Intermediate Range Monitor
From kanterella
Revision as of 21:46, 18 November 2017 by
StriderTol
(
talk
|
contribs
)
(Created page with "{{system-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Air Temperature Control System
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Emergency Ventilation Air Supply
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Electrohydraulic Control
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Actuation System
Emergency Feedwater Initiation and Control
Emergency Feedwater System
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Main Turbine Bypass System
Mechanical Pressure Regulator
Moisture Separator Reheater
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
NLS2026009, Request for Notice of Enforcement Discretion for Technical Specifications Limiting Condition for Operation 3.8.1, AC Sources - Operating
Cooper
4 February 2026
Request for Notice of Enforcement Discretion for Technical Specifications Limiting Condition for Operation 3.8.1, AC Sources - Operating
ML26029A021
LaSalle
4 February 2026
Issuance of Amendment No. 268 to Renewed Facility Operating License Regarding Technical Specification Table 3.3.6.1-1, Primary Containment Isolation Instrumentation (Exigent Circumstances)
IR 05000397/2025004
Columbia
4 February 2026
Integrated Inspection Report 05000397/2025004
IR 05000333/2025004
FitzPatrick
2 February 2026
Integrated Inspection Report 05000333/2025004
RS-26-006, Request for Exigent Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation
LaSalle
21 January 2026
Request for Exigent Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation
IR 05000321/2025003
Hatch
07200036
12 December 2025
Integrated Inspection Report 05000321/2025003 and 05000366/2025003 Independent Spent Fuel Installation 07200036/2024001 Exercise of Enforcement Discretion
ML25356A487
Susquehanna
4 December 2025
Technical Requirements Manual
ML25356A488
Susquehanna
4 December 2025
Technical Requirements Manual
ML25290A035
Susquehanna
13 October 2025
Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.1, Conformance with NRC General Design Criteria
ML25290A106
Susquehanna
13 October 2025
Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Appendix 15a, Nuclear Safety Operational Analysis (Nsoa) - (a System-Level/Qualitative Type Plant FMEA)
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Refresh
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties