APR1400 Chapter 14, Phase 2 SER W/Ois Transmittal Letter to KHNP
ML17058A445
Person / Time
Site: 05200046
Issue date: 03/17/2017
From: Ciocco J
NRC/NRO/DNRL/LB2
To: Kim H
Korea Hydro & Nuclear Power Co, Ltd
Ward W
Shared Package
ML17058A396 List:
References
Download: ML17058A445 (4)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION March 17, 2017 Dr. Han-Gon Kim, Project Manager APR1400 Design Certification Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd.

70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon 305-343 Korea (Republic of)

SUBJECT:

ADVANCED POWER REACTOR 1400 (APR 1400) DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH OPEN ITEMS FOR CHAPTER 14 (SECTION 14.2 ONLY) INITIAL TEST PROGRAM (ITP) AND INSPECTIONS, TESTS, ANALYSIS AND ACCEPTANCE CRITERIA (ITAAC),

Dear Dr. Kim:

The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with open items (OIs) for each chapter of the Advanced Power Reactor 1400 Design Certification Application submitted by Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on December 23, 2014.

The staffs SE with OIs for Chapter 14 Verification Programs is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support upcoming meetings of the ACRS Subcommittee, scheduled to be held on April 5, 2017. This SE with open Items (OI) only contains section 14.2 because section 14.3 is still undergoing Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) review.

The enclosed SE with OIs is being provided only to KHNP for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Requests for Withholding. The staff concludes that the enclosed SE does not contain any information for which exemption from public disclosure has been sought or approved or any factual errors. However, the NRC will withhold the enclosed SE from public disclosure f o r ten days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains no such exempt information or any factual errors. If within that ten day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the NRC Public Document Room and the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.

Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION Dr. Kim If you have any questions or comments concerning this matter, I can be reached at (301) 415-6391 or via e-mail address at Jeff.Ciocco@nrc.gov.

Sincerely,

/RA/

Jeffrey Ciocco, Senior Project Manager Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors Docket No.52-046

Enclosure:

As stated cc w/o enclosure: See Next Page OFFICIAL USE ONLY - PROPRIETARY INFORMATION

Pkg: ML17058A396 Letter: ML17058A445 SER: ML17023A258 via-email* NRO-002 OFFICE DNRL/LB2: PM DNRL/LB2: LA DNRL/LB2: PM NAME WWard CSmith* JCiocco DATE 03/17/2017 03/01/2017 03/17/2017

KHNP Mailing List 9/22/2015 Daegeun Tony Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2

Email kimhg1108@khnp.co.kr [Han-Gon Kim]

hansang.kim@khnp.co.kr [Hansang Kim]

dohwan.lee@khnp.co.kr [Do-Hwan Lee]

junghokim@khnp.co.kr [Jung-Ho Kim]

yunho.kim@khnp.co.kr [Yun Ho Kim]

jiyong.oh@khnp.co.kr [Jiyong Andy Oh]

ahn.daegeun@khnp.co.kr, [Daegeun Tony Ahn]

jksuh@khnp.co.kr [Jeong Kwan Suh]

hachewung@khnp.co.kr [Che Wung Ha]

kang.deogji@khnp.co.kr [Deog Ji Kang]

sunguk.kwon@khnp.co.kr [Sun Guk Kwon]

ptmaster300@kepco.co.kr [Hyun Chul Park]

Page 2 of 2