Similar Documents at Perry |
---|
Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] Category:Meeting Agenda
MONTHYEARPMNS20230994, Environmental Scoping Meeting Related to the Perry Nuclear Power Plant License Renewal Application2023-10-24024 October 2023 Environmental Scoping Meeting Related to the Perry Nuclear Power Plant License Renewal Application PMNS20230995, Environmental Scoping Meeting Related to the Perry Nuclear Power Plant License Renewal Application2023-10-0606 October 2023 Environmental Scoping Meeting Related to the Perry Nuclear Power Plant License Renewal Application PMNS20230081, 2nd Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety)2023-02-15015 February 2023 2nd Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety) PMNS20230098, 2nd Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental)2023-02-14014 February 2023 2nd Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental) ML22199A0352022-07-21021 July 2022 July 21, 2022, Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - Energy Harbor Slides ML22199A0232022-07-21021 July 2022 July 21, 2022, Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - NRC Slides ML22200A2222022-07-21021 July 2022 License Renewal Application - Safety Pre-Application Meeting July 21, 2022 (Perry Slides) PMNS20220611, Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety)2022-07-20020 July 2022 Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety) PMNS20220690, Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental)2022-07-0505 July 2022 Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental) PMNS20210138, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising Flood Mitigation Methodology2021-02-16016 February 2021 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising Flood Mitigation Methodology PMNS20201285, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan2020-10-29029 October 2020 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML14169A5712014-06-13013 June 2014 Operator License Workshop Invitation ML14066A4952014-03-18018 March 2014 Meeting Notice with Public to Discuss Licensee the 2013 Annual Assessment Results for Perry Nuclear Power Plant ML13282A6462013-10-0909 October 2013 Notice of Cancelled Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel ML13276A4942013-10-0303 October 2013 Notice of Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel ML13252A1712013-09-0909 September 2013 9/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse) ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12158A4002012-06-0808 June 2012 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML12111A1712012-04-23023 April 2012 Notice of Forthcoming Meeting with First Energy Nuclear Operating Co. (FENOC) to Discuss a Proposed LAR to Modify Technical Specifications 3.8.1 to Remove Mode Restrictions Associated with Division 3 Surveillance Testing for Perry, Unit 1 ML1009102662010-03-31031 March 2010 Slides FENOC and NRC Senior Management Briefing, 3-31-10 ML0721503412007-08-0303 August 2007 Notice of Closed Meeting with FENOC Regarding the Review of Proposed Security -Based Event Emergency Preparedness Drill Scenario (Perry Plant) ML0717103462007-06-21021 June 2007 Revised Notice of Meeting with Firstenergy to Discuss Response to Nrc'S 05/14/2007, Demand for Information Regarding Fenoc'S Re-analysis of the Timeline and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event ML0716202122007-06-13013 June 2007 Notice of Meeting with Firstenergy Regarding May 14, 2007 Demand for Information Davis-Besse ML0707502802007-03-14014 March 2007 Notice of Forthcoming Category 2 Public Meeting with Boiling Water Reactor Vessel & Internals Project (BWRVIP) Management to Update Management in Office of Nuclear Reactor Regulation (NRR) Management of Status of BWRVIP Program ML0631104002006-11-0909 November 2006 Notice of Closed Meeting Between Fenco Security and NSIR to Discuss Fenco Fleet Security Matters ML0513701522005-05-23023 May 2005 Attachment 2 - Agenda -Public Meeting Summary on FAQ Appeal Meeting May 12, 2005 ML0324812782003-09-10010 September 2003 Agenda and Handout for Public Meeting Between NRC and Firstenergy Nuclear Operating Company Davis-Besse Nuclear Power Station ML0220407282002-07-16016 July 2002 Meeting Handout with FENOC Re IMC 0350 Restart Oversight Panel Public Meeting - July 16, 2002 ML0235703022002-04-11011 April 2002 Memo from A. Mendiola, NRR, to J. Shea, Oedo, Visit by Fec, Fesc, and FENOC Officials with Commissioners ML17037B8001978-03-17017 March 1978 Information Meeting on BWR Equipment Seismic Qualification 2023-02-15
[Table view] Category:Meeting Notice
MONTHYEARPMNS20230994, Environmental Scoping Meeting Related to the Perry Nuclear Power Plant License Renewal Application2023-10-24024 October 2023 Environmental Scoping Meeting Related to the Perry Nuclear Power Plant License Renewal Application PMNS20230995, Environmental Scoping Meeting Related to the Perry Nuclear Power Plant License Renewal Application2023-10-0606 October 2023 Environmental Scoping Meeting Related to the Perry Nuclear Power Plant License Renewal Application ML23145A0402023-05-25025 May 2023 Notice of Significant Public Meeting to Discuss NRC End of Cycle Performance Assessment of Perry Nuclear Power Plant for Performance for 2022 Calendar Year PMNS20230081, 2nd Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety)2023-02-15015 February 2023 2nd Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety) PMNS20230098, 2nd Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental)2023-02-14014 February 2023 2nd Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental) PMNS20220611, Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety)2022-07-20020 July 2022 Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety) PMNS20220690, Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental)2022-07-0505 July 2022 Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental) ML22129A1002022-05-0909 May 2022 Notice of Information Meeting with a Question and Answer Session to Discuss NRC 2021 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML22125A1152022-05-0606 May 2022 Notice of Significant Public Meeting to Discuss NRC End of Cycle Performance Assessment of Perry Nuclear Plant for Performance for 2021 Calendar Year ML21158A1752021-06-0404 June 2021 6/22/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Davis Besse Nuclear Power Station and Perry Nuclear Power Plant for Performance for 2020 Calendar Year PMNS20210138, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising Flood Mitigation Methodology2021-02-16016 February 2021 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising Flood Mitigation Methodology PMNS20201285, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan2020-10-29029 October 2020 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan ML20192A0072020-07-0909 July 2020 7/23/2020 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Davis-Besse Nuclear Power Station and Perry Nuclear Power Plant Performance for the 2019 Calendar Year ML19177A0192019-06-25025 June 2019 7/17/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Perry Nuclear Power Plant Performance for the 2018 Calendar Year ML18068A1992018-03-0909 March 2018 4/5/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Perry Nuclear Power Plant, Unit 1 Performance for the 2017 Calendar Year ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML17172A7062017-06-21021 June 2017 7/11/17 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Perry Nuclear Power Plant Performance for the 2016 Calendar Year ML16133A1642016-05-10010 May 2016 6/9/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Perry Nuclear Power Plant Performance for the 2015 Calendar Year ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15134A2902015-05-14014 May 2015 May 28, 2015 Notice of Public Meeting with Firstenergy Nuclear Operating Company on Perry to Discuss the Nrc'S End-of-Cycle Assessment of Performance ML14169A5712014-06-13013 June 2014 Operator License Workshop Invitation ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14066A4952014-03-18018 March 2014 Meeting Notice with Public to Discuss Licensee the 2013 Annual Assessment Results for Perry Nuclear Power Plant ML14066A2052014-03-0707 March 2014 Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss the 2013 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML13282A6462013-10-0909 October 2013 Notice of Cancelled Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel ML13276A4942013-10-0303 October 2013 Notice of Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel ML13252A1712013-09-0909 September 2013 9/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse) ML13123A4272013-05-0202 May 2013 Ltr 5/2/13 Perry Operator Licensing Workshop ML13086A2922013-03-27027 March 2013 Notice of Meeting with FENOC to Present the Licensee the Results of NRC End-of-Cycle Assessment Regarding Perry Nuclear Power Plant ML13030A4072013-01-25025 January 2013 Notice of Non-Public Meeting with Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant, to Discuss Improvements to Occupational Radiation Safety ML12256A7922012-09-12012 September 2012 Notice of All-FENOC Public Meeting to Discuss Fleet Wide Performance ML12158A4002012-06-0808 June 2012 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML12111A1712012-04-23023 April 2012 Notice of Forthcoming Meeting with First Energy Nuclear Operating Co. (FENOC) to Discuss a Proposed LAR to Modify Technical Specifications 3.8.1 to Remove Mode Restrictions Associated with Division 3 Surveillance Testing for Perry, Unit 1 ML12067A1912012-03-0707 March 2012 Public Meeting Notice to Discuss the 2011 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML12067A1292012-03-0707 March 2012 4/5/2012 - Public Meeting to Discuss the 2011 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML1119602112011-07-15015 July 2011 Notice of Public Meeting for Perry to Discuss the 2010 EOC Plant Performance ML1119600732011-07-13013 July 2011 Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss the 2010 End-Of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML1115401312011-06-0202 June 2011 Notice of Significant Licensee Meeting, Beaver Valley, Perry, & Davis-Besse Nuclear Generating Stations to Discuss Firstenergy Nuclear Operating Company Fleet Wide Performance with FENOC Management ML1019303792010-07-12012 July 2010 Notice of Public Meeting with Firstenergy Nuclear Operating Co., to Discuss End-of-Cycle Assessment of Perry, Unit 1 Performance for Cy 2009 ML1006006372010-03-0101 March 2010 Stations Public Meeting Notice, to Discuss Firstenergynuclearoperating Company Fleet-Wide Performance with FENOC Management ML0930301432009-10-30030 October 2009 Notice of Public Meeting with Firstenergy Nuclear Operating Company to Discuss Substantive Cross-Cutting Issues in Human Performance ML0916903392009-06-17017 June 2009 Notice of Public Meeting with NRC Staff to Discuss 2008 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant 2023-05-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 13, 2014 Mr. Ernest Harkness Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
SUBJECT:
THE U.S. NUCLEAR REGULATORY COMMISSION REGION III 2014 OPERATOR LICENSING WORKSHOP (PUBLIC MEETING)
Dear Mr. Harkness:
This letter serves to notify you and your staff that the 2014 Operator Licensing Workshop sponsored by NRC Region III Division of Reactor Safety, Operations Branch, will be held at the Sheraton Hotel, Arcadia Symposium Room, located at 3000 Warrenville Rd., Lisle, Illinois 60532 on July 9 and 10, 2014. This meeting is categorized as a Public Meeting. Please see the enclosed Meeting Notice (Enclosure 1), as well as the 2014 Workshop Agenda (Enclosure 2) for details concerning subject topics to be addressed during the workshop.
Members of your operations and training staff involved in the overall Operator Licensing Program, along with your staff, responsible for medical and regulatory assurance, are invited to attend this workshop. Note that your training managers were previously informed of this workshop through your participation with the Midwest Nuclear Training Association. Please provide the names and positions of your staff that plan to attend the workshop to Ms. Jan Kweiser by July 1, 2014, either by phone (630) 829-9711 or by electronic mail to Janet.Kweiser@nrc.gov.
In accordance with Title 10, Code of Federal Regulations (CFR) "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
E. Harkness Should you have any questions concerning this workshop, please contact Raymond Walton at (630) 829-9836 or by email: Raymond.Walton@nrc.gov or I can be reached at (630) 829-9707, or by email: Hironori.Peterson@nrc.gov.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
Enclosures:
- 1. Meeting Notice
- 2. Workshop Agenda cc w/encls: Distribution via LISTSERV
E. Harkness Should you have any questions concerning this workshop, please contact Raymond Walton at (630) 829-9836 or by email: Raymond.Walton@nrc.gov or I can be reached at (630) 829-9707, or by email: Hironori.Peterson@nrc.gov.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
Enclosures:
- 1. Meeting Notice
- 2. Workshop Agenda cc w/encls: Distribution via LISTSERV DISTRIBUTION:
Joseph Nick RidsNrrPMPerry Resource RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu John McHale DOCUMENT NAME: Ltr 061314 Perry Operator License Workshop Invitation.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:bl HPeterson DATE 06/13/14 06/13/14 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 13, 2014 NOTICE OF NRC REGION III 2014 OPERATOR LICENSING WORKSHOP THIS WORKSHOP IS A PUBLIC MEETING Name of Licensees: Exelon Generation Company, LLC; Indiana Michigan Power Company, LLC; FirstEnergy Nuclear Operating Co.; NextEra Energy, LLC; Detroit Edison Company; Northern States Power Company, Minnesota; Entergy Nuclear Operations, Inc.
Name of Facilities: Braidwood Station; Byron Station; Clinton Power Station; Davis-Besse Nuclear Power Station; Donald C. Cook Nuclear Power Plant; Dresden Nuclear Power Station; Duane Arnold Energy Center; Fermi Power Plant; LaSalle County Station; Monticello Nuclear Generating Plant; Palisades Nuclear Plant; Perry Nuclear Power Plant; Point Beach Nuclear Plant; Prairie Island Nuclear Generation Plant; and Quad Cities Nuclear Power Station Docket Nos: 50-456, 50-457; 50-454, 50-455; 50-461; 50-346; 50-315, 50-316; 50-237, 50-249; 50-331; 50-373; 50-374; 50-263; 50-255, 50-440; 50-266, 50-301; 50-282; 50-306; 50-254; 50-265; 50-341 Time and Date: 8:00 A.M. - 4:00 P.M. (CDT), on Wednesday, July 9 and 8:00 A.M. - 4:00 P.M. (CDT), on Thursday, July 10, 2014 Location: Sheraton Hotel Lisle Arcadia Symposium Room 3000 Warrenville Rd.
Lisle, Illinois 60532
Purpose:
Operator Licensing Workshop and Meeting. The purpose of the meeting is to share experiences, lessons learned, and discuss issues affecting Operator Licensing Program activities with the licensees. The NRC Region III Division of Reactor Safety, Operations Branch, will present experiences relating to existing internal agency guidance relevant to the Operator Licensing Examination Program. This will also include discussions concerning Operator Licensing Fundamentals.
