Category:Letter
MONTHYEARML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20244012024-05-30030 May 2024 Public - Monticello Nuclear Generating Plant - Cyber Security Inspection Report 05000263/2024401 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2942024-04-25025 April 2024 Sec106 Tribal, Johnson, John-Lac Du Flambeau Band of Lake Superior Chippewa Indians 2024-09-26
[Table view] Category:Meeting Agenda
MONTHYEARPMNS20240506, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-15015 May 2024 Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application PMNS20240505, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-0707 May 2024 Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application PMNS20240066, Cultural Resource Surveys2024-01-19019 January 2024 Cultural Resource Surveys PMNS20231228, Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-11-0101 November 2023 Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20231085, SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation2023-10-0202 October 2023 SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation PMNS20231010, Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy2023-09-0808 September 2023 Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy PMNS20230790, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-29029 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20230237, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-28028 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230213, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-14014 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230188, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-02-24024 February 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20220900, Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-09-12012 September 2022 Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220695, Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant2022-07-26026 July 2022 Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant PMNS20220699, Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel2022-07-0808 July 2022 Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel PMNS20220141, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety PMNS20220131, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220019, Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello)2022-01-13013 January 2022 Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello) PMNS20211229, Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant2021-09-22022 September 2021 Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant PMNS20210203, Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant2021-03-0404 March 2021 Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML18067A0062018-03-12012 March 2018 Forthcoming Closed Meeting with Northern States Power Company Related to Security Plan Changes at Monticello Nuclear Generating Plant ML17293A4292017-10-23023 October 2017 Pre-Application Meeting October 23, 2017 ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML14258A0652014-09-15015 September 2014 Forthcoming Meeting with Northern States Power Company - Minnesota (NSPM) to Discuss License Amendment Requests Associated with Areva Fuel Transition and Future Extended Flow Window for the Monticello Nuclear Generating Plant ML14169A5522014-06-13013 June 2014 Operator License Workshop Invitation ML13322A0092013-11-18018 November 2013 Notice of Forthcoming Meeting with Xcel Energy to Discuss the Proposed License Amendment for Transitioning to Areva Atrium 10XM Fuel in the Extended Flow Window ML12311A3342012-11-0707 November 2012 Notice of Forthcoming Meeting with Northern States Power Company of Minnesota to Discuss the Monticello Nuclear Generating Plant Extended Power Uprate Review ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML0932302042009-11-20020 November 2009 Notice of Meeting with Northern States Power Company to Discuss Issues Related to a Future Application for Amendment to Use the Maximum Extended Load Line Limit Analysis Plus (Mella+) Methodology ML0827304372008-09-30030 September 2008 Notice of Meeting with Northern States Power Co. Regarding a Future Amendment on Extended Power Uprate ML0810604592008-04-14014 April 2008 Summary of Meeting with Nuclear Management Company, Regarding the Nrc'S 2007 End-of Cycle Assessment of the Monticello Nuclear Generating Plant Safety Performance ML0800402012008-01-0707 January 2008 Notice of Meeting with Nuclear Management Company to Discuss Issues for a Future Extended Power Uprate Amendment at Monticello Nuclear Generating Plant ML0735318272007-12-21021 December 2007 Notice of Meeting with Nuclear Management Company Re Issues Related to the Proposed Combined Emergency Plan for Monticello and Prairie Island ML0725602242007-09-14014 September 2007 Notice of Forthcoming Meeting with Monticello Nuclear Generating Plant Regarding Steam Dryers in Extended Power Uprate Conditions ML0715806062007-06-0505 June 2007 Handout for Pre-application Meeting for Monticello Extended Power Uprate ML0634003252006-12-0707 December 2006 Notice of Presubmittal Conference for Proposed Emergency Plan Changes ML0609606082006-03-22022 March 2006 Meeting Agenda for Draft Suplement EIS Public Meeting - Monticello Nuclear Generating Plant ML0606700372006-03-21021 March 2006 Summary of Meeting to Discuss Full-Scope Application of Alternative Source Term (AST) Methodology for Monticello Nuclear Generating Plant ML0605906122006-02-28028 February 2006 03/22/2006 - Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for License Renewal at Monticello Nuclear Generating Plant (Monticello) ML0604502112006-02-17017 February 2006 Notice of Meeting with Nuclear Management Company, LLC, Monticello Nuclear Generating Plant, Regarding Full-Scope Application of Alternative Source Term Methodology 2024-05-07
[Table view] Category:Meeting Notice
MONTHYEARPMNS20240506, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-15015 May 2024 Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application PMNS20240505, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-0707 May 2024 Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application ML24115A3102024-04-24024 April 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Plant for Performance for 2023 Calendar Year PMNS20240066, Cultural Resource Surveys2024-01-19019 January 2024 Cultural Resource Surveys PMNS20231228, Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-11-0101 November 2023 Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20231085, SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation2023-10-0202 October 2023 SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation PMNS20231010, Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy2023-09-0808 September 2023 Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy PMNS20230790, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-29029 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML23111A2762023-04-25025 April 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Plant for Performance for 2022 Calendar Year PMNS20230237, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-28028 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230213, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-14014 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230188, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-02-24024 February 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20220900, Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-09-12012 September 2022 Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220695, Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant2022-07-26026 July 2022 Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant PMNS20220699, Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel2022-07-0808 July 2022 Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel ML22109A0672022-04-20020 April 2022 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant for 2021 Calendar Year PMNS20220131, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220141, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety PMNS20220019, Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello)2022-01-13013 January 2022 Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello) PMNS20211229, Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant2021-09-22022 September 2021 Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant ML21145A3462021-05-25025 May 2021 6/9/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant for Performance for 2020 Calendar Year ML21146A1902021-05-25025 May 2021 Notice of Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant PMNS20210203, Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant2021-03-0404 March 2021 Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20183A2872020-07-0101 July 2020 7/16/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant Performance for the 2019 Calendar Year ML19144A2402019-05-23023 May 2019 6/19/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2018 Calendar Year ML18122A0992018-05-0101 May 2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2017 Calendar Year ML17258A0772017-09-14014 September 2017 17 U.S. Nuclear Regulatory Commission Region III 2017 Operator Licensing Workshop (Public Meeting) for Monticello Nuclear Generating Plant (CMS) ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML16119A3892016-04-27027 April 2016 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2015 Calendar Year ML15275A4362015-10-0202 October 2015 EA-14-193 Monticello Nuclear Generating Plant- Notice of Significant Licensee Meeting Newly Scheduled (non-public) ML15181A0202015-07-0101 July 2015 July 9, 2015 Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15071A4012015-03-12012 March 2015 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2014 Calendar Year ML14357A1372014-12-23023 December 2014 January 14, 2015 Notice of Significant Non-Public Lecensee Meeting Regulatory Conference Regarding Monticello Nuclear Generating Plant ML14258A0652014-09-15015 September 2014 Forthcoming Meeting with Northern States Power Company - Minnesota (NSPM) to Discuss License Amendment Requests Associated with Areva Fuel Transition and Future Extended Flow Window for the Monticello Nuclear Generating Plant ML14205A5242014-07-24024 July 2014 August5, 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML14169A5522014-06-13013 June 2014 Operator License Workshop Invitation ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14071A5612014-03-12012 March 2014 Notice of Significant Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2013 Calendar Year ML14013A3202014-01-27027 January 2014 Federal Register Notice Regarding the 611th ACRS Meeting, February 5-7, 2014 ML13322A0092013-11-18018 November 2013 Notice of Forthcoming Meeting with Xcel Energy to Discuss the Proposed License Amendment for Transitioning to Areva Atrium 10XM Fuel in the Extended Flow Window ML13172A0802013-06-20020 June 2013 Notice of Meeting with Northern States Power Company, Minnesota to Present the Licensee the Results of NRC End-of-Cycle Assessment Regarding Monticello Nuclear Generating Plant 2024-05-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 13, 2014 Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
THE U.S. NUCLEAR REGULATORY COMMISSION REGION III 2014 OPERATOR LICENSING WORKSHOP (PUBLIC MEETING)
Dear Ms. Fili:
This letter serves to notify you and your staff that the 2014 Operator Licensing Workshop sponsored by NRC Region III Division of Reactor Safety, Operations Branch, will be held at the Sheraton Hotel, Arcadia Symposium Room, located at 3000 Warrenville Rd., Lisle, Illinois 60532 on July 9 and 10, 2014. This meeting is categorized as a Public Meeting. Please see the enclosed Meeting Notice (Enclosure 1), as well as the 2014 Workshop Agenda (Enclosure 2) for details concerning subject topics to be addressed during the workshop.
