3
ML113550536
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/21/2011
From: Kennedy K
NRC/RGN-IV/DRP
To: Jacobs D
Entergy Operations
References
Download: ML113550536 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 December 21, 2011 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751

SUBJECT:

ASSESSMENT FOLLOWUP LETTER - WATERFORD STEAM ELECTRIC STATION, UNIT 3

Dear Ms. Jacobs:

On November 17, 2011, the NRC staff completed, as part of our continuous review, an updated assessment of Waterford Steam Electric Station, Unit 3 performance. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment of the fourth quarter of 2011 and its plans for a future inspection at your facility. This letter supplements, but does not supersede, the mid-cycle letter issued on September 1, 2011.

Overall, Waterford Steam Electric Station, Unit 3, operated in a manner that preserved the publics health and safety and fully met cornerstone objectives. On November 17, 2011, the NRC forwarded a letter that stated the final significance determination of a White inspection finding in the Occupational Radiation Safety Cornerstone. This finding involved the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure associated with leaking reactor coolant pump seals.

The NRC determined the performance at Waterford Steam Electric Station to be in the Regulatory Response Column of the Reactor Oversight Process Action Matrix beginning on July 1, 2011. As a result of the Regulatory Response performance, a supplemental inspection will be performed in accordance with Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. The objectives of this supplemental inspection are to provide assurance that the root causes and contributing causes of risk-significant performance issues are understood, provide assurance that the extent of condition and extent of cause of risk-significant performance issues are identified, and provide assurance that your corrective actions for risk-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence. We will not schedule the supplemental inspection until you notify us of your readiness for the inspection.

Entergy Operations Inc. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room ).

Please contact Ray Azua at (817) 860-8445 with any questions you may have regarding this letter.

Sincerely,

/RA/

Kriss M. Kennedy Director, Division of Reactor Projects Docket: 50-382 License: NPF-38

Enclosures:

Electronic Distribution Distribution via: Electronic Distribution

Entergy Operations Inc. Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Senior Resident Inspector (Marlone.Davis@nrc.gov)

Resident Inspector (Dean.Overland@nrc.gov)

Acting Branch Chief, DRP/E (Ray.Azua@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer (Jim.Melfi@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Kaly.Kalyanam@nrc.gov)

Acting DRS/TSB Branch Chief (Ryan.Alexander@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource ROPreports RSLO (Bill.Maier@nrc.gov)

NSIR (Robert.Kahler@nrc.gov)

NSIR/DPR/EP (Eric.Schrader@nrc.gov)

OEDO RIV Coordinator (Mark.Franke@nrc.gov)

ML113550536 R:\_REACTORS\WAT SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials JFM1 Publicly Avail Yes No Sensitive Yes No Sens. Type Initials JFM1 PE:DRP/E C:DRP/E SHP:PSB2 C:DRS/PSB2 RIV/PAO JMelfi RAzua LRicketson GWerner VDricks

/RA/ /ASanchez for/ /RA/ /RA/ /RA/

12/12/11 12/12/11 12/12/11 12/13/11 12/9/11 DD:DRS D:DRS D:DRP TBlount AVegel KKennedy 12/11/11 12/13/11 12/21/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax