Proposed Retyped Tech Specs Page 3/4 9-13,incorporating Changes Resulting from Issuance of Amend 84 Re SFP Water Level & Revised Fuel Handling Accident Analyses
ML18016A756
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/07/1998
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18016A755 List:
References
NUDOCS 9812150133
Download: ML18016A756 (2)


Text

ENCLOSUR TO SERIAL: HNP-98-158 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RETYPED TECHNICALSPECIFICATION PAGES FOR SPENT FUEL POOL WATER LEVEL AND REVISED FUEL HANDLINGACCIDENT ANLYSES RETYPED TS PAGE 3/4 9-13 98i2i50i33 98i207 05000400 PDR ADQCK P PDR

~ ~

1 REFUELING OPERATIONS 3 4.9.11 WATER LEVEL - NEW AND SPENT FUEL POOLS LIMITING CONDITION FOR OPERATION 3.9. 11 At least 23 feet of'ater shall be maintained over the top of fuel rods within irradiated fuel assemblies seated in the storage racks.

APPLICABILITY: Whenever irradiated fuel assemblies are in a pool.

ACTION:

a. With the requirements of the above specification not satisfied, suspend all movement of fuel assemblies and crane operations with loads in the affected pool area and restore the water level to within its limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
b. The provisions of Specification 3.0.3 are not applicable, SURVEILLANCE REQUIREMENTS 4.9. 11 At least once per 7 days, when irradiated fuel assemblies are in a pool, the water level in that pool shall be determined to be at least its minimum required depth.

SHEARON HARRIS - UNIT 1 3/4 9-13 Amendment No.