Members of your operations and training staff involved in the overall Operator Licensing Program, along with your staff, responsible for medical and regulatory assurance, are invited to attend this workshop. Note that your training managers were previously informed of this workshop through your participation with the Midwest Nuclear Training Association. Please provide the names and positions of your staff that plan to attend the workshop to Ms. Jan Kweiser by July 1, 2014, either by phone (630) 829-9711 or by electronic mail to Janet.Kweiser@nrc.gov.
In accordance with Title 10, Code of Federal Regulations (CFR) "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
K. Fili Should you have any questions concerning this workshop, please contact Raymond Walton at (630) 829-9836 or by email: Raymond.Walton@nrc.gov or I can be reached at (630) 829-9707, or by email: Hironori.Peterson@nrc.gov.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22
Enclosures:
- 1. Meeting Notice
- 2. Workshop Agenda cc w/encls: Distribution via LISTSERV
K. Fili Should you have any questions concerning this workshop, please contact Raymond Walton at (630) 829-9836 or by email: Raymond.Walton@nrc.gov or I can be reached at (630) 829-9707, or by email: Hironori.Peterson@nrc.gov.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22
Enclosures:
- 1. Meeting Notice
- 2. Workshop Agenda cc w/encls: Distribution via LISTSERV DISTRIBUTION:
Joseph Nick RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu John McHale DOCUMENT NAME: Ltr 061314 Monticello Operator License Workshop Invitation.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:bl HPeterson DATE 06/13/14 06/13/14 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 13, 2014 NOTICE OF NRC REGION III 2014 OPERATOR LICENSING WORKSHOP THIS WORKSHOP IS A PUBLIC MEETING Name of Licensees: Exelon Generation Company, LLC; Indiana Michigan Power Company, LLC; FirstEnergy Nuclear Operating Co.; NextEra Energy, LLC; Detroit Edison Company; Northern States Power Company, Minnesota; Entergy Nuclear Operations, Inc.
Name of Facilities: Braidwood Station; Byron Station; Clinton Power Station; Davis-Besse Nuclear Power Station; Donald C. Cook Nuclear Power Plant; Dresden Nuclear Power Station; Duane Arnold Energy Center; Fermi Power Plant; LaSalle County Station; Monticello Nuclear Generating Plant; Palisades Nuclear Plant; Perry Nuclear Power Plant; Point Beach Nuclear Plant; Prairie Island Nuclear Generation Plant; and Quad Cities Nuclear Power Station Docket Nos: 50-456, 50-457; 50-454, 50-455; 50-461; 50-346; 50-315, 50-316; 50-237, 50-249; 50-331; 50-373; 50-374; 50-263; 50-255, 50-440; 50-266, 50-301; 50-282; 50-306; 50-254; 50-265; 50-341 Time and Date: 8:00 A.M. - 4:00 P.M. (CDT), on Wednesday, July 9 and 8:00 A.M. - 4:00 P.M. (CDT), on Thursday, July 10, 2014 Location: Sheraton Hotel Lisle Arcadia Symposium Room 3000 Warrenville Rd.
Lisle, Illinois 60532 Purpose: Operator Licensing Workshop and Meeting. The purpose of the meeting is to share experiences, lessons learned, and discuss issues affecting Operator Licensing Program activities with the licensees. The NRC Region III Division of Reactor Safety, Operations Branch, will present experiences relating to existing internal agency guidance relevant to the Operator Licensing Examination Program. This will also include discussions concerning Operator Licensing Fundamentals.
Meeting Category: This is a Category I Public Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Enclosure 1
Notice of Public Meeting Operator Licensing Workshop NRC Attendees: Region III Division of Reactor Safety, Operator Licensing Branch personnel; J. McHale, Chief Operator Licensing and Training Branch, NRR; T. Kolb, Operator Licensing and Training Branch, NRR Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Janet Kweiser at 630-829-9711 by close-of-business on Thursday, July 3, 2014.
This meeting between NRC technical staff and applicants or licensees is open for interested members of the public. Members of the public who wish to attend should contact Janet Kweiser or the meeting contacts of your intention to attend by July 1, 2014.
