HNP-98-158, Forwards Retyped TS Page 3/4 9-13,incorporating Changes Resulting from Issuance of Amend 84 to License NPF-63 Re SFP Water Level & Revised Fuel Handling Accident Analyses
| ML18016A754 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/07/1998 |
| From: | Scarola J CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18016A755 | List: |
| References | |
| HNP-98-158, NUDOCS 9812150131 | |
| Download: ML18016A754 (4) | |
Text
CATEGORY j.
REGULA'Y INFORMATION DISTRIBUTI SYSTEM (RIDS)
ACCESSION NBR:9812150131 DOC.DATE: 98/12/07 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.14ANE AUTHOR AFFILIATION SCAROLA,J.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
DOCKET ¹ 05000400
SUBJECT:
Forwards retyped TS page 3/4 9-13,incorporating changes resulting from issuance of amend 84 to license NPF-63 re SFP water level 6 revised fuel handling accident analyses.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED: LTR I
ENCL L SIZE:
TITLE: OR Submittal:
General Distribution NOTES:Application for permit renewal filed.
0500040@
RECIPIENT ID CODE/NAME PD2-1 LA FLANDERS, S COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1
1 0
INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB NUDOCS-ABSTRACT EXTERNAL: NOAC 1
1 1
1 1
1 1
1 1
1 1
1 LE CENTER 01 R7DWfEMCB NRR/DSSA/SPLB NRR/SPSB JUNG,I OGC/HDS2 NRC PDR 1
1 1
1 1
1 1
1 1
0 U
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 15 ENCL 14
0 4
Carolina Power & Light Company PO Box 165 New Hill NC 27562 James Scarola Vice President Harris Nuclear Plant DEC - 7 1998 United States Nuclear Regulatory Commission ATTENTION:Document Control Desk Washington, DC 20555 SERIAL: HNP-98-158 10 CFR 50.90 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RETYPED TECHNICALSPECIFICATION PAGES FOR SPENT FUEL POOL WATER LEVELANDREVISED FUEL HANDLINGACCIDENTANALYSES
Dear Sir or Madam:
On September 1, 1998, Carolina Power 8r, Light Company (CPSL) requested a Licensed Amendment to revise the Harris Nuclear Plant (HNP) Technical Specifications (TS) 3/4.9.11 related to "Water Level - New and Spent Fuel Pools." As a result of a recently issued License Amendment, CP&L is submitting a retyped TS page which supersedes a page included in the September 1, 1998 submittal.
On October 20, 1998, the NRC issued License Amendment No. 84 to the HNP TS, which revised multiple TS pages as a result of changes to TS 3.0.4 and 4.0.4, "LimitingConditions for Operation and Surveillance Requirements."
Issuance of Amendment 84 independently affected one page, (3/4 9-13), from the September 1, 1998 request, which is currently under NRC review.
Enclosure 1 contains the retyped TS page which incorporates changes resulting from the issuance of Amendment No. 84.
4o/
Please refer any questions regarding this matter to Mr. J. H. Eads at (919) 362-2646.
98i2i50i3i 98i207 PDR ADQCK 05000400 P
PDR Sincerely, Enclosure Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)
Mr. S. C. Flanders (NRR Project Manager, HNP)
Mr. M. Fry (Acting Director N.C. DEHNR)
Mr. L. A. Reyes (NRC Regional Administrator, Region II) 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362.2095
I 0
Document Control Desk HNP-98-158/Page 2 bc:
Ms. D. B. Alexander Mr. G. E. Attarian Mr. R. H. Bazemore Mr. H. K. Chernoff Mr. B. H. Clark Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Field Mr. K. N. Harris Ms. L. N. Hartz Mr. W. J. Hindman Mr. C. S. Hinnant Mr. G. J. Kline, Ms. W. C. Langston Mr. R. D. Martin Mr. J. W. McKay Mr. P. M. Odom Mr. W. S. Orser Mr. P. M. Sawyer Mr. J. M. Taylor Mr. C. A. VanDenburgh Licensing File(s)
Nuclear Records