Meeting Category: This is a Category I Public Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Enclosure 1
Notice of Public Meeting Operator Licensing Workshop NRC Attendees: Region III Division of Reactor Safety, Operator Licensing Branch personnel; J. McHale, Chief Operator Licensing and Training Branch, NRR; T. Kolb, Operator Licensing and Training Branch, NRR Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Janet Kweiser at 630-829-9711 by close-of-business on Thursday, July 3, 2014.
This meeting between NRC technical staff and applicants or licensees is open for interested members of the public. Members of the public who wish to attend should contact Janet Kweiser or the meeting contacts of your intention to attend by July 1, 2014.
Meeting
Contact:
Raymond K. Walton Senior Operations Engineer, NRC RIII 630-829-9836 raymond.walton@nrc.gov Hironori Peterson Branch Chief, NRC RIII 630-829-9707 hironori.peterson@nrc.gov Audio Tele-Conferencing: None Video Tele-Conferencing: None Approved: ________/RA/________ __6/13/14__
Hironori Peterson, Chief Date Operations Branch Division of Reactor Safety Enclosure 1
NRC RIII OPERATIONS BRANCH 2014 OPERATOR LICENSING WORKSHOP July 9 and 10, 2014 Dates and Times: July 9 and 10, 2014, (8:00 A.M. to 4:00 P.M. and 8:00 A.M. to 4:00 P.M., respectively)
Meeting Classification: Public Meeting Place of Meeting: Sheraton Hotel, Lisle, Illinois Attendees: All Available Operations Branch Staff and Invited Licensees
Purpose:
The purpose of the meeting is to share experiences, lessons learned, and discuss issues affecting Operator Licensing Program activities with the licensees. The NRC Region III Division of Reactor Safety, Operations Branch, will present experiences relating to existing internal agency guidance relevant to the Operator Licensing Examination Program. This will also include discussions concerning Operator Licensing Fundamentals.
AGENDA - Day 1 - July 9, 2014 TIME TOPICS 7:30 - 8:00 A.M. Registration and Networking 8:00 - 8:15 A.M. Introduction Overview, Agenda, and Logistics 8:15 - 8:45 A.M. Welcome Address and Opening Remarks NUREG 1021, Revision 10 - New Revision to Examination Standard 8:45 - 9:45 A.M.
(NRR Status; New Changes; Q&As) 9:45 - 10:00 A.M. Break Exam Quality: Written Examination Fundamentals 10:00 - 11:00 A.M.
(From Outline to Question; SRO; Distracters; LOD)
Exam Quality: Initial License Exam Program Consistency 11:00 A.M. - 12:00 P.M.
(Requirements and Expectations; Preparation and Development; Validation, etc.)
12:00 - 1:00 P.M. Lunch Requalification Issues and Perspectives 1:00 - 2:00 P.M.
(Recent Operational Events; Training; Requalification SDP; Exam Quality, etc.)
Status of Fukushima Rulemaking Efforts 2:00 - 3:00 P.M.
(NRR Update) 3:00 - 3:15 P.M Break Open Forum: Various Topics of Interest 3:15 - 3:45 P.M (Panel Discussion; Programmatic Q&As)
Wrap-up First Day Workshop 3:45 - 4:00 P.M.
(Public Q&As) 1 Enclosure 2
AGENDA - Day 2 - July 10, 2014 TIME TOPICS Open Discussions 7:45 - 8:00 A.M.
(Recap of Previous Day and Todays Agenda Review) 8:00 - 9:00 A.M. Exam Quality: Simulator Scenario Fundamentals (From Outline to Submittal; Design; Requirements; etc.)
9:00 - 10:00 A.M. Exam Quality: Job Performance Measure Fundamentals (From Outline to Submittal; Administrative Topics; Alternate Path, etc.)
10:00 - 10:15 A.M. Break 10:15 - 11:15 A.M. New ANS/ANSI 3.4 Licensed Operator Medical Standard (Overview; Templates; Examples and Guidance, etc.)
11:15 A.M. - 12:00 Recent Regulatory Operational Experiences P.M. (Past/Current Issues and Feedback; Medical Issues, etc.)
12:00 - 1:00 P.M. Lunch 1:00 - 1:30 P.M. NRC Administrative Issues and Perspectives (Application and License Correspondence Submittals; Waivers, etc.)
1:30 - 2:30 P.M. Vogtle Exam Failure Hearing (Results; Recent Issues and Status; NRC Lessons Learned Review Team) 2:30 - 2:45 P.M. Break 2:45 - 3:45 P.M. Industry Operator Licensing Focus Group Update (State of the Industry; Midwest Nuclear Training Association Status, etc.)
Wrap-up Second Day Workshop 3:45 - 4:00 P.M. Public Q&As Plans for 2015 Critique Forms 2 Enclosure 2