Meeting Contact: Raymond K. Walton Senior Operations Engineer, NRC RIII 630-829-9836 raymond.walton@nrc.gov Hironori Peterson Branch Chief, NRC RIII 630-829-9707 hironori.peterson@nrc.gov Audio Tele-Conferencing: None Video Tele-Conferencing: None Approved: ________/RA/________ __6/13/14__
Hironori Peterson, Chief Date Operations Branch Division of Reactor Safety Enclosure 1
NRC RIII OPERATIONS BRANCH 2014 OPERATOR LICENSING WORKSHOP July 9 and 10, 2014 Dates and Times: July 9 and 10, 2014, (8:00 A.M. to 4:00 P.M. and 8:00 A.M. to 4:00 P.M., respectively)
Meeting Classification: Public Meeting Place of Meeting: Sheraton Hotel, Lisle, Illinois Attendees: All Available Operations Branch Staff and Invited Licensees Purpose: The purpose of the meeting is to share experiences, lessons learned, and discuss issues affecting Operator Licensing Program activities with the licensees. The NRC Region III Division of Reactor Safety, Operations Branch, will present experiences relating to existing internal agency guidance relevant to the Operator Licensing Examination Program. This will also include discussions concerning Operator Licensing Fundamentals.
AGENDA - Day 1 - July 9, 2014 TIME TOPICS 7:30 - 8:00 A.M. Registration and Networking 8:00 - 8:15 A.M. Introduction Overview, Agenda, and Logistics 8:15 - 8:45 A.M. Welcome Address and Opening Remarks NUREG 1021, Revision 10 - New Revision to Examination Standard 8:45 - 9:45 A.M.
(NRR Status; New Changes; Q&As) 9:45 - 10:00 A.M. Break Exam Quality: Written Examination Fundamentals 10:00 - 11:00 A.M.
(From Outline to Question; SRO; Distracters; LOD)
Exam Quality: Initial License Exam Program Consistency 11:00 A.M. - 12:00 P.M. (Requirements and Expectations; Preparation and Development; Validation, etc.)
12:00 - 1:00 P.M. Lunch Requalification Issues and Perspectives 1:00 - 2:00 P.M.
(Recent Operational Events; Training; Requalification SDP; Exam Quality, etc.)
Status of Fukushima Rulemaking Efforts 2:00 - 3:00 P.M.
(NRR Update) 3:00 - 3:15 P.M Break Open Forum: Various Topics of Interest 3:15 - 3:45 P.M (Panel Discussion; Programmatic Q&As)
Wrap-up First Day Workshop 3:45 - 4:00 P.M.
(Public Q&As) 1 Enclosure 2
AGENDA - Day 2 - July 10, 2014 TIME TOPICS Open Discussions 7:45 - 8:00 A.M.
(Recap of Previous Day and Todays Agenda Review) 8:00 - 9:00 A.M. Exam Quality: Simulator Scenario Fundamentals (From Outline to Submittal; Design; Requirements; etc.)
9:00 - 10:00 A.M. Exam Quality: Job Performance Measure Fundamentals (From Outline to Submittal; Administrative Topics; Alternate Path, etc.)
10:00 - 10:15 A.M. Break 10:15 - 11:15 A.M. New ANS/ANSI 3.4 Licensed Operator Medical Standard (Overview; Templates; Examples and Guidance, etc.)
11:15 A.M. - 12:00 Recent Regulatory Operational Experiences P.M. (Past/Current Issues and Feedback; Medical Issues, etc.)
12:00 - 1:00 P.M. Lunch 1:00 - 1:30 P.M. NRC Administrative Issues and Perspectives (Application and License Correspondence Submittals; Waivers, etc.)
1:30 - 2:30 P.M. Vogtle Exam Failure Hearing (Results; Recent Issues and Status; NRC Lessons Learned Review Team) 2:30 - 2:45 P.M. Break 2:45 - 3:45 P.M. Industry Operator Licensing Focus Group Update (State of the Industry; Midwest Nuclear Training Association Status, etc.)
Wrap-up Second Day Workshop 3:45 - 4:00 P.M. Public Q&As Plans for 2015 Critique Forms 2 Enclosure 2